Flores, Jhovelle Martinez, Alcy Jay Paradero, Mark Anthony Paulino, Collin Tan, Eduardo Construction Estimates
Electrical and Plumbing Works Bill of Quantities and Labor Cost
Electrical Works for a 53m² house/lot Unit Cost Materials
Unit
Total Cost
Qty Material
Labor
Material
Labor
Grand Total
Roughing-ins Electrical Conduit uPVC, 15mmØ RSC 20mmØ Entrance Cap 20mm dia. Junction Box , 4" x 4" G.I Utility Box, 2" x 4" x G.I Grounding Rod, 2.4m x 16mm dia.
pc
20
58.00
17.40
1,160.00
348.00
1,508.00
pc
1
400.00
120.00
400.00
120.00
520.00
pc
1
25.00
7.50
25.00
7.50
32.50
pc
6
20.00
6.00
120.00
36.00
156.00
pc
4
20.00
6.00
80.00
24.00
104.00
pc
1
200.00
60.00
200.00
60.00
260.00
m
180
25.00
7.50
4,500.00
1,350.00
5,850.00
pc
2
108.00
32.40
216.00
64.80
280.80
pc
1
148.00
44.40
148.00
44.40
192.40
pc
1
68.00
20.40
68.00
20.40
88.40
set
5
550.00
165.00
2,750.00
825.00
3,575.00
set
1
620.00
186.00
620.00
186.00
806.00
set
1
410.00
123.00
410.00
123.00
533.00
Wires and Fixtures 3.5 mm2 THW wire , Stranded Duplex C.O. with Plate 3- Gang Switch with Plate Single Switch with Plate FL 1x 40W industrial Type ESL 1 x 12W 2U Type Safety Switch 30A 2P
TOTAL
8,737.00
2,621.10 11,358.10
Material and Labor Cost Total Material Cost Total Labor Cost = Total Material Cost*.30 Total Cost = Total Material Cost+ Total Labor Cost
Php8,737.00 Php2,621.10
Php11,358.10 or Php214.30/m²
Labor Cost Labor
Cost
Installation of lights, receptacle, switch and wirings Installation of electrical sockets and wirings
Php300/pc Php200/pc
No. of lights, receptacle, switch and wirings No. of electrical sockets and wirings
6 2
Total Labor Cost
Php2200.00 or Php41.51/m²
Plumbing Works for a 53m² house/lot
Unit Cost Materials Water Closet 1.6gpf with Accessories Lavatory, Pedestral Type with Accessories Faucet , Hose Bibb , Brass 3/4"Ø G.I Coupling, 3/4"Ø G.I Tee, 3/4"Ø G.I. Pipe 3/4" Sch.40 G.I. Elbow 90° x 3/4"Ø Gate Valve , 3/4"dia. Gate Valve , 3/4'"dia. Check Valve , 3/4"dia. Tissue Holder S.S. Floor Drain 4' x 4"
Total Cost
Unit
Qty
Material
Labor
Material
Labor
Grand Total
set
1
4,500.00
1,350.00
4,500.00
1,350.00
5,850.00
set
1
2,500.00
750.00
2,500.00
750.00
3,250.00
pc pc
4 8
220.00 17.00
66.00 5.10
880.00 136.00
264.00 40.80
1,144.00 176.80
pc pc pc pc pc pc pc
10 20 1 2 1 2 3
370.00 17.00 215.00 215.00 215.00 250.00 200.00
111.00 5.10 64.50 64.50 64.50 75.00 60.00
3,700.00 340.00 215.00 430.00 215.00 500.00 600.00
1,110.00 102.00 64.50 129.00 64.50 150.00 180.00
4,810.00 442.00 279.50 559.00 279.50 650.00 780.00
14,016.00
4,204.80
18,220.80
TOTAL
Material and Labor Cost Total Material Cost Total Labor Cost = Total Material Cost*.30 Total Cost
Php14,016.00 Php4,204.80
= Total Material Cost+ Total Labor Cost
Php18,220.80 or Php343.79/m²
Labor Cost Labor Installation of all Plumbing Works No. of laborers 2
No. of days to finish 3
Cost Php500/day Total Cost
Php3000.00 or Php56.60/m²