Flores, Jhovelle Martinez, Alcy Jay Paradero, Mark Anthony Paulino, Collin Tan, Eduardo Construction Estimates

Electrical and Plumbing Works Bill of Quantities and Labor Cost 

Electrical Works for a 53m² house/lot Unit Cost Materials

Unit

Total Cost

Qty Material

Labor

Material

Labor

Grand Total

Roughing-ins Electrical Conduit uPVC, 15mmØ RSC 20mmØ Entrance Cap 20mm dia. Junction Box , 4" x 4" G.I Utility Box, 2" x 4" x G.I Grounding Rod, 2.4m x 16mm dia.

pc

20

58.00

17.40

1,160.00

348.00

1,508.00

pc

1

400.00

120.00

400.00

120.00

520.00

pc

1

25.00

7.50

25.00

7.50

32.50

pc

6

20.00

6.00

120.00

36.00

156.00

pc

4

20.00

6.00

80.00

24.00

104.00

pc

1

200.00

60.00

200.00

60.00

260.00

m

180

25.00

7.50

4,500.00

1,350.00

5,850.00

pc

2

108.00

32.40

216.00

64.80

280.80

pc

1

148.00

44.40

148.00

44.40

192.40

pc

1

68.00

20.40

68.00

20.40

88.40

set

5

550.00

165.00

2,750.00

825.00

3,575.00

set

1

620.00

186.00

620.00

186.00

806.00

set

1

410.00

123.00

410.00

123.00

533.00

Wires and Fixtures 3.5 mm2 THW wire , Stranded Duplex C.O. with Plate 3- Gang Switch with Plate Single Switch with Plate FL 1x 40W industrial Type ESL 1 x 12W 2U Type Safety Switch 30A 2P

TOTAL

8,737.00

2,621.10 11,358.10

Material and Labor Cost Total Material Cost Total Labor Cost = Total Material Cost*.30 Total Cost = Total Material Cost+ Total Labor Cost

Php8,737.00 Php2,621.10

Php11,358.10 or Php214.30/m²

Labor Cost Labor

Cost

Installation of lights, receptacle, switch and wirings Installation of electrical sockets and wirings

Php300/pc Php200/pc

No. of lights, receptacle, switch and wirings No. of electrical sockets and wirings

6 2

Total Labor Cost

Php2200.00 or Php41.51/m²



Plumbing Works for a 53m² house/lot

Unit Cost Materials Water Closet 1.6gpf with Accessories Lavatory, Pedestral Type with Accessories Faucet , Hose Bibb , Brass 3/4"Ø G.I Coupling, 3/4"Ø G.I Tee, 3/4"Ø G.I. Pipe 3/4" Sch.40 G.I. Elbow 90° x 3/4"Ø Gate Valve , 3/4"dia. Gate Valve , 3/4'"dia. Check Valve , 3/4"dia. Tissue Holder S.S. Floor Drain 4' x 4"

Total Cost

Unit

Qty

Material

Labor

Material

Labor

Grand Total

set

1

4,500.00

1,350.00

4,500.00

1,350.00

5,850.00

set

1

2,500.00

750.00

2,500.00

750.00

3,250.00

pc pc

4 8

220.00 17.00

66.00 5.10

880.00 136.00

264.00 40.80

1,144.00 176.80

pc pc pc pc pc pc pc

10 20 1 2 1 2 3

370.00 17.00 215.00 215.00 215.00 250.00 200.00

111.00 5.10 64.50 64.50 64.50 75.00 60.00

3,700.00 340.00 215.00 430.00 215.00 500.00 600.00

1,110.00 102.00 64.50 129.00 64.50 150.00 180.00

4,810.00 442.00 279.50 559.00 279.50 650.00 780.00

14,016.00

4,204.80

18,220.80

TOTAL

Material and Labor Cost Total Material Cost Total Labor Cost = Total Material Cost*.30 Total Cost

Php14,016.00 Php4,204.80

= Total Material Cost+ Total Labor Cost

Php18,220.80 or Php343.79/m²

Labor Cost Labor Installation of all Plumbing Works No. of laborers 2

No. of days to finish 3

Cost Php500/day Total Cost

Php3000.00 or Php56.60/m²