K G

Developers Construction division

S.NO.

0597/tnd/chndw/kgd/2009-10 DATE.30/11/2009

To, The Executive Engineer, P.H.E. Div. – CHHINDWARA (M.P.) SUBJECT: - Mutual assessment of terms and conditions. REFRENCE: - Const. Of R.C.C. Anicut across River Pench Along with Intake well cum Pump House near village Singodi (Amarwara,) N.I.T. No. 35/2009-10 /SAC/EE/PHEDn/ Chhindwara Dated 04/11/2009 Dear Sir, We here by submitting the following Terms and condition which i think suitable for giving better offer under referenced work. Thanking You! Enclosed: - Terms and Conditions.

Faithfully Your’s

Er. Ashish K. Kharya

Reg. office: 5, Barelagaon Lalghati Bhopal (M.P.)Ph:07552665838/+919303113301/+919179094449 Admin. Office: 1A1 Vandana Nagar Extn. Indore. Ph: 0731-4230330/ +919179095559 E-mail: [email protected]/ [email protected]

Page1

(Partner, K G Developers)

K G

Developers Construction division

S.NO.

0597/tnd/chndw/kgd/2009-10 DATE.30/11/2009

TERMS AND CONDITIONS 1. Advance Payment: - Secured advance, Moblization advance and machinery advances may be paid as per CPW code. 2. Amount retain under defect liability As the provision of manual the maximum defect liability of the contractor may not be exceeded from 10% of the total contract value. We also know and assume the contractor’s profit which is 10% of total value of any contract. This is not justified to retain the amount more than 10% at any stage of the contract as per your document s it has mentioned as follows: 1: Security deposit in advance 5% 2: Withheld as per clause (form 15) 10% 3: finishing testing of whole work 7% . Total 20% This will make a bad impact on our cash flow and will create an extra price loading in offer. In our opinion to simplify this you can modify the payment schedule in following manner: 1: Retention of 10% amount under clause 15 of contract should be retained after the adjustment of 5% of security deposit + 5% from R.A bills. 2: Amount retains for filling and testing (trial period) 7% should be deleted from break up schedule of payment. This amount may be retained from clause 15 because this retained amount is sufficient for contractor’s liability which is maximum of 10% of contract value as per norms. 3: Period for approval of drawing & design: Drawing and design shall be approved within 15 days of submission.

5: Bank Protection: The bank protection work will be done by the way of providing cement concrete panel pitching including construction of toe wall suitable to retain entire bank protection work bad slope cutting embankment the slope cutting of bank shall be done in the stable slope in 10m upstream and 10m downstream or as per design requirement. Reg. office: 5, Barelagaon Lalghati Bhopal (M.P.)Ph:07552665838/+919303113301/+919179094449 Admin. Office: 1A1 Vandana Nagar Extn. Indore. Ph: 0731-4230330/ +919179095559 E-mail: [email protected]/ [email protected]

Page1

4: Revision of drawing and design: should be considered for approval.

K G

Developers Construction division

S.NO.

0597/tnd/chndw/kgd/2009-10 DATE.30/11/2009

6:Land acquisition: Land acquisition should be done by the department before agreement for working area, approach roads for both banks and submergence area. 7: Time allowed for completion: This is a river valley project so it is not possible to continue in Rainey seasons so time for completion shall be 15 months excluding Rainey season. 8:Depth of foundation : 1. As per your contract data - The depth of foundation / cut off wall below the scour line shall not be les than 1.2 meters. The depth of embedment shall exclude that portion of rock which is weathered for fissured. As per our suggestions –The depth of the foundation shall extend to the depth of at least 0.60 meter in hard rock 2. Extra depth from the proposed depth of foundation given in NIT, quantity shall be paid at 15% above the rate in USOR of W.R.D. with effect from 01.02.2009 amended up to date of issue of N.I.T with price escalation. 9: Under Water Concrete:As per your contract data - For laying foundation concrete under water, it shall be done by skip boxes centremie pipe, pumping out of water shall not be done be permitted from the time of placing of concrete up to 72 Hrs thereafter. As per our suggestions -1. In case of under water concrete 10% extra cement will be added for same mix as used for dry conditions. The concrete should have slump not less than 100 mm for easy flow on depositing by approved method.

As per our suggestions - The grade of concrete in foundation for leveling coarse may be min. M-10, but as per recommendation of IS:456-2000 in hearting portion it will be M-15 with 25% plum, the size of stone plums may be from 150 to 300 mm. The maximum dimension of these stones or plums shall not exceed 1/3 rd of the least dimension of the Reg. office: 5, Barelagaon Lalghati Bhopal (M.P.)Ph:07552665838/+919303113301/+919179094449 Admin. Office: 1A1 Vandana Nagar Extn. Indore. Ph: 0731-4230330/ +919179095559 E-mail: [email protected]/ [email protected]

Page1

10: Cement Concrete: as per your contract data – 1. At page 28-29/ clause 4.6-The material for foundation shall Be M-10 plum concrete encased all around by M-25 grade R.C.C. structure of minimum thickness of 20 cm only 2. At page 36/ clause C.9- The foundation, sill and superstructure shall be comprised of plum, concrete and reinforced cement concrete. The plum concrete shall be in M-15 grade with maximum of 100 mm plum not more than 50%. The maximum size of aggregate M-15 concrete shall be 40 mm. The plum concrete structure shall be encased all around by M-25 grade RCC structure of minimum thickness of 20 cms with required reinforcement for temperature and other stress.

K G

Developers Construction division

S.NO.

0597/tnd/chndw/kgd/2009-10 DATE.30/11/2009 members. The superstructure will be encased by minimum 30 cm thick layer of M - 25 R.C.C. with minimum reinforcement of 0.30 % of cross sectional area of concrete encasing all over the body of anicut up to top level with construction of R.C.C. piers. 11: Treatment of Foundation: Consolidated grouting with testing for water loss will have to be done by us but quantity shall be paid at 15% above the rate in USOR of W.R.D. with effect from 01.02.2009 amended up to date of issue of N.I.T with price escalation. 12: Approval of Drawing and Design : As per your contract data – 1.At page 30/ clause B.9- Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering collage. As per our suggestions - It is part of liability of department to checkout design and drawing .No payment will be deducted from us against checking. 13: Testing : In our opinion one full flood made all worst combinations for testing so passing of one rainy season is sufficient for defect liability in place of two Rainey seasons. 14: any modification, addition and alteration to the design and structure to meet such requirements if needed will have to be done by us but quantity shall be paid at 15% above the rate in USOR of W.R.D. with effect from 01.02.2009 amended up to date of issue of N.I.T with price escalation. 15: The wall of pump house may be 20cm thick in brick masonry. Thanking you and assuring our best services all the time. Faith fully yours

Reg. office: 5, Barelagaon Lalghati Bhopal (M.P.)Ph:07552665838/+919303113301/+919179094449 Admin. Office: 1A1 Vandana Nagar Extn. Indore. Ph: 0731-4230330/ +919179095559 E-mail: [email protected]/ [email protected]

Page1

Er. Ashish K. Kharya (Partner, K G Developers)

K G

Developers Construction division 0597/tnd/chndw/kgd/2009-10 DATE.30/11/2009

Reg. office: 5, Barelagaon Lalghati Bhopal (M.P.)Ph:07552665838/+919303113301/+919179094449 Admin. Office: 1A1 Vandana Nagar Extn. Indore. Ph: 0731-4230330/ +919179095559 E-mail: [email protected]/ [email protected]