CHAPTER 2.2. PLANNING FOR PRIORITIZING OF WATER RESOURCES PROJECTS QUESTIONNAIRE
__________ 1. It is an activity that initiates or accelerates the recovery of an ecosystem with respect to its integrity and sustainability. __________ 2. Most of the erosion occurs on the _______ of a river bend and most deposition occurs on the ________ of the bend. __________ 3. A process in Hydropower that can generate electricity without the use of dam. __________ 4. It allows the consumption of 100 liters per person per day on average, supplied continuously through multiple taps and which meets all consumption and hygiene needs. __________ 5. ________ are built to increase river depths, eliminate meandering, and reduce water velocities in existing rivers.
Answers: 1. 2. 3. 4. 5.
Ecological restoration Outside, inside Run-of-the-river Optimal access Navigation structures