Cat Quant Test No 12

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cat Quant Test No 12 as PDF for free.

More details

  • Words: 1,002
  • Pages: 3
Log in | Sign up | Feedback | Blog

Search MBA

Quant

DI

English

Vocabulary

Archives

ForumsNew!

Events

B-Schools

Quant Test 12

1.  Tania prepares for the CAT examination by practicing for 100 days. On any of these 100 days she does not solve more than 20 questions. If on  any day, she solves more than 12 questions, then she solves at most 6 questions each on the next two days. What is the maximum possible  number of questions that she can solve over the period of 100 days?  

j 1200 k l m n j 1208 k l m n j 1220 k l m n j 960 k l m n j 1240 k l m n i Skip this question j k l m n

2.  In the figure given below, ABOP is a rectangle and O is the centre of the circle. It is also given that AB = BC and the measure of the angle ABC is 60°. Find the measure of the angle OPN.

j 30 k l m n j 15 k l m n j 20 k l m n j 25 k l m n j 35 k l m n i Skip this question j k l m n

3.  I cut a piece of paper in four equal parts. Now, I cut exactly one out of these four parts into four equal parts. Now, again if I keep on repeating the  same process for infinite number of times, then which of the following can be the number of parts of paper at any instant of time?

j 2048 k l m n j 2049 k l m n j 2050 k l m n j 2051 k l m n j 2052 k l m n i Skip this question j k l m n

4.  A dice is rolled three times. Find the probability of getting a larger number than previous number each time.

j 5/54 k l m n j 7/54 k l m n j 11/54 k l m n j 13/54 k l m n j 17/54 k l m n i Skip this question j k l m n

5.  Sum of the first 30 terms of an arithmetic progression is 0. If the first term is –29, then find the sum of the 28th, 29th and 30th terms of this  arithmetic progression.

www.complore.com/test4PDF.php?id=34

Page 1 / 3

   

 

5.  Sum of the first 30 terms of an arithmetic progression is 0. If the first term is –29, then find the sum of the 28th, 29th and 30th terms of this  arithmetic progression.    

   

j 81 k l m n j 84 k l m n j -84 k l m n j –81 k l m n j None of these k l m n i Skip this question j k l m n

6.  The height of an apple tree is given by the sum of two terms. The first term is directly proportional to the weight of the tree and the second term is  directly proportional to the square of the weight of the tree. The height of the tree was 6 m and 8 m, when its weight was 40 kg and 50 kg  respectively. Find the approximate weight of the tree when its height was 5 m.  

j 39 kg k l m n j 44 kg k l m n j 25 kg k l m n j 35 kg k l m n j 32 kg k l m n i Skip this question j k l m n

7.  A two-digit number N is ‘q’  times the sum of its digits. A two-digit number formed by reversing the digits of N is ‘p’ times the sum of the digits. Which of the following is equal to ‘p’?

j (9 – q) k l m n j (q + 1) k l m n j (11 – q) k l m n j (q – 1) k l m n j (10 – q) k l m n i Skip this question j k l m n

8.  Four black cows and three brown cows give as much milk in five days as three black cows and five brown cows give in four days. If a black cow  gives 10 L of milk per day, then how much milk would be given by a brown cow per day under the same conditions.  

j 6L k l m n j 8L k l m n j 10 L k l m n j 12 L k l m n j 16 L k l m n i Skip this question j k l m n

9.  How many six-digit numbers can be made by using the first 6 natural numbers such that the digit at the unit’s place is greater than the digit at the hundred’s place and the number thus formed is a multiple of 4? (Repetition of digits is not allowed.)  

j 96 k l m n j 108 k l m n j 114 k l m n j 78 k l m n j 120 k l m n i Skip this question j k l m n

10.  A combo pack having a bulb and a tubelight costs Rs. 52. If the cost of the bulb drops by 20% and the cost of the tubelight escalates by 50%, the  pack would cost Rs. 50. Find the price of a tubelight?  

j Rs. 8 k l m n j Rs. 9 k l m n j Rs. 10 k l m n j Rs. 12 k l m n j Rs. 15 k l m n www.complore.com/test4PDF.php?id=34 i Skip this question j k l m n

Page 2 / 3

j Rs. 12 k l m n j Rs. 15 k l m n i Skip this question j k l m n

Take this test online © Copyright 2009. All Rights Reserved.

www.complore.com/test4PDF.php?id=34

Page 3 / 3

Related Documents

Cat Quant Test No 12
June 2020 1
Cat Quant Test No 11
April 2020 4
Cat Quant Test No 14
June 2020 2
Cat Quant Test No 15
June 2020 1
Cat Quant Test 5
June 2020 4
Cat Quant Test 2
June 2020 7