DESIGN DRAWINGS
45
DESIGN DRAWINGS
FIRST FLOOR PLAN 1. Entry & Bus Canopy 2. Indoor Plaza 3. Atrium 4. Trellis / Column Forest 5. Greenhouse & Deck 6. Library & Deck 7. Environmental Laboratories 8. Laboratory Deck 9. Boat Float 10. Academic Classrooms 11. Mechanical 12. Faculty Lounge 13. Administration 14. Guidance 15. Gym 16. Boilers & Chillers 17. Refuse 18. Revolving Shelf 19. Pond
DESIGN DRAWINGS
46
1
2 15 14
13
KEY Common Area 2
Down
17 11 10
11 18
10
10
11
11 18
10
10
12
10
18
10
16 Down
3
Open to Above
Open to Above
3
Open to Above
6
5
7
18 11
7 7
7
18
18
7 11
11
18
7
2 11
8
8
19
4
FIRST FLOOR PLAN 0’ 10’ 20’ 30’ 40’ 50’
47
DESIGN DRAWINGS
100’
9
SECOND FLOOR PLAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Entry & Bus Canopy Below Indoor Plaza & Entry Spine Below Atrium Greenhouse Below Music Library Art Deck Academic Classroom Octagonal Classroom Mechanical Student Dining Faculty Dining Gym Below Kitchen Multipurpose Multipurpose Lounge Faculty Lounge
DESIGN DRAWINGS
48
1
14
2
KEY
Common Area
2 11 18
17
16
Open to Below
15
3
Open to Below
12
13
4
9
10
Open to Below
7 2
8
9
7
49
DESIGN DRAWINGS
100’
3
6
5 11
8
0’ 10’ 20’ 30’ 40’ 50’
9
5
11
8
SECOND FLOOR PLAN
9
ROOF PLAN 1 2 3 4 5 6 7 8 9 10
Entry & Bus Canopy Entry Spine Atrium Skylight (Photovoltaics) Photovoltaic Array Greenhouse Library & Skylight Octagonal Classroom Plaza Skylights Rooftop Entry Gym
DESIGN DRAWINGS
50
1
1
10 10
2
8
8 7
9
9 5
3
3
4 4
ROOF PLAN 0’
51
DESIGN DRAWINGS
10’
20’
30’
40’
50’
100’
6
Operable ventilation louver Double pane fixed glazing Glue laminated wood truss
Operable ventilation louvers
Clerestory window band
Sound absorbing concrete masonry unit wall LOCKER
ROOM GYM
SECTION 1 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
52
Operable ventilation louver
Glued laminated timber frame Aluminum framed low - e tinted glass Site cast concrete structure
Drainage chain
Operable ventilation louver
Operable ventilation louver PLAZA
53
DESIGN DRAWINGS
Glued laminated wood beam Site cast concrete structure
Transluscent photovoltaic array
Operable ventilation louver
Clerestory window
Low - E fixed double glazing MULTIPURPOSE
DINING
Low - E fixed double glazing Operable ventilation louver
Hopper windows Ventilation louver ACADEMIC
ATRIUM
LABORATORY Ventilating cavity wall
Laboratory doors with hopper windows 12” thermal mass floor
Existing grade line
SECTION 2 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
54
Operable ventilation louvers
Green tinted glass skylight Site cast concrete structure
Double glazed awning windows
SECTION 3 0’
55
DESIGN DRAWINGS
10’
20’
30’
40’
50’
Operable Ventilation Louver Sept 15
Dec 21
Sept 15
OCTAGONAL CLASSROOM
17’- 6”
Dec 21
ART 13’ - 6” Sept 15
Dec 21
ROOF DECK
LABORATORY 13’ - 6”
ACADEMIC
13’ - 6”
ATRIUM
POND
SECTION 4 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
56
AXONOMETRIC SECTION 0’
57
DESIGN DRAWINGS
10’
20’
30’
40’
50’
16’
ATRIUM BEYOND
ENTRY SPINE 36’
COLUMN FOREST / TRELLIS
POND
SECTION 5 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
58
Glulaminated roof beam
Site cast concrete
ENTRY SPINE
59
DESIGN DRAWINGS
ENTRY
BUS CANOPY
WEST ELEVATION 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
60
EAST ELEVATION 0’
61
10’
20’
30’
DESIGN DRAWINGS
40’
50’
SOUTH ELEVATION 0’
10’
20’
30’
40’
50’
DESIGN DRAWINGS
62
63
DESIGN DRAWINGS