UNIVERSIDAD DEL CAUCA VICERRECTORIA ADMINISTRATIVA

AREA DE EDIFICIOS, CONSTRUCCION Y MANTENIM

ANEXO No 3 NIVELACION Y MANTENIMIENTO DE LA CANCHA DE FUTBOL UBICADA EN EL CENTRO D UNIVERSIDAD DEL CAUCA, SEDE POPAY

No. 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3

DESCRIPCION Actividades Preliminares LOCALIZACION-REPLANTEO CANCHA-FUTBOL CONFIGURACION-NIVELACION TERRENO RETIRO PRADO - MALEZA CAMPAMENTO TABLA 9 M2 CERRAMIENTO TELA FIB.TEJIDA H=2.10M-BORD PUERTA TABLA Y GUADUA DEMOLICION SARDINEL TRAPEZOIDAL CONCRETO CINTA SEGURIDAD PREVENTIVA A=8CM-250MTS. Movimiento de tierras TRANSPORTE DE TIERRA PARANIVELACION CONFIGURACION Y NIVELACION TERRENO CANCHA DE FUTBOL Instalaciones PORTERIA FUTBOL TIPO 1 SARDINEL TRAPEZOIDAL B=(5 CM) H=15CM COLOCACION PRADO EXISTENTE Actividades complementarias ESMALTE LINEA DEMARCACION CORTE PRADO MANUAL Y CONTROL MALEZA LIMPIEZA GENERAL COSTO DIRECTO COSTO INDIRECTO CON AUI DEL 25 % COSTO DIRECTO + COSTO INDIRECTO IVA DEL 16 % SOBRE % DE UTILIDAD COSTO TOTAL

VERSIDAD DEL CAUCA

ECTORIA ADMINISTRATIVA

S, CONSTRUCCION Y MANTENIMIENTO

NEXO No 3 CADA EN EL CENTRO DEPORTIVO UNIVERSITARIO SECTOR TULCAN DE LA L CAUCA, SEDE POPAYƁN.

UNID M2 M2 m2 UND ML UND ML

CANT

VR. UNIT.

13,578 13,578 9,853 1 450 1 105

M3 M2

1,440 1,440

JUEGO ML M2

1 105 9,000

ML M2 M2

434 9,853 10,000

VALOR TOTAL