PRESUPUESTO DE

OBRA

JET GROUTING T1 OBRA: PUERTO SANTA MARTA - COLOMBIA Perforaciones : Longitud de tratamiento Cantidad total : Cantidad m3: Plazo de obra previsto : diametro col

8,463 mts. 15.00 mts. 8,463.00 ml 4253.98 m3 6.41 mes

(Incluye 150 ml campo de prueba) (Un turno, 1 equipo) (5 dias a la semana)

0.8 m

DISEÑO DE LAS COLUMNAS JET GROUTING

Tabla de calculo consumo de cemento

Diametro columna arenas limosas, limos arcillosos (m)

Caudal de lechada Presión de lecahada Tipo de lechada Velocidad ascencional

Ascenso Rotación Presión de aire Energía

Producción efectiva Produción industrial Consumo lechada Consumo de cemento 4,253.98 m3 jet col 0,8= 8,463.00

ml

1 m3 jet col 0,8= 1.99

ml perfo

MATERIALES

Tn/m Cemento consumido Jet

ml 0.25

r

8,463 r2

0.4

m2 0.16 Cemento Cemento

LECHADA A/C = Agua x m3 cemento x m3 Bentonita para Inyecciones (1% peso cemento) Aditivo Silicatos 0,1% del peso cemento

1.20 850.00 707.00 7.07 0.71

lts kg Kg kg

Total Tn 2,107.29

0.502656 Tn/m3 Kg/m3

Aditivos antideslavante 0,01% del cemento Aditivos plastificante 0,5% del peso cemento

RCS de proyecto a 28 dias Kg/ m3 cemento

RCS estimada S/cem/m3

0.07 3.54 14 495.37 70-80

Kg kg Kg/cm2 Kg/cm2 Kg/cm2

E

OBRA

1 Fecha :

28/11/18

ampo de prueba) Produccion : Produccion : Produccion :

55.43 ml/dia 304.85 ml/semana 1320.00 ml/mes

consumo de cemento

0.8 Tiempo Ejec 120 Meses 430 6.41 1.2 1 T 10 hs

s, limos arcillosos (m)

l/min Bar A/C cm/min

40

min/m rpm bar

2.5 15 -25 18

Mj/ml

12.90

m/hora m/hora l/metro Tn/metro

24 m x turno m x mes 6 60 1320 300.00 0.25 249.00 Kg/ml

US$/ml

US$/m3

0.00

0.00

Costo Cem x ml C Total cem

Costo Unit (US$/saco)

US$

9.00

(US$)

manipulacion

52.73 446,249.01 22,312.45

long

m3 1.99

468,561.46 total 1.00

0.50 495.37

300

5%

Agua Cemento Eucon CIA Plastol 7000 MEZCLA

A/C 1.2 Peso (kg) δ (gr/cm3) 785.0 1 654.2 3.15 9.8 1.26 2.3 1.08 1439.16667

Volúmen Obra (m3)

4253.98

Materiales Agua Cemento Eucon CIA Plastol 7000

Dosificación (kg/m3) 785.0 654.2 9.8 2.3

DISEÑO DE MEZCLA

Vol (lts) 785 208 8 2 1000

Coef. kg/lts totales 0.78 0.65 0.010 0.002

Total (Kg Obra) 3339372.51648 2782810.4304 41742 9740

δ Mezcla (gr/cm3) 1.45

65477.8925 161.791304 37.7513043

Viscos. Mezcla (seg)