Murphy

From: Jerry Graves, Jr. <[email protected]> To: [email protected] Subject:

Murphy

Date: Wed, 4 Mar 2009 1:30 pm

Suzanne: You were correct in your original assessment yesterday. Public Works and Community Development have received plans for the lab foundation only. They will eventually need to get their drainage plans (among others) reviewed before they begin working on the building itself. Sorry for the confusion, but I will make sure to let you know when the drainage plans are submitted. Thanks. Jerry Graves, Jr., CFM Director of Community Development st. Bernard Parish Government

http://webmaill.webmail.aol.com/41930/aollen-us/maillPrintMessage.aspx

3/1712009

Page 1 of3

RE: Murphy Oil Meraux refinery - testing lab

From: Lenny Young To: '[email protected]'

<[email protected]>

Cc: Lenny Young Subject: RE: Murphy Oil Meraux refinery - testing lab Date: Wed, 4 Mar 2009 2:51 pm

not necessitate a

http://webmaill.webmail.aol.com/41930/aollen-us/maillPrintMessage.aspx

to the

3/1712009

Page 2 of3

RE: Murphy Oil Meraux refinery - testing lab

issue:

From: Lenny Young

Sent: Friday, February 20,20093:08

PM

To: Cc: Lenny Young Subject: RE: Murphy Oil Meraux refinery - testing lab

rw,arded to

From: [email protected]

Sent: Friday, February 20,20092:44

PM

To: Lenny Young

http://webmaill.webmai1.ao1.com/41930/aol/en-us/mail/PrintMessage.aspx

3/17/2009

RE: Murphy Oil Meraux refmery - testing lab

Page 3 of3

Subject: Murphy Oil Meraux refinery - testing lab

Mr Lenny Young LDEG MrYoung: per our phone conversation, if you would be able to direct my question: Murphy Oil Meraux refinery AI #1238 Since our local planning commission and local council has granted the zoning changes for Murphy Oil's new lab (replacing the lab which is inside the refmery fenceline), we were expecting through the agency another opportunity for public notice and public input, including an EAS and additional information as to what exactly are they doing at the lab and what chemicals would be there. Also, why are they exempt from installing a fire protection sprinkler system? or from doing a traffic study? Would someone be able to explain why this was not required? Murphy Oil is beginning to construct the testing lab on Jacob Drive in Chalmette, LA, at the intersection of Jacob Drive and St Bernard Hwy, driving pilings this week. Murphy obtained the local zoning change and building permits. Today, our parish public works was asked to provide a copy of the engineering report for and the storm water drainage plans for this site -- as the municipal storm water drains are on Jacob Drive. The rest of the refinery has its own process waste water treatment. The lab's three lot construction site is directly to the west of the Jacob Drive Drainage Canal (part of our parishes storm water drainage system) and to the west of EXXON's pipeline easement, which is directly to the west and adjacent to the Murphy Meraux refinery. EXXON's pipeline easement is incorrectly labled'Murphy Oil Refmery property road' on attached photo MOMR708G2.jpg. That area labeled property road is actually the pipeline easement.

Thankyou. Suzanne Kneale 504-416-6848

Access 350+ FREE radio stations anytime from anywhere on the web.

http://webmaill.webmail.aol.com/41930/aol/en-us/mail/PrintMessage.aspx

3/17/2009