Bs2 Main Report V2

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Bs2 Main Report V2 as PDF for free.

More details

  • Words: 2,142
  • Pages: 23
PROINTEC S.A.

MINISTRY OF TRANSPORTS, CONSTRUCTIONS AND TOURISM

LOUIS BERGER SAS

Avda. de Burgos, no. 12, 28036, Madrid - Spain

Dinicu Golescu Blvd., no. 38, Bucharest - Romania

Tour Mercure III - 55 BIS, Quai de Grenelle, 75015, Paris France.

Road Safety Report Draft

ALBESTI-PALEOLOGU LOCATION BS NO. 2 DN 1B Km 17+000 – 18+000 Version 1.0

16/07/2007

Produced by PROINTEC& LOUIS BERGER Consortium

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

Document presentation Table of Contents 1 BLACK SPOT n 02...............................................................................................................3 2 ACCIDENTS DATA AND INFORMATION......................................................................4 3 DATA ANALYSIS..................................................................................................................9 4 DESCRIPTION OF THE SITUATION............................................................................12 5 SAFETY DIAGNOSIS .......................................................................................................20 6 MAIN PROPOSED SOLUTIONS.....................................................................................21

16.07.2007

Page 2 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

1 BLACK SPOT n 02 Although it is an early phase to present the solutions for the BS, by client request, the Consultant is presenting in this paper one scenario as possible solution in solving the BS no. 2 located on the DN1B at km 17+000 and 18+000 of DN1B.

1.1 Location County: Prahova Village: Albesti-Paleologu Road: National Road 1B (DN1B) Km 17+000 – 18+000 AADT: 21524 Section Type: two x two lanes road Typology: this BS is located on DN1B, some kilometers S-E of Ploiesti to Buzau direction.

16.07.2007

Page 3 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

2 ACCIDENTS DATA AND INFORMATION The main analysis for this location and the typology of accidents are presented in this chapter. Following are shown the accidents and the traffic data from NAR. Data From List of BS (NAR) Nr. crt.

Regional Directorate

Judet

National Road

Start Kilometre

End Kilometre

Accident number

Fatalities

Seriously injured

AADT

02

BUCHAREST

Prahova

1B

17+000

18+000

9

5

4

21524

The safety analysis of the BS is carried out on the base of the Accident Data Base and takes into consideration the ranges of years between 2001 – 2006 and the distances between km 17+000 – 18+000. Data From Accidents Database Location Data

BUCHAREST

Judet

Prahova

Location DN1B

National Road

Ploiesti – Buzau

Cumul. dist. (m) from

Km 17+000

to

Km 18+000

distance

Km 1+000

Accidents Data per Year Year

Accidents

Seriously injured

Dead

2001

3

1

2

2003

4

3

1

2004

2

2002

2

2005 2006

Total

16.07.2007

9

4

Page 4 of 23

5

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

Accident Data per Km Accidents

Seriously injured

Dead

17000

1

0

1

17000

1

0

1

17130

1

1

0

1

0

Cumul. dist. (m)

17300 17450

1

1

0

17615

1

1

0

17700

1

0

1

17750

1

0

1

18000

1

0

1

The following diagrams highlight the annual trends of accidents and the location of the more dangerous places along the considered section.

The causes of the accidents are shown into the following table. The columns extracted from the database give for each accident information about: 

the location and the periods:



the general causes and typologies of the accident:



the actual characteristics of the section – lanes, shoulders, type of pavement:

the elements of road safety – situation of lighting, paved, road marking and signaling.

16.07.2007

Page 5 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

year

Data Acc.

Drum

Artera

2004

17.10.2004 20:00

DN1B

2001

23.10.2001 23:00

DN1B

2001

23.02.2001 09:00

DN1B

2003

27.11.2003 14:15

DN1B

2003

13.11.2003 19:15

DN1B

2003

25.02.2003 23:00

DN1B

2001

25.03.2001 21:15

DN1B

Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau) Ploiesti-Mizil-D.N.2 (Buzau)

2004

15.12.2004 06:00

DN1B

2003

24.08.2003 22:45

DN1B

16.07.2007

Judet

In Localitate

Localitate

PRAHOVA

DA

VALEA CALUGAREASCA

17000

PRAHOVA

DA

ALBESTI-PALEOLOGU

17000

PRAHOVA

DA

ALBESTI-PALEOLOGU

17130

PRAHOVA

DA

17300

PRAHOVA

DA

PRAHOVA

DA

CHITORANI VALEA CALUGAREASCA VALEA CALUGAREASCA

PRAHOVA

DA

ALBESTI-PALEOLOGU

17700

Ploiesti-Mizil-D.N.2 (Buzau)

PRAHOVA

DA

VALEA CALUGAREASCA

17750

Ploiesti-Mizil-D.N.2 (Buzau)

PRAHOVA

DA

VALEA CALUGAREASCA

18000

Page 6 of 23

Version 1.0

Deplasament

17450 17615

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

16.07.2007

Page 7 of 23

Draft

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

16.07.2007

Page 8 of 23

Draft

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

3 DATA ANALYSIS For each BS site two parameters are used for the data analysis: 

Annual Accident Rate (AR):



Number of Deaths per hectometer.

The calculus of this rates have been carried out considering the number of the accident and the number of Deaths indicated on the NAR list but taking the length from the database (see the graph of dangerous section). The table shows the Rates and the values used for the calculus. Indicator reference to 2001 – 2006 BS N. 02 Accident Rate Annual accident rate values ( AR ) AR = Accident Daily Traffic lengtht of branch T (years)

(106 * A) / 365 * ADT * L * t A

0,229

ADT

21524

L (Km) t

9 1.0 5

Fatalities per hectometer = 0,01

(Dead / L )/ t Dead

D

L (length)

L (hm.)

t (years)

t

5 1000 5

In the next figures, the accidents rate, injuries rate and the death rate from Romania are presented.

16.07.2007

Page 9 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

Figure Accidents rate, injuries rate and the death rate in Romania (source: Romanian National Police Department)

Figure Vehicle rate in Romania (source: Romanian National Police Department)

Table 2 Mortality rate in Europe (data source: HFA db 2003)

16.07.2007

Page 10 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

Figure Mortality caused by road accidents in Europe (data source: HFA db 2003) Although some actions were taken by the Romanian authorities, the death rate in the last years is quit high (please see above Figure) and is on the first place in Europe with 12,81 rate (Table 2 and Figure). But the sever injuries as consequence of the transportation of the dangerous good increased the last 3 years with almost 40%. Moreover, the accidents rate on the national roads or highways located outside of the cities areas is double that in the cities neighbourhood areas. Most of them from these are with heavy vehicles that transport dangerous goods. Based on national economical development and the political integration in EU in 2007, the road transport will continue to grow with 8-10% per year till 2015. If the accidents rate caused by the transportation of the dangerous goods will follow the same rate, in some years the number of injuries will increase tremendous. The social costs of the traffic accidents in 2003 were estimated at over 350 million euro (about 2 % from PIB), representing the losing of human lives, the expenses for re-covering of the people with physical handicaps, as well as those for financial prejudice.

16.07.2007

Page 11 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

4 DESCRIPTION OF THE SITUATION The on-site visit allowed to understand the main safety issue related with this BS 02 located in Albesti-Paleologu on the DN1B from Ploiesti to Buzau.

16.07.2007

Page 12 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

a. LAYOUT OF THE ROAD SECTION – ALIGNMENT The layout and the alignment of the road section show complex junction between DN1B and DJ68 to Valea Mieilor and Albesti/Muru directions.

16.07.2007

Page 13 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

16.07.2007

Page 14 of 23

Draft

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

b.TRAFFIC AND MOBILITY SITUATION There are problems due to the high presence of heavy traffic and to the high speed of traffic.

c. SITUATION CONDITIONS OF THE CARRIAGGEWAY AND SHOULDERS The pavement of the road is in a fair condition but with shoulders only partially paved. On the other hand, there is some small presence of rutting and deformations due to the presence of heavy traffic.

16.07.2007

Page 15 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

d. CONDITIONS OF THE S & M AND SAFETY BARRIER Safety barrier are unsatisfactory. Signaling and Marking are unsatisfactory, in particular during night and bad weather conditions.

16.07.2007

Page 16 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

e. CONDITIONS OF THE LIGHTING The lighting is existing only on the corner with the DJ 69 to Valea Mieilor. The lighting for the junction at whole is very poor. Moreover, many accidents were in the last years during the night.

16.07.2007

Page 17 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

f. PRESENCE AND CONDITIONS OF INTERSECTIONS OR JUNCTIONS There is a complex + junction between DN1B with the DJ68, to/from Valea Mieilor and Albesti/Muru directions.

16.07.2007

Page 18 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

g. LATERAL DITCHES AND RESTRICTION OF THE VISIBILITY OF THE CARRIAGEWAY A lateral unprotected ditch is present on one side of the road (dangerous for both vehicles and pedestrians).

H.PEDESTRIAN CROSSING Before and after this junction doesn’t exist any pedestrian crossing.

16.07.2007

Page 19 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

5 SAFETY DIAGNOSIS 5.1

DESCRIPTION OF THE SITUATION

The on-site visit allowed to understand the main safety issue related with this place. There are three main subjects to be treated and resolved: 1. the junctions between DN1B with DJ68 2. the pedestrian crossings 3. the bus station The existing situation is illustrated in the next paragraph. 5.2

Junction

The DN1B intersects DJ 68 and in this junction. The scenario is also affected by the following elements: a. high presence of heavy traffic on DN1B b. inappropriate geometric characteristics for operating speeds: insufficient sight distances c. there are only painted markings and not plastic markings; this cause low visibility especially during the darker seasons of the year and makes regular road woks necessary for repainting. 5.3

Pedestrian crossings

There are not pedestrian crossings in this area.

16.07.2007

Page 20 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

6 MAIN PROPOSED SOLUTIONS 6.1

Junctions

Taking into consideration the limited amount of space available at this place a possible solution could be based on the improvement of the existing topology. In the annexed scheme the details about this proposal are presented. Furthermore other improvements that should be included are: a. Redesign/remark this junction b. new pavement and paved shoulders on DN 1B and on DJ68 c. integrative signals and markings before the junction (rubber noise bands, flashing signals as notice, etc…) 6.2

Pedestrian crossings Different kinds of solutions should be implemented in parallel as follows: a. improvement of the lightning system, with dedicated lights at each crossing b. integrative signals and markings before the crossings (rubber noise bands, flashing signals as notice, etc…) c. installation of on-demand traffic light systems

6.3

Other improvements Different other solutions should be implemented in the area to improve the safety conditions, as follows: a. eliminating the small irregularities that were observed on DN1B and on DJ68 b. solve the ditches problem c. improve the possibility to turn left/right on the local road without to affect the traffic from the opposite direction d. use of high reflecting and skid resistant plastic markings e. must be used only high reflecting and skid resistant plastic markings

6.4

Operations

Following are shown the safety treatment under consideration. The safety treatment are divided in two main operation categories, diffused and punctual operations. •

diffused operation are referred to the full extension of the studied section;



punctual operation are referred to short sections and specific points inside of the studied section

16.07.2007

Page 21 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

A. DIFFUSED OPERATIONS Code

Type of Action

A.1.1

Pavement rehabilitation

A.1.4

Improvement of Signaling and Marking

B.2.2

Improvement of the lighting system

B. PUNCTUAL OPERATIONS Code

Type of Action

B.2.1

Improvement of the junction

B.2.1

Improvement of the pedestrian crossing

A.1.2

Bus Stop rehabilitation / New Bus Stop

16.07.2007

Page 22 of 23

Version 1.0

TECHNICAL ASSISTANCE FOR THE PREPARATION OF A ROAD SAFETY PIPELINE OF PROJECTS

Draft

Annex 1. PHOTO INTER-GIS (A3) 2. PRESENT SITUATION 3. DESIGN SOLUTION

16.07.2007

Page 23 of 23

Version 1.0

Related Documents

Bs2 Main Report V2
May 2020 5
Bs11 Main Report V2
May 2020 5
Bs12 Main Report V2
May 2020 4
Bs2
May 2020 6
Main Report
May 2020 12
Main Report
June 2020 15