BP-22 PAINTING AND WALLCOVERINGS SCOPE OF WORK DESIGNATED 100% CBE SUBCONTRACTING SET-ASIDE REQUIREMENT DEFINITION OF PROJECT AREA: The Scope of Work includes the painting and wallcovering work for the Georgetown Neighborhood Library which is located at 3260 R Street, NW, Washington, DC. PAINTING AND WALLCOVERINGS Contractor shall be responsible for labor, material and equipment for painting and wallcovering work at the existing building and the new addition as indicated in bid documents (100% Final Construction Drawings and Specifications dated July 9, 2009). Available on CD. Work includes but is not limited to the following specification sections Division 1 – General Requirements Division 7 – Thermal and Moisture Protection 07920 Joint Sealants Division 9 – Finishes 09911 Exterior Painting 09912 Interior Painting 09931 Wood Stains and Transparent Finishes 09991 Encapsulation Coating System 1. 2. 3. 4. 5. 6. 7. 8.

9. 10. 11. 12.

Furnish and install the interior caulking and sealants between dissimilar materials as indicated. Furnish and install the caulking between door frames, trim and casings and drywall or masonry. Furnish and install the interior caulking between aluminum window frames and masonry or drywall. Exterior painting includes put is not limited to railings, flagpole and pipe bollards. Furnish and install all required primers and fillers as indicated. Painting and staining of the doors and frames as indicated. Minor prep work and patching as required. Painting and staining of the drywall, masonry, doors, trim, miscellaneous metals and miscellaneous items with the required coats as indicated. Protection for new and existing surfaces. Sufficient temporary lighting for your work. Hoisting as required for this work. Provide any Independent Testing & Inspection Services required for this Work, including materials testing and inspections;

13. 14. 15.

16.

17.

18. 19.

20. 21. 22.

23. 24.

25.

26.

During the period of this work, contractor agrees that all employees must be experienced in performing the work. Contractor shall coordinate this work with other work in progress. The Contractor shall ensure that no elements determined to be unstable are left unsupported. Any and all required structural bracing for structural systems to remain shall be included in this scope of work. Contractor shall remove and transport debris resulting from erection operations and materials to site disposal area. Recyclable materials shall be separated and stored or stockpiled without intermixing with other surplus materials before transporting to recycling facilities in accordance with a recycling program consistent with the Project LEED Certification Program. Contractor shall comply with all identified performance and specification requirements to achieve LEED points toward the Silver certification goal as indicated in the bid documents. Contractor shall take all necessary precautions to avoid damage to all existing and completed construction in place. It is Contractor’s responsibility to read the Hazardous Materials Survey Report for Georgetown Neighborhood Library, including the July 8th 2008 addendum. Contractor shall submit bids detailing their proposed means, methods and schedule for this scope of work. Provide labor for incidental project clean-up Provide miscellaneous temporary protection of existing conditions during construction as specifically specified herein and OSHA safety barricades, rails and floor coverings, for this Work. Engineering, site survey and layout for this Work. Provide monthly Project construction progress documentation & photographs, including existing building pre-construction condition documentation. Contractor shall leave the workplace in a clean and presentable condition ready for subsequent trades and prepared for finishes as specified. Submittals will be required for approval prior to execution of the work.