Benzinarie A1 - Pitesti 675k

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Benzinarie A1 - Pitesti 675k as PDF for free.

More details

  • Words: 363
  • Pages: 8
Land plot on Bucuresti – Pitesti autostrada Located prior to the new Pitesti ring connection

Location / description z

z

z

z z

The land plot is situated at the Pitesti end of the Bucuresti – Pitesti highway approx 500 m from the exit to the new Pitesti ring and the new Brasov autostrada. No possibility for building after this plot. Last stop opportunity before Pitesti. Utilities connections ( electricity, industrial water and gas ) 50 m from site. Plot size of 4800 m2 – flat plot, no buildings or trees. Double road opening – to autostrada 77 m ( possibility for enlargement to 90 m ) and to secondary road ( to future Pitesti ring ) of 70 m.

z

z

z

z

z

Terenul este situat la finalul autostrazii Bucuresti – Pitesti, la aproximativ 500 m de iesirea catre noua centura a Pitestiului si autostrada spre Brasov Nu exista posibilitatea de a construi dupa acest teren. Ultima posibila oprire inainte de Pitesti Utilitatile se afla la 50 m de teren (curent electric, apa industriala si gaze) Suprafata terenului este de 4800 m2 – terenul este la acelasi nivel cu autostrada si este liber. Deschidere dubla la autostrada de 77 m (cu posibilitatea de a se extinde la 90 m) si la soseau secundara de 70 m (spre viitoarea centura a Pitestiului)

Location / description z z z

z z z

No significant risks for neighbor residences. There is 25 km from the MOL gas station to the site AND indicates possibility of entrance from the highway and re-entry to the highway via the rear service road. High visibility from long distance. Traffic count – highest in Romania. Single owner – Agora Marketing & Consulting

z z z

z z z

Vecinatatile nu prezinta risc rezidential Terenul este situat la 25 de km de o statie de carburanti MOL Conform AND se poate face intrarea din autostrada si iesirea prin soseaua secundara catre autostrada Vizibilitate mare de la distanta Traficul este cel mai mare din Romania Proprietar unic Agora Marketing & Consulting

Map showing location

Site zone plan

Site layout plan

Photo from the end of the site

Photo from 400 m

Related Documents

A1
June 2020 25
A1
May 2020 34
A1
June 2020 29
A1
June 2020 21
A1
May 2020 39