Barn Creek Rd

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Barn Creek Rd as PDF for free.

More details

  • Words: 153
  • Pages: 2
  

D.A. Zerby Building & Restorations Carversville PA 267-446-8053

   Estimate Date: 7/09/2009    Item Material Labor Total Selling Quantit Labor & Material For Creek rd Barn Description Unit Number Cost $4, 000 Cost Cost 1: Labor: Replace (2) 8*8 timbersysills 30' feet in length .00 material : $ 1,800Price 2: Foundation & Stone Repair: 65' $ 6,000 material: $ 4,000 3: ReBuild Barn Entry appox. 500sq $ 7,200 material: $ 6,000 4: sq Build new barn Doors $ 3,800 material: $ 2,000 5: New tear off flat roof 800 900 900 Tin Roof: Barn Red ATAS Roof Sytem $ 1,500 material: $ 1,200 6: Cribbing under Barn with Lintals (2) $ 900 material: $ 700 Total : $ 39,100 new rubber roof 800 1,700 $3,200 $4,900 firestone rubber 2" foam sheets glued & screws & plates ,flash chimney,metal drip flash around perimeter new rubber roof & sealed with primer& glue based flashings dumpster

425

$425

Related Documents

Barn Creek Rd
May 2020 0
Tithe Barn
May 2020 15
The Barn
October 2019 22
Rd
April 2020 24
Rd
December 2019 40
Barn Burning.pdf
May 2020 13