Authorization/Permit/Form
Spill Reporting Requirements 18AAC 75.300
Program
Objective
CSP, PERP
Response
Initial Spill Response Requirements 18AAC 75.310 & 18AAC 75.315 Cleanup Plan Approval
PERP Response CSP
Response
CSP
Response
Interim Removal Action 18AAC 75.330(c) Report Approval 18AAC 75.335(c)
CSP CSP
Response Response
Sampling and Analysis 18AAC 75.355(a) Cleanup Operation 18AAC 75.360 Soil Disposal 18AAC 75.360(b) Final Cleanup Plan Report and Site Closure 18AAC 75.380
CSP
Response
CSP CSP CSP CSP
Response Response Response Response
Streamlined Cleanup of petroleum contamination Contaminated Site Cleanup:
Contaminated Site Cleanup:Cleanup Plan Approval (18 AAC 75.300)
Leaking Underground Tank Cleanup Reporting requirements 18AAC 78.200(a) & 18AAC 78.235(g) Interim Cleanup 18AAC 78.240(c)(1) Corrective Action Plan 18AAC 78.250 & 18AAC 78.260(e) Corrective Action Plan Revision 18AAC 78.270
IPP
Contingency Plan Approval 18 AAC 75.455
Contingency Plan Approval Amendment 18 AAC 75.415
Contingency Plan Revocation/Suspension/Modification 18 AAC 75.490
Conducting Drill or Inspection and Issuing Report
Prevention Preparedness
IPP
Financial Responsibility Certification (18 AAC 75.240)
Prevention Preparedness
Financial Responsibility Action (18 AAC 75.290)
IPP
Prevention Preparedness
IPP
Prevention
Local Response Agreement
PERP
Response
Scientific Discharge Permit
PERP
Prevention
Road Oiling Permit
PERP
Prevention
Nontank Vessel Plan Approval (18 AAC 75.460) Underground Storage Tanks
Underground Petroleum Storage Tank Registration 18 AAC 78.015
Underground Storage Tank Worker Certification 18 AAC 78.400 Third Party Inspection Operations Report 18 AAC 78.017 Registration for Installation, Repair, Upgrade or Reconfiguration 18 AAC 78.015 & .035
Change Ownership of UST 18 AAC 78.015 Intent to Install or Reconfigure a UST 18 AAC 78.015 60-Day Log for Impressed Current Cathodic Protection 18 AAC 78.100
Taken Out of Service or Temporary Closure 18 AAC 78.020 Empty Tank Affidavit 18 AAC 78.100 Closure of a UST 18 AAC 78.085 Post-Closure of a UST 18 AAC 78.085 Site Assessment/Release Investigation 18 AAC 78.090 & . 200-.235
Certification of Financial Responsibility 18 AAC 78.910 Preliminary Risk Evaluation Form Recoverable Cost Affidavit
Who needs this authorization or permit?
How do you get the permit or authorization? Report a Spill webpage
Any one who spills oil or a hazardous substance
Contact DEC by phone when reporting spill, approval may be verbal or in writing. Anyone cleaning up an oil spill. Initial cleanup or emergency response. Low-risk petroleum contaminated sites are elibible for accelerated cleanup process
Contact DEC by phone when reporting spill, approval may be verbal
SCP webpage
Anyone cleaning up an oil or hazardous substance spill Cleanup Process webpage Responsible person must have qualified which has been referred to the contaminated sites program for cleanup, risk reduction, or long-term management.
Cleanup of leaking underground tank
Underground Storage Tank Procedures Manual
Oil PipelinesOffshore Exploration FacilitiesOnshore Exploration FacilitiesOffShore contact section Production manager FacilitiesOnshore Production Fa
Shallow Gas ExplorationOil PipelinesOffshore Exploration FacilitiesOnshore Financial Responsibility Exploration FacilitiesOffShore Webpage Production Facilitie
Non Tank Vessels >400 gross tons
Nontank Vessel Webpage
Regulated underground petroleum storage tanks
UST Forms
Local governments who want to partner with the State to improve local response capabilities Anyone wishing to discharge oil for research or scientific purposes Anyone wishing to apply oil to a road surface for dust control
Local Response Permit for oil discharge for scientific purposes