“How Do We Drive BIM in The Right Process” By : Ahmad Shiddiq Wangsaputra, ST, IAI
01 “BUILDING INFORMATION MODEL”
“BIM IS DATABASE IN 3D MODELS”
“BIM IS AN INTEGRATED MODEL BETWEEN 2D AND 3D”
“BIM CONTAINS
INFORMATION TO BE USED WITH ALL STAKEHOLDERS”
02 “BIM IS ABOUT COMMUNICATION”
TRADITIONAL 2D CAD PROJECTS COORDINATION
Architect Civil / Structure Engineer
Services Engineer
Quantity Surveyor
MEP
Facilities Manager
Contractor / Builder
Project Manager
Building Owner
Information Flow Design Team
Supply Team
Construction Team
Operation Team
FAILURE
FAILURE
FAILURE
2DFloor Plan (+100cm Floor Plan Cut Plane)
FAILURE
TYPICAL CONSTRUCTION PROJECTS 3.000 BIM is About Communication – 20.000 RFI (REQUEST FOR INFORMATION) 200-1000 PAGES OF 2D DRAWINGS
TRADITIONAL 2D CAD PROJECTS INFORMATION FLOW
TRADITIONAL 2D CAD PROJECTS COORDINATION
Architect Civil / Structure Engineer
Services Engineer
Quantity Surveyor
MEP
Facilities Manager
Contractor / Builder
Project Manager
Building Owner
BIM BASED PROJECT
Architect Civil / Structure Engineer
Services Engineer
COORDINATION
Quantity Surveyor
MEP
BIM
Facilities Manager
Contractor / Builder
Project Manager
Building Owner
BIM BASED PROJECTS INFORMATION FLOW
A Story About “Light Table”
Courtesy of SURE HOUSE
A Story About “Light Table”
Courtesy of SURE HOUSE
ARCHITECT | ENGINEERS | CONTRACTORS | SUPPLY TEAM
“SUPERIMPOSE A LOT OF 2D DOCUMENTS JUST TO FIND CLASHES”
“COORDINATED MODEL IN BIM”
A Story About “Light Table”
Courtesy of SURE HOUSE
GRAPHISOFT ARCHICAD TEAMWORK
GRAPHISOFT ARCHICAD CLASH DETECTION
SOLIBRI MODEL CHECKER CLASH DETECTION
BIM COLLAB ZOOM ISSUE MANAGEMENT
BIM COLLAB ZOOM ISSUE MANAGEMENT
IFC4, BIM ISO 16739
BIM COLLAB ZOOM ISSUE MANAGEMENT
CASE STUDY FULLY OPEN BIM PROJECT “PELINDO 3 OFFICE CENTER”
Architect
IFC MEP
Civil / Structure Engineer
CASE STUDY FULLY OPEN BIM PROJECT “PELINDO 3 OFFICE CENTER”
CASE STUDY FULLY OPEN BIM PROJECT “PELINDO 3 OFFICE CENTER”
CASE STUDY FULLY OPEN BIM PROJECT “PELINDO 3 OFFICE CENTER” Designer Team Platform
Contractor Team Platform
HOW BIM REDUCES ERRORS? Shared Project Model Coordination and Collaboration Clash Detection Information Exchange with IFC Geometry Exchange with IFC Issue Management wit BCF (Shiddiq Wangsaputra, 2018)
03 “BIM HANDOVER CHALLENGES”
HANDOVER
TRADITIONAL 2D CAD PROJECTS COLLABORATION
Architect REWORK!
Design Review
Coordination
MEP Deliverables REWORK!
Civil / Structure Engineer
REWORK!
TRADITIONAL 2D CAD PROJECTS
CT
HANDOVER DT
DESIGN TEAM
CON
SC
HANDOVER
OW ST
Architect
Design Review
MEP Deliverables
HANDOVER
OPR
Coordination
Civil / Structure Engineer
FM
FB HANDOVER
DT
SUP PM
SP
OP
TRADITIONAL HANDOVER
STRUCTURAL ENGINEER? MECHANICAL ELECTRICAL? CONSTRUCTION? COST?
“REWORK” “REWORK” “REWORK” “REWORK” “REWORK”
“REWORK”
“INFORMATION LOSS”
“INFORMATION, DATA AND GEOMETRY IN BIM
SHOULD BE USED AFTER HANDOVER BETWEEN STAKEHOLDERS”
BIM BASED PROJECT COLLABORATION
Uniformat and Masterformat in BIM Building Information Models are rich datasets that can be used in the process of creating estimates. Understanding how to use UniFormat and MasterFormat in a project integrating model-based estimate is often the first step in transitioning from exclusively 2D based inventories and quantities. UniFormat and MasterFormat are published organizational standards used in North American building Design and Construction. The two standards are fundamentally different in their intent.
UniFormat is a systemsbased organization of building content. MasterFormat is a material-based organization of building content. Concrete is a very common building material. In MasterFormat, a value of 03-31-00 is reserved for Concrete Material. All use of concrete will be specified with this value of 03-31-00. However, concrete material is used in the construction of many building systems. UniFormat can be used to differentiate the many places concrete is used in a building. Examples of UniFormat codes that can identify how concrete is being used in a project. Uniformat Rich Creveling, Senior Estimator for Swinerton Builders, has vast experience as a VDC Coordinator and BIM consultant.
Masterformat
HANDOVER
HANDOVER
HANDOVER
HANDOVER
HANDOVER
HANDOVER
HANDOVER
HANDOVER
HANDOVER
•
Design Team: Architects, engineers, and special consultants
•
Supply Team: Building product manufacturers, fabricators, and suppliers
•
Construction Team: General contractors, sub-contractors, and trades
•
Operations Team: Owners, operators, and facility managers
HANDOVER CHALLENGES? Improve Interoperability Model, Information, Data should be transferred between stakeholders No more information and geometry loss
(Shiddiq Wangsaputra, 2018)
ZAHA HADID DONGDAEMUN DESIGN PLAZA
BIM (Building Information Modeling) For Professionals
BIM (Building Information Modeling) For Professionals
BIM (Building Information Modeling) For Professionals
“BIM IS ABOUT COMMUNICATION”
“BIMX LIVE
DEMO”
“LEGO CHALLENGES”
2D CAD TEAM vs BIM TEAM
JAMAN NOW! Hand Drafting
2D CAD
3D
•Pencil •Paper
•Autocad 2D
•Autocad 3D •Sketchup
“If we stay in one place, we will become outdated” (Satoru Iwata)
BIM
Compiled By:
Ahmad Shiddiq Wangsaputra, ST, IAI SKALA Academy | CEO | www.skalacourse.com ATTAYA Architects | Principal | www.attayaarchitects.com +62 857 2001 5929