CURRICULUM VITAE PERSONAL DATA NAME
ARTURO BRONDIAL DEL AYRE
BIRTH DATE
NOVEMBER 14, 1963
BIRTH PLACE
Albay Provincial Hospital, Legazpi City
PARENTS FATHER OCCUPATION MOTHER OCCUPATION
Lt. Col. EULALIO MALLON DEL AYRE, JR., P.A. [Ret.] Consultant, Security and Investigations, private company JOSEFINA RAS BRONDIAL-DEL AYRE Homemaker
WIFE
ALMIRA TABORA SABELLANO-DEL AYRE OCCUPATION Homemaker/ Asst. Supervisor, Forever Living Products
EDUCATION BACKGROUND 1. GRADUATE
ILIGAN INSTITUTE OF TECHNOLOGY MINDANAO STATE UNIVERSITY, Iligan City, 2005 to 2008 Course: MASTER in BUSINESS MANAGEMENT Thesis: ―An Evaluation of Flat Carbon Steel Production of National Steel Corporation (NSC) from its Privatization in 1995 to its Liquidation in 1999 and its Implications to the Country’s Steel Industry‖
2. COLLEGIATE
a. BICOL UNIVERSITY College of Engineering Legazpi City, 1981 - 1982, 1985 – 1988 Recipient: UNIVERSITY PUBLICATION SCHOLARSHIP 1987-88 OUTSTANDING STUDENT OF THE UNIVERSITY FOR CAMPUS JOURNALISM, 1988 AWARDEE Course: BACHELOR of SCIENCE in ELECTRICAL ENGINEERING b. PHILIPPINE MILITARY ACADEMY Fort del Pilar, Baguio City, 1982 – 1984 Recipient: ACADEMIC EXCELLENCE BADGE (DEAN’S LIST) SY 1982– 84
3. VOCATIONAL
UNIVERSITY OF LIFE MERALCO Ave., Pasig, Metro Manila, Dec 1984 - Feb 1985 Recipient: Philippine Development Scholarship Course: BASIC BOOKKEEPING and ACCOUNTING
4. SECONDARY
University High School, BICOL UNIVERSITY Legazpi City, 1977 – 1981 NCEE Rating: 99.00% Recipient THIRD HONORABLE MENTION
5. ELEMENTARY
College of Education Laboratory School, BICOL UNIVERSITY, Daraga, Albay, 1971 – 1977
abda@ yahoo.com |
[email protected]
Page 1 of 14 pages
ELEGIBILITY 1. REGISTERED ELECTRICAL ENGINEER #0004734 Per R.A. 184, Registered December 24, 1996 2. LICENSED ASSISTANT ELECTRICAL ENGINEER #20227 October 15 - 16, 1988. Manila. Registered October 05, 1989 3. Civil Service Career (Professional). Rating: 85.41% August 05, 1990, Iligan City. 4. Civil Service Career (Sub Professional). Rating: 90.95% July 26, 1987. Legazpi City. SPECIAL SKILLS
Computer Literate – Microsoft-based / Windows software including Database Programming, Relational Report, MS Office 95/98/2000/XP/2003, MS Project, MS Visual Studio, AutoCAD r.14, Primavera Project Planner 3.0. Web Site Management – HTML, Cascading Style Sheet [CSS], HomeSite 4.0, Apache Proxy Server, VBScript, JavaScript, Perl Scripting, and Ulead Graphic tools. Literary writer – poetry, prose, puzzle-creator.
HOBBIES / SPORTS
Philately. Reading and collecting pocketbooks. Guitar playing. Collecting CD’s and e-books. Soccer-Football, Archery, Badminton.
CHARACTER REFERENCES 1. ENGR. RUBEN A. PIÑAROC Resident Plant Manager NATIONAL STEEL CORPORATION Suarez, 9200 Iligan City Cell No. (63) 917 461-4953
3. ENGR. LEONARDO A. CALDERON Former Department Head, Cold Mill A2 GLOBAL STEEL PHILIPPINES INC. Suarez, 9200 Iligan City Cell No. (63) 919 616-7231
2. ENGR. MICHAEL M. GAGARRA Former Head, Management Initiatives (TPM / Six-Sigma) GLOBAL STEEL PHILIPPINES INC. Suarez, 9200 Iligan City Cell No. (63) 919 408-5391
4. MRS. JANET CUI-TIBUDAN Former Dean, Engineering Department ST. PETER'S COLLEGE Sabayle Street, 9200 Iligan City Tel. No. (63) 063 221-6246
I hereby certify that, on my knowledge, all entries above are true and correct.
ARTURO B. DEL AYRE
abda@ yahoo.com |
[email protected]
Page 2 of 14 pages
RESUME ARTURO BRONDIAL DEL AYRE, REE, MBM Life Member: Institute of Integrated Electrical Engineers (Phils) Inc. (#8E-20227-4010-96) 60C First East Extension, Rosario Heights, 9200 Iligan City, Philippines Contact Number: Cell phone: (63) 998-3224-001 Email Addresses:
[email protected],
[email protected] Internet Resume: http://engr.freeservers.com/abda/
OBJECTIVES Managerial/Supervisory: Plant Operation/Management Managerial/Supervisory: Electrical Maintenance Engineering / Planning Electrical Engineer: Electrical Systems Engineering / Technical Planning
PROFILE TEN years experience in Maintenance Planning. Working knowledge in Maintenance Resource Planning [MRP], technical planning, evaluation and analysis, electrical equipment troubleshooting, maintenance cost and inventory control, and project management and implementation. More than TWENTY years experience in Production/Manufacturing. Working knowledge in Statistical Process Control [SPC], Quality Management Systems [ISO 9002 Quality Audit], KT-GENCO Problem Solving and Decision-Making, Total Productive Maintenance [TPM], Quantitative Analyses: Management Science/Operations Research [MS/OR], Forecasting, Linear Programming, Networks [PERT-CPM], Queuing, Simulation and Markov Analysis, Philippine Electrical Code [PEC]. Includes one-year experience in Business Strategy. SIX years teaching experience. Technical knowledge in engineering management, power plant design, transmission and distribution power systems, and electrical equipment and devices; read and interpret blueprints and schematic diagrams. More than FIFTEEN years computer knowledge. Skilled in Microsoft Windowsbased software including Database and Macro Programming, Data Analyses using Excel Analysis ToolPak, Relational Report, Office 95/98/2000/XP/2003 [Word, Excel, PowerPoint, Access, Project Planner], Visual Studio, AutoCAD r.14/2000, and Primavera Project Planner 3.0. Working knowledge in Web Site Management – HomeSite 4.0 [HTML], Cascading Style Sheet [CSS], Proxy Server [Apache v1.3], VB, JS and Perl Scripting, and ULead Graphic tools. Working knowledge in MSDOS and PC troubleshooting. Extensive writing and journalism experience. Skilled in Technical Report Writing, journalism [editorial, news and features reporting, editing, proof-reading, lay-outing], prose and poetry writing. Edited Masteral and Doctorate theses for a fee since 1981. Edited the GeoCities Tokyo E-zine, an e-magazine. Contributed articles to The Mayon, The CASsette, PMA’s Academy Scribe, The GearCast, The Bicol Universitarian, Istudyante, Mr&Ms Magazine, and NSC News.
[email protected]
Page 3 of 14 pages
WORK EXPERIENCE MINDANAO CONTAINER CORPORATION Brgy. Katipunan, Villanueva, 9002 Misamis Oriental PLANT ELECTRICAL ENGINEER 01 September 2012 to present Managed Plant Electrical Maintenance. Assumed General Services Manager position 19 December 2012. Instituted Planned Maintenance Program for MCC. Specific Tasks/Projects/Reports: Spearheaded troubleshooting of MCC Seam Welders. Oct 23-Nov 04, 2012. Revised Single-Line Diagram of MCC Power Supply. Nov 2011. STAFF, PROJECT MANAGEMENT 07 November 2011 to 01 September 2012 Project management of Equipment Upgrade (07 Nov 2011 to 07 Nov 2012); Construction of MCC Administration Building (07 Feb to 08 Aug 2012). Project Progress Monitoring (Cost, Completion). Prepared Project Status; identified Issues and Concerns. Appointed as ISO QMS Document Controller 15 July 2012.
GLOBAL STEEL PHILIIPINES [SPV-AMC] INC. Camp Overton, Suarez, Iligan City SHIFT-IN-CHARGE, FINISHING LINES Cold Rolling Mills 02 January 2006 to 07 November 2011 Shift supervision of various Finishing Lines—Batch Annealing Furnaces [BAF]/ Gas Generators [GG], 1-Stand & 2-Stand Temper Mills [1-STPM/2-STPM], and Coil Preparation Line [CPL2] (2006-2008); HCD Electrolytic Cleaning Line and Recoiling Line (2008 to date)—to attain safe and efficient mill operation, timely accomplishment of assigned jobs, and operating parameters within standards. Specific Tasks/Projects/Reports: Preparation of Loss-Cost Matrices for BAF, Temper Mills, CPL2. 2005-2008. Adviser, Total Productive Maintenance teams, BAF Model Machine, Horizontal Deployment at BAF, Temper Mills and CPL2. Member, ISO Core Team. ISO 9001: 2004 GSPI’s Certification. Black Belt, Six-Sigma project ―Carbon Edge Reduction at BAF.‖ Line Representative, Easy Kaizen, Jishu Hozen, and Education TPM Pillars. Authored the following reports: ―1-STPM Unaccounted Delays (Jun-Sep 2007)‖. 30 September 2007. ―CPL2 Material Yield (Oct 2005-Jan2007)‖. 06 April 2007. ―550PIW LWE BAF Furnace-to-Base Ratio Analysis.‖ 26 March 2007. ―Inerteen Leaks at 1-STPM: An Analysis.‖ 21 March 2007. ―GSPI’s Virtual Day (The Case vs. the Shifting Eight Hours),‖ 02 Jan 2007. ―BAF Proposed Production Reward Scheme.‖ 09 November 2006. ―1-STPM Proposed Production Reward Scheme.‖ 30 October 2006. ―1-STPM Material Yield Analysis (Jan to Jun 2006).‖ 28 June 2006. ―Reengineering the GSPI’s Information Systems,‖ MSU-IIT, 16 Oct 2006. abda@ yahoo.com |
[email protected]
Page 4 of 14 pages
GLOBAL STEELWORKS INTERNATIONAL, INC. c/o National Steel Corporation, Camp Overton, Suarez, Iligan City ANALYST, BUSINESS STRATEGY 23 November 2004—01 January 2006 Preparation, analyses and performance monitoring of Corporate Business Strategies. Analysis and preparation of various Reports and Studies related to domestic and international steel industry’s developments and trends and their implications to GSPI. Specific Tasks/Projects/Reports: ―World Trade Organization: Preview and Overview.‖ 09 December 2005. ―World Steel Outlook: 1999 – 2008‖, completed December 2004 Executive Summary & Analyses: ―China: Export-Orientated‖, March 2005. ―Threats to Steel Industry: Analyses of Related Industries‖, Dec-Jan 2005 ―Opportunities in ASEAN Steel Markets‖, November– December 2004 ―Philippine Economic Analyses and Forecast: 1999 – 2008‖, December 2004
NATIONAL STEEL CORPORATION Camp Overton, Suarez, Iligan City MILL-IN-CHARGE, PLANT FACILITIES PRESERVATION 01 February—24 September 2004 [Contractual] Supervision of shift activities of Plant Facilities Preservation Team. Managed manpower and other resources to implement planned activities to preserve equipment condition. Specific Tasks/Projects: Assessment of functionality and integrity of mill facilities. Implementation of immediate corrective actions to potential and occurring problems that may jeopardize integrity of mill facility. TEAM LEADER, TECHNICAL PLANNING 01 October 2001—31 January 2004 [Contractual] Planning, documentation and review of preservation activities of Plant Facilities Preservation Team while NSC is under liquidation. Prepared Monthly Electrical Power and Water Consumption Billings and Analyses. Specific Tasks/Projects: Coordination of preservations teams’ activities for Mill Equipment, Electrical Power Distribution, Building & Grounds Maintenance, including progress monitoring; and ensuring the availability of needed manpower, materials and supplies requirements. Evaluation and Analysis of Power Consumption: August-September 2002, including an in-depth study on reduction of power and energy. Saved the company about P 1Million/month in power costs. Comparative Study of Power Rates before and after Unbundling, October 2002. Barrier Guardhouse Relocation Project. Completed November 2003.
abda@ yahoo.com |
[email protected]
Page 5 of 14 pages
PLANNING ENGINEER, TECHNICAL PLANNING 01 July—30 September 2001 [Contractual] Planning, documentation and development of rehabilitation activities for the various plant facilities: Cold Strip Mill, Hot Strip Mills. Electrolytic Tinning Line, Support, Utilities and Administrative groups. Specific Tasks/Projects: Development of Plant Preservation Plans and Programs, i.e. Pre-Start-up Maintenance Master Schedule, Equipment Assessment, Operational Budget. Prepared Monthly Plant Facilities Preservation Accomplishment Highlights and Report, submitted to Danilo L. Concepcion, NSC Liquidator. SUPERVISOR, ELECTRICAL POWER DISTRIBUTION March, 2000 – March, 2001 [Contractual] Shift supervision of Plant Facilities Preservation Team and Electrical Power Distribution crew’s rehabilitation activities. On time-sharing. STOCK ANALYST, SUPPLY & PROCUMENT Plant Facilities Preservation (Special Assignment) November 1999 -January, 2000 [Contractual] Reclassification, specification and reconciliation of Materials and Supplies inventories at Central Warehouse. Build-up of electrical M&S Database and templates. ELECTRICAL MAINTENANCE PLANNER Flat Products Division 30 August 1995—06 June 2000 Ensure effective maintenance of Cold Mill electrical equipment: Four-Stand Tandem Mill and Alkali Cleaning Line (from 1997), Temper Mills [1-STPM & 2STPM] and Roll Shops (from 1996), and Coil Preparation Lines [CPL1 & CPL2] (from 1995); to attain optimum level of reliability and efficiency through comprehensive work planning and scheduling, maintenance resource planning, technical evaluation and analysis and maintenance cost control. Specific Tasks/Projects: Development of Maintenance Plans and Programs, i.e. Annual Preventive Maintenance Schedule/Master Plan, Calibration Schedule/Master Plan, Preventive Maintenance Activities, Running and Maintenance Downturn Inspection Checklists, Annual Maintenance Programs, Maintenance Standards, Spares Management and Budget Preparations, including build-up of databases for Computerized Maintenance Management Systems [CMMS]. Formulation of Maintenance Work Schedules, i.e., Maintenance related activities, Opportunity maintenance, Maintenance Downturn Work Schedule, Annual Maintenance Shutdown Program. Implementation/progress monitoring of maintenance related activities as stipulated by plans and programs. Recording, Evaluation and Analysis to include failure analysis, management reporting, management review participation, and maintenance documentation (history of repairs, ISO 9000, equipment performance evaluation/ analysis reports). Monitoring and Documentation of 2-STPM Annual Shutdown in 1996. Monitoring and Documentation of 5-STCM Rehabilitation Works (1999-2000). abda@ yahoo.com |
[email protected]
Page 6 of 14 pages
Re-commissioning of 56‖ Shibaura Roll Grinder. Spares/Equipment Listing for 1S & 2S Temper Mill and Roll Shop facilities.
STAFF ENGINEER III, MAINTENANCE PLANNING Cold Strip Mill Division 01 February—29 August 1995 Ensure optimum Cold Mill equipment operation, specifically Batch Annealing Furnaces [BAF], reliability and availability through comprehensive planning, scheduling and monitoring of preventive, predictive and corrective maintenance and other line maintenance activities; and ensuring the availability of quality spares and materials & supplies for line/mill equipment. Specific Projects: Spares/Equipment Listing for Batch Annealing facilities. Preventive Maintenance Activity Database Generation for 1100 PIW LWE BAF Internal Quality Audit of Hot Strip Mill 2 in conformance to ISO 9002/1994. TURN SUPERVISOR/SHIFT-IN-CHARGE BAF / Gas Generation, Cold Mill Operations 18 January 1991—23 February 1992 16 June 1992—01 February 1995 Planning and organizing of all annealing activities (annealing furnaces and gas generators) to attain efficient operation of the mill, timely accomplishment of assigned jobs of personnel, and ensure operating parameters are within standards. Worked under shifting schedules. Specific Tasks/Projects: Delay Classification Analyses for BAF Computational Analyses of Production Rates for BAF and M&S Consumption BAF Semestral Budget preparation and review including, economic evaluation of BAF operating spares, update of BAF Standard Operating Procedures & Practices. Financial Evaluation of Gas Generators Optimal Operation Scenarios Economic Study on Preheating Cost at Batch Annealing Furnaces Time and Motion Study of Crane Operations with respect to Annealing Activities. Job Evaluation and Analyses of BAF Personnel positions. Statistical Process Capability (SPC) Study on Temper-2. Task Force Member on Half-Hard Trials at BAF. Flowcharting of Digital Controller Programmer (DCP 700) Programs. Ensure conformity of BAF and Cleaning Line processes to the DENR Pollution Control guidelines as Pollution Control Officer. Adviser for Productivity Improvement of People in Operating Lines (PIPOL) for D’Soakers and D’Reactors Teams. 1990-1994. Received commendation for Force Cooler Splash Guard Project. Task Force Member, Cold Strip Mill Information System, evaluated Cold Strip Mill operations and maintenance management information system (Level 1), 1993.
abda@ yahoo.com |
[email protected]
Page 7 of 14 pages
SUPERVISOR, ELECTRICAL MAINTENANCE Cold Mill Maintenance (Special Assignment) 01 February—15 June 1992 Supervision of CSM Electrical Maintenance crew. Responsible for Manpower Scheduling and Progress Monitoring of plant equipment / facilities maintenance activities and implementation of Capital-Budgeted Projects until completion. TURN SUPERVISOR II, BAF Cold Mill Operations 18 June 1990—17 January 1991 Specialization Training (On-the-Job) as a Turn Supervisor for BAF. Supervision of activities during the 1100 PIW BAF, i.e. equipment checkout, dry-out, preliminary load tests, including training of operators. Specific Tasks/Projects: Commissioning of 1100 PIW BAF and Gas Generation equipment in close coordination with foreign consultants. Manpower Scheduling during Commissioning Activities. PERT-CPM of Commissioning Activities Development of Standard Operating Procedures for 1100PIW BAF. ENGINEERING MANAGEMENT TRAINEE Training, Education and Development Department 18 January 1989—17 June 1990 Attended Classroom Instructions on Financial Analysis and Planning, Value Analysis and Engineering, Employee Discipline Process, Human Relations and Interaction, Trainors' Training, Work Simplification, Productivity Improvement, PERT-CPM, Job Evaluation and Analysis, Business Computer Systems, Budgetary Control (with case studies) and Business Writing. On-the-Job Training at Billet Shop, Hot Mill and Cold Mill Operations and Maintenance departments. Specific Tasks/Projects: Preparation of 1990 Cold Strip Mill Division Operational Budget. Time & Motion Study at Continuous Casting Machine Operations. April 1989. Time & Motion Study at Alkali Cleaning Line & 5-Stand Tandem Mill. June 1989. Equipment Audit at One-Stand Temper Mill (1S-TPM), Coil Preparation Line (CPL) and Hot Rolled Slitter Line (HRSL). July 1989. Devised Coil Stocking Schemes for 1S-TPM and Dehumidifier (DHR) Storage Bays/Staging Areas (July 1989). Revised Coil Stocking Scheme at 5S-TCM (August 1989). Proposed Mill Washing System at Five-Stand Continuous Mill. August 1989. (Implemented February 1990) Revised of Standard Operating Procedures/Practices at Continuous Casting Machine. November 1989 - January 1990. Spares’ Specifications and Equipment Listing for Two-Stand Temper Mill Project, May 1990 Attended GE Series Six, SILCOMatic and SILTRON Seminars, May-June 1990
abda@ yahoo.com |
[email protected]
Page 8 of 14 pages
OTHER EMPLOYMENT EXPERIENCES LECTURER St. Peter’s College, Sabayle St., Iligan City 16 June 1995 — 30 October 2002 Classroom management, lesson plans and lectures on the following subjects: Advanced Electrical Power Systems, Advanced Energy Conversion, Feedback Control Systems, Electrical Machine Design, Engineering Management, Electrical Equipment and Devices, Transient Analysis and Electrical Power Plant Design. Specific Tasks/Projects: Created the Electrical Power Plant Designer©, a Microsoft Excel and Visual Basic application software to aid students in their respective Power Plant Design computations. Beta-tested on September 1998. Designed the Microsoft Word Templates for the Electrical Power Plant Design Report and Electrical Power Plant Feasibility Study. Released in October 1999. Served as consultant for Penwood, the official publication of ST. Peter’s College students. January-March 2000. Adviser of various Electrical Engineering students’ Project Studies. COMMUNITY LEADER/CO-LIAISON GeoCities Volunteer Network, http://www.geocities.com February, 1997—December 1999 Volunteered as a Community Leader for Tokyo of GeoCities, promoted to CoLiaison for Island suburb, developed and edited the Tokyo E-zine, and selected the Tokyo websites for The Best of Tokyo. Specific Tasks/Projects: Community Leader for Tokyo, http://www.geocities.com/tokyoleaders/, welcomed new homesteaders, troubleshooting web management [HTML, scripts and Applets] questions, monitored web site contents. Developed and edited the Tokyo E-zine, http://www.geocities.com/tokyoezine/, a monthly electronic magazine for Tokyo homesteaders Managed the Best of Tokyo, http://www.geocities.com/bestoftokyo/, a showcase of the best websites in GeoCities Tokyo neighborhood. Co-Liaison for Island suburb, a virtual suburb of Tokyo GeoCities, prepared monthly status reports, close coordination with five internationally-based Community Leaders and ensured strict adherence to the GeoCities Terms of Service (TOS) of all web sites (about 5000) within the Tokyo Island suburb. GeoCities Topic Master, Stamp Collecting, selected exceptional stamp collecting web sites for Yahoo Search Engine monthly highlights. COMPANY GUARD Metro Manila Transit Corporation FTI Complex, Taguig, Metro Manila, February—April 1985 Ensure facilities’ security and personnel safety. Ocular inspection of company’s assets and enforce among personnel strict adherence to company policies.
abda@ yahoo.com |
[email protected]
Page 9 of 14 pages
FOREIGN TRAVEL INDIA, 25—29 August 2008. Technical Study on Maintenance and Management Initiatives Practices and Plant Tour at Ispat Industries Int’l in Kalmeshwar, and Dolvi steel works, Maharashtra, India.
SEMINARS CONDUCTED
SWOT Matrix: An Introduction. Cold Rolling Mills. GSPI. November 2008. Introduction to ISO 9001:2000. GSPI, July – August 2008. Six-Sigma Awareness. Management Initiatives’ Seminars. GSPI. 2008 Power Systems. St. Peter’s College. IIEE Engineering Students: 16 Feb 2002. NSC ISO 9002 Modules. January and November 1995. 5S Habits Seminar and Workshop. NSC. 26 May; 05 June 1994. Batch Annealing Furnaces/Gas Generator Operators’ Course. NSC: 24—26 May 1993
SEMINARS ATTENDED A. Local Seminars ISO 9001: 2000 Internal Quality Auditors’ Seminar Conducted by ACCTI Internationale Corp. Iligan City: June 2008. ISO / TS16949: 2002 Awareness Seminar Conducted by ACCTI Internationale Corp. Iligan City: 24 June 2007. Basic Customer Service Skills Conducted by MSU-IIT, MBM. Iligan City: 08 March 2006. Six-Sigma Appreciation Seminar Conducted by MSU-IIT, MBM. Iligan City: 09 October 2005. Technology of Participation. Basic Group Facilitation Methods Conducted by MSU-IIT, MBM. Iligan City: 19-22 September 2005. Transition Supply Contract (Wholesale Electricity Spot Market) Conducted by National Power Corp, Cagayan de Oro City: 21 August 2003. Workshop on the Implementing Rules and Regulations of the Power Act (Republic Act No. 9136) Conducted by Department of Energy, Elena Tower Inn, Iligan City: 06 Nov 2001 Modern Control Systems & Test Instruments Conducted by Siemens Engineering. Iligan Day Inn: 27 February 1998 SIMATIC Totally Integrated Automation Conducted by Siemens Engineering. Iligan Day Inn: 19 May 1997 Level Indicators / Switches & Pressure Transducers Conducted by Wise-Mann Automation and Controls, TED NSC: 15 April 1997 Geared Motors / Reducers Conducted by Multifactors, TED NSC: 02 April 1997 Evolution of Drives Conducted by Siemens Engineering. TED, NSC, 29 November 1996 S-5 SIMATIC Programmable Logic Controllers Conducted by Siemens, TED, NSC, 17 July 1996. abda@ yahoo.com |
[email protected]
Page 10 of 14 pages
Automation: A Technical Presentation Conducted by Voest-Alpine Automation, TED, NSC, May 13-14, 1996. Sensors & Automation Control Conducted by Hans Turck GmBH. Dynasty Court, Cagayan de Oro. 22 Feb 1996. Refractory. Conducted by Jardine Davies, Inc. TED, NSC, 27 November 1995 Transmation ―Vision Series‖ Data Acquisition & Control Systems Conducted by Transmation, USA, Sunburst Iligan City. 21 February 1995 Introduction to 5S Conducted by Development Academy of the Phil, TED, NSC, 15 October 1992 B. Conducted by Institute of Integrated Electrical Engineers (IIEE) Iligan Bay Chapter, Iligan City 12th IIEE Northern Mindanao Regional Conference Elena Tower Inn, Iligan City: 16—18 August, 2007. The Millennium Bug – Y2K Elena Tower Inn, Tibanga, Iligan City: 17 April 1999 Governors: Concept and Application Elena Tower Inn, Tibanga, Iligan City: 17 April 1999 Power Substation: Engineering Design, Operation and Maintenance Crystal Inn, Tibanga, Iligan City, 12—13 December 1998 23rd IIEE National Convention Philippine International Convention Center, Makati City, 23—26 November 1998 4th IIEE Regional Convention, Region VIII Iligan Day Inn, Iligan City 11—13 October 1996. Revision of R.A. 184 and Amendments to Philippine Electrical Codes I and II. National Power Corporation. Crystal Inn, Iligan City. NPC Power Situation & Programs in Mindanao National Power Corporation. Crystal Inn, Iligan City. Metering, Testing, Relaying & SILTRON/DMC Power Converter Lai-Lai Oriental Restaurant, Iligan City. 29 April 1993. Latest Technology on Test & Measuring Instruments Centrum Consolidated Industries. Crystal Inn, Iligan City. 12 August 1992. C.
Conducted by Global Steel Philippines (SPV-AMC), Inc. Internal Quality Audit Training, June 2008. Training-Workshop on Newsletter Writing, 29—30 May 2008. Document Control Training (ISO 9001:2000), 04 Apr 2008. Six-Sigma Black Belt [DMAIC] Advanced Seminar. Jun 2006—Dec 2007. ISO/TS Core Team Capacity Building, 20 Mar 2007. Customer-at-Your Service Seminar. 29 Nov 2006. Total Productive Maintenance Awareness Workshop, 07 Nov 2006. Cost and Budgeting Fundamentals, 23 Sept 2005. Six-Sigma Green Belt Seminar. 14—16 Sep 2005. Basic Problem Solving Tools and Techniques, 08 Sep 2005. Refresher Course on QC (Quality Circle) Story, 09 Sep 2005. Office Management Orientation, Step 1: 27 April 2005; Step 2: 08 July 2005. Finance for Non-Finance Course. 29 Mar 2005.
abda@ yahoo.com |
[email protected]
Page 11 of 14 pages
D.
Conducted by National Steel Corporation (NSC) Problem Solving & Decision Making, KT GENCO. 17—20 February 1999 Project Management, 29 November 1996 Networking in PERT / CPM 20 June 1996 Quality Management Systems (ISO 9000) (Module I - Introduction to ISO) 28—29 October 1994 (Module II – Assessors’ Course) 10—11 November 1994 (Module III – Developing & Documenting QMS) 16 October 1995 Cost Optimization Workshop. 08 June 1994. CDM-QA Inspection System/Procedures/Practices 16—17 March 1994 5S Habits Seminar/Workshop 17 February 1994. Tasks/Needs Analysis/Program Design Seminar 21—23 Oct. 1993. Introduction to Total Productive Maintenance. 15 October 1993 Grid-Organization Development Workshop. 13 October 1993 Philippine National Standards Orientation Course. 23 September 1993. Workshop on Employee Discipline. 20 August 1993. Kaibigan Seminar-Workshop. Ozamiz City. 02—05 September 1992. Interaction Management [IM] Introduction to IM. 19—22 May 1990. Day-to-Day Management. 18—20 July 1991. Managing Performance. September 18 - 19, 1991; February 6 - 7, 1992. PIPOL Teambuilding Seminar/Workshop (7th Session) June 19 - 20, 1991 and (13th Session) August 15 - 16, 1991. PIPOL Workshop for Supervisors May 21 - 25, 1991. HLN 800 Gas Generator Operations Seminar May 02, 1991. Advanced Database Programming FoxBASE Plus. March 18 - 22, 1991. DCP 720 / UDC 3000 Programming. January 17 - 19, 1991. Statistical Process Control. November 14 -24, 1990 DCP 510 Program Setter. July 6 - 7, 1990. 1100 PIW BAF Operations & DCP 720 Programming. June 25 - 26, 1990 Computer Software. May 28 - June 9, 1990. Employee Discipline Process. May 14, 1990 Trainors' Training. May 15 - 18, 1990. Financial Analysis and Planning. May 23 - 26, 1990. Value Analysis and Engineering. May 8 - 13, 1990. General Electric Drive Systems, September 4, 1989 - October 14, 1989. Seminar on Rolling Computer Programs. September 8, 1989. Business Writing. May 8 - 13, 1989. Budgetary Control (with case studies). May 5 - 6, 1989. Computer Systems. April 17 - 28, 1989. Job Evaluation. April 13 - 15, 1989. Supervisory Safety. April 10 - 12, 1989. PERT / CPM Concepts and Applications. April 6 - 8, 1989. Productivity Improvement. March 29 - April 5, 1989. Work Simplification. March 10 - 21, 1989.
E. Collegiate Extra-Curricular 5th Regional Student Press Congress Conducted by College Editors Guild of the Philippines (CEGP) Bicol Chapter. St. Raphael Parish Rectory, Legazpi City. April 8 - 10, 1988. abda@ yahoo.com |
[email protected]
Page 12 of 14 pages
First Bicol University (BU) Congress of College Students BU College of Fisheries Compound, Tabaco, Albay. February 2 - 5, 1988. Special Seminar on Ideologies and Human Rights Conducted by the Center for Research and Communications (Personal and Human Development Program). Legazpi City. November 13, 1987. Fourth Regional Journalism Seminar-Workshop Conducted by the College Editors Guild of the Philippines (CEGP) Bicol Chapter. CSSAC Compound, Pili, Camarines Sur. September 25 - 27, 1987. Research and Technical Paper Writing Seminar & Workshop Conducted by the Philippine Society of Youth Science Clubs, Inc. (PSYSCI). Legazpi City. October 9 - 10, 1981. Disaster Preparedness Seminar and Workshop Conducted by National Police Commission, Legazpi City. September 12 - 13, 1981. In-Gallery Activity National Science Fair and Quiz. Legazpi City. December 4, 1980.
abda@ yahoo.com |
[email protected]
Page 13 of 14 pages
CLUB AFFILIATIONS/MEMBERSHIP A.
PROFESSIONAL AFFILIATIONS Life Member: Institute of Integrated Electrical Engineers (Philippines) Inc. ISO 9001:2000 Assessor: GSPI Internal Quality Assessment. 2007 to date. Member: GSPI ISO Core Team, GSPI, 2007—to date. Communications Coordinator, Global Phoenix. Newsletter, GSPI, 2005. Director, IIEE Iligan Bay Chapter: IIEE Iligan Bay Chapter 1996—1997 ISO 9000 Assessor: NSC Internal Quality Assessment. Feb 1995—June 2000. Team Leader: "Stress Relievers " Online Statistical Process Control Study on Hardness Capability of BAF, NSC. Aug 1991-Feb 1992. Team Adviser: Productivity Improvement of People in Operating Lines (PIPOL). D'Soakers and D’Reactors. NSC. 1990 - 1994. Pollution Control Office: Cleaning Lines/Batch Annealing Furnaces NSC. 1994-96. Area Coordinator: NSC Supervisors & Staff Union (NASSU). 1990—1993. Area Coordinator: NSC NEWS. NSC, 1990 to 2000. Member: Development of Half-hard Temper CRC. NSC. Mar—Dec 1994. Member: Cold Mill Information Systems Task Force. NSC. 1993.
B. INTERNET AFFILIATIONS Community Liaison / Community Leader: May 1996 to December 1999 URL: http://www.geocities.com/tokyo/island/ Homesteader: May 1996 to date URLs: http://www.geocities.com/abda/ and http://www.geocities.com/rey_adel Editor-In-Chief: Geocities Tokyo E-zine, http://www.geocities.com/tokyoezine/ Topic Master: Stamp Collecting, Geocities, 1998 to 1999 Member: HTML Writer’s Guild, http://www.hwg.org Member: International Webmasters Association, http://www.iwanet.com C.
COLLEGIATE EXTRA-CURRICULAR ACTIVITIES: University Delegate: 1st IIEE National Quiz, Adamson Univ., Manila. 18 Sept, 1987. Editor-In-Chief: BICOL UNIVERSITARIAN, Bicol University. 1987—1988. Vice Chairman, University Student Council, Bicol University. 1987—1988 Vice President for Internal Affairs, IIEE Junior Chapter, BU, 1987—1988. Correspondent: ISTUDYANTE, 1987 - 1988. Associate Editor: The GEARCAST, Bicol University. 1986—1988. Member: Study Committee, The ACADEMY SCRIBE PMA, 1983 Member: Silent Drill Company of Sinagtala Class of 1986, PMA. 1982—1984. Participant: 1st Annual Laoag City 10K Classic, Ilocos Norte, May 1, 1983 First Year Representative: EUREKA Math & Science Club, Bicol University College of Engineering, 1981—1982. Staffer: The CASsette, BICOL UNIVERSITY. 1981—1982. Senior Editor: The MAYON, UHS, BICOL UNIVERSITY. 1980—1981.
abda@ yahoo.com |
[email protected]
Page 14 of 14 pages