Architectural 20080309

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Architectural 20080309 as PDF for free.

More details

  • Words: 195
  • Pages: 2
Quotation for finishing works of residential building at Uttara List of works to be done: Architectural design Roof – overhead tank, lift machine room, shade, plantation, parapet and railing. Ground floor – boundary wall, main gate, guard room, toilet, guest room, generator room, paving, concealing plumbing Design, parking, Stair – railing, tiles, Verandah – railing, plantation Lift – front cladding Paint work [exterior] Structural design Over head tank, lift machine room, shade

Architectural design Fee = 15,000/= TK Architectural Supervision

= 25,000/= TK

Structural design Fee Structural Supervision

= 6,000/= TK = Per Visit 1,500/= TK

Plumbing Design Fee Plumbing Supervision

= 6,000/= TK = Per Visit 1,500/= TK

Electrical Design Fee Electrical Supervision

= 6,000/= TK = Per Visit 1,500/= TK

Prepared by Arch. Mohammad Rafidul Islam 2008 02 17

List of works to be done:

Architectural design

Roof – overhead tank, lift machine room, shade, plantation, parapet and railing.

Ground floor – boundary wall, main gate, guard room, toilet, guest room, generator room, paving, concealing plumbing Design, parking,

Stair – railing, tiles,

Verandah – railing, plantation

Lift – front cladding

Paint work [exterior]

Structural design Over head tank, lift machine room, shade

Plumbing

Related Documents

Architectural 20080309
November 2019 25
Architectural
May 2020 33
Architectural Drawing.pdf
November 2019 26
Architectural Tour
November 2019 24
Architectural Governance
December 2019 19