7. WITHDRAWAL CERTIFICATE The Real Estate Regulation & Development Act, 2016 directs promoters to withdraw the amounts from the separate account, to cover the cost of the project, in proportion to the percentage of completion of the project. And, it also directs the promoters to withdraw such amount after it has been duly certified by an Architect, an Engineer, and a CA in practice. A template of the Architect’s Certificate is as given below: 7.1 ARCHITECT’S CERTIFICATE (To be submitted for withdrawal of Money from Designated Account) To The_____________(Name & Address of the Promoter) Subject: Certificate of Percentage of Completion of Construction Work of _____________No. of Building(s)___________Wing(s) of the ____________Phase of the Project (Bihar RERA Registration Number) situated on the Plot bearing C.N. No/CTS No./Survey no./Final Plot no______________ demarcated by its boundaries (latitude and longitude of the end points)____________to the North _________to the South ___________ to the East _________to the West of Division ___________village __________ taluka ________________District __________ PIN ___________ admeasuring ____________ sq.mts. area being developed by (Promoter’s Name) Sir, I/We ___________ have undertaken assignment as Architect/Engineer of certifying Percentage of Completion of Construction Work of the_____________Building(s)/___________Wing(s) of the ____________Phase of the Project, situated on the plot bearing C.N. No./CTS No./Survey no./Final Plot no.____________ of Division ___________ village _____________ taluka _____________ District ________________ PIN _____________ admeasuring___________ sq.mts. area being developed by ________________(Promoter’s Name) as per the approved plan. Following technical professionals are appointed by Owner/Promoter:- (as applicable) i. M/s./Shri/Smt._______________________ as Architect/Engineer ii. M/s./Shri/Smt._______________________ as Structural Consultant iii. M/s./Shri/Smt._______________________ as MEP Consultant iv. M/s./Shri/Smt._______________________ as Site Supervisor/Clerk of Works Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number _______________ under Bihar RERA is as per table A

herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table A and B. Table – A Building/Wing Number _______ (to be prepared separately for each Building/Wing of the Project) Sr. No.

Tasks/Activities

1 2 3 4 5 6

Excavation _______ no. of basement(s) & Plinth _______ no. of podiums Stilt Floor _______ no. of slabs of super structure Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate

7 8 9 10

Percenta ge of work done

Table - B Internal & External Development Works in Respect of the entire Registered Phase Sr. No

Common areas and Facilities Amenities

1 2 3

Internal Roads & Footpaths Water Supply Sewerage (chamber, lines, Septic Tank,

Propos ed (Yes/No )

Percenta ge of work done

Remark s

4 5 6 7 8 9 10 11 12 13 14

STP) Storm Water Drains Landscaping & Tree Planting Street Lighting Community Buildings Treatment and disposal of sewage and sullage water /STP Solid Waste Management & Disposal Water Conservation, Rain Water Harvesting , Percolating Well/Pit Energy Management Fire Protection and Fire Safety Requirements Electrical Meter Room, Sub-station, Receiving Station Others (Option to Add more)

Yours Faithfully, Signature & Name (IN BLOCK LETTERS) of Architect (License No.......................)

The Architect is responsible for certifying the progress of work that is being/has been executed in the project. Note: This Architect certificate is independent of the Quarterly update of Project Status as mentioned in mandatory compliances under Point 6. This certificate is required to be obtained from an Architect in order to withdraw monies which is to be used towards the cost of land and cost of development of the project.

Related Documents

Architect Certificate
August 2019 34
Architect
June 2020 21
Siebel Architect
October 2019 29
Canadian Architect
May 2020 20
Architect - Qtp
May 2020 13
Architect List.pdf
October 2019 24

More Documents from "SV B"