1 OFFICE OF THE DEPUTY EXECUTIVE ENGINEER SSLC & SB SUB.DIVISION NO.IV, K.R.DAM. *** Office order No.
Dt.
.7.2008.
Sub:- Government Quarters at K.R.Dam – Allotment of ‘D’ type quarters – orders – issued – Reg. Ref:-
Applications of Individuals. ****
In view of the circumstances explained by the individuals in their applications cited under reference, the following ‘D’ type T.G.P.Quarters at K.R.Dam are hereby allotted to the above individuals as detailed hereunder on standard rent basis as fixed by the camp authorities. S.No Name of the Applicant
Quarter allotted
Permitted to occupy the quarter w.e.f.
S/Sri
Name and Designation of employee who has given surity
1
R.C.Kondaiah
D/19
1.5.2008
2
V.Srinivasulu Watchman 21st Century gurukulam K.R.Dam P.Mohan
D/69
1.1.2008
D/70
1.1.2008
4
Smt.D.Kamalamma W/O D.Thirupalu (retd)
D/31
--
5
Smt.Panchakalathapa W/O Chitra Bahadoor (Late)SSLC & SB Sub.Divn.No.2, K.R.Dam B.Penchalaiah
D/135
--
Dhan Bahadur SSLC & SB Sub.Divn.No.4, K.R.Dam.
D/80
--
N.Venkataiah, S.A,SSLC & SB Sub.Divn,.No.2 K.R.Dam
7
Sk.Khaja Saimuddin S/O K.Saleemuddin
D/93
--
R.Narasaiah, Operator SSLC & SB Divn.No.I, Pulikallu
8
V.Pulla Reddy
D/134
1.12.2008
G.Penchalarami Reddy,SSLC & SB Sub.Divn.No.3, K.R.Dam
3
6
Remarks
S.C.Penchalaiah K.R.Dam. --
--
K.Eswaraiah Operator Gr.IV SSLC & SB Sub.Division No.4, K.R.Dam D.Prasanna Babu,Operator Gr.IV SSLC & SB Sub.Divn.No.2 K.R.Dam.
--
--
On vacation of Sri.D.Thirupalu, Watchman who is retired from Government service ie., on 31.1.2008 --
On vacation of Sri.N.Penchalaiah, Man Mazdoor who is expired on 2.4.2008. On vacation of Sri.Syed Khaja Saleemuddin, Operator who is to be retired from Govt.Service ie., on 30.6.2008 --
2
9
Inthiyaz S/O Abdul Khayyum
D/99
--
Sk.Abdullah, SSLC & SB Sub.Divn.,No.II, K.R.Dam.
10
Smt.B.Nagamma W/O B.Lingaiah
D/9
4.2.2008
--
On vacation of Sri.Syed Abdul Khayyum, Operator who is to be retired ie., on 30.6.2008 --
11
Sri.Y,.Polisetty, Attender APSWR School for Girls at K.R.Dam
D/71
1.3.2008
--
--
12
Smt.Y.Radhamma, Teacher APSWRSchool for Girls, K.R.Dam.
D/30
1.5.2008
--
--
The above individuals are directed to occupy the Quarters after due consultation with the camp authorities at K.R.Dam and after payment of dues previous (if already occupied quarters) and payment of 2 months rent in advance by means of Demand Draft in favour of Asst. Pay & Accounts Officer, Telugu Ganga Project, Nellore and also a surety bond duly obtained from a permanent employee of the project before occupation. They are informed that the House Tax, water and current consumption charges etc., shall be paid by them for the period of their stay in the quarter. They are also informed that , they have to vacate the quarter as and when requisitioned by the departmental authorities. Deputy Executive Engineer, SSLC & SB Sub.Divn.No.4, K.R.Dam To The Individuals. Copy submitted to the Executive Engineer, SSLC & SB Division No.2, Nelloe for favour of information and necessary action. My action taken may kindly be ratified. Copy transmitted to the Director, 21St Century Gurukulam, K.R.Dam for information and necessary action. Copy submitted to the Executive Engineer, SSLC & SB Divn,.No.I, Nellore for favour of information and necessary action. Copy to the Principal, APSWR School for Girls, Kandaleru Dam for information and necessary action Copy to the Deputy Executive Engineers, SSLC & SB Sub.Divn.No.1, Pulikallu and sub. Divn.No.2 & 3 K.R.Dam. for information and necessary action. Copy to the Section Officer, Camps for information and necessary action. He is requested to collect previous dues and to collect the two months rent as advance from the above individuals and sent the amount by means of Demand Draft in favour of Asst. Pay & Accounts Officer Telugu Ganga Project , Nellore before their occupation. He is also requested to obtain la surety bond from the persons and the same submitted to this sub division. Deputy Executive Engineer, SSLC & SB Sub.Divn.No.4, K.R.Dam
3
4