LEAD Piping Engineer
CURRICULUM VITAE LEAD PIPING ENGINEER Personal Information Name Address Telephone Mobile E-mail Nationality Date of Birth Place of Birth Marital Status Military Service
: Ahmed Salah Moubarak Mansour : The Third Settlement -New Cairo City – Cairo, Egypt : +2-02-7588203 : +966-55-457-3021 :
[email protected] ,
[email protected] : Egyptian : 29/11/1972 : GIZA, Egypt : Married : Exempted
Education University : Cairo Faculty : Engineering Graduate : B.Sc. in Mechanical Power Engineering-(July 1997) General Appreciation : Very Good with Honor Degree (83.13 %) Final Year Grade : Excellent Rank : The Second Graduate Project Topic : Fire Safety Science and Applications Graduate Project Grade : Excellent
Memberships Member of Egyptian Engineers Syndicate Member of Egyptian Society for Mechanical Engineers (ESME)
Conferences Attended 7th Cairo University International Conference on Mechanical Design & Production Engineering. February 15-17, 2000, Mena-House Oberoi Hotel, Cairo, Egypt.
1 of 10
LEAD Piping Engineer
General Experience summary 11 years of experience on Design of Pipeline & Piping systems for oil & gas and Petrochemical industries on shore & off shore with the following fields of experiences: I- Piping Design Experience Complete design of piping general arrangement layouts, Piping isometrics, Supports Details, Materials take off, Equipments location plans, plot plans, orientation drawings, Tie-in Index & tie in packages. Provide piping input to Process Piping and instrumentation diagrams (P&ID), Line designation table (LDT), Instrument specification sheets (ISS), Preparing material take-off requirements and isometric drawings for construction using 3D CADD (Computer Aided Design and Drafting) modeling software e.g. Intergraph’s PDS (Plant Design System). Preparing& checking of equipments orientation drawings for all types of petrochemical equipments, Considering equipments spacing, accessibility, operation and maintenance requirements. Review all vendor documentations to assure the compliance with the design and technical requirements. II- Piping Technical Experience Preparing and reviewing piping specifications in accordance with the company standards and general codes (full awareness of Bechtel standards, ARAMCO standards, ENPPI standards). Preparing and reviewing valves datasheets, vendor technical specifications and bidders’ quotations. Provide piping technical input to P&IDs including piping classes, valve types and special items. Preparing pipeline and piping safety instruction sheets with the required calculations for pipe wall thickness, Maximum allowable operating pressure (MAOP), and test pressure Preparing and reviewing Hot Tap calculations in accordance to ASME B31.3, ASME section VIII div. 1 III- Plant Design System (PDS) Experience
2 of 10
LEAD Piping Engineer
Highly experienced in using all PDS activities and modules including Equipment modeling, Piping Designer, Isometric Extraction, Drawing Manager, Piping stress analysis, Piping supports designer, piping design data manager and Project administrator. Provide PDS administration activities including PMC and PCD files update in accordance with the project specifications, Reference database (RDB) update, Isometric options setup and material reporting. Review the plant 3D model from design, accessibility, Maintainability and constructability using Smart Plant Review software. IV- Field Experience Construction supervision on site activates for petrochemical and gas plants including: Providing redesign solutions for the field Problems or changes (clashing mismatching lack of material item) Ensuring implementation and adherence to project specifications and procedures Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary actions to maintain satisfactory standards Preparing work packages with all design documentations and method statement for work permits approval Producing documentations required for field testing including hydrotest diagrams test certificates mechanical completion certificates (MCC) Witnessing all field tests including hydrotest (HT) dye Penetrante (PT) ultrasonic test (UT) Reviewing all site work and prepare the punch list for the construction contractor V- Other Experience includes: Project Management, design management, staff mentor, engineering supervision, coordination, materials procurement and inspection Front End, conceptual and detailed design of offshore / onshore piping design and construction, including LNG piping cryogenic piping, Jacketed Piping for sulfur plants. Prepare complete piping modeling using PDS software and reviewing the plant design using smart plant review software. Highly experienced in using international regulations, codes and standards used in the petroleum field (API, ASTM, MSS SP, TEMA, NFPA, ASME, ANSI, ISO, BS, NACE, ISA, etc.) High communication, presentation and coordination skills Highly experienced in using Programs and software including PDS, Smart plant review, Bentley navigator, AutoCAD, ORTHOGEN, MS office and MS Project planner
3 of 10
LEAD Piping Engineer Highly experienced in providing training courses for Piping design, piping technical and Plant Design System (PDS),
Work Experiences Zuhiar Fayez Partnership company (ZFP) Consultant for Saudi Arabian Oil Company (ARAMCO) (Decembery, 2006 – present) Position: Lead Piping Engineer & PDS group Supervisor Projects: 1- Master gas system Upgrade Project: BI-10-00432 Gas Pipeline EWYFG-1 20” pipeline for ARAMCO including valve stations, pigging facilities and filtration stations. 2- Master gas system Upgrade Project: BI-10-00433 gas pipelines UBTG-4 56” 192 KM pipeline, BJBFG-3 42” 7KM Pipeline, SRG-2 56” 56KM Pipeline
for ARAMCO
3- “UTHMANIYAH & SHEDGUM Gas Plants- Sulfur Plant Upgrade Project: BI-10-00057 & BI-10-00059 Detail design for 10 sulfur trains to upgrade the process from normal CLAUS process to SUPERCLAUS process. 4- HAWTAH Stabilizer upgrade project: Detail design for upgrade HAWTAH stabilizer plant from 100MBCD to 200MBCD of ARAMCO Light crude including installation of a new O.H compression area new equipments to produce NGL from OH gas 5- Crude pipeline to Ras Elzawar Project: BI-10-00227 20” 18 KM crude pipeline for ARAMCO including pigging and metering facilities. Scope of work: • Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports •
Details, orientation drawings and vendor drawings). Prepare the required Man-hour estimate for the project scope.
4 of 10
LEAD Piping Engineer •
Review the piping activities and completion in accordance with schedule
•
requirements. Compilation of piping scope activities including MTO’s, drawings, and project
• • •
activity durations. Prioritized scope activities to most efficiently meet project schedule requirements. Ensuring implementation and adherence to project specifications and procedures. Responsibility for monitored piping designer’s quality and taking necessary actions to
• • • • •
maintain satisfactory standards. Continuously updated project drawings and documents to final As-built status. Ensuring implementation and adherence to project specifications and procedures. Setup the project specs, Catalogues and RDB for PDS 3D modeling Resolve RDB problems, for PDS Review the plant 3D model for all design, accessibility, Maintainability,
•
constructability using Smart Plant Review software. Preparing work Packages for construction activities and method of statements
Bechtel Corporation London branch for KHORSANIYAH Gas plant Saudi Arabian Oil Company (ARAMCO) (January, 2006 – November 2006) Recruited from (ENPPI) Position: Senior Piping Engineer & PDS group Supervisor Scope of work: • Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports •
Details, orientation drawings and vendor drawings). Review the piping activities and completion in accordance with schedule
•
requirements. Compilation of piping scope activities including MTO’s, drawings, and project
• • •
activity durations. Prioritized scope activities to most efficiently meet project schedule requirements. Ensuring implementation and adherence to project specifications and procedures. Responsibility for monitored piping designer’s quality and taking necessary actions to
• •
maintain satisfactory standards. Ensuring implementation and adherence to project specifications and procedures. Review the plant 3D model for all design, accessibility, Maintainability, constructability using Smart Plant Review software.
5 of 10
LEAD Piping Engineer Rashid Petroleum Company (Rashpetco) & British Gas (BG) recruited from Egyptian Maintenance company (EMC), Loaned from Engineering for the Petroleum & Petrochemical Industries company (ENPPI) (September, 2004 – December, 2005) Position: Senior Piping Engineer & Technical Assistance Scope of work: • Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports •
Details, and MTO). Check the Material availability at site stock and the material replacements when
•
required. Review the piping activities and completion in accordance with schedule
•
requirements. Compilation of piping scope activity work packs including MTO’s, drawings, method
• •
statements, sequences, manpower & equipment requirements and project activity durations. Identify the piping materials deficiencies affecting in successful activity completion. Liaised closely with materials procurement group to specify and instigate local and
• • •
international piping materials purchases. Prioritized scope activities to most efficiently meet project schedule requirements. Arranged work permits as performing authority. Project the piping and Mechanical progress measurement and review of contractor
• •
invoices in conjunction with site cost control department. Ensuring implementation and adherence to project specifications and procedures. Responsibility of monitoring the fabrication shop to insure the quality of piping
•
fabrications, welding, implementation of the required NDE, and Hydrostatic testing in accordance with the codes and standards. Responsibility for monitored workmanship quality and taking necessary actions to
•
maintain satisfactory standards. This also included the preparation of punch lists and associated rectification programs. Continuously updated project drawings and documents to final As-built status.
Engineering for the Petroleum & Petrochemical Industries company (ENPPI) (From April 1998 to September 2004) Position: Starting from junior piping Engineer to Senior Piping Engineer & assistance to lead Engineer. Scope of work:
6 of 10
LEAD Piping Engineer
Starting from preparing detail design piping drawings for construction using AutoCAD, preparing manual MTO using P&ID and equipments arrangement till doing the following activates: • Assisting in man-hours estimate for new project within the proposal phase. • Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports • •
Details, and MTO). Preparing complete 3D Model For petrochemical plants Using PDS Review the piping activities and completion in accordance with schedule
•
requirements. Compilation of piping scope activities including MTO’s, drawings, and project
• • •
activity durations. Prioritized scope activities to most efficiently meet project schedule requirements. Ensuring implementation and adherence to project specifications and procedures. Responsibility for monitored piping designer’s quality and taking necessary actions to maintain satisfactory standards.
Major oil and gas projects I participated in: • • • • • • • • • • • • • •
MIDOR-Middle East Oil Refinery, one of the largest oil refineries in the Middle East. 1998 MIDOR- Refinery off Fence Pipelines and Facilities. (1998) GASCO-Egypt's national gas producing company-project for NGL (Natural Gas Liquids). (1998-1999) SABAN-JARNOF field development project in Syria. (1999) SAMSUNG (western desert) gas plant project. 1999 GUPCO, HA'PY-west harbor gas treatment plant. (2000) OBAYED field development project. (2000) BAPETCO, OBAYED Pipeline, Epc. (2000) TEMSAH concession plant (on-shore and off-shore gas plant). 2000 Scarab & Saffron gas development project (West Delta Deep Marine Concession). UGDC (United Gas Derivatives Company) for NGL (Natural Gas Liquids). 2001(2002) Egyptian LNG (Liquefied Natural Gas) project (working in FEED & Detailed Phases at Bechtel Head office, Houston, TX., USA). (2002-2004) ELAB (Egyptian Linear Alkyl Benzene) project (working in FEED& Detailed Phases at Enppi) (2004) Scarab/Saffron & Rosetta plant Enhancement & Debottlenecking project (working in Detailed Engineering Review & Construction Supervision With Rashid Petroleum Company (RASHPETCO) through Egyptian Maintenance Company EMC (20042005)
7 of 10
LEAD Piping Engineer • •
KHORSANIYAH Gas plant Saudi Arabian Oil Company (ARAMCO) with Bechtel Corporation London branch (January, 2006- November 2006) Master gas system Upgrade Project (MGS): BI-10-00432 Gas Pipeline EWYFG-1 20” pipeline for ARAMCO, Via ZFP (December, 2006- March 2007)
•
Master gas system Upgrade Project (MGS): BI-10-00433 gas pipelines UBTG-4 56” 192 KM pipeline, BJBFG-3 42” 7KM Pipeline, SRG-2 56” 56KM for ARAMCO, Via ZFP (December, 2006- March 2007)
•
“UTHMANIYAH” & “SHEDGUM” Gas Plants- Sulfur Plant Upgrade Project: BI10-00057 & BI-10-00059 Detail design for 10 sulfur trains to upgrade the process from normal CLAUS process to SUPERCLAUS process for ARAMCO, Via CZFP (March , 2007- Current)
•
HAWTAH Stabilizer upgrade project: Detail design for upgrade HAWTAH stabilizer plant from 100MBCD to 200MBCD of ARAMCO Light crude including installation of a new O.H compression area new equipments to produce NGL from OH gas for ARAMCO, Via CZFP (March , 2007- Current)
•
Crude pipeline to” RAS ELZAWAR” Project: BI-10-00227 SKRZ-1 20” 18 KM crude pipeline for ARAMCO including pigging and metering facilities. for ARAMCO, Via CZFP (February , 2008- Current)
Main contractors of projects include: SAMSUNG Engineering, BROWN &ROOT Ltd., TPL (TechniPetrol), AGIP, BECHTEL, LG, J&P, IMAD Faculty of Engineering – Cairo University (August 1997 – March, 1998) Position: Demonstrator Scope of work: Teaches the following courses: •
Turbo machines theory and design (at Cairo university faculty of engineering)
•
Fundamentals of fluid mechanics (at Cairo university faculty of engineering)
•
Mechanical engineering Labs (at Cairo university faculty of engineering)
8 of 10
LEAD Piping Engineer
Training Experiences Training at sites is included the construction phase, solving the erection problems and making inspection on the site equipment/pipes/fittings for the following projects. •
GASCO-Egypt's national gas producing company-project for gas production (Alexandria)
•
CORC-Cairo Oil Refinery Company-for refining and producing petroleum products (Cairo)
•
SIDPEC-SIDI KERIR Oil Refinery & Petrochemical Industries Company (Alexandria)
•
KHALDA Petroleum Company; Oil and Gas Production (Western Desert – Mattroh)
•
GUPCO Gulf Petroleum Company; Oil and Gas Production (Eastern Desert – The Red Sea)
Training Courses: • •
Welding Technology & Inspection – By CMRDI (Central Metallurgical Research and Development Institute) NDT (Non Destructive Test) – By CMRDI
•
Liquid Penetrate Inspection - By CMRDI
•
Magnetic-Particle Inspection – By CMRDI
•
Ultrasonic Inspection – By CMRDI
•
Radio graphic Inspection - By CMRDI
•
PDS( PDS 3D theory, PD_Design, PD_Report, PD_Drawing Manager, PD_Shell, pd_iso, pd_isogen, PD_Equip., PD_Project, PD Design_Review, PD_Clash check, PD_Data, PD_Model, PD_ Spec Writing, Frameworks, Smart plant review), and Microstation_V8 – By Enppi
•
PDS OrthoGen- By 3DS
•
Material Selection for Piping Engineers – By Enppi
•
Materials Management, Warehousing Techniques and Inventory Control - By AUC 9 of 10
LEAD Piping Engineer •
Material Requirements Planning - By AUC
•
English and Business Communication Courses - By British Counsel in Cairo
I gave the following training courses during my work experience: •
PDS (Plant design system) Equipment Modeling (at ENPPI &ZFP)
•
PDS (Plant design system) Piping Modeling (at ENPPI &ZFP)
•
PDS (Plant design system) Drawing Manager (at ENPPI )
•
Microstation 2D & 3D (at Enppi)
•
Piping design & drafting (at ENPPI & ZFP)
•
Piping Technical course for piping components and materials selection (at ZFP)
•
Smart plant Review Course (at ZFP)
•
Welding technology & welding symbols (at corporation of petroleum)
•
Construction and maintenance of pipelines(at corporation of petroleum)
Skills Language Skills
: Arabic English
(Mother Tongue) (Very Good)
Computer Skills
: Programming (Very Good) Using Packages (Very Good)
Programming: Q Basic, FORTRAN, General software: Dos, Windows NT, Windows2000, WinWord, Excel, PowerPoint, Access, Special Software: Auto-Cad 2006, Microstation V8, Intergraph’s PDS (Plant Design System), CaesarΙΙ, Auto-Plant, Pro-pipe, Pro-Iso, Design Review, Smart Plant Review& Bentley Navigator Typing Skills Communication Skills Presentation Skills
: Good (20 word/minute) : Excellent : Excellent
10 of 10