Agm 2009-board Report

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Agm 2009-board Report as PDF for free.

More details

  • Words: 732
  • Pages: 16
Gallery Court: AGM 2009

Annual Board Report

Board of Directors Alessandro Alasia, President Wednesday .. October, 2009

Gallery Court: AGM 2009

Board of Directors • • • • •

Alessandro Alasia, President Maria Lo, Treasurer Michael Shaikin, Secretary Henri Proux / Jean-Baptiste Minchelli Jack Cadieux (resigned Aug. 2009)

Gallery Court: AGM 2009

Moving forward • Strengthen the financial situation of the Corporation • Ensure quality of services • Bring the condo fees in line with those prevailing on the market and keep them at a competitive level

Gallery Court: AGM 2009 180 York 309 Cumberland St 180 York Gallery Court 180 York 180 York St 383 Cumberland St 179 George St 700 Sussex Dr 700 Sussex Dr 383 Cumberland St 700 Sussex Dr 700 Sussex Dr 700 Sussex Dr 205 Bolton St 205 Bolton St

Condo fees as percentage of asking price for appartments on sale or recently sold in the Byward Market (Sept 2008)

205 Bolton St 205 Bolton St 205 Bolton St 152 York St 124 Guigues Av

0.04

0.06

0.08

0.1

Source: own elaboration based on data avaialbe at www.condosottawa.com.

0.12

0.14

0.16

0.18

0.2

Gallery Court: AGM 2009

Financial results 2008/09 • Reserve Fund balance end of FY08/09: $77,484 • Surplus end of FY08/09: $10,738 • The Corporation’s reserve fund is approximately to $150,000 as of August 31st, 2009

Gallery Court: AGM 2009

Projected reserve fund balance Balance/deficit - end of year

Balance Sheet, End of year Balance/deficit $210,000

$182,807 about $150,00

$160,000

$110,000

$86,474 $77,484 $60,000

$47,064

$10,000

- $10,088 -$40,000

2006

2007

- $13,916 2008

Source: own elaboration based on Gallery Court Audit Report 2007, 2008, 2009.

2009

Year to date

Gallery Court: AGM 2009

Some achievements • Strengthen reporting – Conducted an extensive expenditure review and produce a report available to owners – Tabulate expenditures

• Completed an Inventory 2009 • Established an annual schedule of activities, to be made available to owners online

Gallery Court: AGM 2009

Repairs and maintenance • Introduce a Request for Services form • Introduced a tracking system for expenditures and commitments

Gallery Court: AGM 2009

Reserve Fund Study • BPL Engineering Inc. contracted to conduct a comprehensive reserve fund study • The study is under way

Gallery Court: AGM 2009

Communication • Web page for communication with owners and for owners – Improve communication and reduce costs become (a bit) more environmentally friendly – Non-searchable through the Internet – Password protected files – DO SUBSCRIBE to the distribution list

Gallery Court: AGM 2009

New management approach • The corporation is entering the 20 years renovation cycle, this requires a focus on project planning, monitoring and reporting • A management approach that emphasizes – – – – –

Transparency Accountability Prompt response Equity Accessibility

Gallery Court: AGM 2009

Hallway renovations • Revised carpet options • Wall options • Logistic: Your collaboration and patience will be much appreciated. Thanks!

Gallery Court: AGM 2009

Hallway renovations costs – MAY 2009 Item

Estimated cost

Carpet

$25,000

Wallpaper, moldings, ceilings, doors

$70,000

Light fixtures

$12,000

Extension of marble in lobbies Total Contingency 15% Total including contingency

$5,000 $112,000 $16,800 $128,800

Important note: all costs are based on estimates made by potential contractors, retailers and suppliers. All cost estimates are for complete installation of the material (for instance, the carpet cost estimate includes removal of old carpet, materials, and complete installation). All cost estimates are inclusive of taxes and shipping costs. Contingency includes: possible contracting and supervision costs, possible unforeseen costs all of which will be documented to owners.

Gallery Court: AGM 2009

Hallway renovations costs – Update October 2009 Item

Estimated cost

Carpet

$30-40,000

Wallpaper, moldings, ceilings, doors

$80,000

Light fixtures

$10,000

Total Contingency 10% Total including contingency

$120-130,000 $13,000 $140-150,000

Important note: all costs are based on estimates made by potential contractors, retailers and suppliers. All cost estimates are for complete installation of the material (for instance, the carpet cost estimate includes removal of old carpet, materials, and complete installation). All cost estimates are inclusive of taxes and shipping costs. Contingency includes: possible contracting and supervision costs, possible unforeseen costs all of which will be documented to owners.

Gallery Court: AGM 2009

Where are we going next • Continue to make a responsible use of the resources of the corporation • Strengthen maintenance and work planning, reporting • Increase and encourage participation of owners

Gallery Court: AGM 2009

Thank you for your attention

Related Documents

Agm Utrecht Report
June 2020 53
Agm 2009-board Report
June 2020 29
Agm Report 2006-07
November 2019 42
Agm
July 2020 52
Agm Hindu
May 2020 51
Agm Minutes
November 2019 49