Africa U2100 Scft Report

  • Uploaded by: Amit Gurung
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Africa U2100 Scft Report as PDF for free.

More details

  • Words: 616
  • Pages: 27
Site Name IMBIMI IMBIMI

Cell 23511 / 23514 23512 / 23515S

LAC 1003 1003

RAC 200 200

PSC

E.T 52 53

2 2

M.T 0 0

Azimuth 0 135

Antenna Height 50 50

LONG

LAT

Antenna_Type

15.45635

-3.797789

ROSENBEGER

15.45635

-3.797789

ROSENBEGER

Antenna Band 5A-G6W9W9X65V-00M 5A-G6W9W9X65V-00M

Single Cell Function Test (SCFT) Site ID: New Site: Others:

Site Name: IMBIMI Site Connected to RNC:

2351

Activity/Process

MS1

Cell ID:

MS2

MS3

cell 1 plan

Idle

Connection

cell 2 Check

23511/ 23512/ 23514/23515

cell 3

plan

Check

plan

result

Remarks

Check

1 629 1003 200 10637 / 10662 52

1 629 1003 200 10637 / 10662 53

-60.00 -3.00 100.00% N/A 100.00%

-61.00 -3.00 100.00% N/A 100.00%

RSCP >= -92dBm for 90% samples

100.00% 100.00%

100.00% 100.00%

98.50%

HSDPA Throughput (Mbps)

16.40

15.40

R99 Throughput (DL) Kbps

413.00

401.00

HSUPA Throughput (Mbps)

3.20

3.10

R99 Throughput (UL) (Kbps)

390.00

386.00

y

Y

2G to 3G and 3G to 2G (IRAT handover -both wa

100.00%

100.00%

For Voice Call : 3G to 2G at all cells and 2G to 3G whereever applicable. For PS calls : 2G to 3G at all cells and 3G to 2G whereever applicable. Target >=97.5%

3G to 3G

100.00%

100.00%

Both Soft and Softer Handover needs to be checked. Target >=98%

PS Soft HO PS Softer HO PS Hard HO PDP context activation Success rate PS & CS CCSR

100.00%

100.00%

Target >=98%

100.00%

100.00%

100.00%

100.00%

100.00% / 100.00%

100.00% / 100.00%

41 / 128

45 / 93

0.00% / 0.00%

0.00% / 0.00%

0.00% / 0.00%

0.00% / 0.00%

MNC MCC LAC RAC ARFCN PSC RSCP(nearby site) Ec/Io(nearby site) Voice Call Setup Success rate (MO & MT) Video Call Setup Success rate (MO & MT) PS Setup Success rate HSUPA Setup Success rate HSDPA Setup Success rate

Ec/Io >=-12 dB for 90% samples to 95% samples MOC & MTC >= 99% MOC & MTC >= 98% 98.50% 98.50% More than 13 Mbps peak without any bandwith bottleneck. E2E backhaul to be provided with a 20% Overrate to meet this target Target shall be applicable with Dongle in static condition

PS

>=512 Kbps More than 3.5 Mbps without any bandwith bottleneck. E2E backhaul to be provided with a 20% Overrate to meet this target Target shall be applicable with Dongle in static condition

Handover

Handover Function

Target >=98%

Latency( R99,HSPA)

CS & PS call setup time CS & PS drop call rate Packet drop Packet retransmission Interrrupt time drive map

> =64 Kbps

,

Target >=97%

Static tests only. Average of all samples. R99: 200msec, HS: 90 msec Target shall be applicable with Dongle in static condition Multiple 512 byte pings with 5-second interval. Minimum of 100 pings attempt

CS <= 1% & PS <= 1.5%

If Applicable If Applicable

RSCP covery map per site

Remarks (Comments):

SP Signature

SCFT will be conducted using 3 class of handset and one dongle. RSCP Coverage check till first handover or coverage dies out (whichever happens earlier)

Bharti Signature:

Date:

SC PLOT

IMBIMI-Uu_ActiveSet_SC_0 (Scrambling Code) 

052 (138) 28.9%



053 (340) 71.1%

RSCP PLOT

IMBIMI-Uu_ActiveSet_RSCP_0 (dBm) 

Below -97.00 (25) 5.2%



>=-97.00 to <-85.00 (129) 27.0%



>=-85.00 to <-75.00 (142) 29.7%



>=-75.00 to <-65.00 (163) 34.1%



>=-65.00 to <0.00 (19) 4.0%

ECNO PLOT

IMBIMI-Uu_ActiveSet_EcNo_0 (dB) 

Below -14.00 (0) 0.0%



>=-14.00 to <-12.00 (0) 0.0%



>=-12.00 to <-9.00 (0) 0.0%



>=-9.00 to <-7.00 (0) 0.0%



>=-7.00 to <0.00 (478) 100.0%

DL UARFCN

IMBIMI-Uu_DownlinkUARFCN (ARFCN) 

10637 (92) 19.2%



10662 (386) 80.8%

SEC_1

SEC_2

SEC_3

SEC1

SEC2

SEC3

SEC_1 V

SEC_2

SEC_3

SEC_1

SEC_2

SEC_3

SNAPS SEC_1

SEC_2

HS LATENCY

SEC_3

SNAPS SEC_1

SEC_2

R99 LATENCY

SEC_3

Related Documents

Africa U2100 Scft Report
August 2019 39
Africa
October 2019 45
Africa
October 2019 48
Africa
July 2020 25
Africa
November 2019 14
Africa
November 2019 15

More Documents from ""

Interface Dimensioning
August 2019 29
Africa U2100 Scft Report
August 2019 39
Kotak Life Insurance
May 2020 28
Celebrity Lecture Agency-fs
November 2019 32
Stpi Registration
June 2020 17
Moor Court Problem-3.pdf
April 2020 23