ABSTRACT ESTIMATE

Name. of Work :

Sl.No. 1

2

3

4

5

6

7

8

Qty

Improment works to 'A' Type Quarters From Quarter No:1 To 36 (i.e for 18 Blocks) and 'DEE'type Quarters 10Nos in T.G.P Camp colony @ K.R.Dam Description of Item

25889

Sqm White washing with best shell lime (or) snow ceam or equelent ceam one after racking of old white washing including cost and vonveyance of Brushes gangee powder Or Gum watering the wall before white washing etc.complete as directed by the department 2237 sqm Painting of doors and windows with best enamil pait cast including cost and conveyance of all materials and labour charges, Centring, Scaffolding etc, complete for finished Item of Cum work. 60 Brick masanary in CM 1:5 using with country bricks including cost and conveyance of all metereials and labour charges etc complete. 790.00 Sqm Plastaring with CM 1:4,12mm thick to the exposed faces of brick masonary including cost and conveyance of all materials and labour charges 198

Sqm celing plastaring with CM 1:2,20 mm thick including scaffolding charges etc including cost and coveyance of all materials and labour charges etc. complete for finished item of work. 864.00 RMT Supplying and fixing of 7/18 Alluminimum service wire (double)along with plastic cleats at 0.3m C/C and ceramic egg insulators 3 nos and supporting G.I wire including cost and converyance of all materials and labour charges etc complete 38 Nos Supplying and fixcing of Main Switch board of TW of size 12" x 10" (0.3M X0.2 m) including cost and conveyance of all materials and labour charges etc complete. 15

Nos Supplying and fixing of main Switchs of CI/MS of 32 AMPS including cost and conveyance of all meterials and labour charges etc complete for finished item of work

Page 1

Rate

Per

Amount

5.23 1 Sqm

135,399

24.10 1 Sqm

53,912

2,701.00

1Cum

162,060

69.00

1 Sqm

54,510

157.00

1 Sqm

31,086

39.20

1 RM

33,869

53.00

1 No

2,014

1,292.00

1 No

19,380

9

2

10

60

11

72

12

44

13

44

14

30

15

36

16

69

17

25

18

30

19

43

20

330

Nos Supplying and fixcing of Meter Boards of Size 0.2 mX0.3 M of TW ( 10"/12") made including cost and conveyance of all meterials and labour charges etc complete . Nos Supplying and fixcing of 16 AMPS Fuges links of Ceramic made including cost and conveyance of al meterials and labour charges etc. complete Nos Supplying and fixcing of 6 AMPS Swithces (Single) including wiring cost and conveyance of all meterials and labour charges etc. complete Nos Supplying and fixcing of 6" X 8" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Nos Supplying and fixcing of 6" X 4" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Nos Supplying and fixcing of 6 AMPS 2 in one socket and switch including wiring and cost and conveyance of all meterials and labour chares etc.complete. Nos Supplying and fixcing of PVC battern Holders including wiring and cost and convyance of all meterials and labour charges etc.complete. Nos Supplying and fixing of Bulk Heads along with wiring including cost and conveyance of all meterials and labour charges etc.complete Nos Supplying and fixing of 40 W - 4' Feet long Tube light Set along with copar ballase and starter of standard company including wring and cost and convyeance of all meterials and labour charges etc. complete. Nos Repars to Celing fans of 48" Dia including replaceing of Coil, capasitor etc,complete and painting with best enamil paint in two coats including cost and convyance of all meterials and labour charges etc. complete. Nos Supplying and fixing of Ceiling rose including wiring and cost and convyance of all meterials and labour charges etc. complete. RMT Supplying and fixing of 3/4 " PVC condect pipe of gage 2 mm including cost of clamps,screws and all other all meterials and etc. complete.

Page 2

53.00

1 No

106

45.00

1 No

2,700

34.00

1 No

2,448

22.50

1 No

990

11.20

1No

493

54.25

1No

1,628

32.00

1No

1,152

500.00

1No

34,500

520.00

1No

13,000

500.00

1No

15,000

37.00

1No

1,591

35.00

Rmt

11,550

21

230

22

58

23

48

24

234

25

50

26

14

27

140

Nos Supplying and fixing of 5mm thick Tinted Glass of sixe o.1 m/ 0.45m including cutting and fixing in grove and cost and conveyance of all meterials and labour charges etc. complete. Nos supplying and fixing of 4" Dia A/C pipe of 3 m length for rain water down fall pipe including fixing of "T" at top and shoe at bottomand fixing with G.I 4" clamps with nails and finished the gaps with cement mortar 1:5 including cost and convyance of all meterials and labour charges etc. Nos complete. Repars to country wood door and window includign cost of nails country wood and labour charges complete for finished item of work. RMT Suppplying and fixing of Swg 4"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all meterials and labour charges etc.complete. Nos Supplying and fixing of 3" Dia PVC round blocks including screw etc complete for finished item of work. Nos Supplying and fixing of ALL Drops of 300 mm long ieron including cost and conveyance of all meterials and labour charges etc.complete. RMT Suppplying and fixing of Swg 6"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all materials and labour charges etc.complete.

Page 3

46.00

1No

10,580

550.00

1No

31,900

500.00

1No

24,000

154.00

1Rmt

36,036

11.00

1No

550

167.00

1No

2,338

260.00

1Rmt

36,400

28

24

29

21

30

2400

31

4

32

Nos Construction of 904.0mm (3feet) Dia Brick masanary inspection chamber as per I S- 4011; Part-1; 1996 with Cement mortar 1:6 Prop. Using second class clay Bricks of 225mm thick from approved scorces having a minimum crushing strength of 5n /Sqm including plastaring with cement mortar 1:3 prop. 1/2" thick both inside and out side fitted with 20" Dia RCC man hole covers and frames including excavating pits up to a depth of 904.0mm (3feet) in all sorts soils (exculding rock) and laying cement concret 1:4:8 150mm thick using 40mm HBG metel and PCC 1:2:4 Benching and Channel 100 mmm thick as per standared specefication and including cost and convyance of all meterials like cement sand bricks water,etc, to site cost of cenarage charges on all meterals and all incidetal and operational labour charges like mixing cement mortar construction masanary lift charges quring etc. complete for finished item of work as Nos Suppluing and fixing of 12.7 mm N P BIB TAPs including cost of Coupling etc. complete. Rmt Supplying and fixing of Run of mains with 320 cuppor wire of best quality including cost and convyance of all metereals and labour charges etc.complete. Nos Supplying and fixing of 15 AMPS 2 in one socket including cost and conveyance of all metereals and labour charges etc.complete.

46 Quar Labour Charges for removing of ter vegitabule debress all around the quarters including removing and depositing them with a lead of 1 Km. conveayance charges Mislenious item

4,411.00 1No

105,864.00

262.00

1No

5,502

9.05

1Rmt

21,720

272.00

1No

1,088

2,000.00 1 quarter

LS Total Rs. Or Say

92,000

35.00 945,400.27 945,400.00

ASSISTANT ENGINEER

DEPUTY EXECUTIVE ENGINEER

EXECUTIVE ENGINNER

SSLC & SB CAMP SECTION

SSLC & SB SUB. DIVION NO.4

SSLC & SB DIVION No.2

Page 4

K.R. DAM

NELLORE

K.R. DAM

Page 5

Name of Work:

DETAILED ESTIMATE Improment works to 'A' Type Quarters From Quarter No:1 To 36 (i.e for 18 Blocks) and 'DEE'type Quarters 10Nos in T.G.P Camp colony @ K.R.Dam

Sl.No.

Discription of Item

Nos.

1

White washing with best shell lime (or) snow ceam or equelent ceam one after racking of old white washing including cost and vonveyance of Brushes gangee powder Or Gum watering the wall before white washing etc.complete as directed by the department

For A" Type Quarters 1 To 36 Nos For "DEE" Type Quarters 1 To 10 Nos

1x36 1x10

L

B

D

538.83 Sqm 649.15 Sqm

Contents

Or say

2

19,397.70 6,491.50 25,889.20 25889 Sqm

Painting of doors and windows with best enamil pait cast including cost and conveyance of all materials and labour charges, Centring, Scaffolding etc, complete for finished Item of work.

Total Number of door and windos in each Block of A" type Quarter D:1 - Door - 1X2X 3'-6"X6'-6"X2 = 91.00 sft D:2 - Door - 1X2X4X 3'-0"X6'-6"X2 = 312 sft D:3 - Door - 1X2X3X 2'-6"X6'-6"X2 = 195 sft Windos - 1X2X6 X 3'-0"X4'-0 X2.25 = 324 ventelators 1X2X2X 2'-6"X2'-0"X2 = 40 sft Total 962 sft or 89.37 sqm/1 Block For 18 Blocks of A"Type = 89.37X18=1608.66 sqm For 10 Nos DEE Type Quarters D:1 - Door - 1X1X 3'-6"X6'-6"X2 = 45.50 sft D:2 - Door - 1X4X 3'-0"X6'-6"X2 = 156.00 sft D:3 - Door - 1X3X 2'-6"X6'-6"X2 = 97.50 sft W 1-Windos - 1X4X6'-0" X 4'-0"X2.25 = 216 W 2-Windos - 1X4X3'-0" X 4'-0"X2.25 = 108 ventelators 1X2X 2'-0"X1'-6"X0.75 = 4.50 sft Iron Grills -1X2X 6'-0"X4'-0"X1.00 = 48 sft Total 675.50 sft or 62.75 sqm/1 Quarter For 10 Quarters of DEE"Type = 10X62.75=627.50 sqm TOTAL

-

-

-

1,608.66 -

-

-

Or Say 3 Brick masanary in CM 1:5 using with country bricks including cost and conveyance of all metereials and labour charges etc complete. for Compound wall of A Level 1X1 in between Quarters Middel of compound wall 1X18 Parapert wall of A -5 Quarter 1X1 for side pillars of A-14 1X1 -do- Compound wall 1X1 For compound wall of A -24 1X1 For compound wall of DEE-2 1X5

Page 6

15.00 5.00 1.00 1.00 1.00 10.00 10.00

0.23 0.23 0.23 0.23 0.23 0.23 0.23

2.50 0.75 0.75 0.75 1.00 2.50 2.50

627.50 2236.16 Sqm 2,237.00

8.62 15.52 0.17 0.17 0.23 5.75 28.75

Total

59.21 60.00 Cum

Or Say 4 Plastaring with CM 1:4,12mm thick to the exposed faces of brick masonary including cost and conveyance of all materials and labour charges For A-11 Compound Wall 1X2 in between Quarters Middel of compound wall 2X18 Parapert wall of A -5 Quarter 1X2 for side pillars of A-14 1X2 -do- Compound wall 1X2 For compound wall of A -24 1X2 For compound wall of DEE-2 2X5 Total

15.00 5.00 1.00 1.00 1.00 10.00 10.00

-

2.50 0.75 0.75 0.75 1.00 2.50 5.23

75.00 135.00 1.50 1.50 2.00 50.00 523.00 788.00 790.00

5.00 4.00 3.50 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -

5.00 6.00 4.00 5.00 6.00 8.00 4.00 12.50 6.00 16.00 12.25 7.00 6.00

1.00

-

Or Say 5 celing plastaring with CM 1:2,20 mm thick including scaffolding charges etc including cost and coveyance of all materials and labour charges etc. complete for finished item of work. For A-1 1X5 For A-4 1X6 For A-5 1X4 For A-14 1X5 For A-16 1X6 For A-17 1X8 For A-17 Flooring 1X4 For A-23 kitchen flooring 1X1 For A-25 1X6 For A-26 1X1 For A-27 1X1 For A-27 1X7 For A-30 1X6 1X10 For Dee Type Quarters X10

1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.50 1.00 4.00 3.50 1.00 1.00 1.00 TOTAL

OR Say 6 Supplying and fixing of 7/18 Alluminimum service wire (double)along with plastic cleats at 0.3m C/C and ceramic egg insulators 3 nos and supporting G.I wire including cost and converyance of all materials and labour charges etc complete Quantity as per statement enclosed for A"type 1X2 Quantity as per statement enclosed for DEE"type 1X2

328 Rm 104.00 ToTal

7 Supplying and fixcing of Main Switch board of TW of size 12" x 10" (0.3M X0.2 m) including cost and conveyance of all materials and labour charges etc complete. Quantity as per statement enclosed 1X31+7 8 Supplying and fixing of main Switchs of CI/MS of 32 AMPS including cost and conveyance of all meterials and labour charges etc complete for finished item of work Quantity as per statement enclosed 1X13+2

Page 7

100.00 197.75 198.00

656.00 208.00 864.00

38.00

15.00

9 Supplying and fixcing of Meter Boards of Size 0.2 mX0.3 M of TW ( 10"/12") made including cost and conveyance of all meterials and labour charges etc complete . Quantity as per statement enclosed 1X2 10 Supplying and fixcing of 16 AMPS Fuges links of Ceramic made including cost and conveyance of al meterials and labour charges etc. complete Quantity as per statement enclosed 48+12 11 Supplying and fixcing of 6 AMPS Swithces (Single) including wiring cost and conveyance of all meterials and labour charges etc. complete Quantity as per statement enclosed 27+45 12 Supplying and fixcing of 6" X 8" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Quantity as per statement enclosed 27+17 13 Supplying and fixcing of 6" X 4" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Quantity as per statement enclosed 38+6 14 Supplying and fixcing of 6 AMPS 2 in one socket and switch including wiring and cost and conveyance of all meterials and labour chares etc.complete. Quantity as per statement enclosed 19+11 15 Supplying and fixcing of PVC battern Holders including wiring and cost and convyance of all meterials and labour charges etc.complete. Quantity as per statement enclosed 22+14 16 Supplying and fixing of Bulk Heads along with wiring including cost and conveyance of all meterials and labour charges etc.complete Quantity as per statement enclosed 55+14 17 Supplying and fixing of 40 W - 4' Feet long Tube light Set along with copar ballase and starter of standard company including wring and cost and convyeance of all meterials and labour charges etc. complete. Quantity as per statement enclosed 16+9 18 Repars to Celing fans of 48" Dia including replaceing of Coil, capasitor etc,complete and painting with best enamil paint in two coats including cost and convyance of all meterials and labour charges etc. complete. Quantity as per statement enclosed 18+12 19 Supplying and fixing of Ceiling rose including wiring and cost and convyance of all meterials and labour charges etc. complete. Quantity as per statement enclosed 31+12 20 Supplying and fixing of 3/4 " PVC condect pipe of gage 2 mm including cost of clamps,screws and all other all meterials and etc. complete. Quantity as per statement enclosed 1X180+150 21 Supplying and fixing of 5mm thick Tinted Glass of sixe o.1 m/ 0.45m including cutting and fixing in grove and cost and conveyance of all meterials and labour charges etc. complete. Quantity as per statement enclosed 177+53

Page 8

2.00

60.00

72.00

44.00

44.00

30.00

36.00

69.00

25.00

30.00

43.00

330Rmt

230.00

22 supplying and fixing of 4" Dia A/C pipe of 3 m length for rain water down fall pipe including fixing of "T" at top and shoe at bottomand fixing with G.I 4" clamps with nails and finished the gaps with cement mortar 1:5 including cost and convyance of all meterials and labour charges etc. complete. Quantity as per statement enclosed 41+17 23 Repars to country wood door and window includign cost of nails country wood and labour charges complete for finished item of work. Quantity as per statement enclosed 26+22 24 Suppplying and fixing of Swg 4"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all meterials and labour charges etc.complete. Quantity as per statement enclosed 134+100Rmt 25 Supplying and fixing of 3" Dia PVC round blocks including screw etc complete for finished item of work. Quantity as per statement enclosed 30+20 26 Supplying and fixing of ALL Drops of 300 mm long ieron including cost and conveyance of all meterials and labour charges etc.complete. Quantity as per statement enclosed 6+8 27 Suppplying and fixing of Swg 6"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all materials and labour charges etc.complete. Quantity as per statement enclosed 80+60Rmt 28 Construction of 904.0mm (3feet) Dia Brick masanary inspection chamber as per I S- 4011; Part-1; 1996 with Cement mortar 1:6 Prop. Using second class clay Bricks of 225mm thick from approved scorces having a minimum crushing strength of 5n /Sqm including plastaring with cement mortar 1:3 prop. 1/2" thick both inside and out side fitted with 20" Dia RCC man hole covers and frames including excavating pits up to a depth of 904.0mm (3feet) in all sorts soils (exculding rock) 18+6 and laying cement concret 1:4:8 150mm thick using 40mm HBG metel and PCC 1:2:4 Benching and Channel 100 mmm thick as per standared specefication and including cost and convyance of all meterials like cement sand bricks water,etc, to site cost of cenarage charges on all meterals and all incidetal and operational labour charges like mixing cement mortar construction masanary lift charges quring etc. complete for finished item of 29 Suppluing and fixing of 12.7 mm N P BIB TAPs including cost of Coupling etc. complete. Quantity as per statement enclosed 13+8 30 Supplying and fixing of Run of mains with 320 cuppor wire of best quality including cost and convyance of all metereals and labour charges etc.complete. For 36 Nos of A" Type Quarters 1X36X2X26 For 10 Nos of DEE " Type Quarters 1X10X2X26

Page 9

58.00

48.00

234 Rmt

50.00

14.00

140 rmt

24.00

21.00

1,872.00 520.00 TOTAL Err:522 OR Say 2400 Rmt

31 Supplying and fixing of 15 AMPS 2 in one socket including cost and conveyance of all metereals and labour charges etc.complete. Quantity as per statement enclosed 1X4 32 Labour Charges for removing of vegitabule debress all around the quarters including removing and depositing them with a lead of 1 Km. conveayance charges For A" Type Quarters 1X36 For DEE" Type Quarters 1X10

4.00

TOTAL

Page 10

36.00 10.00 46.00

36.16 Sqm

Page 11

Page 12

Page 13

Page 14

Page 15

DATA Name of Work :

Sl.No. 1

Improment works to 'A' Type Quarters From Quarter No:1 To 36 (i.e for 18 Blocks) and 'DEE'type Quarters 10Nos in T.G.P Camp colony @ K.R.Dam

Qty

Description of Item

Cum White washing with best shell lime (or) snow ceam or equelent ceam one after racking of old white washing including cost and vonveyance of Brushes gangee powder Or Gum watering the wall before white washing etc.complete as directed by the department 0.05 Cum white washing in one coat with best shell lime or snow cem or equlelent lime 0.35 Nos Painter Ist class 0.77 Nos Painter IIst class 0.3 Nos man Mozdoor 1.9 Nos Women Mazdoor

Rate

Per

1013 180 160 130 130

Amount

1 cum 1 No 1 No 1 No 1 No

50.65 63.00 123.20 39.00 247.00 522.85

1.00 LTS

108.50

1.00 No

126.00 6.50

for 1 Sqm - 522.85/100=5.2285 or 5.23 1 Sqm Cum Painting of doors and windows with best enamil pait cast including cost and conveyance of all materials and labour charges, Centring, Scaffolding etc, complete for finished Item of work.

2

0.70 lts

Cost of synthatic enamil paint 155.00 Itm No 312/ Page 19 0.70 Nos Cost of painter 180.00 LS towards breshes white lead linced Ls Ls oil etc.

TOTAL 3

600.00 0.32 92.16 0.42 0.98 0.70 2.10 0.32

Nos Cum Kgs Nos Nos Nos Nos Cum

For 1 Sqm - 241/10=24.1 1 Sqm Brick masanary in CM 1:5 using with country bricks including cost and conveyance of all metereials and labour charges etc complete. Cost of Country Bricks Cost of Sand Cost of Cement Brick layer Ist Class Brick layer IIst Class man Mozdoor Women Mazdoor Cost of Mixing Charges of mortar Itm No 184/ Page 16

Page 16

2,600.20 439.30 4,300.00 180.00 160.00 130.00 130.00 22.50

1,000 1.00 1.00 1.00 1.00 1.00 1.00

241.00

Nos Cum Mt No No No No

1,560.12 140.58 396.29 75.60 156.80 91.00 273.00

1.00 Cum TOTAL Cost OR Say

7.20 2,700.59 2,701.00

4

0.15 54.00 0.33 0.77 0.50 1.10 0.15

Cum Kgs Nos Nos Nos Nos Cum

0.21 144.00 0.66 1.54 0.50 3.20 0.21 0.21

Cum Kgs Nos Nos Nos Nos Cum Cum

5

6

10Rm+10 Rm 34.00 Nos 6.00 Nos 1.00 Kgs 1.00 Role

7

1.00 sqm

1.00 Nos

Plastaring with CM 1:4,12mm thick to the exposed faces of brick masonary including cost and conveyance of all materials and labour charges Cost of Sand Cost of Cement Brick Layear Ist Class Brick Layear IIst Class man Mozdoor Women Mazdoor Cost of Mixing Charges of mortar

15.00

1.00 RM

15.00

439.30 1.00 Cum 65.9 4,300.00 1.00 Mt 232.2 180.00 1.00 No 59.4 160.00 1.00 No 123.2 130.00 1.00 No 65 130.00 1.00 No 143 22.50 1.00 Cum 3.37 Total 692.07 For 1 Sqm 692.07/10 Sqm=69.21 Or Say 69 celing plastaring with CM 1:2,20 mm thick including scaffolding charges etc including cost and coveyance of all materials and labour charges etc. complete for finished item of work. 92.25 Cost of Sand 439.30 1.00 Cum 619.2 Cost of Cement 4,300.00 1.00 Mt 118.8 Brick Layear Ist Class 180.00 1.00 No 246.4 Brick Layear IIst Class 160.00 1.00 No 65 man Mozdoor 130.00 1.00 No 416 Women Mazdoor 130.00 1.00 No 4.72 Cost of Mixing Charges of mortar 22.50 1.00 No Scaffolding Charges wide item no 7.56 36.00 1.00 No 1569.93 974/ pageNO 60 For 1 Sqm 1569.96/10=156.993 /1 SQm 157 Supplying and fixing of 7/18 143.00 157.3 Alluminimum service wire (double)along with plastic cleats at 0.3m C/C and ceramic egg insulators 3 nos and supporting G.I wire including cost and converyance of all materials and labour charges etc complete Cost of wire 7/18 wide item 111.00 10.00 RM 222 no:221/page no 103 plastic cleats @0.30Mc/cfor 10 M 3.00 1.00 No 102 length wide item no 755/ p:no126 Ceramic Egg isulators local reate 3.00 1.00 No 18 G.I Wire wide item No: 757/P:126 40.00 1.00 40 Labour Charges for fixing of service 10.00 1.00 Rm 10 wire including providing leads G.I wire and fixed to pole to house connections,local rate Total Cost 392 Fro 1 Rm 392/10=39.20/1Rm Supplying and fixcing of Main Switch 25.00 1.00 Sqm board of TW of size 12" x 10" (0.3M X0.2 m) including cost and conveyance of all materials and labour charges etc complete. 12"X10" T.W Board Item No 28.10 1.00 No 28.1 713/Page:125

Page 17

1.00 Nos Labour Charges for fixing of board with nails including conveyance of board etc.complete.

25.00

1.00 No

25

Total Cost 8

Supplying and fixing of main Switchs of CI/MS of 32 AMPS including cost and conveyance of all meterials and labour charges etc complete for finished item of work 1.00 Nos Cost of 32 AMPS GI/Ms Main switchs wide item No:103 Page No:98 1.00 Nos Fixing Charges of 32 AMPS main switch with Screw including wireing and cost of wire labour charges etc.complete

53.10

1192.5

1.00

No

1192.5

100

1.00

No

100

Total Cost Or Say 9

1.00 No

1.00 No

10

1.00 No

1.00 No 11

1.00 No

1.00 No

Supplying and fixcing of Meter Boards of Size 0.2 mX0.3 M of TW ( 10"/12") made including cost and conveyance of all meterials and labour charges etc complete . Cost of Mater Board of 12"X10" Local rate Labour Charges for fixing of Meter board of repalceing of Damaged old one and fixing the meter on new board with scrows and wiring the same etc. complete.

Supplying and fixcing of 16 AMPS Fuges links of Ceramic made including cost and conveyance of al meterials and labour charges etc. complete Cost of 16 Ams fuge links item no:114/Page No101 Labour charges for removing of old one and fixing with new one with scrows and wire connecations etc.complete. Supplying and fixcing of 6 AMPS Swithces (Single) including wiring cost and conveyance of all meterials and labour charges etc. complete Cost of 16 Ams switch(single) wide item no 24/ Page No:95 Labour charges for removing of old one and fixing with new one with scrows and giveing wire connecations etc.complete.

Page 18

1,292.50 1,293.00

28.10

1.00 No

28.10

25.00

1.00 No Total Cost Or Say

25.00

1.00 No

25.00

20.00

1.00 No Total Cost

20.00 45.00

19.10

1.00 No

19.10

15.00

1.00 No Total Cost Or Say

15.00 34.10 34.00

25.00 53.10 53 1 No

1.00 No 1.00 No

13

1.00 No 1.00 No

14

Supplying and fixcing of 6" X 8" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Cost of 6"X8" TW Board wide item No:711/Page No:125 Labour charges for fixing of board after removing of old one including cost of scrows etc complete.

Supplying and fixcing of 6" X 4" TW switch board with lamination top including cost and conveyance of all meterials and labour charbges etc. complete. Cost of 6"X4" TW Switch board wide item no 710 Page no:125 Labour charges for fixing of board after removing of old one including cost of scrows etc complete.

12.50

1.00 No

12.50

10.00

1.00 No Total Cost Or Say

10.00 22.50 23.00

6.20

1.00 No

6.20

5.00

1.00 No Total Cost Or Say

5.00 11.20 11.00

29.25

1.00 No

29.25

25.00

1.00 No Total Cost Or Say

25.00 54.25 54.00

17.00

1.00 No

17.00

15.00

1.00 No Total Cost

15.00 32.00

360.00

1.00 No

360.00

140.00

1.00 No Total Cost

140.00 500.00

Supplying and fixcing of 6 AMPS 2 in one socket and switch including wiring and cost and conveyance of all meterials and labour chares etc.complete. 1.00 No 1.00 No

15

Rate as per SSR itme No: 27 P:95 Labour charges for fixing of board after removing of old one including cost of scrows etc complete.

Supplying and fixcing of PVC battern Holders including wiring and cost and convyance of all meterials and labour charges etc.complete. 1.00 No 1.00 No

16

1.00 No

1.00 No

Rate as per SSR itme No: 48 P:95 Labour charges for fixing of board after removing of old one including cost of scrows etc complete. Supplying and fixing of Bulk Heads along with wiring including cost and conveyance of all meterials and labour charges etc.complete Rate as per SSR itme No: 318 P:108 Labour charges for fixing of bulk heads including wireing,conveyance scrows etc complete.

Page 19

1.00

Supplying and fixing of 40 W - 4' Feet long Tube light Set along with copar ballase and starter of standard company including wring and cost and convyeance of all meterials and labour charges etc. complete. Rate ascharges per SSRfor itme No:of322 P:108 Labour fixing Tube light with scrows and wireing connection including cost of wire etc.complete.

1.00 No

Repars to Celing fans of 48" Dia including replaceing of Coil, capasitor etc,complete and painting with best enamil paint in two coats including cost and convyance of all meterials and labour charges etc. complete. Rate as per locaal Qotation

17

1.00 No

18

19

1.00 No 1.00 20

1.00 Rm 1.00 Rm 21

22

Supplying and fixing of Ceiling rose including wiring and cost and convyance of all meterials and labour charges etc. complete. Rate as per SSR itme No: 68 P:96 Labour charges for fixing of Celing rose and wing Supplying and fixing of 3/4 " PVC condect pipe of gage 2 mm including cost of clamps,screws and all other all meterials and etc. complete. Rate as per SSR itme No: 8 P:94 Labour Charges for fixing of pipe with 2 nos of clamps scrows, etc complete.

Supplying and fixing of 5mm thick Tinted Glass of sixe o.1 m/ 0.45m including cutting and fixing in grove and cost and conveyance of all meterials and labour charges etc. complete. Cost of 5mm thick tinted Glass wide 1/0.045 Sqm ssr item no:283 Page no:18 Labour charges for Cutting conveyance and fitting to wentelated 1.00 No etc complete as per local quotations supplying and fixing of 4" Dia A/C pipe of 3 m length for rain water down fall pipe including fixing of "T" at top and shoe at bottomand fixing with G.I 4" clamps with nails and finished the gaps with cement mortar 1:5 including cost and convyance of all meterials and labour charges etc. complete.

Page 20

320.00

1.00 No

320.00

200.00

1.00 No Total Cost

200.00 520.00

500.00

1.00 No Total Cost

500.00 500.00

22.00

1.00 No

22.00

15.00

1.00 No Total Cost

15.00 37.00

19.75

1.00 Rm

19.75

15.25

1.00 Rm Total Cost

15.25 35.00

570.00 20.35

1.00 Sqm 1.00 No Total Cost

25.65 20.35 46.00

Cost of 4" Dia A/C Pipe as per local Quotation Cost of 4" Dia A/C "T" as per local 1.00 NO Quotation Cost of 4" Dia A/C "T" shoe as per 1.00 NO local Quotation Cost of 4" Dia width clamps as per 4.00 Nos local Quotation labour charges for fixing of A/C pipe and specials and clamping with nails and finished the gaps with CM 1:5 1.00 No mortor etc.complete,. 1/3 Rm

23

1.00 No 24

1.00 Rm 1.00 25

1.00 No 1.00 No 26

1.00 No 1.00 No 27

1.00 Rm 1.00 Rm

Repars to country wood door and window includign cost of nails country wood and labour charges complete for finished item of work. Rate as per locaal Qotation Suppplying and fixing of Swg 4"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all meterials and labour charges etc.complete. Rate as per SSR itme No:2 Page: 65 Conveyance Charges from Nellore To Dam Site. Supplying and fixing of 3" Dia PVC round blocks including screw etc complete for finished item of work. Cost of 3"Dia PVC round blocks item no:771 Page No:126 labour charges for fixing of round blocks including cost of nails transportatin etc.complete. Supplying and fixing of ALL Drops of 300 mm long ieron including cost and conveyance of all meterials and labour charges etc.complete. Cost of ieron 300 mm dia long ALL Drops wide itme no: 162 P:13 labour charges for fixing of all drops including bolts and nuts Suppplying and fixing of Swg 6"Dia pipe including cost of earth work and refilling charges etc and jointing with C:M 1:5 including cost and convyance of all materials and labour charges etc.complete. Cost of 6"Dia Swg pipes wide item no "3 Page No:65 Conveyance Charges from Nellore To Dam Site.

Page 21

150.00

1.00 No

150.00

75.00

1.00 No

75.00

75.00

1.00 No

75.00

25.00

1.00 No

100.00

150.00

1.00 No Total Cost

150.00 550.00

500.00

1.00 No Total Cost

500 500.00

149.00

1.00 Rm

149

5.00

1.00 RM Total Cost

5.00 154.00

6.00

1.00 No

6.00

5.00

1.00 No Total Cost

5.00 11.00

92.00

1.00 No

92.00

75.00

1.00 no Total Cost

75.00 167.00

254.00

1.00 RM

254.00

6.00

1.00 Rm

6.00

Total Cost

260.00

1.00 No

Construction of 904.0mm (3feet) Dia Brick masanary inspection chamber as per I S- 4011; Part-1; 1996 with Cement mortar 1:6 Prop. Using second class clay Bricks of 225mm thick from approved scorces having a minimum crushing strength of 5n /Sqm including plastaring with cement mortar 1:3 prop. 1/2" thick both inside and out side fitted with 20" Dia RCC man hole covers and frames including excavating pits up to a depth of 904.0mm (3feet) in all sorts soils (exculding rock) and laying cement concret 1:4:8 150mm thick using 40mm HBG metel and PCC 1:2:4 Benching and Channel 100 mmm thick as per standared specefication and including cost and convyance of all meterials like cement sand bricks water,etc, to site cost of cenarage charges on all meterals and all incidetal and operational labour charges like mixing cement mortar construction masanary lift charges quring etc. complete for finished item of work as per standared specificatiion. Rate as per SSR Item No:58 P:67

4,411.00

1.00 No Total Cost

4411 4,411.00

1.00 No

Suppluing and fixing of 12.7 mm N P BIB TAPs including cost of Coupling etc. complete. Rate as per SSR Item No:157 P:72

162.00

1.00 No

162.00

1.00 No

Labour charges for fixing of Tap with cupplying white lead thread etc.complete as per local reate.

100.00

1.00 No Total Cost

100.00 262.00

5.05

1.00 Rm

5.05

4.00

1.00 Rm Total Cost

4.00 9.05

147.00

1.00 No

147.00

28

29

1.00 Rm

Supplying and fixing of Run of mains with 320 cuppor wire of best quality including cost and convyance of all metereals and labour charges etc.complete. Cost of 3/20 Cuppor wire wide item no 220 p:103 labour charges for fixing the main wire along with G.I wire in PVC conduct pipe which was already fixed

1.00 No

Supplying and fixing of 15 AMPS 2 in one socket including cost and conveyance of all metereals and labour charges etc.complete. Rate as per SSR item No:66/P:96

30

1.00 Rm

31

Page 22

1.00 No 32

Fixing Charges with Screwes including wireing and cost of wire labour charges etc.complete

Labour Charges for removing of vegitabule debress all around the quarters including removing and depositing them with a lead of 1 Km. conveayance charges 1.00 Quartras per local rate obtain

Assist Engineer SSLC & Sb Camps

K.R.Dam

Deputy Executive Engineer SSLC &Sb Sub Division no:4 K.R.Dam

Page 23

125.00

2,000.00

1.00 No Total Cost

1.00 Quarter Total Cost

Execuvive Engineer SSLC &Sb Division no:2 Nellore

125.00 272.00

2000.00 2,000.00

Page 24

Page 25

Page 26

Page 27

Page 28

Page 29

Page 30

Page 31

LEAD STATEMENT Name of Work :

Improment works to 'A' Type Quarters From Quarter No:1 To 36 (i.e for 18 Blocks) and 'DEE'type Quarters 10Nos in T.G.P Camp colony @ K.R.Dam Add

Sl. No.

Description of Item

Source of Materials

LEAD

Unit CT

1 Cement

2 Bricks

At Site Padugu Padu

SSLC & Sb Camps

K.R.Dam

-

-

4300/MT

607.00 (-) 6.80

-

-

2600.2/MT

/1000 P8/ I

89.00

318.90 (-) 4.60

36

-

439.30/Cum

P15/179

671.00

346.80 (-) 4.50

-

1013.00/Cum

Item No. 187/P16

-

60.00

60.00

2,000.00

3.00

50.00

54.00

-

55.00

50.00

Nellore

1 Cum

-

Vide Item No:183P.15 of Common SSR

1000 Nos

5 Shell Lime

-

4,300.00

-

-

1. The leads provided in the lead statement are correct to my knowledge. 2. The seinarage Charges are payable at Quarries 3. There are sufficient material are available in the Quarries 4. Blasting Charges are requested for Blastering the materials

Deputy Executive Engineer SSLC &Sb Sub Division no:4 K.R.Dam

Remarks

s

Total

-

Sangam 1 Cum

Assist Engineer

MR

1 MT

4 Sand

CERTIFIED THAT :

Conveyan Deduct senari Add Total Stocking age Blasteri Net Rate Initial Cost ce Charges charge Charges ng

Execuvive Engineer SSLC &Sb Division no:2 Nellore