Data and test specimen: Report No. IES/ABONI/PV-18-03 Test Specimen Water Treatment Plant 01 No. of Vessel 02 Material C/S Manuf. Year N/A Allowable T Min. -10° C

Date Manufacturer Capacity Working Pressure Test Pressure Allowable T. Max

15-08-2018 N/A N/A 4 BAR N/A +50° C

B. Test Data Sheet and Evaluation: Degree

X mm

A mm

B mm

C mm

Y mm



36.2

26.3

27.4

26.9

30.8

90®

35.1

27.0

27.8

27.5

30.9

180®

35.2

26.9

28.1

27.3

30.6

270®

35.1

28.0

26.3

27.9

30.2

Inspection Date:-15/08/2018 0® (East Side)90® North Side180®West Side270®South Side

X A

X

X

X

A

A

A

B

B

B

B

C

C

C

C

Y

Y

Y

Y

Fig: Pressure Vessel (Air Receiver Tank) Page 1 of 1

TESTED BY:

Aboni Witness

IES AUTHORITY approved

Name: Md. Amit Hasan ASNT Level –II (UT, RT, MT, PT,VT)

Name: Aboni – Mr. Md. Jahid , Deputy Manager -MTS

Signature:

Signature:

Name: Akik Ahmed Chowdhury API-510, 570, 580 (Pressure Vessel Inspector ) Signature:

Date: 15/08/2015 Date: 15/08/2018 TEST CARRIED OUT AS PER CODE & STANDARD OF API Standard 1104

TESTED BY IES-INDUSTRIAL ENGINEERING SERVICES House # 64, (1st Floor), Road # 06, Block # A, Sec # 12, Mirpur, Dhaka-1216, Phone : +8804477972245, 01710134359, 01711834576, E-mail: [email protected], [email protected], [email protected], [email protected], Web: www.iesndt.com