9th February20091

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 9th February20091 as PDF for free.

More details

  • Words: 272
  • Pages: 3
PROGRESS REPORT ON ASSIGNMENT

ASSIGNMENT: Practical Development and Implementation of a Simple (Two View) WynerZiv/Slepian-Wolf Codec)

Wyner–Ziv-Based Multiview Video Coding Authors: Xun Guo, Yan Lu, Member, IEEE, Feng Wu, Senior Member, IEEE, Debin Zhao, and Wen Gao, Senior Member, IEEE.

The Paper Published: IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, VOL. 18, NO. 6, JUNE 2008

The Key Points:  It is a recent paper published in the IEEE transaction. Shows that the issues we are grappling with are very relevant and current in research literature.  Reports on an implementation of the Multi-view, Wyner-Ziv Codec.  It proposes a Joint Inter-view decoding scheme that improves side information by exploiting the correlation between views.

The proposed scheme in the paper.

 A six-parameter affine model of Global motion model is used to exploit the inter-view correlation.

Experiments and results reported:  Marginal improvement reported. Better performance than intra-view codec but lagging behind predictive coding. Comments/Conclusion  It is a good way to start multi-view coding and exploit inter-view correlation.  It concentrates more on side information improvement.  I will try to implement it, while looking at other implementations.  Must start to think critically about my own contribution

SCALABLE MULTIVIEW IMAGING SHORT TERM PLAN ITEM

TIME

ADDITIONAL LITERATURE REVIEW ON MULTIVIEW CODEC

On-Going

TECHNICAL REPORT ON SINGLE VIEW WYNER-ZIV CODEC

Up till 9/03/2009

SIMULATIONS AND FINETUNING OF SINGLE VIEW CODEC WITH TECHNICAL REPORT REQUIREMENT

Up till 9/03/2009

ADDITION OF A SECOND, THIRD etc VIEWS TO WYNER-ZIV CODEC SECOND TECHNICAL REPORT/ AIM FOR CONFERENCE

By March ending By April ending

TECHNICAL REPORT I have written an abstract and introduction. Formatted

Related Documents

9th February20091
July 2020 7
9th
November 2019 48
9th Experiment
November 2019 19
9th. Science
May 2020 10
Garbhanal 9th
July 2020 12
December 9th
November 2019 16