Project Name: Two-Storey Residential Building Location: Nagsaing, Calasiao, Pangasinan Subject: Bill of Materials ITEM NO.

ITEM DESCRIPTION

QTY

UNIT

UNIT COST Materials

I.

DIRECT COST

A.

General Requirements Mobilization and Demobilization Temporary Facilities Permits and Insurance Sub-Total Lighting Wiring Devices and Roughing-ins Utility Box Junction Box 15 mmǾ PVC Pipe 20 mmǾ PVC Pipe 25 mmǾ PVC Pipe 32 mmǾ PVC Pipe 15 mmǾ PVC Pipe Coupling 20 mmǾ PVC Pipe Coupling 25 mmǾ PVC Pipe Couplig 32 mmǾ PVC Pipe Coupling 32 mmǾ Locknut and Bushing One-Gang Switch, 10A, 220V Two-Gang Switch, 10A, 220V Three-Gang Switch, 10A, 220V Duplex Convenience Outlet, 20A, 230V Weather Proof Duplex Convenience Outlet, 20A, 230V ACU Outlet, Grounding Type, 3-prong, 30A, 230V End Bells Miscellaneous

B.

Total

Labor

Total

1 1 1

lot lot lot

3000 3000 50000

34 34 0 0 0 0 0 0 0 0 0 0 0 0 0

pcs. pcs. lgs lgs lgs lgs pcs. pcs. pcs. pcs. pair set set set set

12 20 0 0 0 0 0 0 0 0 0 0 0 0 0

408 680 0 0 0 0 0 0 0 0 0 0 0 0 0

2.4 4 0 0 0 0 0 0 0 0 0 0 0 0 0

81.6 136 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0

set set pcs. lot

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

Sub-Total C.

D.

E.

Lighting Fixtures Flourescent Lamp, 40W, Industrial type Incandescent Lamp Pinlight Chandelier Circular Flourescent Lamp Sub-Total Panelboards Main: 200AT/200AF, 230V, 2P Branches: 3 - 15AT/50AF, 230V, 2P 4 - 20AT/50AF, 230V, 2P 8 - 30AT/AF, 230V, 2P Panel board enclosure Sub-Total Wires and Cables 2.0 mm2 2.0 mm2 3.5 mm2 5.5 mm2 60 mm2 Miscellaneous Sub-Total

0 0 0 0 0

set set set set set

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

pcs

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

pcs pcs pcs assy

lm lm lm lm lm lot

Total Direct Cost I.

INDIRECT COST Contractor's Overhead, Supervision and Profit Contractor's VAT Total Indirect Cost TOTAL PROJECT COST

lot lot

UNIT COST

TOTAL AMOUNT

Mark -Up Cost QTY

489.6 816 0 0 0 0 0 0 0 0 0 0 0 0 0

16646.4 27744 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0

0 0 0 0

Mult

Matls

1 1 1

1 1 1

34 34

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Mult.

12 20

Labor

1 1 1

0.2 0.2 0.2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

1

0.2 0.2 0.2 0.2

1 1

44390.4

0 0 0 0 0

0 0 0 0 0

1 1 1 1 1

1 1 1 1 1

0.2 0.2 0.2 0.2 0.2

0 0 0 0 0 0

0 0 0 0 0 0 0

1

1

0.05

1 1 1

1 1 1

0.2 0.2 0.2

1 1 1 1 1 1

1 1 1 1 1 1

0.2 0.2 0.2 0.2 0.2 0.2

1 1

1 1

44390.4 44390.4 0 44390.4 88780.8