56560501-metrados-pavimentos.pdf

  • Uploaded by: 355436
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 56560501-metrados-pavimentos.pdf as PDF for free.

More details

  • Words: 1,422
  • Pages: 10
PRESUPUESTO REFERENCIAL Proyecto:

NOMBRE DEL PROYECTO

Alternativa 01: PAVIMENTO RIGIDO: CONCRETO SIMPLE Departamento Item A

Descripción

Fecha : Provincia : Und

TANGIBLES

01.00.00 PAVIMENTACION: 01.01.00

OBRAS PROVISIONALES

01.01.01

IDENTIFICACION DE OBRA (GIGANTOGRAFIA 1.3X2.5M)

und

01.01.02

MOVILIZACION Y DESMOVILIZACION

GLB

01.01.03

CERCOS PROV. DE SEGURIDAD DE OBRA

GLB

01.02.00 01.02.01 01.03.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

01.03.01

CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA

m3

01.03.02

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

01.03.03

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

01.03.04

NIVELACION Y COMPACT. DE SUBRASANTE CON MAQUINARIA

m2

01.03.05

MEJORAMIENTO DE SUBRASANTE (e=0.15m.)

m3

01.03.06

CONFORMACION BASE GRANULAR (E=0.25M)

m2

01.03.06

REPARACION DE REDES E INSTALACIONES EXISTENTES

m

01.04.00

PAVIMENTOS

01.04.01

ENCOFRADO Y DESENCOFRADO DE PISTAS

01.04.02

LOSA DE CONCRETO F'C=210 KG/CM2, e=0.18m. DOSIF. C:A:P=1:1.75:2m2

01.05.00

m2

SARDINELES

01.05.01

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

01.05.02

CONCRETO F'C=140 KG/CM2, EN SARDINELES

m2

01.06.00

JUNTAS

01.06.01

JUNTAS DE DILATACION EN PISTAS

m

01.06.02

JUNTAS DE CONTRACCION EN PISTAS

m

01.07.00

VARIOS

01.07.01

SENALIZACION HORIZONTAL

01.07.02

LIMPIEZA GENERAL Y ENTREGA DE OBRA

m2 GLB

02.00.00 CUNETAS DE CONCRETO SIMPLE 02.01.00 02.01.01 02.02.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

02.02.01

CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA

m3

02.02.02

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE C/MAQ

m3

02.02.04

NIVELACION Y COMPACT. DE SUBRASANTE C/MAQ

m2

02.02.05

MEJORAM. SUBRASANTE

m3

02.02.06

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

02.02.07

CONF. Y REFINE DE BASE

m2

02.03.00 02.03.02

OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO

m2

02.03.03

LOSA DE CONCRETO F'C=140KG/CM2, E=0.10M

m2

02.03.04

CONCRETO F'C=140KG/CM2

m3

02.04.00 02.04.01 02.05.00 02.05.01

JUNTAS JUNTAS EN CUNETAS

m

VARIOS CURADO DE OBRAS DE CONCRETO

m2

03.00.00 VEREDAS DE CONCRETO SIMPLE 03.01.00 03.01.01

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

METR L (m)

a (m)

h(m)

03.02.00

MOVIMIENTO DE TIERRAS

03.02.01

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

03.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

03.02.03

ELIMINACION DE MATERIAL EXCED. CON VOLQUETE

m3

03.02.04

NIVELACION Y COMPACTACION DE SUB RASANTE CON EQUIPO LIVIANO m2

03.02.05

MEJORAMIENTO DE TERRENO DE FUNDACION (E=0.10M)

m2

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

03.02.06 03.03.00 03.03.01 03.03.02 03.04.00 03.04.01 03.05.00

OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO F'C=140KG/CM2, E=0.09M

m2 m2

JUNTAS JUNTAS EN VEREDAS

m

VARIOS

03.05.01

CURADO DE OBRAS DE CONCRETO

m2

03.05.02

ADECUACION DE TAPAS DE DESAGUE

und

04.00.00 MUROS DE CONTENCION 04.01.00 04.01.01 04.02.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

04.02.01

EXCAVACIÓN PARA ESTRUCTURAS

m3

04.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

04.02.03

ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

04.02.04

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

04.03.00 04.03.01 04.03.02 04.04.00

MUROS DE CONCRETO CICLOPEO ENCOFRADO Y DESENCOFRADO CONCRETO F'C=140KG/CM2 + 30 % PM.

m2 m2

JUNTAS

04.04.01

JUNTAS DE CONSTRUCCIÓN DE TECKNOPORT

m2

04.04.02

CURADO DE OBRAS DE CONCRETO CON ADITIVOS

m2

COSTO DIRECTO GASTOS GENERALES UTILIDAD

13% 5%

SUB TOTAL 1 IGV (19%)

19%

SUB TOTAL 2 B

INTANGIBLES ELABORACION DE ESTUDIOS DEFINITIVOS

2.5%

SUPERVISION

4.5%

TOTAL PRESUPUESTO DE PROYECTO

UESTO REFERENCIAL

Dist. : METRADO # veces # Elem acero (kg) Factor

A(m2)

V(m3)

Metrado

Precio

Costos (S/.) Parcial Subtotal

Total 0

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00 0 0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

S/. S/. S/.

0 0 0

S/.

0 0

S/.

0

S/. S/.

0 0

S/.

0

S/.

986.94

PRESUPUESTO REFERENCIAL Proyecto: Alternativa 02: PAVIMENTACIÓN CON BLOQUES DE GRANITO Departamento Item A

Descripción

Fecha : Provincia : Und

TANGIBLES

01.00.00 PAVIMENTACION: 01.01.00

OBRAS PROVISIONALES

01.01.01

IDENTIFICACION DE OBRA (GIGANTOGRAFIA 1.3X2.5M)

und

01.01.02

MOVILIZACION Y DESMOVILIZACION

GLB

01.01.03

CERCOS PROV. DE SEGURIDAD DE OBRA

GLB

01.02.00 01.02.01 01.03.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

01.03.01

CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA

m3

01.03.02

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

01.03.03

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

01.03.04

NIVELACION Y COMPACT. DE SUBRASANTE CON MAQUINARIA

m2

01.03.05

MEJORAMIENTO DE SUBRASANTE (e=0.15m.)

m3

01.03.06

CONFORMACION BASE GRANULAR (E=0.25M)

m2

01.03.06

REPARACION DE REDES E INSTALACIONES EXISTENTES

m

01.04.00 01.04.01 01.05.00

PAVIMENTOS BLOQUES DE GRANITO

m2

SARDINELES

01.05.01

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

01.05.02

CONCRETO F'C=140 KG/CM2, EN SARDINELES

m2

01.06.00 01.06.01 01.06.02 01.07.00

JUNTAS JUNTAS DE DILATACION EN PISTAS

m

JUNTAS DE CONTRACCION EN PISTAS

m

VARIOS

01.07.01

SENALIZACION HORIZONTAL

01.07.02

LIMPIEZA GENERAL Y ENTREGA DE OBRA

m2 GLB

02.00.00 CUNETAS DE CONCRETO SIMPLE 02.01.00 02.01.01 02.02.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

02.02.01

CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA

m3

02.02.02

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE C/MAQ

m3

02.02.04

NIVELACION Y COMPACT. DE SUBRASANTE C/MAQ

m2

02.02.05

MEJORAM. SUBRASANTE

m3

02.02.06

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

02.02.07

CONF. Y REFINE DE BASE

m2

02.03.00 02.03.02

OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO

m2

02.03.03

LOSA DE CONCRETO F'C=140KG/CM2, E=0.10M

m2

02.03.04

CONCRETO F'C=140KG/CM2

m3

02.04.00 02.04.01 02.05.00 02.05.01

JUNTAS JUNTAS EN CUNETAS

m

VARIOS CURADO DE OBRAS DE CONCRETO

m2

03.00.00 VEREDAS DE CONCRETO SIMPLE 03.01.00 03.01.01 03.02.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA) MOVIMIENTO DE TIERRAS

m2

METR L (m)

a (m)

h(m)

03.02.01

CORTE A NIVEL DE SUBRASANTE MANUAL

m3

03.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

03.02.03

ELIMINACION DE MATERIAL EXCED. CON VOLQUETE

m3

03.02.04

NIVELACION Y COMPACTACION DE SUB RASANTE CON EQUIPO LIVIANO m2

03.02.05

MEJORAMIENTO DE TERRENO DE FUNDACION (E=0.10M)

m2

03.02.06

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

03.03.00 03.03.01 03.03.02 03.04.00 03.04.01 03.05.00

OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO F'C=140KG/CM2, E=0.09M

m2 m2

JUNTAS JUNTAS EN VEREDAS

m

VARIOS

03.05.01

CURADO DE OBRAS DE CONCRETO

m2

03.05.02

ADECUACION DE TAPAS DE DESAGUE

und

04.00.00 MUROS DE CONTENCION 04.01.00 04.01.01 04.02.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO (INICIO DE OBRA)

m2

MOVIMIENTO DE TIERRAS

04.02.01

EXCAVACIÓN PARA ESTRUCTURAS

m3

04.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

04.02.03

ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

04.02.04

CONFORMACION DE BASE GRANULAR (e=0.10M.)

m2

04.03.00 04.03.01 04.03.02 04.04.00

MUROS DE CONCRETO CICLOPEO ENCOFRADO Y DESENCOFRADO CONCRETO F'C=140KG/CM2 + 30 % PM.

m2 m2

JUNTAS

04.04.01

JUNTAS DE CONSTRUCCIÓN DE TECKNOPORT

m2

04.04.02

CURADO DE OBRAS DE CONCRETO CON ADITIVOS

m2

COSTO DIRECTO GASTOS GENERALES UTILIDAD

13% 5%

SUB TOTAL 1 IGV (19%)

19%

SUB TOTAL 2 B

INTANGIBLES ELABORACION DE ESTUDIOS DEFINITIVOS

2.5%

SUPERVISION

4.5%

TOTAL PRESUPUESTO DE PROYECTO

TO REFERENCIAL

Dist. : 986.94 METRADO # veces

# Elem acero (kg) Factor

A(m2)

V(m3)

Metrado

Costos (S/.) Precio

Parcial

Subtotal

Total 0

###

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

### 0.00

0

###

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

### 0.00

0.00

0.00

0.00

0.00

0.00 0.00

0 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

S/. S/. S/.

0 0 0

S/.

0 0

S/.

0

S/. S/.

0 0

S/.

0

S/.

More Documents from "355436"