5168_ficha-tecnica-de-intervencion-n0-002-2018-mp-nasca-descolmatacion-encauzamiento-en-el-cauce-del-rio-taruga-sector-pajonal-alto-distrito-vista-aalegre-.docx

  • Uploaded by: Willan TG
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 5168_ficha-tecnica-de-intervencion-n0-002-2018-mp-nasca-descolmatacion-encauzamiento-en-el-cauce-del-rio-taruga-sector-pajonal-alto-distrito-vista-aalegre-.docx as PDF for free.

More details

  • Words: 2,820
  • Pages: 16
CONVENIO DE COOPERACION INTERÍNSTTTUCIONAL ENTRE EL MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO, Y LA MUNICIPALIDAD PROVINCIAL DE NASCA N° 025 -2018-VMENDA

FICHA TECNICA DE INTERVENCIÓN FT1. N° 002 - 2018 MP-NASCA PARTIDA PRESUPUESTAD PP-068 "DESCOLMATACION, ENCAUZAMIENTO EN EL CAUCE DEL RIO TARUGA: SECTOR PAJONAL ALTO DISTRITO VISTA ALEGRE, PROVINCIA NASCA - REGION ICA” MODALIDAD DE EJECUCION POR CONVENIO Plazo de Ejecución: 40 de.

I-UBICACIÓN

UBfGEO

110301

DEPARTAMENTO:

ICA

PROVINCIA: DISTRITO:

NASO VISTA ALEGRE

SECTOR

RIO TARUGA- SECTOR PAJONAL ALTO

Datum COORDENADAS UTM WGS 84 ZONA 18L- (A) Inicio: E 0505819, N 8 350806 ALTITUD 563mts. (B) Final: E 0505297, N 8 350907 POBLACIÓN DIRECTAMENTE AFECTADA 300 Habitantes

LMETA:

DESCRIPCION DESCOLMATACION, ENCAUZAMIENTO EN EL

UNIDAD

CANDDAD

m3

18,900.00

CAUCE DEL RIO DESCOLMATACION, ENCAUZAMIENTO EN EL CAUCE DEL RIO

km

0.540

■.RESPONSABLES (ELABORACIÓN Y VERACIDAD DE LA INFORMACIÓN)

3.1 FUNCIONARIO QUE FORMULÓ LA FICHA TECNICA MUNICIPALIDAD PJÍOVIHCÍAL ¡X

32 FUNCIONARIO QUE SE RESPONSABILIZA POR LA VERACIDAD DE LA INFORMACIÓN CONSIGNADA EN LA FICHA TÉCNICA

“"Iña^BederjCerón Torres REG./IP.WMM

nt/tÜRRMíO OIWNO y Seto Nombre: DNL

Nombre: DNL Cargo: Correo: Cet

MóW Ate

y

Cargo: Correo: Cet

^.DESCRIPCIÓN DEL SERVICIO O INFRAESTRUCTURA ANTES Y DESPUÉS DE LA OCURRENCIA DEL EVENTO O DESASTRE 4.1. DESCRIPCIÓN DE LA INFRAESTRUCTURA A PROTEGER



El tramo del proyecto materia de la presente intervención, se encuentra Comprendido en el Rio Taruga del tramo denominado, Sector Pajonal Alto, aguas abajo respectivamente, del cauce del Río Taruga, .El cauce del río tiene un ancho promedio entre los 30 y 40 metros, como consecuencia de una no oportuna intervención a un mantenimiento anual. Asimismo a causa de las constantes precipitaciones pluviales y caídas de huaycos que cdmataron su cauce con material acumulado (piedras, rocas, arena) y han erosionado sus diques de protección, hechos ocurridos en años anteriores pero con mayor actividad el año 2017 por presencia del fenómeno costero. Esta situación actual que presenta el cauce del Río Taruga ha dado lugar a que se presenten tramos críticos que ponen en situación de alto riesgo a sus centros poblados de Pajonal Alto - Nasca, por estar colmatado y debilitado en sus diques de protección por lo que resulta realizar actividades de prevención en la descolmatación y encauzamiento en el cauce del rio.



Los daños que ocasionaría en la ciudad de pajonal alto del distrito de vista alegre

42. DESCRIPCIÓN DE LA INFRAESTRUCTURA PROTEGER

□□□

Viviendas de material adobe 50.00 Viviendas de material noble 15,00 Centro de salud 01 □ Red de agua con punto de piletas y utilización de desagüe con pozo séptico □ Educación: Inicial 01 Infraestructura Eléctrica de Media y Baja Tensión Área recreativa 01

ao

O

POBLACION AFECTADA : 300 HABITANTES

PANEL FOTOGRAFICO: SECTOR PAJONAL ALTO.

flMSUUNIClPM.IWROV'‘‘

Ing

c^KHtóC*

'"rña'Ó^rCérórTfórres

GERtirir te ofsMfflorrn

Poste de alumbrado publico

PAJONAL ALTO

fumáesVdaide UCAtOE

Inq. Btrier Cerón Torres EG.CIP.10W34 0E DESARROLLO URBANO

V. CROQUIS DE UBICACIÓN DE LA ZONA DE INTERVENCIÓN El Rio Taruga - sector Pajonal Alto se encuentra ubicada a 16 Km aproximadamente de la Plaza de Armas de Nasca, el acceso a la zona de la intervención es por la panamericana sur con desviación ala Izquierda del Grifo Primax entrando a través de la carretera afirmada al pueblo Pajonal Alto - Nasca. El acceso de la maquinaria pesada a la zona de intervención es a través del cauce del rio Taruga, para lo cual cuenta con un acceso natural al cauce del rio.

HMW ína B<$er Cerón ing. CIP. unas*

Torres

GERE OE DESAHROLW URBANO

VI. UBICACIÓN DEL PUNTO CRÍTICO A INTERVENIR EN EL RIO TARUGA - NASCA El Sector critico, en el Rio Taruga denominado sector Pajonal Alto, comprende trabajos al margen Derecho aguas abajo del sector Taiuga Alto (555 m.s.n.m.), en una zona curva del cauce del Rio Taruga -Nasca.

RESUMEN DE PLANILLA DE MOVIMIENTOS DE TIERRAS DESCOLMATACION, ENCAUZAMIENTO EN EL CAUCE DEL RÍO OBRA:

TARUGA: SECTOR PAJONAL ALTO DISTRITO DE VISTA ALEGRE, PROVINCIA DE NASCA- REGION ICA

Sectores

DESCOLMATACION (M3.)

SECTOR PAJONAL

18,900.00

ALTO TOTALES

18,900.00

‘lná~Bétíer Cerón Torres my*rip <07334 GER

MMSWWUfl URBANO

AREA ESTACA

CORTE 0+000 0+020 0+040 0+060

VOLUMENES (M3)

DISTANCIA RELLENO

CORTE

RELLENO

VOLUMENES ACUMULA DOS(M3) CORTE

RELLENO

0.00

27.14

0.36

20.00

2738 27.41

3.86 3.64

6815000 684.8750

423000 75.0000

6813000 13663750

423000 1173000

2739

1.98

685.0000

563000

2,0513750

173.4000

20.00

TRAMOS CENTROS POBLADOS

0+080

20.00 20.00

2751

188

6863500

38.6000

2,737.6250

212.0000

0+100

20.00

27.75

1.94

690.7500

383000

3,4283750

2503000

0+120 0+140

20.00 20.00

27.19 27.06

252 2.02

686.7500 6781250

44.6000 45.4000

4J15.1250 4,7933500

294.8000 3403000

0+160

20.00

2754

2.30

6825000

433000

5,475.7500

383.4000

0+180

20.00

29.01

2.11

706.8750

44.1000

6,182.6250

4273000

20.00 20.00

27.09

2.02

7012500

413000

6,883.8750

468.8000

§

2.21

423000 423000

73S80000 8330.0000

5111000 5533000

<

0+200 0+220 0+240

20.00

26 84 26.92

2.01

674.1250 672.0000

0+260 0+280

20.00 20.00

26.49 26.14

331 2.11

667.6250 657.8750

523000 533000

8,897.6250 95555000

6055000 658.7000

o

0+300 0+320

20.00

2631 27.11

109 1.84

655.6250 667.7500

32.0000 293000

1031H250 10,8788750

690.7000 720.0000

27.03

136

676.7500

31.0000

11555.6250

7510000

oc O O h tu

0+340

20.00 20.00


0+360 0+380

20.00 20.00

28.16 2850

0.96 0.84

689.8750 7083500

223000 18.0000

123455000 12,953.7500

773.2000 791.2000

0+400

20.00

29.19

104

7211250

18.8000

13,674.8750

810.0000

0+420

20.00

29.15

101

729.2500

203000

14,404.1250

8305000

0+440 0+460

20.00

29.82 2937

131 163

7373250 7386250

223000 28.4000

15,1413500 15,879.8750

852.7000 8813000

30.05

132

7415000

293000

16,6213750

910.6000

30.64

0.98

7586250

23.0000

17380.0000

933.6000

3039 30.18

0.93 0.65

762.8750 757.1250

19.1000 15.8000

18342.8750 18,900.0000

952.7000 9685000

0+480 0+500 0+520 0+540

20.00 20.00 20.00 20.00 20.00

2

VOLUMEN TOTAL DE CORTE DE TERRENO SEMI ROCOSO: 18,900.00 M3

MASCA

5ér~¿erón Torres tt DE UtSARROU-O URBANO

VI. DESCRIPCION DE LAS ACTIVIDADES A REALIZAR

01. OBRAS PROVISIONALES 01.01

.-Estacionamiento para Maquinaria y Equipos. - La Municipalidad Provincial de Nasca habilitará un lugar donde sirva de almacén y/o estacionamiento de la maquinaria, luego de las jomadas diarias de trabajo, así como de los días no laborables, hasta la culminación de la intervención. 0l.o2.-Cartel de Identificación. - Servirá para la Identificación de la actividad y se colocará en un lugar visible. 02.-OBRAS PRELIMINARES 02.01-Moviltzación de Maquinaria. - Acciones que se realizará con camión cama baja para Movilizar (ida y vuelta) a la zona de trabajo 01 Tractor sobre Orugas D6 5EX-16 (205 hp.), a una distancia aproximada de 210 km, las maquinarias en mención se ubica en la Provincia de Pisco que se llevara hasta el rio Taruga sector de Pajonal Alto del Distrito de Vista Alegre - Nasca. 03.-MOVIMIENTO DE TIERRAS 03.01. Descolmatación, Encauzamiento en el cauce del Rio Taruga. Acción que se realizara con maquinarias pesadas, las que efectuarán un corte promedio de 1.00 m de altura a una base de 35.00 m en una longitud total de 0.540 km, en el cauce del rio taruga el material des colmatado sera arrimado asía la margen derecha del mencionado rio, esto con la finalidad de conformar un terraplén y/o defensa rivereña para que sirva de protección ante una posible avenida o desborde del rio taruga . El volumen estimado a remover es de 18,900.00 m3, actividades que se desarrollaran en el sector Pajonal Alto - Nasca. Para la ejecución de esta actividad se utilizara maquinaria pesada consistente en, 01 Tractor sobre Orugas modelo D65EX-16. 04.- ABASTECIMIENTO DE COMBUSTIBLE 04.01.

Abastecimiento

de

Combustible

a

Maquinarias.

Acción

que

consiste

en

abastecer

el

combustible a la maquinaria pesada y liviana 'para ello se utilizara un camión cisterna que transportara dicho combustible. 05.-SEGURIDAD EN OBRA 05.01 .-Vigilancia y Guardianía. - Consiste en contar con los servicios de un Vigilante que realice la actividad de vigilancia las 24 horas, de todo el pool de maquinaria que estará trabajando en la actividad.

PROVIHCIAL

Ing.

er CerórTTorres EG.CIP. 10X234 Di DESARROLLO URBANO

A

Vil.- HOJA DE METRADOS "DESCOLMATACION, ENCAUZAMIENTO EN EL CAUCE DEL RIO TARUGA - SECTOR PAJONAL ALTO PROVINCIA DE NASCA REGION ICA “

PART.

DESCRIPCION

METRADOS UNID.

LARGO Cant

Dimensión (m) Sección Rectangular

ALTURA

PARCIAL

SUB TOTAL

OBRAS PROVISIONALES

1.00

GL6

ESTACIONAMIENTOS PARA MAQUINAS Y EQUIPOS

1.01

CARTEL DE OBRA

1.02

1.00

1.00

1.00

GLB

1.00

1.00

GLB

1.00

1.00

OBRAS PRELIMINARES

2.00

MOVILIZACION 2.01

Y

DESMOVILIZACION

DE

MAQUINAS MOVIMIENTO DE TIERRAS .

3.01

DESCOLMATACION

Y

ENCAUZAMIENTO

EN

EL M3

18,900.00

CAUCE DEL RIO TARUGA

540.00

SECTOR PAJONAL ALTO 4.00

ABASTEC. DE COMBUSTIBLE

4.01

ABASTECIMIENTO DE COMBUSTIBLE A MAQUINARIAS

CON

CAMION

CISTERNA

35.00

1.00

--- 1

HM

50

50

50

DIA

40

40

40

EN

CAMPO 5.00

SEGURIDAD EN OBRA

5.01

VIGILANCIA Y GUARDANIA

^UUNICIPALíOtól

¡na. Beder Cerón Torres RPG.CIP. 101234 GEREHTt'DE DESARROLLO URBANO

1

VHL-COSTO EN SOLES

PRESUPUESTO GENERAL DE LA ACTIVIDAD TESCOUMTACION, ENCAUZAMENTO EN EL CAUCE DEL RIO TARUGA, SECTOR PAJONALALTO PROVINCIA DE NASCA REGEN CA‘

Item

Descripción

01

OBRAS PROVISIONALES

0101

ESTACIONAMIENTO PARA MAQUINAS Y EQUIPOS

0b

too

1,000.00

01.02

CARTEL DE OBRA

gb

100

500 00

02

OBRAS PRELIMINARES

0201 03

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS

Und.

Met Jo

Precio SI.

1,500.00

DESCOLMATACION Y ENCAUZAMELO EN EL CAUCE DEL RIO TARUGA

04

ABASTECIMIENTO DE COMBUSTIBLE

04 01

ABASTECIMENTO DE COMBUSTIBLE A MAQUINA

05

SEGURIDAD EN OBRA

0601

VIGILANCIA Y GUARDIAN» COSTO DILECTO GASTO GENERALES

PRESUPUESTO TOTAL SON : CIENTO TRENTA Y OCHO MIL SETECENTOS UNO Y 501100 SOLES

1,00000 50000 8,000.00

Bb

1.00

8.00000

8.00000 88,45200

m3

18,603.00

4.68

88.45200

hm

6000

16099

B,049 50

día

40.00

8000

MOV1MENTO DE TIERRAS

0301

Parcial Si.

8,049.50

3,200.00 3.20000 109,201.50 29,500.00

DETALLE DE GASTOS GENERALES METRADOS ITEM

DESCRIPCION

UNID.

Cant.

PRECIO (S/.) UNID.

Pardal

l.GASTOS FUOS

9,400.00

1.1 GASTOS INDIRECTOS VARIOS

PEAJES Y CONSTANCIAS TRAMITES AL ALA

GLB

1.00

200.00

200.00

9,000.00

9,000DO

1.2 REPARACION MENORES PARA EQUIPOS POR IMPREVISTOS REPARACIONES

(PÁRCHADO,

SOLDADURA,REPUESTOS,LUBRICANTES

GLB

Y OTROS

A

1.00

1.3 INSUMOS Y OTROS AGUA DE MESA

OFICINA MATERIALES DE ESCRITORIO Y AFINES

GLB

1.00

100.00

100.00

GLB

1.00

100.00

100.00

2. GASTOS VARIABLES 2.1 PERSONAL PROFESIONAL RESIDENTE DE OBRA

20,100.00 GLB

5,500.00

5,5OODO

1.00

B

SUPERVISOR OPERACIONES PNC

GLB

CONTROLADOR DE MAQUINARIA Y/O COMBUSTIBLE PNC

GLB

1.00 1.00

8,000.00

8.000D0

3,600.00

3,600.00

1,500.00

1,500.00

1,500.00

1.500D0

2.2 PERSONAL AUXIUO Y OTROS TOPOGRAFO

GLB

AYUDANTE

GLB

TOTAL

1.00 1.00

29,500.00

¡na. Be£er Cerón Torres ÍÍG.CIP. 101234 DE DESARROLLO URBANO

5

«.-PROGRAMACION DE LA ACTIVIDAD DESCOLMATACION, ENCAUZAMIENTO EN EL CAUCE DEL RIO TARUGA-SECTOR PAJONAL ALTO, PROVWOADENASCAREGÜNCA “

CRONOGRAMA DE ACTIVIDADES PROGRAMADO ITEM

PARTIDA

UND

TOTAL

1 SI
2SEMANA 3 SEMANA 4 SEMANA SSaUNA

6 SEMANA

PROCESO DE EJECUCION F 01 0101

OBRAS PROVK30NAL Esiaacfamertt) paa Maqunanas / Equps

01 02

Cate de obra

F 02

OBRAS PRELIMINARES

0201

Morwaoín, desrrwiizxün demaqjrara pesada , equuos

to

MOV MENTO DE TIERRAS

r 0301

Descoheteoon encararen h.

20%

20%

20%

20%

10%

100%

100% 100%

50%

90%

100%

m3

10%

20%

20%

20%

20%

10%

100%

hn

10%

20%

20%

20%

20%

10%

’00%

Vgianaa y gueriaía

da

10%

20%

20%

20%

20%

10%

100%

Supervsón de Adwdades

da

10%

20%

20%

20%

20%

10%

100%

* 04

ABASTBCIMENTO DE COMBUSTIBLE

«01

A tasíeoraerto de antusfUe a maqunaias

05

SEGURIDAD EN OBRA

0501

502

r---

10%


X.-MAQU1NARIA Y EQUIPO REQUERIDO

í--------------------------------------------nsvi

Tractor Sobre Orugas D6 5EX-16 TOTAL

Cantidad de Maquina

Hora Maquina

100

245B84

Combustible Cantidad total (GAL) GaUHr

45

1,106.47 1,10647

Precio Galón W 1180

Costo Total Combustible (&) 13,05635 13,056.35

er Cerón Torres EG.CIP. 10X234 DE DESAMOUO

URBANO

XI.-APORTES DEL MVCS 11.1.- Maquinarias y Operadores Cantidad de Maquina

ÍTEM

Tractor Sobre Orugas D6 5EX-16

1.00

Aporteen maquinaria (SO

Total Costo HM Hora (S/.J Maquina 245.884

359.73

88,45200

TOTAL Sí.

88(45200

Nota. - el costo del combustible está incluido en el costo HM de cada maquina

11.2.- Equipos Auxiliares

I Maquinaria de Apoyo Marca/Modeto

Cantidad de Maquina

Costo Total Combustible

Predo Galón

Hora

Maquina

Combustible Gal/Hr

Cantidad Total (Gal)

(s/.)

(sí.) 1

Camión Cisterna combustible

para

1

50

2

100

TOTAL

Maquinaria Marca / Modelo

1,180.00 1,180.00

100

Cantidad de Maquinaria

Total Horas Maquina

1.00

50

Camión cisterna para combustible r'

11.80

(Sí)

Aporte en Maquinaria (SZ)

160.99

8,049.50

Costo HM

TOTAL

8/14950

11.3.- Mano de Obra Calificada - SUPERVISOR A tiempo completo durante el tiempo que dure la intervención

SUPERVISIÓN Supervisor de Campo TOTAL

Cantidad de 40

(Sí.)

Retribución Económica Total (s/.)

200,00

8,000.00

Costo Unlt

8,000.00

nHClALDEHA SCA

NTf DE DESftRROttO

2 rel="nofollow">

11.4 Controlador de Maquinaria y/o combustible A tiempo completo durante el tiempo que dure la intervención

CONTROLADOR DE MAQUINARIA Y/O COMBUSTIBLE

Cantidad de

Controlador

40

Costo Unit (&) 90.00

TOTAL

Retribución Económica Total (SZ.) 3,600.00 3,600,00

11.5 Mantenimiento de las Maquinaria. De acuerdo a los horómetros de las maquinarias utilizadas, se realizará el Mantenimiento preventivo que corresponda

XII. APORTES DE LA MUNICIPALIDAD PROVINCIAL DE NASCA 12.1

Movilización de la maquinaria

Aportará con la movilización y desmovilización de maquinaria; 01 Tractor sobre Orugas D6 5EX-16 (205hp.), con tracto remolcador y plataforma cama baja.

Costo Unit ITEM

Cantidad

Movilización y Desmovilización de Maquinaria y Equipos

GLB

(S/.)

8,000.00

TOTAL

12.2

Retribución Económica Total (S/.) 8,000.00 8,000.00

Estacionamiento de Maquinaria y Equipos

La Municipalidad Provincial de Nasca habilitará un lugar donde sirva de almacén y/o estacionamiento de la maquinaria, luego de las jomadas diarias de trabajo así como de los días no laborables, hasta la culminación de la intervención.

Costo Unit ÍTEM Estacionamiento de Maquinaria y Equipos TOTAL

Cantidad

1.00

(SQ

Retribución Económica Total (&.)

1,000.00

1,000.00 1,000.00

DE NASCA

Iñg.'Bffaer Cerón Torres GF

Ur EG. CIP. 10*234 DE DE SAHROtlO tJAAANO

12.3

Dirección Técnica del Desarrollo de la Intervención

La Municipalidad Provincial de Nasca costeará al personal que tendrá a cargo la ejecución de la Actividad en campo a tiempo completo, hasta ia culminación de la intervención.

ÍTEM

Cantidad

Costo Unit (Sq

Retribución Económica Total (&)

Dirección Técnica

GLB

5,500.00

5,500.00

Topografía y ayudante

GLB

3,500.00

3,500.00

12.4

Materiales de escritorio

La Municipalidad Provincial de, costeará los gastos que se generen por éste rubro en atención al desarrollo de la intervención.

12.5

Permisos y/o Autorizaciones para el desarrollo normal de la Intervención

yste ítem corresponde a los permisos a obtener del ANA-ALA, y otras Instituciones Involucradas en el desarrollo de 4a Intervención planteada en el presente Informe Técnico

12.6

Peajes

Este ítem corresponde al pago del peaje de ida y vuelta para vehículo liviano en éste caso para la Camioneta Mitsubishi L 200 y vehículo pesado-camión cisterna.

12.7

Reparaciones Menores para Maquinaria y/o Equipos

Éste item corresponde a reparaciones menores que se originen durante la intervención de la maquinaria pesada, vehículos pesados, camioneta, por desgate de sus componentes, como pemerias, mangueras hidráulicas, filtros aceites, desgaste de elementos de corte entre otros componentes que serán reemplazados oportunamente para asegurar el estado operativo de las unidades tractores D65 EX16 y vehículos del PNC-Maquinarias- MVCS..

12.8

Vigilancia y Guardianía

Éste ítem corresponde a la custodia y guardianía de la Maquinaria y/o Equipos de la presente intervención, durante las 24 horas de cada día, por el plazo de la ejecución de la actividad, y en el lugar del estacionamiento prefijado, de dichos equipos.

VIGLANCIA Y GUARDIANÍA

Vigilancia y Guardianía

Unidad

Día

Cantidad

40

Costo Unit

Retribución Económica Total

(sq

(sq

80.00

3200.00

TOTAL

12.9

3200.00

IDENTIFICACION INSTFTUCIONAL

Éste ítem corresponde a la Identificación Institucional con la Actividad.

Costo Unit VK5LANCIA Y GUARDIANÍA

CARTEL DE OBRA TOTAL

Unidad

Cantidad

GLB.

1.00

(Sq 500.00

Retrtoución Económica Total (S/.) 500.00 500..00

I

XIII.-ANALISIS DE LOS COSTOS UNITARIOS DESCOLMATACION, ENCAUZAMIENTO Y CONFORMACIÓN en el cauce del rio taruga PROPIO RIO AJA-: SECTOR ALTO Y MATARA PROVINCIA DE NASCA REGION ICA

Partida

01.01

ESTACIONAMIENTO PARA MAQUINAS Y EQUIPOS

Rendimiento

glbJDlA

Código

Descripción Recurso Subcontratos ESTACIONAMIENTO PARA MAQUINARIAS

0401010007

MO 1.0000

EQ. 1.0000

Costo unitario directo pa : glb

Unidad

Cuadrilla

Cantidad

glb 1.0000

Parida

01,02

Rendimiento

glb/DIA

Código

Descripción Recurso Subcontratos CARTEL DE IDENTIFICACION DE ACTIVIDAD

0401010008

Precio Si.

1,00000

1,000.00 Parcial SI. 1.000.00 1,000.00

CARTEL DE OBRA MO. 1.0000

EQ. 1.0000

Costo unitario directo por: glb

Unidad

Cuadrilla

Cantidad

glb

Precio SI.

02.01

Rendimiento

glb/DIA

Código 0232970002

Descripción Recurso Materiales MOVLIZACION Y DESMOVILIZACION

parida

03.01

Rendimiento

m3/DIA

Código

Descripción Recurso

Unidad

0349080100

Equipos TRACTOR S/ORUGA D65X-16

hm

PirtitSi

04.01

Renden rento

hm/DIA

Código

Descripción Recurso

Unidad

0348040041

Equipos CAMION CISTERNA ABASTECEDOR DE COMBUSTIBLE CON CAMION CISTERNA EN CAMPO

hm

Parcial SI.

500.00

500.00 500.00

Costo unitario directo pa glb

10,000.00

10000

Parida

500.00

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS MO 1.0000

EQ 1.0000

Unidad

Cuadrilla

glb

DESCOLMATACION Y ENCAUZAMIENTO Y CONFORMACION MO 600.0000

EQ 600.0000

Cantidad

Precios/.

Parcial SI.

1.0000

10,000.00

10,000.00 10,000.00

en el cauce del rio taruga Costo unitario directo pa m3

Cuadrilla

Cantidad

10000

0.013

4.68

PrecloS/. 35973

Pa reialS/. 523 523

ABASTECIMIENTO DE COMBUSTIBLE A MAQUINA MO 8.0000

EQ. 8.0000

Costo unitario directo pa hm

Cuadrilla

Cantidad

10000

1 0000

160.99

PrecioSL 16059

Parcial SI. 16059 160.99

Pairar

05 01

Rendimiento

dla/DIA

Código

Descripción Recurso Subcon tratos VIGILANCIA Y GUARDIANIA

0401010009

VIGILANCIA Y GUARDIANIA MO 1.0000

EQ. 1.0000

Costo unitario directo pa día

Unidad

Cuadróle

Cantidad

día

10000

80.00

Precio SI. 80 00

Parcial SI. 80.00 80.00

lE NASCA

¡na. Bjíder Cerón Torres U GE

REG.CIP. 101234 DE DESARROH0 URBANO

More Documents from "Willan TG"