W1 Plant 1 Plant 2 Plant 3

0.5 0.4 0.56 9000

W2 0.44 0.52 0.53 13000

W3

W2

W3

0.49 0.5 0.51 11000

W4 0.46 0.56 0.54 15000

W5 0.56 0.57 0.35 8000

W4

W5

34000 25000 31000

Solution W1 Plant 1 Plant 2 Plant 3

Fixed Cost Plant 1 Plant 2 Plant 3 Variable Cost Plant 1 Plant 2 Plant 3

1 1 1 3

1 1 1 3

1 1 1 3

14000 12000 15000

14 13.9 13.6

Total Production Cost Plant 1 14014 Plant 2 12013.9 Plant 3 15013.6 Total 41041.5

Total Distribution Cost 7.49

1 1 1 3

1 1 1 3

5 5 5

Normal Capacity 27000 20000 25000

Jika Plant 1 ditutup, total cost = Jika Plant 2 ditutup, total cost = Jika Plant 3 ditutup, total cost = Jika semua Plant beroperasi, total cost = Kesimpulan: Hentikan operasi pabrik 2

Total Cost 41,048.99

Overtime Production

, total cost = p, total cost = , total cost = eroperasi, total cost =

0 0 0

$B$9:$F$11 by

(All)

Row Labels $B$14 Pabrik 1 Ditutup 221,532.62 Pabrik 2 Ditutup 219,068.34 Pabrik 3 Ditutup 222,430.00 Semua Pabrik Beroperas 220,730.00

W1 Plant 1 Plant 2 Plant 3 Demand

0.5 0.4 0.56 9000

W2 0.44 0.52 0.53 13000

W3 0.49 0.5 0.51 11000

W4 0.46 0.56 0.54 15000

Total W5 Capacity 0.56 34000 0.57 25000 0.35 31000 8000

W2

W3

W4

W5

Normal Capacity 27000 20000 25000

Solution

W1 Plant 1 Plant 2 Plant 3

1 1 1 3

Total Cost 41048.99

1 1 1 3

1 1 1 3

1 1 1 3

Total Produksi 1 1 1 3

Normal Capacity 5 5 5

27000 20000 25000

NOT Overtime Capacity OPR FC OPR FC Reg. VC 7000 14000 6000 2.8 5000 12000 5000 2.78 6000 15000 7500 2.72

Overtime Production

Transport ation Cost FC VC 0 2.45 14000 0 2.55 12000 0 2.49 15000

14 13.9 13.6

OT. VC 3.52 3.48 3.42

Semua Pabrik Beroperasi

0 9000 0

13000 0 0

0 0 11000

Page 6

10029 0 4971

0 0 8000

Pabrik 1 Ditutup

0 8999 1

0 8261 4739

0 1991 9009

Page 7

0 5749 9251

0 0 8000

Pabrik 2 Ditutup

8702 0 298

9041 0 3959

407 0 10593

Page 8

6849 0 8151

1 0 7999

Pabrik 3 Ditutup

0 9000 0

13000 0 0

3000 8000 0

Page 9

15000 0 0

0 8000 0

-PABRIK 3 DITUTUP

0 9000 0

13000 0 0

0 11000 0

Page 10

15000 0 0

3000 5000 0