Iskandar A. Yusuf [email protected]

Http://www.pusair-pu.go.id PUSAT LITBANG SUMBER DAYA AIR Jl. Ir. H. Juanda no. 193 Bandung E-mail: [email protected]

Materi Presentasi Pendahuluan Isi Pedoman AHSP SDA Lingkup Pedoman AHSP-SDA, Edisi 1 Formulasi Pedoman AHSP -SDA Contoh AHSP

Masukan pada Workshop, Launching, Rapat Internal AHSP-SDA (2 mingguan) Sasaran Akhir AHSP-SDA

Pendahuluan Latar Belakang Analisa harga satuan pekerjaan (AHSP) pada berbagai pekerjaan konstruksi baik secara wilayah, lokasi pekerjaan maupun di berbagai institusi khususnya di lingkungan Kementerian Pekerjaan Umum satu sama lain berbeda karena belum mempunyai acuan baku AHSP. Walaupun ada beberapa item pekerjaan pada SNI-ABK Cipta Karya dan BOW, namun secara teknis detailnya terdapat perbedaan karakteristik yang sifatnya khusus untuk pekerjaan SDA yang diantaranya: kondisi waktu/musim/saat ataupun spesifikasi teknis mutu konstruksi/bahan yang digunakan, dll. Terbitnya PerPres No. 70 Tahun 2012, tentang perubahan PerPres No. 54 Tahun 2010, dieperlukannya suatu bakuan AHSP.

Perlu suatu bakuan Pedoman AHSP SDAUmum BidangBidang Pekerjaan

Tujuan dan Sasaran

Tujuan Penyusunan pedoman ini bertujuan untuk membuat bakuan metode AHSP guna pembuatan HPS atau owner’s estimate bagi pengguna untuk pekerjaan konstruksi dan harga perkiraan perencana atau engineering’s estimate bagi para penyedia pada Sub-Bidang Sumber Daya Air Sasaran 2004 Diawali dengan kompilasi Pd.T-01-2005, Pd.T.xx-2006-2007; Pd.T.xx2011 dan khusus untuk pekerjaan tanah secara mekanis menggunakan Pedoman PAHSP-Suplemen P.5 yang disusun menjadi PAHSP-SDA. 2012 Pedoman ini dipersiapkan oleh Panitia Teknis 91-01 BKBRS, telah dibahas dalam forum rapat teknis dan rapat konsensus pada tanggal 13 November 2012 di Bandung yang melibatkan para narasumber, pakar dan lembaga terkait. 2013 Tersusunnya berbagai koefisien AHSP tenaga kerja, bahan dan peralatan yang berdasarkan prinsip efisiensi dan efektifitas pelaksanaan pembangunan infrastruktur Ke-PU-an dalam rangka peningkatan kehandalan mutu infrastruktur SDA.

STATUS PEDOMAN ANALISIS HARGA SATUAN PEKERJAAN Bidang Pekerjaan Umum Tanggal 20 November 2012 04 Maret 2013

08 Mei 2013 16 Mei 2013

23 Mei 2013 13 Juni 2013 Okrober 2013

Status Di Lounching oleh Balitbang yang disampaikan kepada Bapak Menteri Pekerjaan Umum Ditetapkan sebagai Surat Edaran Bapak Menteri PU dg No. 02/SE/M/2013 Disosialisasikan di Pekanbaru untuk stakeholders wilayah Indonesia Barat Khusus Sub-Bidang SDA dipresentasikan di Kolokium Pusat Litbang SDA Disosialisasikan di Surabaya untuk stakeholders wilayah Indonesia Tengah Disosialisasikan di Makassar untuk stakeholders wilayah Indonesia Timur Ditetapkan sebagai Peraturan Menteri PU

Pengertian Istilah Analisis harga satuan pekerjaan (AHSP) adalah analisis untuk menghitung kebutuhan biaya pekerjaan menggunakan koefisien kebutuhan tenaga kerja, bahan dan peralatan yang dikalikan dengan harga satuan dasarnya masing-masing untuk mendapatkan harga satuan dari satu jenis pekerjaan tertentu Harga satuan pekerjaan (HSP) adalah biaya yang dihitung dalam suatu analisis untuk suatu pekerjaan, yang terdiri atas biaya langsung (tenaga kerja, bahan, dan alat), dan biaya tidak langsung (biaya umum atau over head, dan keuntungan) sebagai mata pembayaran dari suatu jenis pekerjaan tertentu. Harga satuan dasar (HSD) adalah harga komponen dari mata pembayaran dalam satuan tertentu, misalnya: bahan (m, m2, m3, kg, ton, zak, dsb.), peralatan (unit, jam, hari, dsb.), dan upah tenaga kerja (jam, hari, bulan, dsb.) Harga perkiraan sendiri (HPS) atau owner’s estimate (OE) adalah perkiraan biaya pekerjaan yang dihitung secara profesional oleh panitia dan disahkan oleh pejabat pembuat komitmen, yang digunakan sebagai salah satu acuan dalam melakukan evaluasi harga penawaran; HPS bersifat terbuka dan tidak rahasia.

Manfaat AHSP 1. Adanya bakuan AHSP yang legal 2. Metode AHSP yang sama digunakan oleh pembuat HPS baik dari satker ataupun dari penawaran penyedia jasa dapat menghindari terjadinya HSP timpang 3. Coverage HSP sudah termasuk biaya tidak langsung (biaya umum, overhead, dll). 4. Dapat menghitung extra cost untuk lokasi-lokasi remote terkait biaya angkutan jarak jauh dan/atau lintas pulau

Isi Pedoman AHSP-SDA KARAKTERISTIK KHUSUS PEKERJAAN SDA Lokasi kerja

: Berair atau berhubungan dengan air dan sulit transportasi/aksesibilitas

Waktu pengerjaan: Waktu pasang/surut (boleh jadi jam 0:00) atau musim kemarau/hujan Jenis Konstruksi : - Kedap air campuran khusus - Tahan air laut/asam semen khusus

STRUKTUR AHSP_PST-SDA AHSP-PST XIV. Studi Terpadu XIII. Konservasi SDA XII. Drainase Perkotaan XI. Pengendali

II. Bendung

III. Irigasi

I. U M U M Pek. Pengukuran & Pemetaan Pek. Geoteknik Pek. Hidrologi Pek. Tanah Pek. Pasangan KONSTRUKSI Pek. Beton Pek. Pemancangan Pek. Dewatering Pek. Pintu Air dan Hidro Mekanik Pek. Lain-lain

X. Pengendali

IX. Infrastruktur

IV. Pengaman Sungai V. Bendungan VI. Pengaman Pantai VII. Pengendali Muara VIII. Infrastruktur

STRUKTUR PEDOMAN AHSP vs PST Sumber Daya Air PST

VS

AHSP

Jenis Pekerjaan/ Infrastruktur/Kegiatan

><

Jenis Pekerjaan/ Infrastruktur/Kegiatan

1. 2. 3. 4.

Deskripsi Satuan Pengukuran Metode/Teknologi Spesifikasi Teknis - dimensi/volume - mutu/kekuatan - Jumlah - Waktu

Perencanaan Desain

Konstruksi OP

1. Deskripsi 2. Satuan Pengukuran 3. Formulasi Jumlah MM Formulasi Produktvit’s 4. Koefisien: - Tenaga kerja - Bahan - Peralatan

STRUKTUR PEDOMAN AHSP – SDA (SIDCOM) Perencanaan: -

Study Awal Study Identifikasi Study Pengenalan Pra-Desain dan Study Kelayakan

Model Formulasi Kebutuhan OB atau MM

Desain: (Detail Desain)

Konstruksi

Volume – I: UMUM + Bangunan Air

Operasi dan Pemeliharaan

- Honor Rapat/Diskusi - Biaya OP peralatan dan bangunan dll.

LINGKUP PEDOMAN AHSP BIDANG SUMBER DAYA AIR Edisi – 1: Konstruksi 4. Sungai 1. Umum Cara Manual……………….(300 item) (Krib, perkuatan tebing sungai, tanggul; 1.1 Pekerjaan Tanah ……………………….. 51 Sodetan dan/atau Restorasi; dan 1.2 Pekerjaan Pasangan…………………… 82 Acuan 1.3 Pekerjaan Beton ……………………….. 64 Berbagai Pengerukan) 5. Bendungan 1.4 Pekerjaan Pemancangan……………… 18 Jenis (Bendungan Urugan Tanah, Batu, CFRD, 1.5 Pekerjaan Dewatering…………………. 8 Konstruksi Beton; Bangunan Pelengkap: Pelimpah, 1.6 Pekerjaan Pintu Air ……………………. 56 Intake, Tanggul, Pengelak, dan 1.7 Pekerjaan Lain-lain ……………………. 20 Terowongan; Hidromekanik & Instrumen; Contoh AHSP Cara Mekanis ………(033 item) (1) Angkutan material/dredging di Situ/Waduk (2) Penggalian tanah di Sungai (3) Angkutan material lintas pulau (4) Galian, angkutan dan pemadatan 2. Bendung (Bd. Tetap, Bd. Gerak dan Penangkap Sedimen) 3. Irigasi (Saluran Primer, Sekunder; Bangunan ukur & pengatur dan Bangunan pelengkap)

dan Embung)

6. Pengaman Pantai (Tembok Laut, Revetmen, Krib Laut, Tanggul Laut, Pemecah Gelombang, dan Vegetatif

7. Pengendali Muara Sungai (Jeti, ambang tenggelam, pengerukan) 8. Rawa (Saluran primer-tertier, intake air baku) 8. Airtanah (Sumur dalam, JIAT)

RINCIAN LINGKUP PEDOMAN AHSP SUB-BIDANG SUMBER DAYA AIR Volume I: Umum

Edisi – 1: Konstruksi

1. PEK. TANAH……………………………………………………..(083 item) a). Manual 1) Pembersihan dan pengupasan permukaan tanah …( 3 item) 2) Uitzet trase saluran dan pasang profil melintang …( 2 item) 2) Galian, Timbunan-pemadatan dan angkutan Tanah. (46 item) b). Mekanis 1) Timbunan………………………………………………………..( 2 item) 2) Perbaikan sifat teknis tanah……………………………...( 6 item) (grouting dan pemadatan)

3) Pengerukan ………………………………………………….. ( 4 item) 4) Pengangkutan material/hasil galian - dg Dumptruck 0,5; 1; 3; 5; 10; 20; 30 km….……. (4+7 item) - dg Ponton 0,5; 1km ……………………………............ ( 2 item) - dg Tongkang/Perahu 0,5; 1; 3; 5; 10; 20; 30 km ( 7 item)

2. PEK. PASANGAN………………………………………………….(082 item) a). Pas. Batu………………………………………………………… ( 6 item) b). Pas. Bata merah………………………………………………. ( 5 item) b). Siaran………..…………………………………………………… ( 2 item) c). Plesteran……………………………………………………… ( 6 item) d). Bronjong………………………………………………………… ( 30 item) e). Pasangan lain………………………………………………….. ( 33 item) - Batu kosong, batu muka, batu candi - Geotekstil, Beton terkunci, Armor 3. PEK. BETON………………………………………………………..(072 item) a). Pembuatan campuran beton ……………………………… ( 32 item) b). Pembesian beton ..…………………………………………… ( 7 item) c). Bekisting dan curing beton ……………………..………… ( 27 item) d). Pembongkaran konstruksi beton dan water stop…… ( 6 item) 4. PEK. PEMANCANGAN……………………………………………(018 item) a). Hammer tanpa mesin …………..……………………………( 9 item) b). Hammer dengan mesin……..……………………………… ( 9 item)

5. PEK. DEWATERING ………..……………………………………….( 8 item) 6. PEK. PINTU AIR DAN PERALATAN HIDROMEKANIK a). Pintu Angkat ……………….…….………………………..….. ( 16 item) b). Pintu Sorong Kayu rangka besi ……………………..….. ( 11 item) c). Pintu Sorong Baja ..…….………………………..…………. ( 29 item) 7. PEK. AIRTANAH……………………………………………………. ( 18 item) 8. PEK. LAIN-LAIN ……………………………………………………. ( 20 item) Mengacu pada Volume I: Umum, CONTOH menghitung HPS:

Vol. II : Bendung

Vol. VI : Pengaman Pantai

Vol. III : Jaringan Irigasi

Vol. VII : Pengendali Muara

Vol. IV : Pengaman Sungai Vol.VIII : Rawa Vol. V : Bendungan

Vol. IX : Airtanah & Air Baku

CONTOH ALAT UNTUK PEKERJAAN SDA 1). Manual - Simpel/sederhana - Alat pribadi pekerja/Tukang a). Meteran b). Sendok tembok/palu/pahat/gergaji, dll.

2). Mekanis - Volume besar/waktu terbatas - Alat berat a). Alat utama/pokok b). Alat bantu, dll.

CONTOH ALAT BERAT UNTUK PEKERJAAN SDA

CONTOH ALAT BERAT UNTUK PEKERJAAN SDA

CONTOH ALAT BERAT UNTUK PEKERJAAN SDA

Komposisi Tenaga Kerja vs Target Mutu Generalisasi Komposisi Tenaga Kerja a. Tingkat Mutu Produk - Tinggi Pekerja+Tukang+Kep. Tukang+Mandor - Sedang Pekerja+Tukang+Mandor - Rendah Pekerja+Mandor b. Kondisi Lapangan - Jarak - Kemiringan medan

Rasio P/M = 10 P/T ditetapkan sendiri2

Additional Effort

- Bahan aditif - Peralatan - Teknologi

PENENTUAN KOEFISIEN AHSP – SDA (Manual) - Tentukan jenis pekerjaan apa

(kasar/halus)

- Tentukan Tingkat Mutu Produk (rendah/tinggi)

?

- Kondisi lapangan yg seperti apa (datar/curam; kelompok/nyebar) Berdasarkan Tingkat mutu produk

A. Galian tanah

Pekerja dan Mandor

B. Pasangan batu

Pekerja, Tukang dan Mandor

C. Plesteran/acian

Pekerja, Tukang, Kepala tukang dan Mandor

2 Group: 10 pekerja 2 tukang 1 mandor

Menghasilkan 3,7 m3 pasangan batu per hari

Koefisien: Pekerja=10/3,7 Tukang= 2/3,7 Mandor= 1/3,7

= 2,7 = 0,54 = 0,27

PENETAPAN KOEFISIEN AHSP – SDA Acuan yang digunakan: -

SNI Penelitian di SDA Pedoman/Manual yg ada di PU Rata-rata dari kontrak (1985 – 1999) Pembandingan dg referensi lain: a. BOW b. Studi Ditjen SDA (1995) c. Bappenas (2000) Contoh: Pekerjaan Galian tanah biasa kedalaman 1 m’ Koefisien 0,5630 Pekerja Diambil acuan Ditjen SDA 0,0563 Mandor

- Ada arahan pekerjaaan yg sama di Kem. PU harus sama Jika berbeda deskripsikan dg jelas - Dibuatkan lampiran Acuan Kinerja Tukang (terampil/semi-terampil)

FORMULASI PEDOMAN AHSP BIDANG SUMBER DAYA AIR Edisi – 1: Konstruksi Konstruksi

Koefisien/given:

Manual dan/atau Semi Mekanis

- Tenaga kerja

Acuan Kinerja SDM terampil/bersertifikat

- Bahan

Faktor susut/hilang dan kualitas bahan

- Peralatan

Kinerja peralatan dan biaya OP/sewa

Formulasi/Rumus: - Alat berat (biaya IOP dan produktifitas alat) - Perencanaan (kebutuhan TA dan B.Langsung) Koefisien AHSP berlaku di Seluruh INDONESIA (HSP dapat berbeda karena Harga Satuan Dasarnya)

PROSES PERHITUNGAN HPS - SDA

DAERAH SETEMPAT

BASIC PRICE Acuan Kinerja

ANALISA HARGA SATUAN PEKERJAAN (AHSP) Koefisien : -Bahan -Upah Tenaga Kerja -Peralatan -Lain-lain

HARGA SATUAN PEKERJAAN (HSP)

DETAIL DESAIN

VOLUME PEKERJAAN -Satuan panjang -Satuan luas -Satuan Volume -Satuan Waktu

HARGA PERKIRAAN SENDIRI (HPS)

Contoh Harga Satuan Dasar Tabel A.1 - Contoh Daftar Harga Satuan Dasar Tenaga Kerja, Bahan dan Peralatan Jawa Barat 2012 Harga No 1

Uraian

Satuan

Kode

2

3

4

Satuan Dasar ( Rp. ) 5

I

UPAH TENAGA KERJA

1 2

Pekerja Tukang

OH OH

L.01 L.02

50.000,00 60.000,00

3 4 5 6 7 8 9 10 11 12 13 14 15 16

Kepala Tukang Mandor Juru/operator/mekanik Pembantu Juru/operator/mekanik Akhli muda Akhli madya Akhli utama Supir truck Supir kendaraan < 2 ton (termasuk sedan) Kenek Penjaga malam/Satpam Drafter CAD/manual Desain Engineer Operator printer/ploter

OH OH OH OH OH OH OH OH OH OH OH OH OH OH

L.03 L.04 L.05 L.06 L.07 L.08 L.09 L.10 L.11 L.12 L.13 L.14 L.15 L.16

70.000,00 75.000,00 100.000,00 50.000,00 450.000,00 650.000,00 1.000.000,00 85.000,00 65.000,00 45.000,00 65.000,00 100.000,00 400.000,00 50.000,00

m3 m3 L bh bh bh bh bh m3 m3 m2 m2 kg m3 m3 m3 m3 m3 m3 m3 m3

M.01 M.02 M.03 M.04.a M.04.b M.04.c M.04.d M.04.e M.05 M.06 M.07a M.07b M.08 M.09.a M.09.b M.09.c M.09.d M.09.e M.09.f M.09.g M.09.h

II

BAHAN / MATERIAL

A

KELOMPOK AIR, TANAH, BATU DAN SEMEN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Abu Batu Air Bahan Aditif (Caldbon, Strorox, dll) Batu bata / merah bakar kelas I Batu bata / merah bakar kelas II Batu bata / merah bakar kw biasa Batu bata / merah bakar pres Batu bata / merah oven (Klingker) Batu / batu kali/ batu belah Batu brojol (Untuk bronjong) Batu candi Batu muka Bentonit Beton Ready Mixed K-175 Beton Ready Mixed K-200 Beton Ready Mixed K-225 Beton Ready Mixed K-250 Beton Ready Mixed K-275 Beton Ready Mixed K-300 Beton Ready Mixed K-325 Beton Ready Mixed K-350

150.000,00 3.075,00 35.000,00 6.325,00 8.305,00 450,00 650,00 13.750,00 95.000,00 118.250,00 140.500,00 100.000,00 8.500,00 710.000,00 730.000,00 750.000,00 765.000,00 775.000,00 800.000,00 817.500,00 834.000,00

CONTOH AHSP CARA MANUAL Perhatian !! Pastikan Harga Satuan 1 m3 beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87 yg digunakan dalam Harga Satuan No Uraian Kode Satuan Koefisien (Rp) satuan yang sama 1 A 1 2 3 4

Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor

B 1 2 3 4

Bahan PC / Portland Cement PB / Pasir Beton Kr / Krikil Air

C

D E F

2

Peralatan 1 Molen 0,35 m3

3

4

L.01 L.02 L.03 L.04

OH OH OH OH

1,323 50.000,00 0,189 60.000,00 0,019 70.000,00 0,132 75.000,00 Jumlah Harga Tenaga Kerja

66.150,00 11.340,00 1.330,00 9.922,50 88.742,50

M.15 M.14.a M.12 M.02

kg m3 m3 L

247 1.240,00 0,621 140.000,00 0,74 140.000,00 215 25,00 Jumlah Harga Bahan

306.280,00 86.940,00 103.600,00 5.375,00 502.195,00

E.28.b

Sewa-hari

0,250 400.000,00 Jumlah Harga Peralatan

100.000,00 100.000,00 690.937,50 103.640,63 794.578,13

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) Overhead + Profit (Contoh 15%) Harga Satuan Pekerjaan per - m3 (D+E)

5

6

Jumlah (Rp)

15% x D

7

CONTOH AHSP PEKERJAAN MEKANIS 1. Angkutan Material/ Dredging di Waduk/Situ

(2) Tanah Galian di Waduk/Situ (1) Excavator 1 di atas Ponton 1 (3) Ponton 2 mengangkut hasil galian ke darat

Jarak angkut ponton 2 ke daratan 1 km

Stock pile hasil galian diratakan oleh Buldozer (4) Excavator 2 di darat menurunkan hasil galian dari ponton 2 ke daratan

1.1

AHSP Galian tanah di Situ/Waduk

No

Uraian

Kode

2

3

4

L.01 L.04

OH OH

1 A 1 2

Tenaga Kerja Pekerja Mandor

B

Bahan

C 1 2 3

Peralatan Biaya Operasi Excavator 1 (long arm) + Ponton 1 Biaya Operasi Excavator 2 (long arm) Biaya Operasi Buldozer meratakan + perapihan

D E F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) Overhead + Profit (Contoh 15%) Harga Satuan Pekerjaan per - m3 (D+E)

Satuan Koefisien

Harga Satuan (Rp)

Jumlah (Rp)

6

7

5

0,1626 50.000,00 0,0163 75.000,00 Jumlah Harga Tenaga Kerja Jumlah Harga Bahan

jam jam jam

0,0449 664.520,12 0,0327 614.466,87 0,0191 514.141,55 Jumlah Harga Peralatan 15% x D

8.127,77 1.219,17 9.346,93 29.809,39 20.119,42 9.814,59 59.743,40 69.090,33 10.363,55 79.453,90

A. Analisis Biaya OP Peralatan No 1)

2)

Uraian Kegiatan DATA 1. Merk/Model/Tipe Alat 2. Tenaga 3. Kapasitas 4. Umur Ekonomis 5. Jam operasi per tahun 6. Harga Pokok Perolehan 7. Harga sisa 8. Harga Penyusutan

Satuan

Rumus/Notasi m³ m³ Tahun Jam

Rp /jam Rp /jam Rp /jam

2. Asuransi

Pw Cp A W B C=10%

Rp x 1000 Rp x 1000 Rp x 1000

ANALISIS BIAYA a) Biaya Modal + Asuransi 1.Pengembalian modal (E)

Metode pada butir 5.2.2

Rp /jam

Biaya Modal dan Asuransi….a)

Metode P.5 (SDA) Rumus/Notasi

Nomor

N Q UE H HP Hs = 10% = (HP-Hbp)* HP-Hbp-Hs

(02a) (02b)

Nomor

(02)

Biaya pasti

Biaya pemilikan

Pengembalian Modal

Penyusutan + Bunga Modal

D =

𝑖 × (1 + 𝑖) 𝐴 (1 + 𝑖) 𝐴 − 1

(𝐵 − 𝐶) 𝑥 𝐷 𝑊 𝐼𝑛𝑠 × 𝐵 F = 𝑊 G = E + F

E =

(03)

D



( HP  H bp

 Hs)

+

(03a)

UE .h

E

(04)

(05)

Bm

FBa

 i%(



UE  1

) 

HP

2 UE

h

( UE  1 )

HP

p%



2 UE

(06)

h

(04a)

(05a) (06a)

G = EBm + FBa

b) Biaya Operasi 1. Bahan bakar

(H)

2. Bahan Oli / Pelumas

(I)

Rp /jam

H= (12 s.d 15)% x Pw x Ms

(07)

I= (2,5 s.d. 3)% x Pw x Mp

(08)

0 ,8 .N.S

HBBM 

H bbm

E

a. Mesin

Rp /jam

b. Transmisi

Rp /jam

c. Hydraulic Oil

I

BBO

m

IBBO t

C





( T



C (

IBBO h

 (



E

C

Rp /jam



IBBO g



3. Bahan Pokok a. Ban

Rp /jam

J = (6,25 s.d. 8,75)% x B/W

(08b) (08c) (08d)

S N.H bbp

(08e)

+IBBOh+IBBOg)

Biaya Bengkel

(08a)

)N.H bbp

IBFF = 0,5(IBBM + IBBOm + IBBOt

Rp /jam (J)

) N.H bbp

S E

E

e. Filter-filter

) N.H bbp

S

T

d. Grease

S E

T

Rp /jam

(07a)

I = IBBOm + IBBOt+IBBOh+IBBOg+IBFF

Biaya perbaikan (09)

Jbb 

H bb

(09a)

T

b. Pipa-pipa

Rp /jam

Jbp 

c. Rubber Slovel

Rp /jam

Jbr 

Hbp

(09b)

T H br

(09c)

T

d. Ponton pipa

Rp /jam

Jpp 

Hp p

(09d)

T

4. Operator

(L+M)

Biaya operasi ……………..b)

Rp /jam

L = 1 orang/jam x U1 M= 1 orang/jam x U2

(10)

Rp /jam

P = H + I + J + L + M

(11)

c). Biaya pemeliharaan /peralatan 3)

TOTAL BIAYA OPERASI ALAT

K=(12,5 s.d. 17,5)% x B/W

(12)

S = E + F + P + K

(13)

*) Hbp = harga bahan pokok: ban, pipa-pipa, Rubber Sleeve, Ponton Apung.

L = 1 orang/jam x U1 M= 1 orang/jam x U2

J = H + I + J + L + M KBPP = f

( HP - H

(10a) (11a)

bbp

)

UE

S = E + F + P + K

(12a) (13a)

Contoh Analisis Biaya OP Peralatan ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH DI SITU/WADUK JENIS ALAT : Excavator, Ponton dan Buldozer SATUAN PEMBAYARAN : Rupiah/jam No.

URAIAN

KODE SATUAN

A. 1. 2. 3. 4. 5. 6. 7.

URAIAN PERALATAN Jenis Peralatan Merk / Tipe Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat

3.

2.

Pw Cp A W B

HP Tahun Jam Rp

C

Rp

Perhitungan Biaya Operasi Peralatan

KETERANGAN

Excavator 2 (Long Arm) 80-140 HP 133,0 0,6 5,0 2.000 1.500.000.000

Excavator 1 + Ponton-1 80-140 HP 133,0 0,8 5,0 2.000 1.725.000.000

120,0 0,0 5,0 2.000 225.000.000

100-150 HP 150,0 0 5,0 2.000 900.000.000

150.000.000

172.500.000

22.500.000

90.000.000

0,26380

0,26380

0,26380

0,26380

Ponton-2

Bulldozer

Suku bunga i = 10%

Faktor Angsuran Modal

=

D

-

Biaya Pasti per Jam : a. Biaya Pengembalian Modal

=

E

Rp/jam

178.063,30

204.772,79

26.709,49

106.837,98

b. Asuransi, dll.

=

F

Rp/jam

1.500,00

1.725,00

225,00

900,00

G = (E + F)

G

Rp/jam

179.563,30

206.497,79

26.934,49

107.737,98

H

Rp/jam

159.600,00

159.600,00

144.000,00

180.000,00

12,00%

I

Rp/jam

99.750,00

99.750,00

90.000,00

112.500,00

2,50%

Biaya Pasti per Jam C. 1.

URAIAN ANALISA HARGA SATUAN

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas

= (2.5%-3%) x Pw x Mp

Asuransi p = 0,2%

Biaya bengkel

= (6,25% - 8,75%)

x

J

Rp/jam

46.875,00

53.906,25

7.031,25

28.125,00

6,25%

3.

Perawatan dan perbaikan

= (12,5%-17,5%)

x

K

Rp/jam

93.750,00

107.812,50

14.062,50

56.250,00

12,50%

4. 5.

Operator = (m orang/jam) x U1 Pembantu operator = (n orang/jam) x U2

M L

Rp/jam Rp/jam

14.285,71 7.142,86

14.285,71 7.142,86

14.285,71 7.142,86

14.285,71 7.142,86

Biaya Operasi (per Jam)

P

Rp/jam

421.403,57

442.497,32

276.522,32

398.303,57

S

Rp/jam

600.966,87

648.995,12

303.456,82

506.041,55

Mb Ms Mp

Liter Liter Liter

10.000,00 10.000,00 30.000,00

10.000,00 10.000,00 30.000,00

10.000,00 10.000,00 30.000,00

10.000,00 10.000,00 30.000,00

=

D.

BIAYA OPERASI ALAT / JAM = (G + P)

E. 1. 2. 3.

LAIN - LAIN Bahan Bakar Premium (non subsidi) Bahan Bakar Solar (non subsidi) Minyak Pelumas

B. Analisis Produktivitas Alat I.

ASUMSI 1. Jam kerja efektif per hari 2. 3. 4. 5.

II.

Tk

7,00

jam

Fk Fk1 L

1,20 1,00 1,00

km

V Fb Fa

0,60 0,70 0,69

Waktu Siklus Menggali, swing dan memuat ke ponton 2 Swing kembali dan Lain - lain

Ts1 T. 1 T. 2 Ts.1

0,40 0,25 0,65

Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk )

Q.1

22,29

Faktor pengembangan tanah Faktor pengembangan tanah lepas Jarak angkut Urutan kerja : a. Lebar situ diperkirakan 2.0 km b. Excavator 1 + Ponton 1 mengeruk / menggali tanah dan dimuat ke Ponton 2. c. Ponton 2 mengangkut tanah hasil galian ketepi situ d. Excavator 2 menurunkan tanah hasil galian pada Ponton 2 ke darat tempat timbunan hasil galian e. Bulldozer menghampar, meratakan dan merapihkan

ALAT a. Excavator 1 (Long Arm) + Ponton 1 Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat

Koefisien Alat/m3 = 1 / Q.1

III.

Tenaga. a. Di Excavator 2 di darat menurunkan hasil galian dari ponton 2 ke daratan Produksi yang menentukan: 3 buah Ponton 2 Produksi / hari = Tk x Q.1 Kebutuhan tenaga - Pekerja - Mandor Koefisien Tenaga / m3 - Pekerja : ( Tk x P ) : Q.1' - Mandor : ( Tk x M ) : Q.1'

Q.1 Q.1' P M

Jarak rata - rata.

m3 Pemuatan sedang Kondisi operasi alat sedang Pemeliharaan mesin baik Menit Menit Menit Menit m3/jam

0,0449

jam

23,20 162,42

m3/jam m3/hari

2,00 0,20

OH OH

0,0862 0,0086

jam jam

Contoh Analisis Produktivitas Alat NO

U R A I A N

KODE

KOEF

SATUAN

KETERANGAN

m3

Pemuatan ringan Kondisi operasi alat sedang Pemeliharaan mesin baik

ANALISIS PRODUKTIVITAS PENGGALIAN TANAH DI SITU/WADUK DENGAN EXCAVATOR DI PONTON 1, c. Excavator 2 (Long Arm) Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat

HASIL GALIAN DIANGKUT DENGAN PONTON 2 JENIS PEKERJAAN : GALIAN TANAH / PENGERUKAN SITU JARAK ANGKUT : 1,0 Km SATUAN PEMBAYARAN : M3

NO I.

II.

U R A I A N

KODE

KOEF

SATUAN

KETERANGAN

V Fb Fa

0,60 0,90 0,69

Waktu Siklus Menggali, swing dan membuang ke tanggul Swing kembali dan Lain - lain

Ts3 T. 1 T. 2 Ts.3

0,36 0,25 0,61

Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk )

Q.3

30,54

Menit Menit Menit Menit

ASUMSI 1. Jam kerja efektif per hari

Tk

7,00

2. 3. 4. 5.

Fk Fk1 L

1,20 1,00 1,00

Faktor pengembangan tanah Faktor pengembangan tanah lepas Jarak angkut Urutan kerja : a. Lebar situ diperkirakan 2.0 km b. Excavator 1 + Ponton 1 mengeruk / menggali tanah dan dimuat ke Ponton 2. c. Ponton 2 mengangkut tanah hasil galian ketepi situ d. Excavator 2 menurunkan tanah hasil galian pada Ponton 2 ke darat tempat timbunan hasil galian e. Bulldozer menghampar, meratakan dan merapihkan

ALAT a. Excavator 1 (Long Arm) + Ponton 1 Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat

jam

Koefisien Alat/m3 = 1 / Q.3

km

2

Waktu Siklus Menggali, swing dan memuat ke ponton 2 Swing kembali dan Lain - lain

Ts1 T. 1 T. 2 Ts.1

0,40 0,25 0,65

Menit Menit Menit Menit

Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk )

Q.1

22,29

m3/jam

0,0449

jam

V Fa v.1 v.2

10,00 0,75 5,00 7,00

m3 Km/jam Km/jam

Waktu Siklus : Waktu tempuh isi = ( L : v.1 ) x 60 Waktu tempuh kosong = ( L : v.2 ) x 60 Muat = ( V : Q.1 ) x 60 Lain-lain

Ts.2 T.1 T.2 T.3 T.4 Ts.2

12,00 8,57 26,92 1,00 48,49

Menit Menit Menit Menit Menit Menit

Kap. Produksi/jam = ( V x Fa x 60 ) / ( Ts.2 x Fk )

Q.2

7,73

m3/jam

Koefisien Alat/m3 = 1 / Q.1

0,1293

m3 Pemuatan sedang Kondisi operasi alat sedang Pemeliharaan mesin baik

III.

jam

50,00 3,415 1,15 0,80 46,67 116,17 0,05 0,75

m m m

Penggusuran sedang

Baik m3

Ts.4

1,55

Menit

Produksi menggusur tanah = ( q x 60 x E x Fk1 )/Ts4

Q4

104,771

m3

Produksi perataan tanah = ( q x 60 x E x Fk1 )/ 2Ts ( diperlukan 2 kali bolak balik )

Q4

52,385

m3

Tenaga. a. Di Excavator 2 di darat menurunkan hasil galian dari ponton 2 ke daratan Produksi yang menentukan: 3 buah Ponton 2 Produksi / hari = Tk x Q.1 Kebutuhan tenaga - Pekerja - Mandor

0,0191

Q.1 Q.1' P M

Koefisien Tenaga / m3 - Pekerja : ( Tk x P ) : Q.1' - Mandor : ( Tk x M ) : Q.1' b. Di Stock pile meratakan dan merapihkan dg Buldozer di daratan Produksi yang menentukan: Buldozer Produksi / hari = Tk x Q.1 Kebutuhan tenaga - Pekerja - Mandor Koefisien Tenaga / m3 - Pekerja : ( Tk x P ) : Q.1' - Mandor : ( Tk x M ) : Q.1'

Q.1 Q.1' P M

23,20 162,42

m3/jam m3/hari

2,00 0,20

OH OH

0,0862 0,0086

jam jam

52,39 366,70

m3/jam m3/hari

4,00 0,40

0,0764 0,0076

D.65 E-8

m/menit m/menit Menit

3,61

Koefisien Alat/m3 = 1 / Q4

Baik

jam

D Lb Tb Fb F R Z E

0,0327

q

Waktu siklus = D/F + D/R + Z

0,60 0,70 0,69

Koefisien Alat/m3 = 1 / Q.2

d. Bulldozer 100 - 150 HP Jarak gusur Lebar blade Tinggi blade Faktor blade Kecepatan maju ( 0.75 x 3.7 km/jam = 2.8 km/jam) Kecepatan mundur ( 0.85 x 8.2 km/jam = 6.97 km/jam) Waktu ganti persneling Faktor Efisiensi Alat Kap. Per siklus = Tb x Lb x Fb

V Fb Fa

b. Ponton 2. Kapasits Faktor Efisiensi Alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong

Jarak rata - rata.

m3/jam

orang orang

jam jam

2 Contoh AHSP Penggalian Tanah di Sungai dengan Excavator di Darat yang diangkut oleh Dump Truck Excavator menaikan hasil galian ke Dumptruck

Lokasi Dumping hasil galian

Lokasi Galian Tanah di pinggir Talud Sungai

3. Contoh AHSP Angkutan Material/hasil galian Lintas Pulau B A

Jarak antar pulau B-C Sejauh 10 km, pakai Tongkang Kapasitas 2000 Ton

Borrow Area (A) Ke Pantai (B) 1 km, pakai Dumptruck Kapasitas 3 –4 m3

C

Jarak pulau (C) –darat (D) Sejauh 2 km pakai perahu Kapasitas 2 – 3 m3

D

Lokasi Pembangunan Pengaman Pantai

Contoh Harga Satuan Pekerjaan (HSP) 1.1

No 1 A 1 2 B

Perhatian !! AHSP Galian tanah di Situ/Waduk Pastikan Harga Satuan Uraian yg digunakan dalam satuan yang sama 2 Tenaga Kerja Pekerja Mandor

Kode Satuan Koefisien 3

4

L.01 L.04

OH OH

Harga Satuan (Rp)

Jumlah (Rp)

6

7

5

0,1626 50.000,00 0,0163 75.000,00 Jumlah Harga Tenaga Kerja

8.127,77 1.219,17 9.346,93

Bahan Jumlah Harga Bahan

C 1 2 3

Peralatan Biaya Operasi Excavator 1 (long arm) + Ponton 1 Biaya Operasi Excavator 2 (long arm) Biaya Operasi Buldozer meratakan + perapihan

D E F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) Overhead + Profit (Contoh 15%) Harga Satuan Pekerjaan per - m3 (D+E)

jam jam jam

0,0449 664.520,12 0,0327 614.466,87 0,0191 514.141,55 Jumlah Harga Peralatan 15% x D

29.809,39 20.119,42 9.814,59 59.743,40 69.090,33 10.363,55 79.453,90

CONTOH KOMPONEN PEKERJAAN PADA BERBAGAI JENIS KONSTRUKSI Matrik jenis pekerjaan + Contoh konstruksi:

No. 1. 2. 3. 4. 5.

Vol. Vol. Vol. Vol. Vol.

6.

Vol. VI : Pengendali Muara

7. 8.

Vol. VII : Rawa Vol. VIII: Airtanah

II III IV V VI

Konstruksi : Bendung : Jaringan Irigasi : Pengaman Sungai : Bendungan : Pengaman Pantai

Contoh - Bendung Tetap - Pembuatan Saluran (Manual +Mekanis) - Krib Tiang Pancang Beton - Bendungan Urugan Tanah - Krib Laut Pasangan Buis Beton - Pemecah Gelombang Pas. Batu - Tanggul Laut & Tembok Laut - Jeti Pasangan Buis Beton - Pengerukan - Saluran dan Intake - Pembuatan Deep well

Ket.

Tabel B.1 – Komponen Infrastruktur pada Bendung Tetap NO

1. 1.1 1.2 1.3 1.4 1.5

KOMPONEN

JENIS PEKERJAAN Tanah

Pasangan

Beton

Pancang

PA+HM

Dewatering

TUBUH BENDUNG Ambang Bendung Mercu Bendung Lapisan Tahan Aus Tembok Pangkal (kn&ki) Fondasi



 

* *

 

    

2. 2.1 2.2 2.3

UDIK BENDUNG Tembok Sayap Udik (kn&ki) Tembok Pengarah Arus Lantai Udik

  

  

  

  

3. 3.1 3.2 3.3 3.4

HILIR BENDUNG Tembok Sayap Hilir (kn&ki) Peredam Energi Fondasi Rip-Rap

   

  

   

   

















 

  

   

4. 4.1 4.2 4.3 4.4 4.5 4.6

PERLENGKAPAN BENDUNG Dinding Tirai Tanggul Banjir/Tanggul Penutup Saluran pengelak Rumah Jaga Penduga Muka Air Tangga Operasi







Lain-lain

    





Contoh Bendung Tetap

Tampak Atas

Contoh Perhitungan HPS Bendung Tetap NO

URAIAN PEKERJAAN

KODE

VOLUM E

SATUAN

Har ga Satuan

JUM LAH HARGA

(Rp)

(Rp)

I

Pe k e r jaan Pe r s iapan

1

Mobilisasi/Demob Peralatan dan SDM

1

LS

15.000.000,00

15.000.000,00

2

Pembuatan Direksi keet, Los kerja dan Gudang

LA.02

24



1.541.169,51

36.988.068,24

3

Papan Nama Proyek

LA.03

2

bh

1.023.500,00

2.047.000,00

4

Pengukuran kembali (Uitzet, MC0%........MC100%)

-

1

LS

4.000.000,00

4.000.000,00

II

Pe k e r jaan Tanah

1

Pembersihan Lapangan 26.979.000,00

- Pembersihan lapangan dan striping/korsekan

L.04

T.01

6.800



3.967,50

- Tebas tebang tanaman perdu

T.02

84



5.041,60

423.494,40

- Cabut tunggul tanaman keras

T.03

112

31.625,00

3.542.000,00

pohon

2

Galian tanah biasa

T.06a

2.100



37.228,38

78.179.587,50

3.

Galian Batu

T.07a

76



112.622,38

8.559.300,50

4.

Timbunan dan Pemadatan - Timbunan tanah/pasir

T.14a

26.000



21.821,25

567.352.500,00

- Pemadatan tanah

T.14b

18.200



41.687,50

758.712.500,00

- Mengangkut bahan timbunan 3 - 10 m

T.15a.3)

4.700



17.678,38

83.088.362,50

- Mengangkut bahan timbunan 10 - 50 m - Mengangkut bahan timbunan dari borrow area jarak angkut 100 m termasuk perataan dan perapihan

T.15a.5)

600



26.084,88

15.650.925,00

T.15a.6)

2.700



37.087,50

100.136.250,00

III

Pe k e r jaan Pas angan

1

Pasangan batu kosong

1200



280.462,00

336.554.400,00

2

Pasangan batu dengan mortar jenis PC-PP tipe N

P.01c

212



742.060,50

157.316.826,00

3

Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N

P.04c

120



38.309,95

4.597.194,00

4

Pasangan batu bronjong kaw at

P.06a.1.a

43

bh

1.173.015,53

50.439.667,58

IV

Pe k e r jaan Be ton

1

Beton kedap air f c = 16,9 MPa(K300)

B.10b

3,5



1.012.225,95

3.542.790,84

2

Beton f c = 16,9 MPa (K225)

B.07b

9,8



957.389,69

9.382.419,01

3

Beton f c = 14,5 Mpa (K175)

B.05a

6,5



898.228,90

5.838.487,87

4

Pekerjaan besi beton biasa (lepasan)

B.17

3690

kg

12.128,48

44.754.072,75

5

Bekisting beton biasa tidak exspose

B.21

350



158.786,25

55.575.187,50

6

Bekisting beton expose

B.23

35



271.319,50

9.496.182,50

7

Beton dicorkan pada lokasi berjarak > 25m dan < 50 m’ dengan ketinggian 3-4 m

B.16b

7,8



40.825,00

8

Water stop PVC lebar 200 mm

B.42

112

m'

9

P.05

116.173,00

318.435,00 13.011.376,00

Bongkar bekisting

B.35

350



1.653,13

578.593,75

10

Bongkar bekisting secara hati-hati

B.36

35



3.967,50

138.862,50

V

De w ate r ing dan Pe k e r jaan Lain-lain

1

Kistdam pasir/tanah

D.01a

8700

bh

20.930,00

182.091.000,00

2

Rangka kayu kistdam pasir/tanah

D.02

12,5



136.594,13

1.707.426,56

3

Pengoperasian per hari selama 24 jam pompa air diesel

D.04

90

hari

1.248.233,00

112.340.970,00

VI

Pe k e r jaan Lain-lain

1

Joint f ilter, joint sealent

-

1

LS

4.500.000,00

4.500.000,00

2

Suling-suling

-

64

m’

95.000,00

6.080.000,00

3

Pengujian laboratorium

LA.06

10

sampel

2.500.000,00

25.000.000,00

4

As Built Draw ing

LA.08b

1

set

1.943.212,50

1.943.212,50

5

Dokumentasi

LA.05b

1

paket

1.782.500,00

Jumlah Pajak PPN : 10 %

uk. 43 cm x 65 cm

1.782.500,00 2.727.648.592,49 272.764.859,25

Jumlah Total

3.000.413.451,74

Dibulatk an

3.000.413.000,00

Tabel C.1 – Komponen Infrastruktur pada Jaringan Irigasi NO

JENIS PEKERJAAN

KOMPONEN

Tanah

Pasangan

Beton

Pancang

PA+HM

Dewatering

Lain-lain





















1

Saluran Primer dan sekunder



2

Saluran tersier







3

Saluran pembuang











4

Bangunan pengukur













5

Bangunan pengatur













   

    

    





6

Bangunan pelengkap a. Bangunan terjun b. Got miring c. Talang dan syphon

   

   

   

   

7

Bangunan intake









8

Bangunan pembilas









2)



Pembuatan Badan Tanggul Volume pekerjaan :

No

Uraian

1 A 1 2 3

2 Tenaga Kerja Pekerja Tukang Mandor

B

Bahan

C 1 2 3 4 5

Peralatan Bulldozer Backhoe Dump Truck Water Tanker

81.666 m3

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah (Rp)

3

4

5

6

7

L.01 L.02 L.04

OH OH OH

1.338,57 50.000,00 669,29 60.000,00 133,86 75.000,00 Jumlah Harga Tenaga Kerja Jumlah Harga Bahan

D E F F

E.05 E.11.a E.08.a E.49 E.48

Unit/Jam Unit/Jam Unit/Jam Unit/Jam Unit/Jam

66.928.571,43 40.157.142,86 10.039.285,71 117.125.000,00 -

2.811 500.360,00 1.406.511.960,00 5.622 553.850,00 3.113.744.700,00 25.299 154.900,00 3.918.815.100,00 16.866 78.500,00 1.323.981.000,00 Vibro Roller 3.748 513.000,00 1.922.724.000,00 Jumlah Harga Peralatan 11.685.776.760,00 Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 13.092.288.720,00 Biaya Produksi Per m3 160.315,05 Overhead + Profit (Maksimum 15%) 15% x D 24.047,26 Harga Satuan Pekerjaan per - m3 (D+E) 184.362,31

Contoh Jaringan Irigasi

Penambang B-B

Penampang A-A

Gambar C.2 Penampang potongan lokasi pembuatan saluran dan tanggul

Contoh Perhitungan HPS Jaringan Irigasi Contoh Perhitungan HPS Pembuatan Saluran Irigasi (Cara Manual) No.

Uraian Pekerjaan

Satuan

Harga Satuan

Jum lah Harga

(Rp)

(Rp)

Kode

Volum e

L.04

1

LS

20.000.000,00

20.000.000,00



1.541.169,51

30.823.390,20

I.

Persiapan

1.

Mobilisasi/Demob Peralatan dan tenaga

2.

Direksikeet

LA.02

20

3.

Papan Nama

LA.03

4

bh

1.023.500,00

4.094.000,00

4

Pengukuran kembali/Uitzet

-

1

LS

15.500.000,00

15.500.000,00

II.

Saluran

1.

Galian tanah sedalam 1m'

2.

Galian tanah sedalam 1-2m'

3.

Angkut tanah dari borrow area sejauh 600 m

4.

T.06a

35.000



37.228,38

1.302.993.125,00

T.06b

15.000



44.634,38

669.515.625,00

T.15a.10)

8.200



142.292,38

1.166.797.475,00

Timbunan tanah dari BA

T.14a

15.000



21.821,25

327.318.750,00

5.

Pemadatan tanah

T.14b

15.000



41.687,50

625.312.500,00

6

Dew atering: - kistdam

D.01a

220

bh

18.745,00

4.123.900,00

- Rangka Baja L.50.50.5

D.03

7

m3

394.692,65

2.762.848,55

- Pompa

D.05

70

hari

1.933.213,25

135.324.927,50

III.

Lain-lain

1.

Uji laboratorium

LA.06

1

LS

12.000.000,00

12.000.000,00

2

As Built Draw ing

LA.08b

1

set

1.943.212,50

1.943.212,50

3

Dokumentasi

LA.05b

1

paket

1.782.500,00

1.782.500,00

J u ml a h Pajak PPN: 10%

4.320.292.253,75 432.029.225,38

Total Biaya

4.752.321.479,13

Dibulatkan

4.752.321.000,00

Contoh Perhitungan HPS Jaringan Irigasi Contoh Perhitungan HPS Pembuatan Saluran Irigasi (Cara Mekanis) No.

Uraian Pekerjaan

Kode

Volum e

Satuan

Harga Satuan

Jum lah Harga

(Rp)

(Rp)

I.

Persiapan

1.

Mobilisasi dan Demobilisasi Peralatan

L.04

1

LS

200.000.000,00

200.000.000,00

2.

Pembuatan Direksi keet, Los kerja dan Gudang

LA.02

54



1.541.169,51

83.223.153,54

3.

Papan Nama

LA.03

4

bh

1.023.500,00

4.094.000,00

4.

Pengukuran kembali (Uitzet)

-

1

LS

4.500.000,00

4.500.000,00

II.

Pem buatan Saluran

1.

Saluran primer dan sekunder, panjang 10 km (Galian tanah)

-

197.336



96.501,66

19.043.250.906,70

2.

Pembuatan Badan Tanggul

(Timbunan tanah)

-

81.666



111.522,05

9.107.559.764,13

3.

Finishing Badan Tanggul

(Perapihan dan pemadatan)

-

39.408



19.879,98

783.430.437,89

III. 1

Lain-lain LS

30.000.000,00

30.000.000,00

2 3

Pengujian laboratorium: beton, kayu, baja, tanah, dll.

-

1

As Built Draw ing

LA.08b

1

set

1.943.212,50

1.943.212,50

Dokumentasi

LA.05b

1

paket

1.782.500,00

1.782.500,00

J u ml a h Pajak PPN: 10%

29.226.058.262,26 2.922.605.826,23

Total Biaya

32.148.664.088,48

Dibulatkan

32.148.664.000,00

Tabel D.1 – Komponen Infrastruktur pada Pengaman Sungai No.

KOMPONEN

JENIS PEKERJAAN Tanah

Pasangan

Beton

Pancang

Pintu Air

Dewatering



  

1. 1.1 1.2 1.3

PEKERJAAN POKOK BANGUNAN KRIB  Krib bronjong kawat Krib tiang pancang beton   Krib tiang pancang kayu

2.. 2.1 2.2

PEKERJAAN POKOK KONSTRUKSI PELINDUNG TEBING DAN TALUD Bronjong kawat         Pasangan batu kosong

 

 

3.. 3.1 3.2 3.3

PEKERJAAN POKOK KONSTRUKSI TANGGUL Tanggul timbunan tanah   Tanggul pasangan batu kosong  Tanggul bronjong kawat

  

  

4.. 4.1 4.2 4.3 4.4 4.5

PEKERJAAN KONSTRUKSI POKOK PENGENDALI DASAR SUNGAI     Bronjong kawat    Pasangan batu kali    Pasangan batu kosong Urugan tanah diperkuat geotekstil      Cerucuk matras beton

   

    

5. 5.1 5.2 5.3 5.4 5.5

PEKERJAAN POKOK KONSTRUKSI PENGENDALI SEDIMEN(CHECK DAM) Bronjong kawat          Pasangan batu kali     Pasangan batu kosong   Urugan tanah diperkuat geotekstil Cerucuk matras beton    

    

  

  

 

  

  

Lain-lain





Contoh Krib Tiang Pancang Beton 5 -10m

Contoh Perhitungan HPS Krib Tiang Pancang Beton NO

URAIAN PEKERJAAN

I

Pe k e rjaan Pe rs iapan

1

Mobilisasi peralatan dan SDM

2

Pembuatan Direksi keet, Los kerja dan Gudang

3

Pengukuran kembali dan stake out

4

Papan Nama

II

Pe k e rjaan Tanah

1

Pembersihan lapangan

KODE

-

VOLUME

SATUAN

Harga Satuan

JUMLAH HARGA

(Rp)

(Rp)

1

LS

10.000.000,00

10.000.000,00

24



1.541.169,51

36.988.068,24

-

1

LS

2.000.000,00

2.000.000,00

LA.03

4

bh

1.023.500,00

4.094.000,00

LA.02

a. Pembersihan lapangan dan striping/kosrekan

T.01

100

M3

3.967,50

b. Tebas tebang tanaman perdu

T.02

78

M3

5.041,60

393.244,80

c. Cabut tunggul tanaman keras

T.03

32

M3

31.625,00

1.012.000,00

396.750,00

2

Galian tanah biasa

T.06a

65

M3

3

Galian tanah cadas/keras

T.06d

14

M3

102.062,50

1.428.875,00

4

Galian batu

T.08a

6

M3

274.602,75

1.647.616,50

5

Timbunan pemadatan a. Timbunan tanah

T.14a

15

M3

21.821,25

327.318,75

b. Pemadatan tanah

T.14b

15

M3

41.687,50

625.312,50

c. Mengangkut bahan tanah timbunan 3 - 10 m

T.15a.3)

10

M3

17.678,38

176.783,75

d. Mengangkut bahan tanah timbunan 10 - 50 m e. Mengangkut bahan tanah timbunan dari daerah pengambilan dengan jarak angkut 100 m

T.15a.5) T.15a.6)

3

M3 M3

26.084,88 37.087,50

2

37.228,38

2.419.844,38

78.254,63 74.175,00

III

Pe k e rjaan Pas angan

1

Pasangan batu kosong Pasangan batu dengan mortar jenis PC-PP, Mortar tipe N

P.05

25

M3

280.462,00

7.011.550,00

2

P.01c

8

M3

742.060,50

5.936.484,00

3

Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N

P.04c

45

M2

1.723.947,75

4

Pasangan batu bronjong kaw at

P.06a.1.a

25

M3

38.309,95 1.173.015,53

IV

Pe k e rjaan Be ton dan pe m ancangan

1

Tiang pancang beton bertulang (40x40cm)

245.203.488,75

Pengangkutan 550m tiang pancang ke lokasi pek

1

m' LS

445.824,53

2

35.000.000,00

35.000.000,00

3

Beton mutu tipe B, f c = 14,5 Mpa (K175)

16

M3

898.228,90

14.371.662,44

4

Pekerjaan besi beton biasa (lepasan)

B.17

3.200

kg

5

B.26

150

M2

424.436,25

63.665.437,50

6

Bekesting beton biasa Perancah bekesting tinggi 4m

B.28

M2

562.430,50

28.121.525,00

7

Beton dicorkan pada lokasi berjarak > 25m dan <50m' dengan ketinggian 3-4m

B.16b

50 16

M3

40.825,00

653.200,00

8

Bongkar bekesting

B.35

50

M2

1.653,13

82.656,25

V

De w ate ring dan Pe k e rjaan Lain-Lain

1

Kistdam pasir/tanah

360

bh

20.930,00

7.534.800,00

2

Kayu untuk 1m kistdam pasir/tanah uk. 43 cmx 65 cm

D.02

10

M3

3

Pengoprasian perhari selama 24 jam pompa air diesel

D.04

45

Sew a-hari

136.594,13 357.500,00

16.087.500,00

Jumlah Pajak PPN : 10 %

F.04

550

B.05b

D.01a

12.128,48

38.811.120,00

1.365.941,25 527.231.556,48 52.723.155,65

Jumlah Total

579.954.712,13

Dibulatk an

579.954.000,00

Tabel E.1 – Komponen Infrastruktur pada Bendungan NO

KOMPONEN

JENIS PEKERJAAN Tanah

Pasangan

Beton

Pancang

PA+PHM

Dewtering

1. 1.1

PEKERJAAN BENDUNGAN URUGAN TANAH

Pondasi Bendungan Urugan Tanah (Galian tanah, timbunan, pasangan, beton, tiang pancang, siklop, split treatment, Grouting, dan dewatering)

*









1.2

Tubuh bendungan (Galian tanah, timbunan, pasangan, beton dan Instrumentasi)











2. 2.1

PEKERJAAN BENDUNGAN URUGAN BATU

*



















2.2

Pondasi Bendungan Urugan Batu (Galian tanah, timbunan, pasangan, beton, tiang pancang, siklop, split treatment, Grouting, dan dewatering) Tubuh bendungan (Galian tanah, timbunan, pasangan, beton dan Instrumentasi)

3. 3.1

PEKERJAAN BENDUNGAN BETON

Pondasi Bendungan Beton (Galian tanah, timbunan, pasangan, beton, tiang pancang, siklop, split treatment, Grouting, dan dewatering)

*









3.2

Tubuh bendungan (Galian tanah, timbunan, pasangan, beton dan Instrumentasi)











4. 4.1

PEKERJAAN BENDUNGAN CFRD Pondasi Bendungan Urugan Batu (Galian tanah, timbunan, pasangan, beton, tiang pancang, siklop, split treatment, Grouting, dan dewatering)

*









4.2

Tubuh bendungan (Galian tanah dan batu, timbunan, pasangan, beton dan Instrumentasi)











Lain-lain









Contoh Bendungan Urugan Tanah

Gambar E.2. Potongan melintang tanggul bendungan urugan tanah

Gambar E.1. Layout bendungan urugan tanah

Contoh Perhitungan HPS Bendungan NO I

URAIAN PEKERJAAN

KODE

VOLUME

SATUAN

Harga Satuan

JUMLAH HARGA

(Rp)

(Rp)

1

Pekerjaan Persiapan Mobilisasi Peralatan dan SDM

LA.04

1

LS

550.000.000,00

550.000.000,00

2

Pembuatan Direksi keet, Los kerja dan Gudang

LA.02

28

m2

1.541.169,51

43.152.746,28

3

Papan Nama Proyek uk 1, 2m x 1, 8m

LA.03

4

bh

1.023.500,00

4.094.000,00

4

Pengukuran rinci Lokasi Bendungan

-

1

Paket

20.000.000,00

5

Pemagaran Daerah Kerja

LA.01b

1.300

m'

20.000.000,00 410.718,48

II

PEKERJAAN TANAH

1

Clearing and grubbing

T.01

198.000

m2

2

Tebas tebang tanaman perdu

T.02

4.840

m2

3

Cabut tunggul tanaman keras (dia.≥ 15 cm)

T.03

320

4

Galian tanah biasa

T.06a

610.000

5

Galian cadas/tanah keras

T.09a

3.000

m3

6

Galian batu

T.07a

1.488

m3

112.622,38

167.582.094,00

7

Timbunan tanah untuk Tubuh Bendungan (Zona-1)

T.14a

376.000

m3

21.821,25

8.204.790.000,00

8

Timbunan lapisan kedap pada core Tubuh Bendungan (Zona-2)

T.14a

192.000

m3

21.821,25

4.189.680.000,00

Timbunan tanah untuk Tubuh Bendungan (Zona-3)

T.14a T.14c

472.000 4.600

m3 m3

21.821,25 150.650,00

10.299.630.000,00 692.990.000,00

T.14d

72.000

m3

27.600,00

9 10

pohon m3

3.967,50 5.041,60

533.934.017,50 785.565.000,00 24.401.344,00

31.625,00

10.120.000,00

37.228,38

22.709.308.750,00

102.062,50

306.187.500,00

11

Timbunan pasir lantai kerja (agregate ≤5cm) untuk berbagai jenis bentuk konstruksi Timbunan kembali dan pemadatan tanah di berbagai sisi bangunan

III

PEKERJAAN PASANGAN

1

Pasangan batu kosong pada Zona-4

P.05

1.200

m3

280.462,00

336.554.400,00

2

pasangan batu dengan mortar tipe N

P.01d

41.000

m3

704.616,50

28.889.276.500,00

3

Plesteran tebal 1 cm dengan mortar Tipe N

P.04c

50.000

4

Bronjongan kaw at uk. 2 x 1 x 0,5m, kaw at galvanis diameter 3 mm.

P.06a.4.a

16.000

m2 buah

38.309,95 738.455,25

11.815.284.000,00

IV

PEKERJAAN BETON

1

Campuran beton tipe A

B.09b

8.000

m3

1.003.185,25

8.025.482.000,00

2

Campuran beton tibe B

B.05b

6.200

m3

898.228,90

5.569.019.197,22

3

Besi beton baja lunak polos berbagai ukuran

B.17

255.000

kg

12.128,48

3.092.761.125,00

4

Bekisting F1, (permukaan beton biasa)

B.21

17.000

m2

158.786,25

2.699.366.250,00

5

Bekisting F2, (permukaan beton ekspose)

B.23

6.500

Pengadaan dan pemasangan w ater stop lebar 20cm

B.42

425

271.319,50 116.173,00

1.763.576.750,00

6

m2 m'

V

PEKERJAAN LAIN-LAIN

1

Dew atering dengan 180 kistdam dan 5 Kw pompa air selama 100 hari

D.04

10

hari

1.248.233,00

2 3

Pengadaan dan pemasangan railing GP 3", 2.5mm

P.17

250 10

m' m'

425.000,00 398.529,78

4

Pengujian geoteknik dan bahan konstruksi

1

LS

100.000.000,00

5

Pengujian Kualitas Air

52

m'

1.822.750,00

Staf f gauge baja tebal 1mm, lebar 25cm, tinggi 5m dicat enamel, ketelitian mm.

Jumlah Pajak PPN : 10 %

AT.07

1.987.200.000,00

1.915.497.500,00

49.373.525,00 12.482.330,00 106.250.000,00 3.985.297,80 100.000.000,00 94.783.000,00 115.002.327.326,81 11.500.232.732,68

Jumlah Total

126.502.560.059,49

Dibulatkan

126.502.560.000,00

Tabel F.1 – Komponen Infrastruktur pada Pengaman Pantai NO 1. 1.1 1.2 1.3

1.4 2. 2.1 2.2 2.3

2.4 3. 3.1 3.2 3.3

3.4 3.5 3.6 3.7 4. 4.1 4.2 4.3

KOMPONEN KONSTRUKSI KRIB LAUT Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. Jeti rubble mound dari armor batu b. Jeti rubble mound armor blok beton c. Jeti turap baja kantilever d. Jeti turap baja berongga e. Jeti dari kaisson beton f. Jeti dari susunan pipa bulat Kaki bangunan KONSTRUKSI REVETMEN Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. Revetmen plat beton b. Revetmen plat beton bergigi c. Revetmen kayu d. Revetmen tumpukan bronjong e. Revetmen blok beton bergigi f. Revetmen susunan batu kosong g. Revetmen buis beton Kaki bangunan KONSTRUKSI TANGGUL LAUT Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. Tanggul laut dari pasangan batu b. Tanggul laut susunan blok beton c. Tanggul laut susunan batu belah Pelindung kaki Filter Sulingan Saluran drainase KONSTRUKSI TEMBOK LAUT Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. Tembok laut beton b. Tembok laut pasangan batu c. Tembok laut armor beton d. Tembok laut armor dari blok beton e. Armor dari tetrapod Kaki bangunan

b. Tembok laut pasangan batu

4.4 5. 5.1 5.2 5.3

5.4 6. 6.1 6.2 6.3

KONSTRUKSI PEMECAH GELOMBANG Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. SSB blok beton beton& tetrapod b. SSB Geotube& Geobag Kaki bangunan KONSTRUKSI JETI Kepala/mercu bangunan Pondasi bangunan ** Tubuh bangunan a. Jeti rubble mound dari armor batu b. Jeti rubble mound armor blok beton

JENIS PEKERJAAN Tanah

Pasangan



      

  

     

  

Beton

Pancang

Dewatering

 





      

      

 

 

       

 

 

 

 

PA+HM

Lain-lain

     

     







  

     



      

 



   



   



  √

 

 

 

 



     

     

  

    

    

 

 







  

  



 

 

 

 

 

 





  

 

Contoh Bentuk Tembok Laut

Contoh Perhitungan HPS Tembok Laut Pasangan batu dengan mortar tipe N, dengan data teknis: - Panjang tembok laut = 50 m’ - Tinggi tembok laut = 1,0 m’ dan kedalaman fondasi 0,5m’ No. 1 1.1 1.2 1.3 2

Uraian Kegiatan

Satuan

Harga Satuan (Rp)

Jumlah Harga (Rp)

Kode

Volume

Papan Nama Pelaksanaan Kegiatan Pengukuran kembali/uitzet

LA.03

4

bh

1.023.500,00

4.094.000,00

-

1.000.000,00

1.000.000,00

Direksi keet

1 12

LS

LA.02

m2

1.541.169,51

18.494.034,12

51.180,75

1.074.795,75

478.501,49

14.355.044,70

26.450,00

1.322.500,00

PEKERJAAN PERSIAPAN

TEMBOK LAUT

2.1 2.2

Galian pasir Pasangan batu 1PC:5PP

T.11a P.01d

21 30

m3 m3

2.3 2.4

Pengisian pasir dibagian dalam tanggul

T.14d

50

m3

Plesteran 1PC:4PP

P.04f

50

m2

41.796,75

2.089.837,50

2.5

Pelindung kaki

P.14l

125

m3

258.934,00

32.366.750,00

3

PEKERJAANLAIN-LAIN

3.1

Pengujian mutu bahan

LA.06

2

sample

2.500.000,00

5.000.000,00

3.2

As built draw ing

LA.08b

1

set

1.943.212,50

1.943.212,50

Jumlah Pajak - PPN = 10%

81.740.174,57 8.174.017,46

Jumlah Total

89.914.192,03

Dibulatkan

89.914.000,00

Tabel G.1 – Komponen Infrastruktur pada Pengendali Muara NO 1. 1.1 1.2

1.3

1.4 2.

JENIS PEKERJAAN

KOMPONEN

Tanah

KONSTRUKSI JETI Kepala/mercu bangunan Pondasi bangunan a. Galian tanah b. Tiang pancang c. Siklop d. Dewatering Tubuh bangunan a. Jeti rubble mound armor batu b. Jeti rubble mound armor blok beton c. Jeti dari susunan pipa bulat Kakibangunan

Pasangan

Beton

Pancang

PA+HM

Dewatering

Lain-lain

        

  

  

  



PENGERUKAN



Contoh perhitungan HPS pengerukan muara sungai No. 1

Uraian Kegiatan Mobilisasi

1.2

Papan Nama Pelaksanaan Kegiatan

1.3 2

Direksi keet PENGERUKAN MUARA SUNGAI

2.1

Penggalian tanah dengan Excavator Pembuangan hasil galian dengan Dump Truck, jarak 1 km Pengerukan muara dengan kapal keruk

2.3 3

Volum e

Satuan

Harga Satuan (Rp)

Jum lah Harga (Rp)

PEKERJAAN PERSIAPAN

1.1

2.2

Kode L.04

LS bh

200.000.000,00

LA.03

1 4

200.000.000,00

300.000,00

1.200.000,00

LA.02

32

m2

1.100.000,00

35.200.000,00

-

54.250

m3

17.355,20

941.519.600,00

-

54.250

m3

29.051,30

1.576.033.025,00

-

162.740

m3

22.669,30

3.689.201.882,00

sample

2.500.000,00

2.500.000,00

set

1.943.212,50

1.943.212,50

PEKERJAANLAIN-LAIN

3.1

Pengujian mutu bahan

3.2

As built draw ing

LA.06 LA.08b

32 1

Jumlah Pajak - PPN = 10% Jumlah Total Dibulatkan

Terbilang :#Tujuh milyar sembilan puluh dua juta tiga ratus lima puluh tujuh ribu rupiah#

6.447.597.719,50 644.759.771,95 7.092.357.491,45 7.092.357.000,00

ANALISIS BIAYA OPERASI KAPAL KERUK

Contoh perhitungan produktivitas kapal keruk Sebuah suction dredger beroperasi dengan data-data sebagai berikut: - Panjang pipa hisap pada ladder = 6 m - Panjang pipa seluruhnya = 600 m(minus pipa pada ladder) Pipa hisap = 20 m Pipa apung = 300 m Pipa darat = 280 m - Diameter seluruh pipa 14’’ = 0,3556 m - Tanah lumpur lunak 20% = 1,20(lumpur 20%, air 80%) - Berat lumpur 1400 kg/m3

JENIS ALAT SATUAN PEMBAYARAN

No.

U R AI AN

A.

B.

Uraian

1 2 A Tenaga Kerja 1 Pekerja 2 Mandor

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah (Rp)

3

4

5

6

7

L.01 L.04

jam jam

0,1159 7.142,86 0,0116 10.714,29 Jumlah Harga Tenaga Kerja

Nilai Sisa Alat

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal

b. Asuransi, dll.

C.

827,76 124,16 951,93

Jumlah Harga Bahan jam

0,0046 4.078.311,57 Jumlah Harga Peralatan D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) E Overhead + Profit (Contoh 15%) 15% x D F Harga Satuan Pekerjaan per - m3 (D+E)

KET.

SATUAN

KAPAL KERUK ( SUCTION DREDGER ) Pw 380,0 HP Cp 250,0 M3 A 5,0 Tahun W 2.000 Jam B 15.000.000.000 Rupiah

1.

200 HP K.Keruk 180 HP Pompa

Tahun 2012

= 10 % x Harga Alat Baru

C

1.500.000.000

D

0,26380

=

E

1.780.633,00

Rupiah

=

F

15.000,00

Rupiah

=( E + F )

G

1.795.633,00

Rupiah

=

Rupiah -

Tingkat suku bunga i = 10%

Biaya asuransi p = 0,2%

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

570.000,00

Rupiah

15,00%

2.

Pelumas

I

285.000,00

Rupiah

2,50%

= (2.5%-3%) x Pw x Mp

Biaya bengkel = (6.25% dan 8.75%)

x

J

468.750

Rupiah

6,25%

3.

Perawatan dan = (12,5 % - 17,5 %) perbaikan

x

K

937.500,00

Rupiah

12,50%

4. 5.

Sopir = ( 1 Orang / Jam ) x U1 Pembantu Sopir = ( 1 Orang / Jam ) x U2

L M

14.285,71 7.142,86

Rupiah Rupiah

Biaya Operasi per Jam

P

2.282.678,57

Rupiah

S

4.078.311,57

Rupiah

Mb Ms Mp

10.000,00 10.000,00 30.000,00

B Bahan C Peralatan * 1 Biaya operasi kapal keruk

Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi dalam 1 Tahun Harga Alat

Biaya Pasti per Jam

Kode

KOEF.

BIAYA PASTI PER JAM KERJA

Total Head = Hi = 24,525 m’ Kapasitas pengerukan : Q = A.V = 0,2978 m3/s = 1072,08 m3/jam suspensi = 0,2 x 1072,08 = 214,416 m3/jam lumpur

KODE

URAIAN ANALISA HARGA SATUAN

URAIAN PERALATAN 1. 2. 3. 4. 5. 6.

Untuk menghitung kapasitas kapal keruk per jam, perlu menghitung total head loss dan diasumsikan kecepatan (V) aliran lumpur dalam pipa konstan 3 m/s

No

: KAPAL KERUK (SUCTION DRADGER ) : JAM

(H+I+K+L+M) =

18.904,89 18.904,89 19.856,81 2.978,52 22.835,30

D.

TOTAL BIAYA OPERASI ALAT / JAM = ( G + P )

E.

LAIN - LAIN 1. 2. 3.

Bahan Bakar Bensin (non subsidi) Bahan Bakar Solar (non subsidi) Minyak Pelumas

Liter Liter Liter

non-subsidi non-subsidi

Tabel F.1 – Komponen Infrastruktur pada Pengaman Pantai No.

KOMPONEN

JENIS PEKERJAAN Tanah

Pasangan

Beton

Pancang

PA+HM

Dewatering

Lain-lain

1. 1.1 1.2 1.3 1.4 1.5

SALURAN Primer Sekunder Sub-sekunder/kolektor Tersier Kuarter

    

  

 





2.

TANGGUL











3. 3.1 3.2

PINTU Sekat / Tabat / Stop log Pintu Klep







 

  

 

Tabel H.1 – Komponen Infrastruktur pada Airtanah No.

KOMPONEN

JENIS PEKERJAAN Tanah

Pasangan

Beton

Pancang

1.

PENGEBORAN (Geoteknik)

2. 2.1 2.2

PEMASANGAN CASING Pipa-pipa Saringan

2.3

Asesoris

3.

BRONCAPTERING









4.

RUMAH POMPA









5.

PIPA DISTRIBUSI







PA+HM



  

 

Dewatering

Lain-lain







  







 

Contoh Perhitungan HPS Rehabilitasi Saluran Sekunder Jaringan Reklamasi Rawa NO

URAIAN PEKERJAAN

KODE

VOLUM E

SATUAN

Harga Satuan

JUM LAH HARGA

(Rp)

(Rp)

I

Pe k e rjaan Pe rs iapan

1

Mobilisasi dan Demobilisasi

L.04

1

LS

30.000.000,00

30.000.000,00

2

Pembersihan lapangan

T.01

1

LS

7.000.000,00

7.000.000,00

3

Papan Nama Pelaksanaan Kegiatan

LA.

4

bh

1.023.500,00

4.094.000,00

4

LA.08a T.05

32 250

m2

1.541.169,51

49.317.424,32

5

Direksi keet Pengukuran/Bouw plank

m'

23.402,50

5.850.625,00

II

Re hab Saluran Se k unde r

1

Tebas Pembersihan

T.02

37.650



5.041,60

189.816.240,00

2

Mengangkat tanah di BA ke DT dan mengangkut sejarak 1 km

-

18.320

m3

46.743,10

856.333.592,00

3

Menimbun raw a dengan tanah menggunakan Buldozer dan memadatkan

-

18.320

m3

21.297,90

390.177.528,00

4

Galian Tanah (dengan Excavator)

-

60.240

m3

17.320,80

1.043.404.992,00

III

Pe m buatan Gorong-Gorong Fungs i Ganda

1

Pekerjaan Tanah

2

a. Galian Tanah Pondasi

T.06a

1,09



37.228,38

40.578,93

b. Timbunan Tanah

T.14a

63,76



21.821,25

1.391.322,90

c. Urugan Pasir (tebal 10cm)

T.14c

0,83



P.07.a

42

m

43.196,88

Cerucuk Kayu Galam Diameter 10 cm 3

5

125.039,50 1.814.268,75

Pekerjaan Pondasi dan Lantai Kerja a. Lantai Kerja (tebal 5 cm); 1pc : 3 ps : 6 kr

4

150.650,00

Pekerjaan Kayu

B.01

0,41



681.760,25

279.521,70

b. Pondasi Koker (tinggi 60 cm); 1pc : 3ps : 3kr

B.07b

2,41



957.389,69

2.307.309,16

c. Lantai Arus (tebal 20 cm); 1pc : 3ps : 3kr

B.07b

1,65



957.389,69

1.579.693,00

d. Pek. Sheet Pile 5/20; 1pc : 3ps : 3kr

B.07b

1,09



957.389,69

1.043.554,77

a. Pek. Dinding (tebal 20 cm); 1pc : 3ps : 3kr

B.07b

6,68



957.389,69

6.395.363,16

b. Dinding Sayap Samping (tebal 20 cm); 1 pc : 3 ps : 3 kr

B.07b

5,77



957.389,69

5.524.138,54

c. Pek. Lantai atas; 1 pc : 3 ps : 3 kr

B.07b

1,37



957.389,69

1.311.623,88

d. Pek. Crab; 1 pc : 3 ps : 3 kr

B.07b

0,28



957.389,69

268.069,11

e. Pek. Plesteran

P.04b

33,71



40.085,09

1.351.268,38

a. Sand Bag uk. 0,45 x 1,2 m

D.01b

120

b. Pompa 10 KW

D.05

Pekerjaan Beton

Pekerjaan Dew atering 2

bh

18.745,00

2.249.400,00

hari

1.933.213,25

3.866.426,50

IV

Pe m buatan dan Pe m as angan Sk ate Balok

1

Kayu Kelas II uk. 8/12 - 3,0 m

M.33.b

1,728



5.500.000,00

9.504.000,00

2

Baja L.50.50.5 untuk spooneng, 100 m

M.54.g

392,5

kg

12.000,00

4.710.000,00

3

Baja strip

M.53.f

20

bh

12.000,00

240.000,00

V

Pe k e rjaan Lain-lain

1

Pengujian laboratorium: beton, kayu, baja, tanah, dll.

2

As built draw ing dan laporan

4 x 50 x 2500 mm

Jumlah Pajak PPN : 10 %

-

1

LS

10.000.000,00

10.000.000,00

LA.08b

1

set

1.943.212,50

1.943.212,50 2.631.939.192,10 263.193.919,21

Jumlah Total

2.895.133.111,31

Dibulatk an

2.895.133.000,00

Contoh Perhitungan HPS Pengeboran Airtanah Dalam NO

URAIAN PEKERJAAN

I

Pekerjaan Persiapan

1

Mobilisasi dan demobilisasi

2

Pembuatan Direksikeet

3

Pembuatan kolam sirkulasi dan salurannya

II

Pekerjaan Pembuatan Sumur Airtanah Dalam

1

Pengeboran lobang dia 8 3/4"

2

Reaming/pelebaran lubang bor :

KODE

L.04 LA.02 AT.02

VOLUME

SATUAN

Harga Satuan

JUMLAH HARGA

(Rp)

(Rp)

1

LS

15.000.000,00

15.000.000,00

32

m2

1.541.169,51

49.317.424,32

1

LS

2.500.000,00

2.500.000,00

800

m'

542.142,87

433.714.297,92

a. Reaming lubang dia 8 3/4" ke 12"

AT.03

48

m'

501.396,90

24.067.051,39

b. Reaming lubang dia 8 3/4" ke 14 3/4"

AT.04

752

m'

506.594,33

380.958.936,69

3

Pengambilan contoh dan diskripsi litologi batuan

AT.01

800

m'

506.594,33

405.275.464,56

4

Pemasasangan dan pembongkaran Temporary Casing dia 17"

AT.06

48

m'

336.812,11

16.166.981,32

5

Electric logging / penampangan geofisik

AT.18

6

1.423.240,00

8.539.440,00

6

Pengadaan dan pemasangan pipa konst. Sumur : a. Pipa Black Steel dia 8"

AT.09

560

m'

358.556,86

200.791.839,67

b. Screen low carbon dia 8"

AT.10

240

m'

4.070.262,36

976.862.965,57

c. Pipa Sounding GWI BSA dia 1"

AT.11

336

m'

68.923,28

23.158.221,42

7

Pengadaan dan Pemasangan Gravel Pack

AT.12

67,36

m3

2.051.025,47

138.157.075,92

8

Pembersihan sumur/Development : a. w ater Flushing

AT.13

32

jam

940.872,81

30.107.930,01

b. w ater Jetting

AT.13

32

jam

940.872,81

30.107.930,01

c. Air Jetting

AT.14

64

jam

333.082,97

21.317.310,31

d. Air Lifting

AT.14

104

jam

333.082,97

34.640.629,26

a. Pemas. dan pembongkaran peralatan uji

AT.15

1

kali

701.500,00

701.500,00

b. Step Draw Dow n Test/uji surutan bertahap

AT.14

4

jam

333.082,97

1.332.331,89

c. Long Perioda Test/uji debit konstan

AT.14

72

jam

333.082,97

23.981.974,10

d. Pengukuran Recovery/uji kambuh

AT.14

12

jam

333.082,97

3.996.995,68

10

Pemeriksaan lab/analisa kualitas air

AT.07

2

1.822.750,00

3.645.500,00

11

Sementasi dan pengecoran lantai sumur

P.04a

7,5

650.000,00

4.875.000,00

12

Tutup Sumur

1.200.000,00

1.200.000,00

III

Pekerjaan Lain-lain

1

Patok tanda lokasi pekerjaan

2

As built draw ing

3

Laporan dan Dokumentasi

9

lokasi

Pekerjaan Pengujian :

Jumlah Pajak PPN : 10 %

contoh m3

-

1

-

1

bh

253.000,00

253.000,00

LA.08b -

1

set

1.943.212,50

1.943.212,50

10

Jilid

250.000,00

buah

2.500.000,00 2.835.113.012,57 283.511.301,26

Jumlah Total

3.118.624.313,82

Dibulatkan

3.118.624.000,00

Contoh Perhitungan HPS Air Baku NO I 1

URAIAN PEKERJAAN

KODE

V OLUM E

SATUAN

Har ga Satuan

JUM LAH HARGA

(Rp)

(Rp)

Pe k e r jaan Pe r s iapan

2

Pembersihan Lapangan Pengukuran Pipa dan Pematokan

-

1

LS

3

Papan Nama Proyek

LA .03

2

Buah

4

Direksi Keet

LA .02

24

m2

II

Pe m buatan Br oncapte r ing PEKERJA A N TA NA H a. Galian Tanah

T.06a

18

M3

b. Urugan Tanah Kembali

T.14a

9

M3

21.821,25

196.391,25

c. Urugan Pasir

T.14c

18

M3

150.650,00

2.711.700,00

a. Pasangan Batu Kali 1:3

P.01b

2,42

M3

794.052,00

1.921.605,84

b. Pasangan Batu Kosong

P.05

5

M3

280.462,00

1.402.310,00

P.04a

62,5

M2

43.168,24

2.698.015,00

B.10b

12,45

m3

1.012.225,95

12.602.213,12

b. Bekisting kayu

B.21

36,85

m2

158.786,25

5.851.273,31

c. Besi beton, f y=2400 Mpa

B.17

2241

kg

29.475,94

66.055.575,94

d. Rabat Beton 1:3:5

B.01

0,85

M3

681.760,25

579.496,21

M

259.994,30

6.239.863,20

1

2

3

6

1

3

37.228,38

2.047.000,00

670.110,75

b. Saringan DN 4" CI termasuk Packing dan Mur Baut

-

2

Buah

2.000.000,00

4.000.000,00

c. Gate V alve 4"

-

2

Buah

2.800.000,00

5.600.000,00

d. Bend 4" x 90°

-

2

Buah

450.000,00

900.000,00

e. V alve Flange DN 4"

-

4

Buah

2.700.000,00

10.800.000,00

f . Tangga Besi DN 1” galvanized

-

2

Buah

1.800.000,00

3.600.000,00

g. Pipa V entilasi GIP DN 2"

-

2

Buah

475.000,00

950.000,00

h. Plat Manhole 100x100 cm, tebal 3 mm, rangka besi siku, kunci, engsel

-

2

Buah

500.000,00

1.000.000,00

i. Pengecatan Pipa, Plat Manhole dan Dinding

-

18

M2

32.000,00

576.000,00

P.06a.4.a

36

3

M

36

M2

738.455,25 303.807,00

26.584.389,00

P.09c

a. Galian Tanah

T.06a

8,82

M3

37.228,38

328.354,27

b. Urugan Tanah Kembali

T.14a

4,2

M3

21.821,25

91.649,25

T.14c

0,3

3

M

150.650,00

45.195,00

a. Pasangan Batu Kali 1:3

P.01b

6

M3

794.052,00

4.764.312,00

b. Pasangan Batu Kosong

P.05

4

M3

280.462,00

1.121.848,00

8,45

m3

1.012.225,95

BA NGUNA N PENA NGKA P a. Bronjong

10.937.052,00

Pe m buatan Bak Pe nam pung PEKERJA A N TA NA H

PEKERJA A N PA SA NGA N

PEKERJA A N BETON B.10b

8.553.309,31

b. Bekisting kayu

B.21

22,54

m2

158.786,25

3.579.042,08

c. Besi beton, f y=2400 Mpa d. Rabat Beton 1: 3: 5

B.17

1521

kg

29.475,94

44.832.900,94

B.01

4,225

M3

681.760,25

2.880.437,06

P.04a

38

M2

43.168,24

1.640.393,12

PENKERJA A N PIPA a. Pipa GIP 4"

-

12

m

259.994,30

3.119.931,60

b. Saringan DN 4" CI termasuk Packing dan Mur Baut

-

2

Buah

2.000.000,00

4.000.000,00

c. Pipa V entilasi GIP DN 2"

-

2

Buah

475.000,00

950.000,00

d. Plat Manhole 100x100 cm, tebal 3 mm, rangka besi siku, kunci, engsel

-

2

Buah

2.800.000,00

5.600.000,00

e. Pengecatan Pipa, Plat Manhole dan Dinding

-

1

LS

2.000.000,00

2.000.000,00

f . Bend 4" x 90°

-

8

Buah Buah

450.000,00 100.000,00

3.600.000,00

4

PEKERJA A N PLESTERA N

g. Kran A ir + aksesoris IV

36.988.068,24

24

a. Plesteran 1:2 + A ci 5

10.000.000,00

1.023.500,00 1.541.169,51

-

a. Campuran Beton 1pc: 2ps: 3 kr

4

6.000.000,00

10.000.000,00

PEKERJA A N PIPA a. Pipa GIP 4"

c. Urugan Pasir 2

6.000.000,00

PEKERJA A N BETON

b. Geotextile III

LS

PEKERJA A N PLESTERA N

a. Campuran Beton 1pc: 2ps: 3 kr

5

1

PEKERJA A N PA SA NGA N

a. Plesteran 1:2 + A ci 4

T.01

400.000,00

Pe ngadaan dan Pe m as angan Pipa & Ak s e s or is PEKERJA A N TA NA H (manual)

1

Galian Tanah Biasa

T.06a

1245

M3

37.228,38

46.349.326,88

2

Galian Tanah Keras/Cadas

T.09d

1145

M3

26.018,75

29.791.468,75

3

21.821,25 150.650,00

13.583.728,13

M3

15.000.000,00

3

Urugan Tanah Kembali

T.14a

622,5

4

Urugan Pasir

T.14c

84

III

Pe k e r jaan Lain-lain

1

Tes Kebocoran Pipa

2

A s built draw ing Jumlah Pajak PPN : 10 %

M

-

1

LS

LA .08b

1

set

1.943.212,50

12.654.600,00 15.000.000,00 1.943.212,50 427.740.772,73 42.774.077,27

Jumlah Total

470.514.850,00

Dibulatk an

470.514.000,00

MASUKAN PADA WORKSHOP, LAUNCHING, Diskusi INTERNAL, Sosialisasi

• Perlu adanya konsistensi penulisan: satuan, istilah, dan format. • Perlunya koordinasi untuk mengintegrasikan antara A, B dan C khususnya untuk pekerjaan yang sama dan sejenis lainnya. • Jika koefisien diberlakukan sama di Indonesia, perlu adanya acuan kinerja atau produktivitas peralatan ataupun SDM untuk dapat disesuaikan dimasing-masing lokasi ataupun daerah. • Perlu dihindari satuan Lumpsum (LS) agar lebih terukur • Menampung masukan melalui Surat, Tilpon dan E-mail: [email protected] serta diskusi di website: http://www.pusair-pu.go.id • Melengkapi item pekerjaan dari berbagai masukan di Lamp.AHSP-SDA • Memperbaiki/sinkronisasi A-B-C pada Bab 1 – 5 (Umum) • Agar segera ditetapkan oleh PerMen PU

PROGRAM AHSP-SDA

Th-2012 : UMUM, Koefisien Pekerjaan Pokok Th-2013 : Sosialisasi UMUM, dan pendetailan : - Pasangan Armor, Tetrapod - Block beton Bergigi/Kunci - Geotekstil, Pengerukan, - Grouting, Angkutan ponton.

SASARAN HARGA SATUAN POKOK KEGIATAN (HSPK) Perencanaan & Desain  Jenis infrastruktur AKHIR Konstruksi : AHSP-SDA - 1 buah bangunan bagi dg Spektek tertentu - Per m’ Saluran utk lebar/dalam tertentu - dll. Operasi dan Pemeliharaan - Berbasis AKNOP tiap jenis bangunan di DI - Berbasis Luas DI

WORKSHOP APLIKASI AHSP-SDA 1. Setiap peserta/kelompok membuka laptopnya 2. Membuka aplikasi AHSP-SDA, Volume I: UMUM 3. Mengganti Sheet HSD dengan harga dasar tenaga kerja, bahan/material, dan peralatan sesuai dengan wilayah kerja masing-masing peserta 4. Lihat pada Sheet Rekap HSP 5. Mencermati HSP masing-masing item/jenis pekerjaan baik untuk harga total ataupun masing-masing komponen seperti tenaga kerja, bahan dan peralatan 6. Masing-masing peserta memberikan masukan/komentar baik secara lisan ataupun tertulis 7. Diskusi dan tindak lanjut

DEMO APLIKASI AHSP-SDA 1. Umum (312 item) 1.1 Pekerjaan Tanah ……………………….. 50 1.2 Pekerjaan Pasangan…………………… 82 1.3 Pekerjaan Beton ……………………….. 64 1.4 Pekerjaan Pemancangan……………… 18 1.5 Pekerjaan Dewatering…………………. 8 1.6 Pekerjaan Pintu Air ……………………. 56 1.7 Airtanah……………………………………18 1.8 Pekerjaan Lain-lain ……………………. 20

Catatan: - Aplikasi Excel untuk pekerjaan dari Volume Umum - Setiap pengguna aplikasi ini agar mengubah sheet HSD sesuai dengan lokasi pelaksanaan pekerjaan - Setelah input HSD diubah, maka secara otomatis akan mendapatkan Besaran HSP

HARAPAN DARI PELAKSANAAN SOSIALISASI - Mengamati kelengkapan item dan konsistensi komponen AHSP

- Mencermati besaran koefisien Diharapkan untuk pekerjaan yang sama di Kementerian PU mempunyai koefisien yang sama di SDA, BM, CK - Kritik membangun dengan memberikan masukan konkrit: * hardcopy (langsung ke SPT-SDA)

* email: [email protected] [email protected] [email protected]

Motto: Meningkatkan Kehandalan Mutu Infrastruktur SDA http//: www.pusair-pu.go.id E-mail: [email protected] [email protected] PUSAT LITBANG SUMBER DAYA AIR Jl. Ir. H. Juanda no. 193 Bandung E-mail: [email protected]