YOKOGAWA MIDDLE EAST E.C. SYSTEM SOLUTIONS DEPARTMENT
RESUME
Name
K.B.SHARATH KUMAR
Designation
Head - Projects, Power Plants Division
Total Experience
16 YEARS
Passport Number
Z1717726
Nationality
INDIAN
Passport Valid till
27-12-19
Date of Birth
12-11-1967
Marital Status
MARRIED
WORK EXPERIENCE From
To
2001
Till now
Organization Yokogawa Middle East, Bahrain
Projects Executed
Brief of Work Responsibilities
¾
Manifa Gas Processing Facility
¾
Active involvement in bid preparation and Bill of material preparation – compliance to SAMMS, SAES & project specification, sub-vendor proposal review and discussions
¾
ENOC Processing Company Limited (EPCL) Dubai, NHTU & Reformer unit.
¾
Involved in FEED Engineering at Foster Wheeler, Glasgow for 4 weeks to conduct the following activities ¾
¾
¾
¾
¾ ¾ ¾
¾
Filename: Resume_Sharath_Kumar_K_B Form: EN-GEN-01 (Rev-0)
Prepare DCS specifications and Drawings for the RFQ to reflect the specific proposed system and all its components which are applicable under the DCS scope of supply. Design/generate the generic system block diagram to reflect the proposed PCS system architecture. Prepare the network diagram to identify the various control networks, and connectivity to other sub-systems. Finalize proposed interface requirements between various sub-systems and auxiliary sub-systems. Finalize the Equipment requirements / interfaces in various buildings. Finalize the Time synchronization philosophy. Prepare a preliminary Bill of Material and deliverables to match with the changes
Active involvement in bid preparation and Bill of material preparation – compliance to project specification, subvendor proposal review and discussions, and closing of the purchase order
Page: 1 of 2
Updated as on: May 18
YOKOGAWA MIDDLE EAST E.C. SYSTEM SOLUTIONS DEPARTMENT
RESUME Name
K.B.SHARATH KUMAR
Designation
SENIOR PROJECT ENGINEER
Total Experience
16 YEARS
Passport Number
Z1717726
Nationality
INDIAN
Passport Valid till
27-12-19
Date of Birth
12-11-1967
Marital Status
MARRIED
WORK EXPERIENCE From
To
Organization
Projects Executed ¾
¾
Brief of Work Responsibilities
Various Saudi Aramco Riyadh & Jeddah Refinery Modification Projects, SA GOSPS, etc…
¾ ¾
Various Saudi Arabia & Iran Projects including SABTANK, SAFCO-Saudi Arabia, SHARQ, etc..
¾ ¾
¾ ¾
¾ ¾ ¾
¾
2000
2001
ABB Saudi Arabia
1992
2000
Yokogawa
¾ Various projects in India ¾ Deputation to YEA Singapore for executing Tuas 2 x 600MW project for 3 years.
1990
1992
Karnataka Power Corporation Limited, India
¾ Worked as Assistant Engineer Instrumentation
Filename: Resume_Sharath_Kumar_K_B Form: EN-GEN-01 (Rev-0)
Various projects in Saudi Arabia including Haradh Scada Project
¾
Site Survey Preparation of Site Survey Reports Material & Man-hour Estimation Preparation of Proposal
Site Survey Study Specification -Design DCS Solution & Configuration -Bid Preparation DCS Configuration & Bill of Material Preparation Engineering Man-hour Estimation Compliance to Project Specification
Active involvement in bid preparation and Bill of material preparation – compliance to SAMMS, SAES & project specification, sub-vendor proposal review and discussions.
¾
Detail Engineering, ordering of various instruments & equipments Basic Engineering activities like review & comment of P & Id’s, Vessel Data sheets. etc. Preparation of Instrument data sheets ¾ Review and correction of various layouts, hook up drawings, schedules etc. ¾ Site support ¾ Installation and Commissioning of DCS ¾ Testing and commissioning of all equipment in the Power plant from the DCS. ¾ Calibration of instruments.
Page: 2 of 2
Updated as on: May 18