PROPUESTA AJUSTE PLAN INVERSIONES CUBANIQUEL 2008 EMPRESAS

RRL ECG Resto Niquel EPM EMNI ESUNI ECRIN OC CEINNIQ CEPRONIQUEL EINI SERCONI EMPLEADORA R. MINERA CECYC CAMARIOCAS ESPROINI Sociedades YSA CCN GNI

PRESUPUESTO Total MCUC

PLAN Total

171423.0 121818.2 31,446.0 306223.0 245615.4 25,481.0 93222.0 85726.7 16061.0 48194.0 44587.0 4,546.0 12090.0 10928.8 3,859.0 4477.0 3481.8 2,751.0 19895.0 19353.7 2,383.0 652.0 442.4 652.0 1379.0 1230.4 520.0 140.0 123.3 329.0 2424.0 1994.7 315.0 179.0 162.0 174.0 163.0 143.0 163.0 3327.0 3019.0 121.0 140.0 123.3 117.0 71.0 63.0 71.0 91.0 74.3 60.0 239.0 221.4 239.0 114.0 107.4 114.0 73.0 66.4 73.0 52.0 47.6 52.0

MCUC

23,899.0 19,819.5 13887.9 4,047.6 3,570.4 2,045.9 2,284.4 442.4 438.4 273.7 177.4 152.8 143.0 92.4 101.0 63.0 55.5 221.4 107.4 66.4 47.6

NUEVO PLAN 2008 Total MCUC

MODIFICACION Total MCUC

29,657.0 22,466.2 -1,789.0 -1,432.8 22,813.4 17,912.0 -2,667.6 -1,907.5 14281.6 12292.4 -1779.4 -1595.5 4,129.5 3,610.4 -416.5 -437.2 3,673.6 3,353.6 -185.4 -216.8 2,740.3 2,062.3 -10.7 16.4 1,692.0 1,643.4 -691.0 -641.0 77.0 32.0 -575.0 -410.4 520.0 438.4 0.0 0.0 354.2 295.3 25.2 21.6 315.0 177.4 0.0 0.0 174.0 152.8 0.0 0.0 237.0 214.9 74.0 71.9 121.0 92.4 0.0 0.0 117.0 101.0 0.0 0.0 71.0 63.0 0.0 0.0 60.0 55.5 0.0 0.0 200.0 189.0 -39.0 -32.4 114.0 107.4 0.0 0.0 34.0 34.0 -39.0 -32.4 52.0 47.6 0.0 0.0

TOTAL

571107.0 453381.7

73227.0

57827.8

66952.0

52859.6 -6275.0 -4968.2

DIRECCION DE INVERSIONES

Codigo a

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Inversiones:

PLAN DE INVERSIONES

b

1057160 Modernización de Lixiviación 1057161 Termoeléctrica 1057162 Proyecto de Homogeneización 1057163 Proyecto de Limpieza de Gases 1057164 Reposición Instrumentación y Automática de RNH3 1057165 Dispositivo eléctrico de distribución.(DDP). 1057166 Filtración de Efluentes 1057167 Obras Liberación de Yacimiento Yagrumaje Norte. 1057170 Reposición Automática de Hornos 1057171 Automática de Silos 1057172 Otros Proyectos de Sostenimiento y Eficiencia 1057173 Electrofiltro de Hornos 1057176 Reposición Grúa depósito interior.

1057178 Otros Equipos de Sostenimiento Industrial 1057180 Nueva Presa de Cola 1057181 Otros Equipos y Proyectos de Medio Ambiente 1058101 Proyecto de Secado de Sulfuro 1058104 Plan de Preparación de Inversiones. 1058105 Nudo de Alimentación de Hornos 1058106 Sistema Contra Incendio 1058107 Tratamiento de Residuales. 1058108 Equipos de Sostenimiento para las Plantas 1057182 Equipos de Transporte Pesado de Posposición. 1057234 Reposición equipos de Seguro. 1058109 Equipos de Transporte Pesado. 1058110 Equipos de Transporte Lígeros 1058111 Equipos Mineros 1058112 Montacargas

VERSIONES

EMPRESA

MODIFICACION PLAN 2008 SITUACION Cont. Nueva

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

306223.0

245615.4

9073.9

7248.7

25481.0

3908.8 1

2

3

4

5

6

7

x

125825.0

97252.6

149.4

88.4

4606.0

x

52305.0

41088.7

5850.1

4567.2

2700.0

x

21979.0

18468.3

367.0

296.3

40.0

x

26010.0

22693.8

0.0

0.0

3541.0

x

3585.0

3200.8

1.0

0.1

442.0

x

3525.0

3318.8

0.0

0.0

915.0

x

3448.0

2861.1

10.2

1.5

80.0

x

6328.0

2937.1

7.9

1.3

558.0

x

494.0

354.1

0.0

0.0

250.0

x

725.0

521.8

0.0

0.0

245.0

x

3328.0

2547.7

516.8

471.2

2217.0

x

3595.0

2628.9

0.0

0.0

2077.0

x

2130.0

1874.0

0.0

0.0

10.0

2728.0

2647.6

2013.1

1746.7

557.0

1000.0

600.0

58.2

58.2

338.0

1856.0

957.2

100.2

17.8

697.0

16551.0

13269.3

0.0

0.0

190.0

674.0

340.0

0.0

0.0

100.0

x

9735.0

8749.8

0.0

0.0

50.0

x

2236.0

2091.0

0.0

0.0

556.0

x

2045.0

1782.5

0.0

0.0

175.0

x

5833.0

5260.3

0.0

0.0

1064.0

x

3127.0

3127.0

0.0

0.0

3127.0

x x x x x

99.0 1152.0 612 4938.0 360.0

98.9 1151.5 611.8 4843.8 337.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0

42.0 166 378 0 360

x

x

x x

x

x x

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

19819.5

6479.6

5068.8

16333.8

12843.2

18823.2

2946.9 10

15876.3

8

9

11

12

3354.1

139.2

96.5

4466.8

3164.8

1500.0

1349.6

737.6

1350.4

762.4

10.8

32.0

2.9

8.0

7.9

3147.8

636.2

303.8

2904.8

2844.0

332.5

200.7

144.3

1360.0

1360.0

884.3

48.3

35.9

60.0

50.0

30.0

0.0

0.0

30.0

15.0

186.0

57.7

6.9

340.0

124.0

130.0

56.0

52.7

25.0

17.0

213.0

0.0

0.0

245.0

213.0

1730.6

489.2

392.3

1300.0

1100.0

1789.5

11.4

1.6

830.0

316.0

7.0

0.0

0.0

10.0

7.0

492.5

760.1

693.1

0.0

0.0

100.0

337.7

314.4

0.3

0.0

270.8

41.3

23.0

100.0

70.0

45.0

10.6

1.6

179.4

43.4

43.3

26.1

3.7

73.9

39.3

15.0

1.5

0.2

48.5

14.8

496.5

0.0

0.0

250.0

200.0

67.5

0.0

0.0

175.0

67.5

923.7

0.0

0.0

800.0

650.0

3127.0

1677.6

1677.6

1449.4

1449.4

42.0 165.9 377.7 0 337

34.7 96.9 117.5 0.0 355.3

34.7 96.4 117.3 0.0 332.3

1.5 69.1 256.7 0.0 0.0

1.5 69.5 256.7 0.0 0.0

ESTIMADO 2008

DISMINUCION 2008

NUEVO PLAN 2008

TOTAL

M.CUC TOTAL M.CUC TOTAL M.CUC

22813.4

17912.0

-2667.6

-1907.5 22813.4 17912.0

18823.2 13=9+11

14=10+12

4606.0

3261.3

0.0

-92.8

4606.0

3261.3

2700.0

1500.0

0.0

0.0

2700.0

1500.0

40.0

10.8

0.0

0.0

40.0

10.8

3541.0

3147.8

0.0

0.0

3541.0

3147.8

1560.7

1504.3 1118.7 1171.8

1560.7

1504.3

108.3

85.9

-806.7

-798.4

108.3

85.9

30.0

15.0

-50.0

-15.0

30.0

15.0

397.7

130.9

-160.3

-55.1

397.7

130.9

81.0

69.7

-169.0

-60.3

81.0

69.7

245.0

213.0

0.0

0.0

245.0

213.0

1789.2

1492.3

-427.8

-238.3

1789.2

1492.3

317.6 -1235.6 -1471.9

841.4

317.6

10.0

7.0

841.4 10.0

7.0

0.0

0.0

760.1

693.1

203.1

200.6

760.1

693.1

338.0

314.4

0.0

214.4

338.0

314.4

141.3

93.0

-555.7

-177.8

141.3

93.0

190.0

45.0

0.0

0.0

190.0

45.0

100.0

43.0

0.0

-0.3

100.0

43.0

50.0

15.0

0.0

0.0

50.0

15.0

250.0

200.0

-306.0

-296.5

250.0

200.0

175.0

67.5

0.0

0.0

175.0

67.5

800.0

650.0

-264.0

-273.7

800.0

650.0

3127.0

3127.0

0.0

0.0

3127.0

3127.0

36.2 166.0 374.2 0.0 355.3

36.2 165.9 374.0 0.0 332.3

-5.8 0.0 -3.8 0.0 -4.7

-5.8 0.0 -3.7 0.0 -4.7

36.2

36.2

166.0

165.9

374.2

374.0

0.0

0.0

355.3

332.3

PLAN DE INVERSIONES RRL DIRECCION DE I

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

1057101 Reposición

b

Equipos de Sostenimiento

1057102 Reconstrucción

Ferroviaria

1057106 Reposición

PGD y CCM Lixiviacion y Lavado

1057115 Reposición

Filtro de Prensa

1058121 Rehabilitación

Dispensario

VERSIONES RRL DIRECCION DE INVERSIONES SITUACION Cont. Nueva

1

2

EMPRESA

MODIFICACION PLAN 2008

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

34851.0

21443.7

14149.4

6274.5

7759.2

6

7

3

4

5

8167.0

7677.0

0.0

0.0

4624.2

x

20403.0

9457.7

14139.0

6272.9

670.0

x

3655.0

2620.0

10.4

1.6

1005.0

x

1340.0

885.0

0.0

0.0

1040.0

x

1286.0

804.0

0.0

0.0

420.0

x

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

6869.4

2449.5

2383.8

3520.5

3052.8

19256.8

13851.5

4349.4

8

9

10

11

12

4505.9

2371.3

2371.3

1732.7

1617.7

547.5

0.0

0.0

432.0

307.6

803.0

63.5

9.9

1141.5

993.1

885.0

14.7

2.6

190.3

122.4

128.0

0.0

0.0

24.0

12.0

ESTIMADO 2008

TOTAL 5970.0

DISMINUCION 2008

NUEVO PLAN 2008

M.CUC TOTAL M.CUC TOTAL M.CUC 5436.6

-1789.2

-1432.8

5970.0

5436.6

18200.9 13=9+11

14=10+12

4104.0

3989.0

-520.2

-516.9 4104.0 3989.0

432.0

307.6

-238.0

-239.9

1205.0

1003.0

200.0

205.0

125.0

-835.0

-760.0

205.0

125.0

24.0

12.0

-396.0

-116.0

24.0

12.0

0.0

0.0

0.0

0.0

432.0

307.6

200.0 1205.0 1003.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

PLAN DE INVERSIONES DIRECCION DE I

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

b

1057141

REPOSICION EQUIPOS DE TRANSPORTE DE SERV ESUNI

1057233

REPOS. 3 EQUIPOS DE TRANSP. POR ESEN A ESUNI

1058156

EQUIPOS DE TRANSPORTE ESUNI

1057136

EQ.P/SERVICIOS GASTRONOMICOS Y ALOJAMIENTO ESUNI

1057138

REMODELACIÓN DE UNIDADES DE ALOJ Y ALIMENT ESUNI

1057232

BALANZAS PARA COCINAS Y ALMACENES ESUNI

1058150

REMODELACIÓN DE UNIDADES GASTRONOMÍA ESUNI

1058151

REMODELACION UNIDADES ALOJAMIENTO ESUNI

1058152

REMODELACION DE OFICINAS ESUNI

1058153

REMODELACION BASE DE TRANSPORTE DE MOA ESUNI

1058155

COMUNICACIONES Y AUTOMATIZACION ESUNI

1058158

PLAN DE PREPARACIÓN DE INVERSIONES ESUNI

VERSIONES DIRECCION DE INVERSIONES

SITUACION Cont. Nueva

EMPRESA

MODIFICACION PLAN 2008

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

4477.0

3481.8

68.5

67.5

2751.0

19.2

1

2

3

4

5

6

7

212.0 84.0 602.0

186.0

0.0

0.0

212.0

84.0

19.2

19.2

24.0

562.3

0.0

0.0

574.0

x

515.0

477.3

48.7

47.7

424.0

x

95.0

63.1

0.0

0.0

75.0

x

60.0

55.2

0.6

0.6

30.0

x

1552.0

1306.3

0.0

0.0

166.0

x

430.0

280.2

0.0

0.0

430.0

x

136.0

56.3

0.0

0.0

136.0

x x x

x x x

623.0 68.0 100.0

345.4

0.0

0.0

512.0

62.7

0.0

0.0

68.0

3.0

0.0

0.0

100.0

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

2045.9

1575.6

1113.3

1164.7

949.0

1683.8 1081.4 8

826.6

9

10

399.1

11

12

186.0

205.9

184.5

0.0

0.0

21.8

22.2

20.9

0.0

0.0

534.9

213.1

205.6

436.9

404.4

421.0

461.2

409.4

21.0

20.0

50.2

25.9

21.0

49.1

29.2

29.2

40.0

29.6

0.0

0.0

149.2

45.5

34.9

120.5

114.3

280.2

135.8

93.7

266.2

168.7

56.3

1.1

1.1

9.9

7.9

251.4

277.9

69.7

234.1

181.7

62.7

53.0

42.6

21.0

20.1

3.0

94.0

0.3

6.0

2.7

ESTIMADO 2008

TOTAL 2740.3

DISMINUCION 2008

M.CUC TOTAL M.CUC 2062.3

-10.7

1225.7

13=9+11

19.4

458.1 355.7

14=10+12 No se modifica, se mantiene como la

205.9

184.5

-6.1

1.5 aprobó el MEP.

22.2

20.9

-1.8

-0.9 aprobó el MEP.

650.0

610.0

76.0

75.1 fletes de los ómnibus.

No se modifica, se mantiene como la Se incrementó por incremento de los

482.2

429.4

58.2

8.4

75.0

50.2

0.0

0.0

40.0

29.6

10.0

0.4

Se incrementó en 59 MP de ellos 9 MCUC. Actualmente está sobregirada en CUP y hay equipos contratados que entran en sept. Se incrementó en 23 MP de ellos 17,6 MCUC por la necesidad de compra de equipos (compras nacionales) para 11 habitaciones del Hotel 90 de Nicaro que se terminan en sept.(Acuerdo reuniones CUBANIQUEL Nicaro) Se incrementó en 10 MP de ellos 0,3 MCUC por estar sobregirada en estos valores.

0.0

No se modifica el plan ajustado (se mantiene como se propuso en el ajuste, si se modifica la aprobada por el MEP).

166.0

149.2

0.0

402.0

262.4

-28.0

-17.8

11.0

9.0

-125.0

-47.3

Se disminuye en 28 MP de ellos 17,8 MCUC. Se eliminan otros gastos, se disminuye construcción y montaje y se incrementa en equipos con el objeto de comprar parte de los equipos de Nicaro (Acuerdo reuniones CUBANIQUEL Nicaro) . Se disminuye en 125 MP de ellos 47,3 MCUC. Se elimina construcción y montaje.

512.0

251.4

0.0

0.0

74.0

62.7

6.0

0.0

100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0

0.0

No se modifica el plan ajustado. Sólo se pasa una parte de construcción y montaje para otros gastos para pagar el proyecto de montaje de la fregadora de ómnibus. No se modifica, se mantiene como la aprobó el MEP. No se modifica, se mantiene como la aprobó el MEP.

TOTAL 2751.0

7

212.0 24.0 574.0 424.0

75.0 30.0 166.0

430.0 136.0

512.0 68.0 100.0

M.CUC 2045.9

1173.3 797.2 8

186.0 21.8 534.9 421.0

50.2 29.2 149.2

280.2 56.3

251.4 62.7 3.0

PLAN DE INVERSIONES DIRECCION DE INVERSIONES SITUACION

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

Cont. Nueva

PRESUPUESTO TOTAL

TOTAL 48194.0

b

1

2

3

1057125

Reconstruccion Muelle 1

x

2785.0

1057126

Rehabilitación Planta de Carbón

x

260.0

1057127

Reh. Base de Combustible

x

11551.0

1057128

Rehabilitación Base de Amoniaco

x

2444.0

1057131

Barreras Antiderrames

x

135.0

1057133

Sist. Prev. Escape Amoniaco

x

500.0

1057134

Equipos de Servicio

x

464.0

1057135

Equipos de Transporte Tecnológico

x

11265.0

1057228

Equipos de Mtto. Y Operaciones

x

1391.0

1058164

Extracción y Transporte de Coral

x

4890.0

1058165

Expansión Explotación Portuaria

x

6328.0

1058166

Proyecto Flota Maritima

x

2727.0

1058167

Rep.C Repos. Eq. Tecnol. y Serv.

x

3215.0

1058168

Equipos de Transporte de Servicio

x

210.0

1058169

Reposición de camioneta ESEN

x

29.0

ERSIONES

EMPRESA

MODIFICACION PLAN 2008

RESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

44587.0

1519.4

1272.0

4546.0

4047.6

1017.6 4

5

6

2992.8 7

8

2785.0

34.0

34.0

555.0

469.9

200.2

31.7

0.9

0.0

0.0

9228.4

65.5

55.0

710.0

579.1

2065.9

322.0

276.1

1,023.0

913.4

135.0

62.2

62.2

97.0

71.3

310.0

0.0

0.0

259.0

158.3

446.1

133.1

93.2

100.0

100.0

10958.9

267.8

238.2

562.0

561.6

1375.0

121.6

71.4

966.0

931.0

4881.7

5.0

5.0

9.0

7.5

6033.8

416.7

378.6

12.0

10.0

2719.0

6.3

6.3

9.0

7.5

3215.0

0.0

0.0

5.0

5.0

204.0

53.5

51.1

210.0

204.0

29.0

0.0

0.0

29.0

29.0

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

ESTIMADO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

2030.4

1765.7

2099.1

1844.7

4129.5

1630.6 9

10

1475.8 11

12

555.0

13=9+11

469.9

555.0 0.0

41.8

16.3

444.2

339.5

486.0

278.5

215.0

314.5

290.5

593.0

96.5

71.3

55.5

55.3

152.0

259.0

158.3

259.0

12.3

3.1

99.7

99.7

112.0

473.2

437.0

88.8

174.8

562.0

1045.0

942.3

91.0

72.4

1136.0

9.0

7.5

9.0

12.0

10.0

12.0

9.5

9.5

9.5 5.0

5.0

5.0

73.6

71.2

136.4

132.8

210.0

29.0

29.0

29.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

ESTIMADO 2008

DISMINUCION 2008

M.CUC TOTAL M.CUC 3610.4

-416.5

-437.2

469.9

0.0

0.0

0.0

0.0

0.0

355.8

-224.0

-223.3

505.5

-430.0

-407.9

126.6

55.0

55.3

158.3

0.0

0.0

102.8

12.0

2.8

611.8

0.0

50.2

1014.7

170.0

83.7

7.5

0.0

0.0

10.0

0.0

0.0

9.5

0.5

2.0

5.0

0.0

0.0

3261.1 14=10+12

204.0

0.0

0.0

29.0

0.0

0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PLAN DE INVERSIONES DIRECCION DE I

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

1058194 EQUIPOS

b

DE TRANSPORTE SERCONI

1058195 EQUIPOS

DE CLIMATIZACIÓN SERCONI EQUIPOS DE TECNOLIGIA DE LA INFORMACIÓN 1058196 SERCONI 1058197 RESTO

DE EQUIPOS SERCONI

1058198 REPOSICIÓN

MOTO SERCONI

VERSIONES DIRECCION DE INVERSIONES SITUACION Cont. Nueva

SERCONI MODIFICACION PLAN 2008 EMPRESA

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

179.0

162.0

0.0

0.0

174.0

0 1

2

3

4

5

6

7

X

100.0

94.0

0.0

0.0

100.0

X

4.0

3.0

0.0

0.0

2.0

X

20.0

17.0

0.0

0.0

20.0

X

52.0

46.0

0.0

0.0

49.0

X

3.0

2.0

0.0

0.0

3.0

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

152.8

8.2

5.9

165.8

146.9

81.5 8

0 9

10

81.5 11

12

94.0

0.0

0.0

95.0

92.0

1.8

0.0

0.0

2.0

1.8

17.0

6.2

4.9

13.8

12.1

38.0

0.0

0.0

55.0

41.0

2.0

2.0

1.0

0.0

0.0

ESTIMADO 2008

TOTAL 174.0

DISMINUCION 2008

M.CUC TOTAL M.CUC TOTAL M.CUC 152.8

0.0

0.0

81.5 13=9+11

NUEVO PLAN 2008

14=10+12

95.0

92.0

-5.0

-2.0

2.0

1.8

0.0

0.0

20.0

17.0

0.0

0.0

55.0

41.0

6.0

3.0

2.0

1.0

-1.0

-1.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

PLAN DE INVERSIONES DIRECCION DE IN

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

b 1058180 Equipos

Informáticos y Otros

VERSIONES DIRECCION DE INVERSIONES SITUACION Cont. Nueva

EMPRESA

MODIFICACION PLAN 2008

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

#REF!

#REF!

#REF!

#REF!

#REF!

0

1

2

X

3

169.0

4

138.9

5

6

12.0

7

11.3

169.0

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

#REF!

#REF!

#REF!

#REF!

#REF!

0

8

138.9

0

9

10

5.5

0

11

5.5

188.7

12

155.0

ESTIMADO 2008

TOTAL 194.2

DISMINUCION 2008

M.CUC TOTAL M.CUC 160.5

25.2

21.6

25.2

21.6

0

13=9+11

14=10+12

194.2

160.5

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

DIRECCION DE INVERSIONES

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

PLAN DE INVERSIONES

b

1057183 Reposición

Equipos Tecnológicos EMNI

1057217 Reposición

Equipos de Laboratorios EMNI

1057186 Reposición

Equipos Sostenimiento EMNI

1057140 Equipos

de control de proceso EMNI

1057141 Reposición

Equipos de Transporte EMNI

VERSIONES

SITUACION Cont. Nueva

1

2

PRESUPUESTO TOTAL

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

12090.0

10928.4

3859.0

3570.4

4

7

8

3

x

9797.0

8735.7

3120.0

2876.6

x

259.0

251.2

113.0

108.0

x

1073.0

997.2

85.0

68.0

114.0

110.3

41.0

36.9

847.0

834.0

500.0

480.9

x x

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

ESTIMADO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

531.4

412.9

3142.2

2940.7

3673.6

9

10

11

12

13=9+11

295.9

198.5

2759.1

2606.5

3055.0

110.5

99.6

94.5

86.3

205.0

6.6

5.5

79.8

68.8

86.4

23.6

18.4

65.9

48.2

89.5

94.8

90.9

142.9

130.9

237.7

0.0

ESTIMADO 2008

DISMINUCION 2008

M.CUC TOTAL M.CUC 3353.6

-185.4

-216.8

2805.0

-65.0

-71.6

185.9

92.0

77.9

74.3

1.4

6.3

66.6

48.5

29.7

221.8

-262.3

-259.1

0 14=10+12

0.0

DIRECCION DE INVERSIONES

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

1058128 Equipos

de Computación

1058129 Equipos

de Pintura

1058130 Máquinas

PLAN DE INVERSIONES

b

Herramientas

1058131 Equipos

Automotor de Construcción Ecrin

1058132 Equipos

Complementarios

1058134 Mobiliario 1058136 Planta

y Electrodomestico

para Producir Hormigón

La disminución del plan 2008 depende de la aprobación de la ficha 1058136, de no ser aprobada bajamos 650.o MCUC. En la ficha 1058129 y 1058131 el total es más bajo que el CUC debido a que la moneda nacional planificada fue menor que la El valor de las importaciones se ve un aumento debido a que si se aprueba la ficha de la planta de hormigón hay un increment

VERSIONES

EMPRESA

MODIFICACION PLAN 2008 SITUACION Cont. Nueva

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

14164.0

13827.2

369.2

307.1

2392.0

460.9 1

2

3

4

5

6

7

X

80.0

72.1

0.0

0.0

80.0

X

63.0

60.5

0.0

0.0

63.0

X

77.0

67.6

0.0

0.0

77.0

12939.0

12690.0

369.2

307.1

1167.0

X

220.0

206.0

0.0

0.0

220.0

X

85.0

81.0

0.0

0.0

85.0

X

700.0

650.0

0.0

0.0

700.0

X

da bajamos 650.o MCUC. al planificada fue menor que la real ejecutada. de hormigón hay un incremento en 650,0 MCUC

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

2292.5

897.2

803.0

1494.0

1488.7

1966.7 8

653.8 9

10

1962.9 11

12

71.2

27.4

19.6

52.6

50.8

60.5

21.1

18.3

41.9

42.2

67.6

13.0

11.3

64.0

56.3

1156.2

725.8

656.3

441.2

499.9

206.0

99.1

88.2

120.1

117.8

81.0

10.8

9.3

74.2

71.7

650.0

0.0

0.0

700.0

650.0

ESTIMADO 2008

TOTAL 1691.2

DISMINUCION 2008

NUEVO PLAN 2008

M.CUC TOTAL M.CUC TOTAL M.CUC 1641.7

-700.8

-650.8

2616.7 13=9+11

14=10+12

80.0

70.4

0.0

-0.8

80.0

71.2

63.0

60.5

0.0

0.0

63.0

60.5

77.0

67.6

0.0

0.0

77.0

67.6

1167.0

1156.2

0.0

0.0 1167.0 1156.2

219.2

206.0

-0.8

0.0

220.0

206.0

85.0

81.0

0.0

0.0

85.0

81.0

0.0

0.0

-700.0

-650.0

700.0

650.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

cumple

DIRECCION DE INVERSIONES

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

1058188

Sistemas Automatizados de RH

1058187

Equipos Automotor

1058114 Remodelación

PLAN DE INVERSIONES

b

de las Instalaciones

VERSIONES

EMPRESA

MODIFICACION PLAN 2008 SITUACION Cont. Nueva

1

2

PRESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

237.0

214.9

0.0

0.0

192.0

3

4

5

6

7

X

90.0

71.6

90.0

x

102.0

98.3

102.0

45.0

45.0

X

N PLAN 2008 PLAN AÑO 2008

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

169.9

149.8

135.2

87.2

79.7

8

9

10

11

12

71.6

60.9

48.4

29.1

23.2

98.3

88.9

86.8

13.1

11.5

45.0

45.0

ESTIMADO 2008

TOTAL 237.0

INCREMENTO 2008

NUEVO PLAN 2008

M.CUC TOTAL M.CUC TOTAL M.CUC 214.9

0 13=9+11

14=10+12

90.0

71.6

102.0

98.3

45.0

45.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

16

10.2

106.0

81.8

45.0

45.0

45.0

45.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

cumple

cumple

CUMPLE

CUMPLE

CUMPLE

CUMPLE

PLAN DE INVERSIONES DIRECCION DE INVERSIONES SITUACION

EMPRESAS/Inversiones TOTAL EMPRESA IMPORTACIONES PAGO Codigo Inversiones: a

Cont. Nueva

PRESUPUESTO TOTAL

TOTAL 48194.0

b

1

2

3

1057125

Reconstruccion Muelle 1

x

2785.0

1057126

Rehabilitación Planta de Carbón

x

260.0

1057127

Reh. Base de Combustible

x

11551.0

1057128

Rehabilitación Base de Amoniaco

x

2444.0

1057131

Barreras Antiderrames

x

135.0

1057133

Sist. Prev. Escape Amoniaco

x

500.0

1057134

Equipos de Servicio

x

464.0

1057135

Equipos de Transporte Tecnológico

x

11265.0

1057228

Equipos de Mtto. Y Operaciones

x

1391.0

1058164

Extracción y Transporte de Coral

x

4890.0

1058165

Expansión Explotación Portuaria

x

6328.0

1058166

Proyecto Flota Maritima

x

2727.0

1058167

Rep.C Repos. Eq. Tecnol. y Serv.

x

3215.0

1058168

Equipos de Transporte de Servicio

x

210.0

1058169

Reposición de camioneta ESEN

x

29.0

ERSIONES

EMPRESA

MODIFICACION PLAN 2008

RESUPUESTO TOTAL

REAL AÑOS ANTERIORES

PLAN AÑO 2008

M.CUC

TOTAL

M.CUC

TOTAL

M.CUC

44587.0

1519.4

1272.0

4546.0

4047.6

1017.6 4

5

6

2992.8 7

8

2785.0

34.0

34.0

555.0

469.9

200.2

31.7

0.9

0.0

0.0

9228.4

65.5

55.0

710.0

579.1

2065.9

322.0

276.1

1,023.0

913.4

135.0

62.2

62.2

97.0

71.3

310.0

0.0

0.0

259.0

158.3

446.1

133.1

93.2

100.0

100.0

10958.9

267.8

238.2

562.0

561.6

1375.0

121.6

71.4

966.0

931.0

4881.7

5.0

5.0

9.0

7.5

6033.8

416.7

378.6

12.0

10.0

2719.0

6.3

6.3

9.0

7.5

3215.0

0.0

0.0

5.0

5.0

204.0

53.5

51.1

210.0

204.0

29.0

0.0

0.0

29.0

29.0

REAL HASTA AGOSTO

ESTIMADO SEP.-DICIEMBRE

ESTIMADO 2008

TOTAL

M.CUC

TOTAL

M.CUC

TOTAL

2030.4

1765.7

2099.1

1844.7

4129.5

1630.6 9

10

1475.8 11

12

555.0

13=9+11

469.9

555.0 0.0

41.8

16.3

444.2

339.5

486.0

278.5

215.0

314.5

290.5

593.0

96.5

71.3

55.5

55.3

152.0

259.0

158.3

259.0

12.3

3.1

99.7

99.7

112.0

473.2

437.0

88.8

174.8

562.0

1045.0

942.3

91.0

72.4

1136.0

9.0

7.5

9.0

12.0

10.0

12.0

9.5

9.5

9.5 5.0

5.0

5.0

73.6

71.2

136.4

132.8

210.0

29.0

29.0

29.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

ESTIMADO 2008

DISMINUCION 2008

M.CUC TOTAL M.CUC 3610.4

-416.5

-437.2

469.9

0.0

0.0

0.0

0.0

0.0

355.8

-224.0

-223.3

505.5

-430.0

-407.9

126.6

55.0

55.3

158.3

0.0

0.0

102.8

12.0

2.8

611.8

0.0

50.2

1014.7

170.0

83.7

7.5

0.0

0.0

10.0

0.0

0.0

9.5

0.5

2.0

5.0

0.0

0.0

3261.1 14=10+12

204.0

0.0

0.0

29.0

0.0

0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Related Documents

2008 Modificado Sep
November 2019 16
Sep-2008
November 2019 44
2008 Sep
October 2019 42
Sep 2008
October 2019 31
Sep 2008
December 2019 35
Sep 2008
December 2019 34