2004-03

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 2004-03 as PDF for free.

More details

  • Words: 537
  • Pages: 3
1) Unit Testing has been introduced newly in the policy. How will you make sure that unit testing is effective? 2) What are the product standards for these a. Test Plan b. Test Script c. Test Report 3) You company is going to create first E-Commerce application. How will you test this application? ( 10 Marks) 4) Describe these terms (15 marks) a. Equivalence Partitioning b. Boundary Value Analysis c. Error Guessing 5) Your customer does not have experience in writing Acceptance Test Plan. How will you do that in coordination with customer? What will be the contents of Acceptance Test Plan? 6) It is being observed that in a project cost of testing is very high. After going in detail it was found that the testers are testing the software which is not left with many defects. How will you make sure that this is correct? Any three ways? What are the disadvantages of Over Testing? 7) There is a new model made with lots of fields, data, and interdependent paths between them. How will you ensure effectiveness, efficiency and total coverage in the testing of this model.(30 Marks) 8) You find that the senior testers are making more mistakes then junior testers; you need to communicate this aspect to the senior tester. Also, you don't want to loose this tester. How should one go about the constructive criticism? (10 Points) 9) Difference between Verification and Validation. 10) List 4 purposes of what you think are the primary goals of testing (15 Marks) 11)You are assigned as the test lead for a new program that will automate takeoffs and landing at an airport. How would you write a test strategy for this new program? (Don't recall exact wording of following 3 questions) 12)Data driven Testing.And test plan for the same. 13)Defects made by testers 14)Case study on when to stop testing.

Objective 1) When does Integration Testing starts a. After Unit testing b. After unit testing before black box testing 2) When a defect is fixed in production how rather than in requirement, how much expensive is that a. 5 times b. 50 times c. 500 times 3) Juran is famous for a. Quality Control b. Working on Trend Analysis c. Two more choices 4) When to stop Testing a. When u run out of time b. All test cases are done c. When quality goals established in the beginning of the projects are met. 5) What is the structure testing process a. Parallel b. Regression c. Stress d. Intersystem 6) Software testing activities should start a. b. c. d.

during the design stage as soon as the code is written when the requirements have been formally documented as soon as possible in the development lifecycle

7) Which one of these is not a statistical test tool? a. b. c. d.

Stratifying Check sheet Regression Analysis Flow Charts

8) What are Histograms commonly know as a. Pie charts b. Scatter plots

c. Bar Charts d. None of the above 9) What are Pareto charts commonly know as a. b. c. d.

80-20 Scatter plots Check sheet None of the above

10)Which is the reputed testing standard? a. b. c. d.

M. Bridge awards QAI ISO Microsoft

Related Documents

200403 Newsletter
April 2020 2
Haller Journal 200403
November 2019 13
200403-21 Ft Rule
October 2019 4