SAUDI ARABIAN OIL COMPANY

ENGG CERT

DIVISION 15 - MECHANICAL SECTION 15500 - FIRE PROTECTION SYSTEMS PART 1 - GENERAL DESCRIPTION OF WORK A.

Provide all labor, material, tools, and equipment; fabricate, furnish and install all fire protection systems complete and in place, including all associated hardware as specified herein, and as indicated on drawings for a complete and proper installation. Items required for this work include, but are not necessarily limited to: 1.

Fire hose cabinets.

2.

Preparations of complete shop drawings for the entire protection systems and approvals.

3.

All required patent rights satisfaction; and inspections.

4.

Connection to site fire main at designated tie-in points outside the building.

5.

Protection of materials and protective coatings.

6.

Cleaning, testing, and adjusting.

7.

Record Drawings of work installed.

00

REV NO.

DATE

05-2006

JO/EWO

DESCRIPTION

IISSUED FOR BIDDING

1.01

DISCIPLINE ENGINEER

DATE: PROJECT ENGINEER

1.02

DATE:

QUALITY ASSURANCE A.

CERTIFIED

DATE:

CONSTRUCTION AGENCY

Codes and Standards: Comply with all applicable codes and standards including, but not limited to, those listed below: 1.

NFPA 14 Standard for Installation of Standpipe and Hose System.

2.

Saudi Aramco Engineering Standards (SAES)

3.

SAES-B-017A

Firewater System Design

4.

SAES-B-019C

Portable Mobile and Auxiliary Fire Fighting Equipment.

5.

SAES-S-050

Sprinkler and Standpipe Systems in Building

6.

SAES-S-060

SAUDI ARAMCO Plumbing Code

DATE:

OPERATIONS OR

DATE:

1.03 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION REVISIONCE CERTIFICATION RTIFICATE

THIS INDICATES THAT REV. NO.__________

BY:

DATE:

SUBMITTALS A.

General: In compliance with requirements in Section 15050, and submit the followings items for Company Representative’s review and approval. SECTION - 15500

CONSTRUCTION FIRE PROTECTION SYSTEM (15500) OPERATION SUPPORT BUILDING SEA WATER PLANT QURAYYAH

DWG.TYPE PLANT NO. INDEX

DOC SAUDI ARABIA

496 JO / EWO:

A

DRAWING NO.

BE-215248

BI# 10-03451-0001

SHT.NO.

REV.NO.

1 OF 4

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

JO/EWO

DESCRIPTION

IISSUED FOR BIDDING

ENGG CERT

B.

00

REV NO.

DATE

05-2006

1.04

DISCIPLINE ENGINEER

1.

Complete material list of items proposed to be furnished and installed under this Section.

2.

Manufacturer’s specifications and other data required to demonstrate compliance with the specified requirements including: catalog numbers, trade names, illustrations, and descriptive data for each article proposed. All pertinent data for each articles shall be underlined in each copy of each catalog or brochure in which it is described. Data shall include valves, gauges, risers, trim, sprinkler heads, and auxiliary equipment.

3.

Names and addresses of the service and maintenance organizations nearest the WORK Sites that readily stocks repair parts.

4.

Manufacturer’s recommended installation procedures which, when approved by SAUDI ARAMCO, shall become the basis for inspecting and accepting or rejecting actual installation procedures used on the work.

PRODUCT DELIVERY, STORAGE AND HANDLING A.

General: Shall be in conformance with Section 15021 Para. 1.04.

PART 2 - PRODUCTS 2.01

DATE: PROJECT ENGINEER

Manufacturer’s Data:

MATERIALS A.

DATE:

Piping and Fittings 1.

Provide sleeves at all points where piping passes through walls and floors. Space between pipe and sleeves shall be filled with Teflon rope or glass fiber material to avoid sound transmission and chrome-plated escutcheons shall be provided at floor and on each side of wall.

2.

Connect to site fire protection main at designated tie-in points outside of building. Extend through foundation wall and up through building at least 6” above floor. Provide adapter as required between two different materials.

CERTIFIED

DATE:

CONSTRUCTION AGENCY

DATE:

OPERATIONS OR

B.

Fire Hose Cabinets and Accessories

DATE: (DCC) NO. _____________________

BY:

1.

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCE CERTIFICATION RTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

CONTROL NUMBER

DATE:

Cabinets shall include Fire Hose & Nozzle (FH$N) as specified below and a portable Fire Extinguisher (FE-1, without mounting bracket). Cabinets shall be so designated as to not interfere with the prompt use of the hose valve, the hose and other requirement within the cabinet at the time of use in fighting a fire. The hose valve shall be located such that there is at least 25mm between any part of the cabinet and the handle of the valve when the valve is in any position form fully opened to fully close. Use Larson Model # HCSS3232-R or equal. SECTION - 15500

CONSTRUCTION FIRE PROTECTION SYSTEM (15500) OPERATION SUPPORT BUILDING SEA WATER PLANT QURAYYAH

DWG.TYPE PLANT NO. INDEX

DOC SAUDI ARABIA

496 JO / EWO:

A

DRAWING NO.

BE-215248

BI# 10-03451-0001

SHT.NO.

REV.NO.

2 OF 4

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.

Fire hose cabinets shall be fully recessed type as shown on design drawings. Door shall be full glass type with tempered glass.

3.

Materials:

4.

a)

Sheet steel for cabinet body shall be cold rolled annealed, stretcher leveled, bonderized or equivalent treatment and cleaned for the finish specified.

b)

Stainless steel for door and frame shall be type 304.

c)

Glass shall be tempered and meet the requirement of ANSI Z97.1.

Construction: a)

Body shall be sheet steel not less than 1.2 mm (18gauge) thick, one piece full welded with square corners, or seamless front full welded to back and at corners. Welds shall be continuous in full depth and width dressed smooth and flush on exposed interior surfaces. Sides shall be blanked or counter sunk for hardware.

b)

Door and frame shall be hollow metal rigid tubular stainless steel construction, welded and ground smooth not less than 1.2 mm (18gauge) thick with attached glass retainers on the inside.

5.

00

REV NO.

DATE

05-2006

JO/EWO

DESCRIPTION

IISSUED FOR BIDDING

ENGG CERT

SAUDI ARABIAN OIL COMPANY

Finish:

DISCIPLINE ENGINEER

a)

Prime concealed exposed metal surfaces of cabinet body with one coat of baked enamel primer. Ground smooth exposed surfaces.

DATE: PROJECT ENGINEER

b)

Exposed interior surfaces, in addition to the prime coat, shall have not less than two coats of baked enamel finish, color shall be white.

DATE:

CERTIFIED

6.

DATE:

CONSTRUCTION AGENCY

Hardware: a)

Cabinets shall have hinges and latch.

b)

Hinges shall be continuous stainless steel permitting door to open 180 degrees.

DATE:

OPERATIONS OR

7.

Fire Hose and Nozzle: For installation in FHC a)

Fire Hose shall be 30 meters(100feet) long, 38mm(1 ½ inches) lined and meet the requirements of SAES-B-019,Section 8.5 and NFPA 14, complete with cast brass couplings with threads meeting the requirements of NFPA 1961 & 63. Use Elkhart Model Elk-Lite Hose with El khart 328 couplings or equal.

b)

Nozzle shall be 38mm (1 ½ inch) cast brass adjustable fog nozzle capable of complete shutoff, straight stream of any degree of solid

DATE: (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION REVISIONCE CERTIFICATION RTIFICATE

THIS INDICATES THAT REV. NO.__________

BY:

DATE:

SECTION - 15500

CONSTRUCTION FIRE PROTECTION SYSTEM (15500) OPERATION SUPPORT BUILDING SEA WATER PLANT QURAYYAH

DWG.TYPE PLANT NO. INDEX

DOC SAUDI ARABIA

496 JO / EWO:

A

DRAWING NO.

BE-215248

BI# 10-03451-0001

SHT.NO.

REV.NO.

3 OF 4

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

ENGG CERT

conical fog. Threads shall meet the requirements of NFPA 194. Use Elkhart Model L-206T nozzle or equal. c)

DESCRIPTION

IISSUED FOR BIDDING

The following accessories shall be provided with the Hose Rack:

05-2006

JO/EWO DATE

00

REV NO.

DISCIPLINE ENGINEER

CERTIFIED

1.

50 x 38mm (2 ½ inch) cast brass angle valve, Underwriters Laboratories approved 150 lb, with threads meeting the requirements of NFPA 194. Use Elkhart Model U-20 or equal.

2.

50 mm (2 inch) steel escutcheon plate. Use Elkhart Model 589 or equal.

3.

38 mm (1 ½ inch) cast brass rack nipple. Use Elkhart Model 46-B or equal.

4.

Spanner wrench of malleable iron with cadmium plated fitting 38 mm (1 ½ inch) pin lug or sidewall lug couplings, Spanner bracket shall be provided.

C.

Valves: Valves shall be provided as required by NFPA 13 and of types approved for fire services. Gate valves shall be flanged clear opening switch check type with flanged inspection and access cover plate for sizes 100mm(4 inches) and larger. An OS&Y valve shall be provided beneath each alarm valve in each riser when more than one alarm valve is supplied from the same water supply pipe.

D.

Identification Signs: Properly lettered approved metal signs conforming to NFPA shall be attached to each valve and alarm device.

DATE: PROJECT ENGINEER

DATE:

Hose Rack shall be semi-automatic 38mm (1 ½ inch) on piece construction, 1.5 mm (16gauge) thick. Rack pins, steel cadmium plated. Unit shall be red enamel painted and be listed or approved by Underwriters Laboratories. Use Elkhart Model S-41 or equal.

DATE:

CONSTRUCTION AGENCY

DATE:

END OF SECTION (15500)

OPERATIONS OR

DATE: (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION REVISIONCE CERTIFICATION RTIFICATE

THIS INDICATES THAT REV. NO.__________

BY:

DATE:

SECTION - 15500

CONSTRUCTION FIRE PROTECTION SYSTEM (15500) OPERATION SUPPORT BUILDING SEA WATER PLANT QURAYYAH

DWG.TYPE PLANT NO. INDEX

DOC SAUDI ARABIA

496 JO / EWO:

A

DRAWING NO.

BE-215248

BI# 10-03451-0001

SHT.NO.

REV.NO.

4 OF 4

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)