ZAPATA COMBINADA RECTANGULAR (Z-16,Z-15) Columna Izquierda Cm = 24.37 Tn Cv = 15.99 Tn t1 = 0.40 m t2 = 0.40 m f'c = 280 Kg/cm2
Columna Derecha Cm = 28.15 Tn Cv = 17.65 Tn t1 = 0.40 m t2 = 0.70 m f'c = 280 Kg/cm2
hf df S/C hc ϒc ϒs σ ult f'c fy
l1 = 2.30 m
1°
Esfuerzo Neto del Terreno
σn = 7.21 Tn/m2 2°
Area de la Zapata Pt Azap Xo Lz lv b Azap
3°
= 86.16 Tn = 11.95 cm2 = 1.64 m = 3.28 m = 0.20 m = 3.62 m = 12.045 cm2
�_𝑧𝑎𝑝=�_ �/�_𝑛
Reacción Neta del Terreno ● Por Unidad de Longitud P1u = 61.301 Tn P2u = 69.415 Tn WNU = 39.61 Tn/m
Cimentación = 2.00 m = 1.85 m = 500 Kg/m2 = 0.15 m = 2.3 Tn/m3 = 1.95 Tn/m3 = 3.50 Kg/cm2 = 210 Kg/cm2 = 4200 Kg/cm2
�_𝑛=�_𝑎𝑑�−�_𝑝𝑜�∙ℎ_𝑓−ℎ_𝑐∙�_(𝑐−) 𝑆/�
3.30 m 3.65 m
�_𝑛𝑢=�_𝑁𝑈/�
�_𝑁𝑈=(�_1𝑈+�_ 2𝑈)/𝑙𝑧
● Por Unidad de Area
WNU = b = Wnu =
39.61 3.65 10.85
Tn/m m Tn/m2
3°
Dimensionamiento de la Altura hz de la Zapata Para una Cuantía ρ = 0.0024 ρmin = 0.0024
φ = 0.9
�_𝑧=−�_1𝑈+�_𝑁𝑈∙�_𝑂=0
w = 0.048479 Xo = 1.55 m Mmáx = -35.17 Tn-m d = 0.33 m hz = 0.41 cm
�_�á𝑥=�_𝑁𝑈∙(�_𝑂^2)/2−�_1𝑈∙( �_𝑂−�_1/2)
�_𝑈=∅∙𝑓^′ 𝑐 ∙�∙𝑑^2∙�∙(1−0.59∙�)
hz = 0.45 m d = 0.37 m
�= 𝜌∙ (𝑓^′ 𝑦)/(𝑓^′ 𝑐)
4°
Verificaciónes ● Por Cortante
φ = 0.85 53.571
7.92218 Vd2 Y3
Y1
0.00 Vd1
Vd3
Y2 -15.8444
-53.38
Y1 = Y2 = Y3 =
0.57 0.57 0.57
�_𝑛=�𝑢/ ∅
m m m
Vd1 = Vd2 = Vd3 = Vu = Vn =
30.99 36.46
Tn Tn
-30.80 30.99 6.73
= = =
�_�=0.53∙√(𝑓^′ 𝑐)∙�∙𝑑
Abs. 30.80 Tn 30.99 Tn 6.73 Tn
Vc = 103.72 Tn
Vn < Vc ……….(Conforme)
● Por Punzonamiento
φ = 0.85
�_𝑈1=�_1𝑈−�_𝑛𝑢∙(�1)∙(𝑛1)
Λ
�_𝑈2=�_𝑈2−�_𝑛𝑢∙(�2)∙(𝑛2)
�_1=�_1+𝑑/2 , 𝑛_1 = �_2+𝑑 �_2+𝑑 m1 = 0.59 n1 = 0.77
Λ
�_2= �_1+𝑑 , 𝑛_2= m2 = n2 =
0.77 1.07
0.27∙(2+4/�)∙√(𝑓^′ 𝑐)∙�_𝑜∙𝑑 �_�≤
0.27∙((�_𝑠∙𝑑)/�_𝑜 +2)∙√(𝑓^′ 𝑐)∙�_𝑜∙𝑑 1.06∙√(𝑓^′ 𝑐)∙�_𝑜∙𝑑
a) Columna Exterior Vu = Vc1 = Vc2 = Vc3 =
56.41
Tn
168.5109 Tn 100.7075 Tn 110.2602 Tn
Vn = 66.3677 Tn
Vc = 100.71 Tn
Vn < Vc ……….(Conforme) b) Columna Interior Vu = Vc1 = Vc2 = Vc3 =
60.47 Tn 102.2358 Tn 189.5394 Tn 209.1535 Tn
Vn < Vc ……….(Conforme)
Vn = 71.1456 Tn
Vc = 102.24 Tn
5°
Diseño por Flexión
φ = 0.9
𝑎=(2𝑑±√(4𝑑^2−8�𝑢/(0.85∙𝑓^′ 𝑐∙∅∙�)))/2
�_𝑆=�_𝑈/(∅∙𝑓^′ 𝑦∙(𝑑−𝑎/2)) ● Refuerzo Superior
Mu As ρ ρmin As
= = = = =
35.174 Tn-m 25.7259 cm2 0.0019 0.0024 32.7351 cm2
a = 0.723 a = 0.0166
Diámetro de Varilla φ: AØ = 1.98 cm2 # var = 16.53 Esp. S = 21.84
5/8" 17 21
Varillas cm
Usar 17 φ 5/8" @ 21 cm ● Refuerzo Inferior
�_𝑆=�_(𝑆 (𝑅𝑒𝑓𝑢𝑒𝑟𝑧𝑜 𝑆𝑢𝑝𝑒𝑟𝑖𝑜𝑟))/3
As = 10.9117 cm2
6°
Diámetro de Varilla φ: 3/8" AØ = 0.71 cm2 # var = 15.37 16 Esp. S = 23.34 23 Usar 16 φ 3/8" @ 23 cm
Varillas cm
Diseño en Dirección Transversal b1 = b2 =
59 77
cm cm
● Zapata Exterior
�_𝑆=�_𝑈/(∅∙𝑓^′ 𝑦∙(𝑑−𝑎/2)) qNU Mu As ρ ρmin As
= 16.7948 Tn/m = 22.1744 Tn-m = 17.5063 cm2 = 0.00802 = 0.0024 = 17.506 cm2
�_𝑁𝑈=�_𝑈 /�
�_𝑈=(�_𝑁𝑈∙((�−�_2) /2)^2)/2
𝑎=(2𝑑±√(4𝑑^2−8�𝑢/(0.85∙𝑓^′ 𝑐∙∅∙�)))/2
a = 0.6702 a = 0.070
Diámetro de Varilla φ: AØ = 2.85 cm2 # var = 6.14 Esp. S = 7.18
3/4" 7 7
Usar 7 φ 3/4" @ 7 cm
● Zapata Interior
�_𝑆=�_𝑈/(∅∙𝑓^′ 𝑦∙(𝑑−𝑎/2))
𝑎=(2𝑑±√(4𝑑^2−8�𝑢/(0.85∙𝑓^′ 𝑐∙∅∙�)))/2
a = 0.6916 a = 0.0484
Varillas cm
qNU Mu As ρ ρmin As
7°
= 19.0178 Tn/m = 20.6878 Tn-m = 15.8261 Tn/cm2 = 0.00555 = 0.0024 = 15.826 cm2
Diámetro de Varilla φ: AØ = 2.85 cm2 # var = 5.55 Esp. S = 12.22
3/4" 6 12
Varillas cm
Usar 6 φ 3/4" @ 12 cm
Planos ● Perfil Usar 17 φ 5/8" @ 21 cm Usar 16 φ 3/8" @ 23 cm
l1 = 2.3 m
lv = 0.2 m
hz = 0.45 m
b1 = 0.59 m
b2 = 0.77 m Lz = 3.3 m Usar 7 φ 3/4" @ 7 cm
Usar 6 φ 3/4" @ 12 cm
● Planta
Acero Superior Usar 17 φ 5/8" @ 21 cm B = 3.65 m Usar 6 φ 3/4" @ 12 cm Usar 7 φ 3/4" @ 7 cm
Lz = 3.3 m Acero Inferior Usar 16 φ 3/8" @ 23 cm
● Secion Trasversal ● Zapata Exterior ( t2 = 0.4 m )
● Zapata Interior ( t2 = 0.7 m )
Lv = 1.625 m Usar 7 φ 3/4" @ 7 cm
Lv = 1.625 m
Lv = 1.475 m
Lv = 1.475 m
Usar 16 φ 3/8" @ 23 cm Usar 6 φ 3/4" @ 12 cm
b = 3.65 m
Usar 16 φ 3/8" @ 23 cm
b = 3.65 m