Construction of High Level Bridge across River Gandak at Bangraghat connecting Baikunthpur Block in Gopalganj & Sahebganj in Muzaffarpur District in the State of Bihar

Project

Designed by:

S. Rastogi

Client

BRPNNL, Patna & M/s S.P. Singla Construction Pvt. Ltd

Checked by:

--------

Job Name

Check for Tilt and Shift for Pier Well at MP28

Date & Rev.

11/04/2019 (R0)

Check for Tilt and Shift for Pier Well at MP28

Tilt & Shift Report of Well Foundation-MP28 Permissible Tilt & Shift of Well

Tilt =

Outer Diameter of the Well Inner Diameter of the Well Actual Height of the Well Steining Measured Coordinates of Steining Top Sl. No. Location of Point Easting (1) (2) (3) (4)

Down Chainage on X-X Axis Up Chainage on X-X Axis U/s Side on Y-Y Axis D/s Side on Y-Y Axis

(5) (6)

Theoritical Center of the Well Actual Center of Well at Top

287536.441

1 in

Muzaffarpur Side Shift =

0.15 m

= 8.000 m = 4.900 m = 40.900 m (All Levels are in metres) Northing RL Level Diff.

Remark

2903055.268

287534.540

2903047.559

287531.636

2903052.364

287539.345

2903050.463

287536.467

2903050.765

287534.301

2903051.707

80

60.585 60.810 60.565 60.960

0.225 m

Well tilted towards Down Chainage

0.395 m

Well tilted towards U/s Side

Down Chainage

+X

U/s Side

-Y

+Y

-X

D/s Side

Up Chainage

Chhapra Side

1.150 m (towards Down Chainage)[Hence, Actual Tilt towards X-X Axis =

Steining Top Shift (due to Tilt only) along X-X Axis

=

Steining Top Shift (due to Tilt only) along Y-Y Axis

=

Resultant Steining Top Shift (due to Tilt only)

=

Steining Top Shift (due to Shift+Tilt) along X-X Axis

=

0.395 m (measured)

Steining Top Shift (due to Shift+Tilt) along Y-Y Axis

=

-1.103 m (measured)

Resultant Steining Top Shift (due to Shift+Tilt)

=

-2.019 m (towards U/s Side) 2.324 m

1.172 m

1 in 35.6 ]

Not OK

[Hence, Actual Tilt towards Y-Y Axis =

1 in 20.3 ]

Not OK

[Hence, Actual Resultant Tilt =

1 in 17.6 ]

Not OK

Net Bottom Shift along X-X Axis =

-0.755 m

Not OK

Net Bottom Shift along Y-Y Axis =

0.916 m

Not OK

Net Resultant Bottom Shift =

1.188 m

Not OK

Conclusion:Present tilt has to be brought within the permissible range of 1 in 80 & well foundation and well cap will be re-designed with effect of actual bottom shift.

Tilt only

Shifted cL of the Well Shifted cL of the Well Shift Only Theoritical cL of the Well

Theoritical cL of the Well

Tilted Position of the Well Shifted Position of the Well

Theoritical Position of the

Theoritical Position of the

Case-1

Tilting of the Well Foundation

Case-2

Shift of the Well Foundation

Project

Construction of High Level Bridge across River Gandak at Bangraghat connecting Baikunthpur Block in Gopalganj Designed by: & Sahebganj in Muzaffarpur District in the State of Bihar

Client

BRPNNL, Patna & M/s S.P. Singla Construction Pvt. Ltd

Checked by:

--------

Job Name

Check for Tilt and Shift for Pier Well at MP29

Date & Rev.

11/04/2019 (R0)

S. Rastogi

Check for Tilt and Shift for Pier Well at MP29

Tilt & Shift Report of Well Foundation-MP29 Permissible Tilt & Shift of Well Outer Diameter of the Well Inner Diameter of the Well Actual Height of the Well Steining Measured Coordinates of Steining Top Sl. No. Location of Point Down Chainage on X-X Axis (1) (2) Up Chainage on X-X Axis (3) U/s Side on Y-Y Axis (4) D/s Side on Y-Y Axis

Tilt =

1 in

80

Muzaffarpur Side Shift =

0.15 m

287528.143

287526.160

2903008.978

287522.903

2903008.771

Easting 287525.210 287523.289 287520.356

Down Chainage

+X

= 8.000 m = 4.900 m = 40.800 m (All Levels are in metres) Northing RL Level Diff. Remark U/s Side 2903012.332 64.530 Well tilted towards -0.290 m Up Chainage 2903004.545 64.240 2903009.399 64.213 Well tilted towards 0.340 m U/s Side 2903007.478 64.553

-Y

+Y

Up Chainage

-X

(5) (6)

Theoritical Center of the Well Actual Center of Well at Top

D/s Side

Chhapra Side

Steining Top Shift (due to Tilt only) along X-X Axis

=

-1.479 m (towards Up Chainage)

[Hence, Actual Tilt towards X-X Axis =

1 in 27.6 ]

Steining Top Shift (due to Tilt only) along Y-Y Axis

=

-1.734 m (towards U/s Side)

[Hence, Actual Tilt towards Y-Y Axis =

1 in 23.5 ]

Not OK

Resultant Steining Top Shift (due to Tilt only)

=

2.279 m

[Hence, Actual Resultant Tilt =

1 in 17.9 ]

Not OK

Steining Top Shift (due to Shift+Tilt) along X-X Axis

=

-0.980 m

Net Bottom Shift along X-X Axis =

0.499 m

Not OK

Steining Top Shift (due to Shift+Tilt) along Y-Y Axis

=

-1.725 m

Net Bottom Shift along Y-Y Axis =

0.009 m

OK

Resultant Steining Top Shift (due to Shift+Tilt)

=

1.984 m

Net Resultant Bottom Shift =

0.499 m

Not OK

Not OK

Conclusion:Present tilt has to be brought within the permissible range of 1 in 80 & well foundation and well cap will be re-designed with effect of actual bottom shift.

Tilt only

Shifted cL of the Well Shifted cL of the Well Shift Only Theoritical cL of the Well

Theoritical cL of the Well

Tilted Position of the Well Shifted Position of the Well

Theoritical Position of the Well

Theoritical Position of the Well

Case-1

Tilting of the Well Foundation

Case-2

Shift of the Well Foundation

Project

Construction of High Level Bridge across River Gandak at Bangraghat connecting Baikunthpur Block in Gopalganj Designed by: & Sahebganj in Muzaffarpur District in the State of Bihar

Client

BRPNNL, Patna & M/s S.P. Singla Construction Pvt. Ltd

Checked by:

--------

Job Name

Check for Tilt and Shift for Pier Well at MP34

Date & Rev.

11/04/2019 (R0)

S. Rastogi

Check for Tilt and Shift for Pier Well at MP34

Tilt & Shift Report of Well Foundation-MP34 Permissible Tilt & Shift of Well Outer Diameter of the Well Inner Diameter of the Well Actual Height of the Well Steining Measured Coordinates of Steining Top Sl. No. Location of Point Down Chainage on X-X Axis (1) (2) Up Chainage on X-X Axis (3) U/s Side on Y-Y Axis (4) D/s Side on Y-Y Axis

Tilt =

Easting 287476.237 287474.328 287471.413 287479.152

1 in

80

Muzaffarpur Side Shift =

0.15 m

Down Chainage

+X

= 8.000 m = 4.900 m = 40.800 m (All Levels are in metres) Northing RL Level Diff. Remark U/s Side 2902802.263 66.440 Well tilted towards -0.290 m Up Chainage 2902794.524 66.150 2902799.348 66.465 Well tilted towards -0.350 m D/s Side 2902797.439 66.115

-Y

+Y

-X

(5) (6)

Theoritical Center of the Well Actual Center of Well at Top

287536.467

2903050.765

287475.298

2902798.390

D/s Side

Up Chainage

Chhapra Side

Steining Top Shift (due to Tilt only) along X-X Axis

=

-1.479 m (towards Up Chainage)

[Hence, Actual Tilt towards X-X Axis =

1 in 27.6 ]

Steining Top Shift (due to Tilt only) along Y-Y Axis

=

1.785 m (towards D/s Side)

[Hence, Actual Tilt towards Y-Y Axis =

1 in 22.9 ]

Not OK

Resultant Steining Top Shift (due to Tilt only)

=

2.318 m

[Hence, Actual Resultant Tilt =

1 in 17.6 ]

Not OK

Steining Top Shift (due to Shift+Tilt) along X-X Axis

=

-1.441 m

Net Bottom Shift along X-X Axis =

0.038 m

OK

Steining Top Shift (due to Shift+Tilt) along Y-Y Axis

=

1.036 m

Net Bottom Shift along Y-Y Axis =

-0.749 m

Not OK

Resultant Steining Top Shift (due to Shift+Tilt)

=

1.775 m

Net Resultant Bottom Shift =

0.750 m

Not OK

Not OK

Conclusion:Present tilt has to be brought within the permissible range of 1 in 80 & well foundation and well cap will be re-designed with effect of actual bottom shift. Shifted cL of the Well Tilt

Shifted cL of the Well Shift Only Theoritical cL of the Well

Theoritical cL of the Well

Tilted Position of the Well Shifted Position of the Well

Theoritical Position of the Well

Theoritical Position of the Well

Case-1

Tilting of the Well Foundation

Case-2

Shift of the Well Foundation

Related Documents

Tilt Angles
August 2019 46
Tilt Text
October 2019 12
Alive And Well
May 2020 6
Well
April 2020 21
Efecto Tilt Shift
October 2019 14

More Documents from ""

Ih Feb 2019.pdf
October 2019 18