Integration Test Plan Test Scenario : Create and configure master warranty ,warranty counter, assign and execute warranty check. No
BUSINESS PROCESS STEPS
1
Preliminary configuration settings for Creating warranty Category
2
Preliminary configuration setting settings for Creating warranty type.
3
Preliminary configuration setting settings for Defining number range for Master warranty.
Module - Plant Maintenance Maintenance Cycle
TRANS. CODE
SPRO>PM&CS> Master data in plant maintenance and customer service>Basic settings> warranties> Check warranty category SPRO>PM&CS> Master data in plant maintenance and customer service>Basic settings> warranties> Define warranty type SPRO>PM&CS> Master data in plant maintenance and customer service>Basic settings> warranties> Define number range for Master
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
SAP Doc Reference/
OK / Error (support by Screen Shots)
Warranty Category: I & O Class active check box for both categories is selected.
DATA accepted. Warranty type 2 created.
OK
Warranty type:2 Warranty category: Warrantee(Vendor/Manufacturer) Text:Vendor /manufacturer warranty. All dialog boxes for notifcation, order , billing request is selected.
DATA accepted. Warranty type 2 created.
OK
Select intervals,
Data accepted.
OK
Define internal number range for Master warranty.
Comments : Tested By K.Kiran Kumar
Test Date 17/04/2007
Approved By
Approved Date
Integration Test Plan
Module - Plant Maintenance Maintenance Cycle
Test Scenario : Create and configure master warranty ,warranty counter, assign and execute warranty check. No
BUSINESS PROCESS STEPS
TRANS. CODE
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
SAP Doc Reference/
OK / Error (support by Screen Shots)
warranty.
4
Create characteristics
CT04
5
Define warranty Counter
GM04
6
Create Master warranty
BGM1
Name: OP-HR. Description: operating hours; Data type: Numeric format. Number of characters: 3 Decimal Places: 1 Value assignment: Single Value Unit of measure: hrs. Warranty counter: OP-HR Default value: Not selected. Time dependent: Not selected. Description: ACFLMC Warranty Warranty type: Vendor/Manufacture warranty. Under services tab enter text: PLC Under counter tab: Select warranty counter OP-HR. Max. Warranty counter value: 10 hr Counter link: OR
4 Create measuring point:
IE02
Equipment: ACFLMC-001 Measuring position: operating Hours Decimal places:1
Data Accepted. Characteristics OP-HR created.
OK
DATA accepted. Warrenty counter OP-HR created. DATA accepted. Master warranty 2000000010 is created
OK
DATA accepted. Measuring point 21 is created for the equipment
OK
OK
Comments : Tested By K.Kiran Kumar
Test Date 17/04/2007
Approved By
Approved Date
Integration Test Plan
Module - Plant Maintenance Maintenance Cycle
Test Scenario : Create and configure master warranty ,warranty counter, assign and execute warranty check. No
5
BUSINESS PROCESS STEPS
Create Measuring document
TRANS. CODE
IE02
7
IW21
8
Create notification
Create maintenance order
OUTPUT DATA / RESULT
Description: operating hours Characteristics: OP-HR Measuring point is counter selected. Counter over reading: 9999 Annual estimate: 3650 Measuring point no:21 Reading of the counter:0
IK11
6 Assign Master warranty to equipment ACFLMC-001
INPUT DATA
Patch/ Reference
OK / Error (support by Screen Shots)
ACFLMC-001
Equipment: ACFLMC-001 Go to additional data 1 tab: Vendor warranty field: Begin warranty:01.01.2007 Master warranty: 2000000010 Select inherit warranty, Pass on warranty.
DATA accepted. Measuring document 41 is created. DATA accepted. Warranty check status OK is displayed.
OK
DATA accepted. Warranty check box displayed.
OK
Notification type: M1 Equipment: ACFLMC-001 Function location: OP-PROD-P10FLA. Order type: PM01 DATA accepted. Equipment: ACFLMC-001 Warranty check
IW31
SAP Doc Reference/
OK
OK
Comments : Tested By K.Kiran Kumar
Test Date 17/04/2007
Approved By
Approved Date
Integration Test Plan
Module - Plant Maintenance Maintenance Cycle
Test Scenario : Create and configure master warranty ,warranty counter, assign and execute warranty check. No
9
BUSINESS PROCESS STEPS
Create Measuring document
TRANS. CODE
Planning Plant: 1000 Business Area: 1000 Measuring point no: 21 Reading of the counter: 11
IK11
10
Create notification
IW21
11
Create maintenance order
IW31
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
SAP Doc Reference/
OK / Error (support by Screen Shots)
box displayed.
DATA accepted. Measuring document 42 is created. Notification type: M1 DATA accepted. Equipment: ACFLMC-001 Warranty check Function location: OP-PROD-P10- box is not FLA. displayed. Order type: PM01 DATA accepted. Equipment: ACFLMC-001 Warranty check Planning Plant: 1000 box is not Business Area: 1000 displayed.
OK
OK
OK
12 13 14 15 16
Comments : Tested By K.Kiran Kumar
Test Date 17/04/2007
Approved By
Approved Date