INSTALACIONES SANITARIAS VALORIZACION DE OBRA Nº OBRA PROCESO

14

( del 01 al 31 de Enero del 2,019)

"MEJORAMIENTO DEL SERVICIO DE ADMINISTRACION DE JUSTICIA DE LOS ORGANOS JURISDICCIONALES DEL DISTRITO Y PROVINCIA DE SULLANA, DEPARTAMENTO DE PIURA, SEDE DE LA CSJ DE SULLANA" LP N°008-2017-GG-PJ PRESUPUESTO BASE : 34,645,682.41 F.R. = 0.9800000

CONTRATISTA:CONSORCIO SULLANA II

MONTO DEL CONTRATO DESCRIPCIÓN

PARTIDA

PRESUPUESTO BASE UNIDAD METRADO P.UNIT.

S/.

PRESUP.

S/.

01

INSTALACIONES SANITARIAS

01.01

APARATOS SANITARIOS Y ACCESORIOS

01.01.01

SUMINISTRO DE APARATOS SANITARIOS

01.01.01.01

INODORO BLANCO, INC. ACCESORIOS,FLUXOMETRO.

PZA

56.00

653.98

36622.88

01.01.01.02

INODORO TAZA TURCA BLANCO, INC. TANQUE ALTO, ACCESORIOS.

PZA

2.00

115.74

231.48

01.01.01.03

LAVATORIO OVALIN BLANCO, INC. ACCESORIOS, GRIFERIA TEMPORIZADA.

PZA

48.00

335.31

16094.88

01.01.01.04

LAVATORIO OVALIN ACERO INOXIDABLE, INC. ACCESORIOS, GRIFERIA TIPO CUE

PZA

1.00

388.73

388.73

01.01.01.05

LAVATORIO DE ACERO INOXIDABLE CON ESCURRIDERO, INC. ACCESORIOS, GRI

PZA

3.00

468.83

1406.49

01.01.01.06

LAVATORIO ADOSADO COLOR BLANCO, INC. ACCESORIOS, GRIFERIA TEMPORIZ

PZA

3.00

264.35

793.05

01.01.01.07

LAVATORIO ADOSADO COLOR BLANCO, INC. ACCESORIOS, GRIFERIA TEMPORIZ

PZA

4.00

298.16

1192.64

01.01.01.08

URINARIO COLOR BLANCO, INC. ACCESORIOS, FLUXOMETRO.

PZA

23.00

674.70

15518.10

01.01.02

SUMINISTRO DE ACCESORIOS SANITARIOS

01.01.02.01

DISPENSADOR DE PAPEL HIGIENICO 29.5x29.5x15cm, INC. ACCESORIOS DE FIJA

UND

56.00

52.00

2912.00

01.01.02.02

DISPENSADOR DE PAPEL TOALLA DE PVC 40x30x22cm, INC. ACCESORIOS DE FIJ

UND

30.00

165.00

4950.00

01.01.02.03

DISPENSADOR DE JABON LIQUIDO ACERO INOXIDABLE INC. ACCESORIOS DE FI

UND

36.00

85.00

3060.00

01.01.02.04

GANCHO SIMPLE METALICO CROMADO INC. ACCESORIOS DE FIJACION.

UND

62.00

23.00

1426.00

01.01.02.05

GANCHO DOBLE PORTA MULETAS DE ACERO INOXIDABLE, INC. ACCESORIOS DE

UND

3.00

50.00

150.00

01.01.02.06

DUCHAS CROMADAS DE CABEZA GIRATORIA

PZA

6.00

123.90

743.40

01.01.03

INSTALACIONES DE APARATOS SANITARIOS Y ACCESORIOS

01.01.03.01

COLOCACION DE APARATOS SANITARIOS

UND

140.00

123.30

17262.00

01.01.03.02

COLOCACION DE ACCESORIOS SANITARIOS

UND

177.00

24.75

4380.75

01.02

SISTEMA DE AGUA FRIA

01.02.01

SALIDAS DE AGUA FRIA

01.02.01.01

SALIDA DE AGUA FRIA PVC-C10 INCLUYE TUBERIA Y ACCESORIOS Ø=1 1/4"

PTO

56.00

116.82

6541.92

01.02.01.02

SALIDA DE AGUA FRIA PVC-C10 INCLUYE TUBERIA Y ACCESORIOS Ø=1"

PTO

25.00

107.33

2683.25

01.02.01.03

SALIDA DE AGUA FRIA PVC-C10 INCLUYE TUBERIA Y ACCESORIOS Ø=1/2"

PTO

71.00

92.87

6593.77

01.02.02

REDES DE DISTRIBUCION, ALIMENTACION, ACCESORIOS DE AGUA FRIA

01.02.02.01

TUBERIAS DE PVC

01.02.02.01.01 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=2 1/2"

M

138.00

33.63

4640.94

01.02.02.01.02 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=2"

M

40.50

31.93

1293.17

01.02.02.01.03 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=1 1/2"

M

71.50

24.86

1777.49

01.02.02.01.04 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=1 1/4"

M

22.80

22.59

515.05

01.02.02.01.05 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=1"

M

70.50

20.36

1435.38

01.02.02.01.06 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=3/4"

M

9.00

16.85

151.65

01.02.02.01.07 TUBERIA PVC CLASE 10 SP PARA AGUA FRIA Ø=1/2"

M

37.00

15.62

577.94

01.02.03

VALVULAS Y ACCESORIOS

01.02.03.01

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 2 1/2"

UND

7.00

384.67

2692.69

01.02.03.02

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 2"

UND

3.00

240.90

722.70

01.02.03.03

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 1 1/2"

UND

20.00

182.70

3654.00

01.02.03.04

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 1 1/4"

UND

10.00

146.10

1461.00

01.02.03.05

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 3/4"

UND

1.00

98.85

98.85

01.02.03.06

VALVULAS DE COMPUERTA PESADA DE BRONCE DE 1/2"

UND

12.00

84.65

1015.80

01.02.04

EQUIPOS Y OTRAS INSTALACIONES

33,952,768.76 AVANCES ACTUAL

ANTERIOR METRADO

:

VALOR S/.

METRADO

VALOR S/.

PAG. Nº IS-01 SALDOS

ACUMULADO METRADO

VALOR S/.

%

METRADO

VALOR S/.

42.00 1.00 36.00 0.00 2.00 2.00 3.00 19.00

27,467.16 115.74 12,071.16 0.00 937.66 528.70 894.48 12,819.30

14.00 1.00 12.00 1.00 1.00 1.00 1.00 4.00

9,155.72 115.74 4,023.72 388.73 468.83 264.35 298.16 2,698.80

56.00 2.00 48.00 1.00 3.00 3.00 4.00 23.00

36,622.88 231.48 16,094.88 388.73 1,406.49 793.05 1,192.64 15,518.10

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

44.00 24.00 28.00 50.00 2.00 5.00

2,288.00 3,960.00 2,380.00 1,150.00 100.00 619.50

12.00 6.00 8.00 12.00 1.00 1.00

624.00 990.00 680.00 276.00 50.00 123.90

56.00 30.00 36.00 62.00 3.00 6.00

2,912.00 4,950.00 3,060.00 1,426.00 150.00 743.40

100.00 100.00 100.00 100.00 100.00 100.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

30.00 30.00

3,699.00 742.50

30.00 30.00

3,699.00 742.50

21.43 16.95

110.00 147.00

13,563.00 3,638.25

36.00 16.00 45.00

4,205.52 1,717.28 4,179.15

20.00 9.00 26.00

2,336.40 965.97 2,414.62

56.00 25.00 71.00

6,541.92 2,683.25 6,593.77

100.00 100.00 100.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

130.00 30.00 30.00 22.80 70.50 9.00 37.00

4,371.90 957.90 745.80 515.05 1,435.38 151.65 577.94

130.00 30.00 30.00 22.80 70.50 9.00 37.00

4,371.90 957.90 745.80 515.05 1,435.38 151.65 577.94

94.20 74.07 41.96 100.00 100.00 100.00 100.00

8.00 10.50 41.50 0.00 0.00 0.00 0.00

269.04 335.27 1,031.69 0.00 0.00 0.00 0.00

0.00 0.00 0.00 10.00 0.00 0.00

0.00 0.00 0.00 1,461.00 0.00 0.00

7.00 3.00 20.00

2,692.69 722.70 3,654.00 98.85 1,015.80

7.00 3.00 20.00 10.00 1.00 12.00

2,692.69 722.70 3,654.00 1,461.00 98.85 1,015.80

100.00 100.00 100.00 100.00 100.00 100.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

1.00 12.00

INSTALACIONES SANITARIAS VALORIZACION DE OBRA Nº OBRA PROCESO

14

( del 01 al 31 de Enero del 2,019)

"MEJORAMIENTO DEL SERVICIO DE ADMINISTRACION DE JUSTICIA DE LOS ORGANOS JURISDICCIONALES DEL DISTRITO Y PROVINCIA DE SULLANA, DEPARTAMENTO DE PIURA, SEDE DE LA CSJ DE SULLANA" LP N°008-2017-GG-PJ PRESUPUESTO BASE : 34,645,682.41 F.R. = 0.9800000

CONTRATISTA:CONSORCIO SULLANA II

PARTIDA

MONTO DEL CONTRATO DESCRIPCIÓN

PRESUPUESTO BASE UNIDAD METRADO P.UNIT.

S/. 01.02.04.01

LINEA DE INGRESO DE AGUA A CISTERNA DE AGUA Ø=1" EN CUARTO DE BOMBE

UND

2.00

745.76

PRESUP.

S/. 1491.52

0.00

33,952,768.76 AVANCES ACTUAL

ANTERIOR METRADO

:

VALOR S/.

0.00

METRADO

2.00

VALOR S/.

1,491.52

PAG. Nº IS-01 SALDOS

ACUMULADO METRADO

2.00

VALOR S/.

1,491.52

%

100.00

METRADO

0.00

VALOR S/.

0.00

INSTALACIONES SANITARIAS VALORIZACION DE OBRA Nº OBRA PROCESO

14

( del 01 al 31 de Enero del 2,019)

"MEJORAMIENTO DEL SERVICIO DE ADMINISTRACION DE JUSTICIA DE LOS ORGANOS JURISDICCIONALES DEL DISTRITO Y PROVINCIA DE SULLANA, DEPARTAMENTO DE PIURA, SEDE DE LA CSJ DE SULLANA" LP N°008-2017-GG-PJ PRESUPUESTO BASE : 34,645,682.41 F.R. = 0.9800000

CONTRATISTA:CONSORCIO SULLANA II

MONTO DEL CONTRATO DESCRIPCIÓN

PARTIDA

PRESUPUESTO BASE UNIDAD METRADO P.UNIT.

S/.

PRESUP.

S/.

01.03

SISTEMA CONTRA INCENDIO

01.03.01

SALIDA DE AGUA CONTRA INCENDIO

01.03.01.01

SALIDA DE AGUA CONTRA INCENDIO Ø=2 1/2"

PTO

4.00

269.55

1078.20

01.03.01.02

SALIDA DE AGUA CONTRA INCENDIO EN GABINETE

PTO

17.00

227.12

3861.04

01.03.01.03

SALIDA PARA VERIFICACION DE PRESION EN GABINETE

PTO

17.00

186.59

3172.03

01.03.01.04

SALIDA PARA ROCIADORES K=5.6, Ø1/2", UL/FM

PTO

54.00

211.10

11399.40

01.03.01.05

SALIDA PARA ROCIADORES K=5.6, Ø1/2", UL/FM EN CIELORASO

PTO

370.00

213.50

78995.00

01.03.02

REDES Y ALIMENTACION SISTEMA CONTRA INCENDIO

01.03.02.01

TUBERIAS SCHEDULE-40 Ø=4", INCLUYE CONEXIONES

M

242.00

83.78

20274.76

01.03.02.02

TUBERIAS SCHEDULE-40 Ø=2 1/2", INCLUYE CONEXIONES

M

10.00

58.34

583.40

01.03.02.03

TUBERIAS SCHEDULE-40 Ø=2", INCLUYE CONEXIONES

M

84.50

43.84

3704.48

01.03.02.04

TUBERIA PVC CLASE 10 C/R PARA AGUA FRIA Ø=2"-PURGA ACL

M

9.20

31.93

293.76

01.03.03

SUMINISTRO E INSTALACION DE GABINETES CONTRA INCENDIO

01.03.03.01

GABINETE CONTRA INCENDIO 0.40x0.30, e=1/20"

UND

4.00

696.99

2787.96

01.03.03.02

GABINETE CONTRA INCENDIO 0.60x0.80, e=1/20"

UND

17.00

1829.36

31099.12

01.03.04

SUMINISTRO E INSTALACION DE JUNTA ANTISISMICA

01.03.04.01

SOPORTE ANTISISMICO SCH-40 Ø=1", UL/FM, DE DOS VIAS

UND

151.00

121.93

18411.43

01.03.04.02

SOPORTE ANTISISMICO SCH-40 Ø=1", UL/FM, DE CUATRO VIAS

UND

60.00

186.47

11188.20

01.03.05

VALVULAS DE SISTEMA CONTRA INCENDIO

01.03.05.01

VALVULA MARIPOSA RANURADA Ø=4", UL/FM

UND

1.00

481.93

481.93

01.03.05.02

JUNTA FLEXIBLE ANTISISMICA Ø=4", UL/FM

UND

2.00

270.86

541.72

01.03.05.03

ESTACION DE FLUJO Ø=4" (SISTEMA DE ROCIADORES)

UND

5.00

4063.17

20315.85

01.03.05.04

ESTACION DE FLUJO Ø=3" (SISTEMA DE ROCIADORES)

UND

3.00

3565.04

10695.12

01.03.05.05

ESTACION DE FLUJO Ø=2 1/2" (SISTEMA DE ROCIADORES)

UND

4.00

3234.57

12938.28

01.03.05.06

PURGA ACI EN MONTANTE

UND

6.00

437.70

2626.20

01.03.05.07

PURGA ACI EN ROCIADORES

UND

36.00

198.48

7145.28

01.03.05.08

NIPLE EN PURGA ACI EXISTENTE

UND

1.00

90.20

90.20

01.04

SISTEMA DE DRENAJE PLUVIAL

01.04.01

RED DE RECOLECCION

01.04.01.01

TUBERIA PVC SAP PARA DRENAJE Ø=6", INC. ACCESORIOS

M

74.00

58.32

4315.68

01.04.01.02

TUBERIA PVC SAP PARA DRENAJE Ø=4", INC. ACCESORIOS

M

325.50

42.52

13840.26

01.04.01.03

TUBERIA PVC CLASE 10 SP PARA DRENAJE IMPULSION Ø=2 1/2"

M

69.30

34.28

2375.60

01.04.01.04

TUBERIA PVC CLASE 10 C/R PARA DRENAJE AIRE ACONDICIONADO Ø=1 1/2"

M

48.00

25.96

1246.08

01.04.01.05

TUBERIA PVC CLASE 10 C/R PARA DRENAJE AIRE ACONDICIONADO Ø=1"

M

170.00

20.94

3559.80

01.04.01.06

TUBERIA PVC CLASE 10 C/R PARA DRENAJE AIRE ACONDICIONADO Ø=3/4"

M

147.00

16.98

2496.06

01.04.01.07

TUBERIA PVC CLASE 10 C/R PARA DRENAJE AIRE ACONDICIONADO Ø=1/2"

M

292.00

15.81

4616.52

01.05

DESAGUE Y VENTILACION

01.05.01

SALIDAS DE DESAGUE

01.05.01.01

SALIDA DE DESAGUE PVC-SAP Ø=4"

PTO

58.00

145.07

8414.06

01.05.01.02

SALIDA DE DESAGUE PVC-SAP Ø=2"

PTO

94.00

99.13

9318.22

01.05.01.03

SALIDA DE VENTILACION c/tuberia pesada Ø=2"

PTO

135.00

102.33

13814.55

01.05.01.04

SOMBRERO DE VENTILACION DE PVC Ø4"

UND

10.00

23.54

235.40

01.05.01.05

SOMBRERO DE VENTILACION DE PVC Ø3"

UND

1.00

20.34

20.34

33,952,768.76 AVANCES ACTUAL

ANTERIOR METRADO

:

VALOR S/.

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

161.00 5.00 43.00 4.50

13,488.58 291.70 1,885.12 143.69

0.00 0.00

METRADO

VALOR S/.

PAG. Nº IS-01 SALDOS

ACUMULADO METRADO

VALOR S/.

%

METRADO

VALOR S/.

6,333.00 19,215.00

0.00 0.00 0.00 30.00 90.00

0.00 0.00 0.00 6,333.00 19,215.00

0.00 0.00 0.00 55.56 24.32

4.00 17.00 17.00 24.00 280.00

1,078.20 3,861.04 3,172.03 5,066.40 59,780.00

50.00 5.00 41.50

4,189.00 291.70 1,819.36 -

211.00 10.00 84.50 4.50

17,677.58 583.40 3,704.48 143.69

87.19 100.00 100.00 48.91

31.00 0.00 0.00 4.70

2,597.18 0.00 0.00 150.07

0.00 0.00

3.00 13.00

2,090.97 23,781.68

3.00 13.00

2,090.97 23,781.68

75.00 76.47

1.00 4.00

696.99 7,317.44

0.00 0.00

0.00 0.00

130.00 55.00

15,850.90 10,255.85

130.00 55.00

15,850.90 10,255.85

86.09 91.67

21.00 5.00

2,560.53 932.35

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

541.72 8,126.34 3,565.04 6,469.14 6,946.80 90.20

0.00 2.00 2.00 1.00 2.00 0.00 35.00 1.00

0.00 541.72 8,126.34 3,565.04 6,469.14 0.00 6,946.80 90.20

0.00 100.00 40.00 33.33 50.00 0.00 97.22 100.00

1.00 0.00 3.00 2.00 2.00 6.00 1.00 0.00

481.93 0.00 12,189.51 7,130.08 6,469.14 2,626.20 198.48 0.00

74.00 325.50 0.00 0.00 0.00 0.00 0.00

4,315.68 13,840.26 0.00 0.00 0.00 0.00 0.00

2,375.60 -

74.00 325.50 69.30 0.00 0.00 0.00 0.00

4,315.68 13,840.26 2,375.60 0.00 0.00 0.00 0.00

100.00 100.00 100.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 48.00 170.00 147.00 292.00

0.00 0.00 0.00 1,246.08 3,559.80 2,496.06 4,616.52

30.00 58.00 19.00 0.00 1.00

4,352.10 5,749.54 1,944.27 0.00 20.34

3,336.61 3,568.68 7,163.10 70.62 -

53.00 94.00 89.00 3.00 1.00

7,688.71 9,318.22 9,107.37 70.62 20.34

91.38 100.00 65.93 30.00 100.00

5.00 0.00 46.00 7.00 0.00

725.35 0.00 4,707.18 164.78 0.00

30.00 90.00

2.00 2.00 1.00 2.00 35.00 1.00

69.30

23.00 36.00 70.00 3.00

INSTALACIONES SANITARIAS VALORIZACION DE OBRA Nº OBRA PROCESO

14

( del 01 al 31 de Enero del 2,019)

"MEJORAMIENTO DEL SERVICIO DE ADMINISTRACION DE JUSTICIA DE LOS ORGANOS JURISDICCIONALES DEL DISTRITO Y PROVINCIA DE SULLANA, DEPARTAMENTO DE PIURA, SEDE DE LA CSJ DE SULLANA" LP N°008-2017-GG-PJ PRESUPUESTO BASE : 34,645,682.41 F.R. = 0.9800000

CONTRATISTA:CONSORCIO SULLANA II

MONTO DEL CONTRATO DESCRIPCIÓN

PARTIDA

PRESUPUESTO BASE UNIDAD METRADO P.UNIT.

S/.

PRESUP.

S/.

01.05.02

RED DE DESAGUE Y VENTILACION

01.05.02.01

TUBERIA PVC SAP PARA DESAGUE Ø=6", INC. ACCESORIOS

M

102.00

58.32

5948.64

01.05.02.02

TUBERIA PVC SAP PARA DESAGUE Ø=4", INC. ACCESORIOS

M

471.50

42.52

20048.18

01.05.02.03

TUBERIA PVC SAP PARA DESAGUE Ø=3", INC. ACCESORIOS

M

39.60

36.11

1429.96

01.05.02.04

TUBERIA PVC SAP PARA DESAGUE Ø=2", INC. ACCESORIOS

M

75.00

29.33

2199.75

01.05.02.05

TUBERIA PVC CLASE 10 SP Ø=2 1/2", EN IMPULSION DESAGUE

M

72.00

33.63

2421.36

01.05.03

CAMARAS DE INSPECCION

01.05.03.01

CAJAS DE REGISTRO, BUZONETAS Y OTROS

01.05.03.01.01 CAJA DE REGISTROS DE DESAGUE 12"x24" C/TAPA DE CONCRETO MAS REGISTR

PZA

33.00

189.82

6264.06

01.05.03.01.02 CAJA DE REGISTROS DE DESAGUE 0.60x0.80m C/TAPA DE CONCRETO MAS REJILL PZA

1.00

291.44

291.44

01.05.03.01.03 CAJA DE REGISTROS DE DESAGUE 0.80x1.20m C/DOS (02) TAPAS DE CONCRETO M PZA

2.00

350.14

700.28

01.05.03.01.04 CAJA DE REGISTRO DE DESAGUE 0.60x1.00m C/DOS (02) TAPAS DE CONCRETO

PZA

1.00

269.85

269.85

01.05.03.01.05 CAJA DE MADERA SEGÚN MODELO DE PLANO

PZA

36.00

113.19

4074.84

01.05.03.01.06 TAPA METALICA DE INGRESO A CASETA DE VALVULAS

UND

4.00

240.82

963.28

01.05.03.01.07 TAPA METALICA DE INGRESO A MANTENIMIENTO DE EQUIPOS

UND

4.00

261.94

1047.76

M

61.60

112.53

6931.85

01.05.03.01.08 REJILLA DE Fe REMOVIBLE CON PLATINA 1"x1/8" @0.02m, inc. acabados 01.05.04

INSTALACIONES ESPECIALES

01.05.04.01

ELECTROBOMBA SUMERGIBLE Q=10.00 LPS HDT=10.00m, 5.0HP

UND

2.00

6428.40

12856.80

01.05.04.02

ELECTROBOMBA SUMERGIBLE Q=8.00 LPS HDT=10.00m, 3.0HP

UND

2.00

4951.38

9902.76

01.05.04.03

TABLERO ELECTRCIO DE CONTROL P/ELECTROBOMBA SUMERGIBLE 5.0HP

UND

1.00

1797.91

1797.91

01.05.04.04

TABLERO ELECTRCIO DE CONTROL P/ELECTROBOMBA SUMERGIBLE 3.0HP

UND

1.00

1397.91

1397.91

01.05.04.05

SISTEMA DE IMPULSION DE ELECTROBOMBAS SUMERGIBLES PARA DRENAJE S

UND

2.00

998.10

1996.20

01.05.04.06

SISTEMA DE IMPULSION DE ELECTROBOMBAS SUMERGIBLES PARA DESAGUE S

UND

2.00

1114.43

01.05.04.07

REGISTROS Y SUMIDEROS

2228.86

33,952,768.76

PAG. Nº IS-01

AVANCES ACTUAL

ANTERIOR METRADO

:

VALOR S/.

METRADO

SALDOS

ACUMULADO

VALOR S/.

METRADO

VALOR S/.

%

METRADO

VALOR S/.

33.00 332.50 0.00 0.00 0.00

1,924.56 14,137.90 0.00 0.00 0.00

20.00 30.00 10.00 50.00 50.00

1,166.40 1,275.60 361.10 1,466.50 1,681.50

53.00 362.50 10.00 50.00 50.00

3,090.96 15,413.50 361.10 1,466.50 1,681.50

51.96 76.88 25.25 66.67 69.44

49.00 109.00 29.60 25.00 22.00

2,857.68 4,634.68 1,068.86 733.25 739.86

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16.00 1.00 1.00 1.00

3,037.12 291.44 350.14 269.85 -

16.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00

3,037.12 291.44 350.14 269.85 0.00 0.00 0.00 0.00

48.48 100.00 50.00 100.00 0.00 0.00 0.00 0.00

17.00 0.00 1.00 0.00 36.00 4.00 4.00 61.60

3,226.94 0.00 350.14 0.00 4,074.84 963.28 1,047.76 6,931.85

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

2.00 2.00 1.00 1.00 2.00 2.00

12,856.80 9,902.76 1,797.91 1,397.91 1,996.20 2,228.86

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

239.31 1,238.40 169.96 1,120.20 693.00

3.00 20.00 4.00 15.00 15.00

239.31 1,238.40 169.96 1,120.20 693.00

42.86 54.05 50.00 31.91 41.67

4.00 17.00 4.00 32.00 21.00

319.08 1,052.64 169.96 2,389.76 970.20

47.00 248.00 44.00 148.00 220.00 53.00 89.00 654.00 65.00 143.00 6.00 0.00

1,488.96 6,480.24 1,083.72 3,571.24 5,308.60 1,080.67 1,720.37 12,314.82 1,126.45 2,406.69 189.78 0.00

130.65 73.89 241.30 40.78 96.65 94.15 34.66 100.98 -

47.00 253.00 47.00 148.00 230.00 55.00 94.00 659.00 67.00 149.00 6.00 0.00

1,488.96 6,610.89 1,157.61 3,571.24 5,549.90 1,121.45 1,817.02 12,408.97 1,161.11 2,507.67 189.78 0.00

100.00 92.67 95.92 91.93 96.23 93.22 97.92 93.48 93.06 96.75 100.00 0.00

0.00 20.00 2.00 13.00 9.00 4.00 2.00 46.00 5.00 5.00 0.00 63.00

0.00 522.60 49.26 313.69 217.17 81.56 38.66 866.18 86.65 84.15 0.00 1,520.19

-

30180.44

01.05.04.07.01 REGISTRO DE BRONCE CROMADO DE 6"

PZA

7.00

79.77

558.39

01.05.04.07.02 REGISTRO DE BRONCE CROMADO DE 4"

PZA

37.00

61.92

2291.04

01.05.04.07.03 REGISTRO DE BRONCE CROMADO DE 2"

PZA

8.00

42.49

339.92

01.05.04.07.04 SUMIDERO DE BRONCE CROMADO DE 4"

PZA

47.00

74.68

3509.96

01.05.04.07.05 SUMIDERO DE BRONCE CROMADO DE 2"

PZA

36.00

46.20

1663.20

01.06

VARIOS

01.06.01

COLGADORES, ABRAZADERAS Y OTROS

01.06.01.01

COLGADORES DE FIERRO GALVANIZADO DE Ø6"

UND

47.00

31.68

1488.96

01.06.01.02

COLGADORES DE FIERRO GALVANIZADO DE Ø4"

UND

273.00

26.13

7133.49

01.06.01.03

COLGADORES DE FIERRO GALVANIZADO DE Ø3"

UND

49.00

24.63

1206.87

01.06.01.04

COLGADORES DE FIERRO GALVANIZADO DE Ø2 1/2"

UND

161.00

24.13

3884.93

01.06.01.05

COLGADORES DE FIERRO GALVANIZADO DE Ø2"

UND

239.00

24.13

5767.07

01.06.01.06

COLGADORES DE FIERRO GALVANIZADO DE Ø1 1/2"

UND

59.00

20.39

1203.01

01.06.01.07

COLGADORES DE FIERRO GALVANIZADO DE Ø1 1/4"

UND

96.00

19.33

1855.68

01.06.01.08

COLGADORES DE FIERRO GALVANIZADO DE Ø1"

UND

705.00

18.83

13275.15

01.06.01.09

COLGADORES DE FIERRO GALVANIZADO DE Ø3/4"

UND

72.00

17.33

1247.76

01.06.01.10

COLGADORES DE FIERRO GALVANIZADO DE Ø1/2"

UND

154.00

16.83

2591.82

01.06.01.11

ABRAZADERA DE F°G° P/TUBERIA Ø=6"

UND

6.00

31.63

189.78

01.06.01.12

ABRAZADERA DE F°G° P/TUBERIA Ø=4"

UND

63.00

24.13

1520.19

3.00 20.00 4.00 15.00 15.00

5.00 3.00 10.00 2.00 5.00 5.00 2.00 6.00

INSTALACIONES SANITARIAS VALORIZACION DE OBRA Nº OBRA PROCESO

14

( del 01 al 31 de Enero del 2,019)

"MEJORAMIENTO DEL SERVICIO DE ADMINISTRACION DE JUSTICIA DE LOS ORGANOS JURISDICCIONALES DEL DISTRITO Y PROVINCIA DE SULLANA, DEPARTAMENTO DE PIURA, SEDE DE LA CSJ DE SULLANA" LP N°008-2017-GG-PJ PRESUPUESTO BASE : 34,645,682.41 F.R. = 0.9800000

CONTRATISTA:CONSORCIO SULLANA II

MONTO DEL CONTRATO DESCRIPCIÓN

PARTIDA

PRESUPUESTO BASE UNIDAD METRADO P.UNIT.

S/. 01.06.01.13

ABRAZADERA DE F°G° P/TUBERIA Ø=2 1/2"

01.06.01.14

CANALETA CON PLANCHA DE ALUZINC e=0.5mm, INC. ACC. DE FIJACION, IMPER

01.06.02

MOVIMIENTO DE TIERRAS Y OTROS

01.06.02.01 01.06.02.02 01.06.02.03 01.06.02.04

PRESUP.

S/.

129.00 129.00 129.00 0.00 0.00 0.00 0.00 0.00 0.00

2,670.30 623.07 2,697.39 0.00 0.00 0.00 0.00 0.00 0.00

269.00 269.00 269.00 1.50 1.50 1.70 2.00 1.00 3.00

3000.00

0.04 0.07 0.00

0.45 0.45 0.45

644,776.62 88,076.49 64,477.66 797,330.77 781,384.16 140,649.15 922,033.30

28.23%

96.00 168.00 0.00 182,014.69 24,863.21 18,201.47 225,079.36 220,577.77 39,704.00 260,281.77

19.13

650.42

M

37.00

37.26

1378.62

EXCAVACION DE ZANJAS PARA TENDIDO DE TUBERIAS, HASTA 0.8m.

M

398.00

20.70

8238.60

CAMA DE APOYO DE ARENA 2", EN ZANJAS

M

398.00

4.83

1922.34

RELLENO COMPACTADO C/COMPATADORA 4HP-MAT PROPIO EN ZANJA

M

398.00

20.91

8322.18

ROTURA DE VEREDA DE CONCRETO C/EQUIPO

M2

1.50

17.20

25.80

01.06.02.05

VEREDA CONCRETO f'c=175kg/cm2 C/CEMENTO TIPO MS, e=0.10m, ACABADO C:A

M2

1.50

61.54

92.31

01.06.02.06

MURO LADRILLO KK MEZCLA C:A 1:5 TIPO IV, P. TARRAJEO DE CABEZA

M2

1.70

92.66

157.52

01.06.02.07

DEMOLICION DE CAJA DE REGISTRO

UND

2.00

25.39

50.78

01.06.02.08

TRAMPA DE GRASA, INC CONEXIONES Y ACCESORIOS

UND

2.00

1356.84

2713.68

01.06.02.09

ACONDICIONAMIENTO DE TUBO DRENAJE EXISTENTE A CANALETA NUEVA, INC.

UND

6.00

54.96

329.76

01.06.03

PRUEBA

01.06.03.01

PRUEBAS HIDRAULICAS Y EN EQUIPOS, EN SISTEMA DE DESAGUE SEGÚN EE.T

GLB

1.00

2400.00

2400.00

01.06.03.02

PRUEBAS HIDRAULICAS Y EN EQUIPOS, EN SISTEMA DE AGUA FRIA SEGÚN EE.T

GLB

1.00

2400.00

2400.00

01.06.03.03

PRUEBAS HIDRAULICAS Y EN EQUIPOS, EN SISTEMA CONTRA INCENDIO SEGÚN

GLB

1.00

3000.00

(a) (b) (c) D=(a+b+c) E = D x FR F=E x igv G=E+F

TOTAL COSTO DIRECTO GASTOS GENERALES 13.66% UTILIDAD 10.00% SUB TOTAL SUB TOTAL x (FR) SIN I.G.V (18%) TOTAL

0.98

METRADO

0.00 0.00

34.00

0.18

VALOR S/.

0.00 0.00

UND

0.1366 0.10

33,952,768.76

PAG. Nº IS-01

AVANCES ACTUAL

ANTERIOR METRADO

:

METRADO

-

32.08%

SALDOS

ACUMULADO

VALOR S/.

VALOR S/.

%

METRADO

VALOR S/.

0.00 0.00

0.00 0.00

0.00 0.00

34.00 37.00

650.42 1,378.62

5,568.30 1,299.27 5,624.79 25.80 92.31 157.52 50.78 1,356.84 164.88

398.00 398.00 398.00 1.50 1.50 1.70 2.00 1.00 3.00

8,238.60 1,922.34 8,322.18 25.80 92.31 157.52 50.78 1,356.84 164.88

100.00 100.00 100.00 100.00 100.00 100.00 100.00 50.00 50.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,356.84 164.88

1,080.00 1,080.00 1,350.00 206,853.01 28,256.12 20,685.30 255,794.43 250,678.54 45,122.14 295,800.68

0.49 0.52 0.45

1,176.00 1,248.00 1,350.00 388,867.69 53,119.33 38,886.77 480,873.79 471,256.31 84,826.14 60.31% 556,082.45

49.00 52.00 45.00

0.51 0.48 0.55

1,224.00 1,152.00 1,650.00 225,728.67 30,834.54 22,572.87 279,136.07 273,553.35 49,239.60 322,792.96

35.01%

Related Documents

Valorizacion
November 2019 17
Valorizacion
May 2020 11
Instalaciones Sanitarias
October 2019 12
Sanitarias Tanque.xlsx
November 2019 5

More Documents from ""