Unit Test Cases Pp

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Unit Test Cases Pp as PDF for free.

More details

  • Words: 17,829
  • Pages: 131
Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Table of Contents Transaction Code(s): MM01.............................................................................................. ...................3 Transaction Code(s): MM02.............................................................................................. ...................5 Transaction Code(s): MM03.............................................................................................. ...................7 Transaction Code(s): CS01.............................................................................................. ....................9 Transaction Code(s): CS02............................................................................................ ....................10 Transaction Code(s): CS03............................................................................................ ....................12 Transaction Code(s): CRC1..................................................................................... ..........................13 Transaction Code(s): CRC2..................................................................................... ..........................15 Transaction Code(s): CRC3..................................................................................... ..........................16 Transaction Code(s): C201............................................................................................................. ....17 Transaction Code(s): C202............................................................................................................. ....19 Transaction Code(s): C203............................................................................................................. ....20 Transaction Code(s): C251............................................................................................................. ....22 Transaction Code(s): C298............................................................................................................. ....23 Transaction Code(s): C223............................................................................................................. ....25 Transaction Code(s): C252............................................................................................................. ....26 Transaction Code(s): MD61............................................................................................................. ...28 Transaction Code(s): MD62............................................................................................................. ...29 Transaction Code(s): MD63............................................................................................................. ...31 Transaction Code(s): MD02............................................................................................................. ...33 Transaction Code(s): MD03............................................................................................................. ...35 Transaction Code(s): MD04............................................................................................................. ...38 Transaction Code(s): MD11...................................................................................................... ..........39 Transaction Code(s): MD12............................................................................................................. ...41 Transaction Code(s): MD13............................................................................................................. ...42 Transaction Code(s): COR1............................................................................................ ...................43 Transaction Code(s): COR2............................................................................................ ...................45 Transaction Code(s): COR3............................................................................................ ...................46 Transaction Code(s): CORK........................................................................................................ .......47 Transaction Code(s): CORT................................................................................................. ..............49 Transaction Code(s): CORS........................................................................................................ .......50 Transaction Code(s): ZPPCOR2...................................................................................... ..................52 Transaction Code(s): ZMRP................................................................................................... ............53 Transaction Code(s): ZSTOCK......................................................................................................... ..55 Transaction Code(s): ZSD4................................................................................................... .............56 Transaction Code(s): ZQI002........................................................................................... ..................57 Transaction Code(s): MB03........................................................................................................ ........59 Transaction Code(s): MB1A....................................................................................... ........................60 Transaction Code(s): MB1B....................................................................................... ........................62 Transaction Code(s): MB1C............................................................................................ ...................64 Transaction Code(s): MB21........................................................................................................ ........66 Transaction Code(s): MB22........................................................................................................ ........68 Transaction Code(s): MB23........................................................................................................ ........70 Transaction Code(s): MB25........................................................................................................ ........72 Transaction Code(s): MB51........................................................................................................ ........74 Transaction Code(s): MB52........................................................................................................ ........75 Transaction Code(s): MBRL............................................................................................ ...................76 Transaction Code(s): MBSM....................................................................................... .......................78 Transaction Code(s): MBST.............................................................................................. .................80 Transaction Code(s): MIGO_GR........................................................................................ ................81 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Code(s): MR51............................................................................................................. ...84 Transaction Code(s): ME23N......................................................................................... ....................85 Transaction Code(s): ME51N ......................................................................................... ...................86 Transaction Code(s): ME52N......................................................................................... ....................88 Transaction Code(s): ME53N......................................................................................... ....................89 Transaction Code(s): ME54N......................................................................................... ....................90 Transaction Code(s): LB11................................................................................................. ................92 Transaction Code(s): LS01N......................................................................................... .....................93 Transaction Code(s): LS02N......................................................................................... .....................95 Transaction Code(s): LS03N......................................................................................... .....................97 Transaction Code(s): LS24........................................................................................................ .........98 Transaction Code(s): LS26........................................................................................................ .........99 Transaction Code(s): LT01......................................................................................... ......................101 Transaction Code(s): LT03......................................................................................... ......................103 Transaction Code(s): LT06......................................................................................... ......................105 Transaction Code(s): LT12......................................................................................... ......................107 Transaction Code(s): LT15............................................................................................................... .110 Transaction Code(s): LT21............................................................................................................... .112 Transaction Code(s): LT31............................................................................................................... .114 Transaction Code(s): LT24............................................................................................................... .116 Transaction Code(s): LX02............................................................................................ ...................117 Transaction Code(s): LX03............................................................................................ ...................119 Transaction Code(s): LX27................................................................................................... ............121 Transaction Code(s): LU04.......................................................................................................... .....122 Transaction Code(s): MB53..................................................................................................... .........124 Transaction Code(s): MB56..................................................................................................... .........125 Transaction Code(s): MB5B.................................................................................... .........................127 Transaction Code(s): MB5M..................................................................................................... ........128 Transaction Code(s): MB5C......................................................................................... ....................130

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MM01 Description:

Create Material

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Material Number

F10001

2

Industry Sector

3

Material Type

Unique code identifying the material Chemicals Industry Finished Goods

4

Copy From

5

Select Views

6

Organization levels: Plant Storage location Warehouse number

Finished Goods

Comments / Notes

Material number used as template Basic view, purchasing view, MRP views, storage location views and accounting views Plant:2000 St.Loc:2301 WH: 001 St.type: 001

Transaction Steps: Sl No 1

Business Process Steps Go to

23-Oct-08

Expected Results

Actual Results

Tester

Initial Screen

Displayed

KM

Wipro Infotech - Confidential

O K

√ Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

2

3 4 5

transaction code MM01 and Click “Enter” Icon or Press “Enter” Enter the set up data as mentioned above Select Views Enter organization data Enter details in basic view screen

6

Enter details in purchasing view

7

Enter details in MRP views

8

Enter details in storage location views

9

Enter details in warehouse management views

10

Enter details in accounting views and save the data

display

KM



KM



KM



N.A.

KM



Displayed

KM



Displayed

KM



Displayed

KM



Displayed

KM



Material F10001 created

KM



Display next screen for selection of views Views as mentioned in set up data As mentioned in set up data

Displayed

Display purchasing view after entry of mandatory fields Display MRP views after entry of mandatory fields Display storage location views after entry of mandatory fields Display Warehouse views after entry of mandatory fields Display accounting views after entry of mandatory fields Material created with a specific externally assigned number

Overall Result: Material F10001 created succesfully. Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM _______________ Power User – TASNEE

_______________ Consultant-Wipro (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MM02 Description:

Change Material Master Record

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Material

F10001

Material assigned number

2

Select Views

Basic view, purchasing view, MRP views, storage location views and accounting views

3

Organization level Plant Storage location Warehouse number

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction

23-Oct-08

Expected Results

Actual Results

Tester

Change Material

Displayed

KM

Wipro Infotech - Confidential

OK

Version: A



Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM code MM02 2

3 4

5

6 7

8

9 10

11

Enter the Material Number if known or search via match code Press Enter or Click Check button Click left side button of each selected view to highlight Press Enter or Click Check button Enter Plant where material maintained Press Enter or Click Check button Do the changes on the views and click the next selected views for a change Continue doing step no. 8 till done Press “Save” button or Press “Ctrl S” to save the changes Press “Exit” button or Press “Shift F3” to exit

initial screen displayed Entered Material Number displayed View selection menu displayed

Displayed

KM



Displayed

KM



KM



Highlighted View selection Organizational Levels displayed (Display depends on the selected views) Entered Plant Number displayed

Displayed

KM



Displayed

KM



Views selected displayed ready to accept changes Displayed click view’s ready to accept changes

Displayed

KM



Displayed

KM



KM



KM



KM



Valid changes were accepted Changes saved

Material saved

Back to Menu display

Overall Result: Material F10001 changed successfully. Remarks: ______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager (Farrukh Zafar Hashmi)

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MM03 Description:

Display Material Master Record

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Material

F10001

2

Plant organization level

2000

3

Storage Location

2301

4

Warehouse Number

001

5

Storage Type

001

Material assigned number Plant where material was assigned and maintain Storage location identification key Number of warehouse where the material maintained Type of the Storage on the warehouse

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code MM03

2

Enter the Material Number if known or search via match code Press Enter or Click Check button Click left side button of each selected view to highlight

3 4

23-Oct-08

Expected Results

Actual Results

Tester

Display Material initial screen displayed Entered Material Number displayed

Displayed

KM



Displayed

KM



View selection menu displayed

Displayed

KM



KM



Highlighted View selection

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 5

Press Enter or Click Check button

6

Enter Plant, Stor. Location, Warehouse number, Stor. Type where material maintained Press Enter or Click Check button Navigate by clicking next view Continue doing step no. 8 till done Press “Exit” button or Press “Shift F3” to exit

7 8 9 10

Organizational Levels displayed (Display depends on the selected views) Entered Plant, Stor. Location, Warehouse number, Number and Stor. type displayed

Displayed

KM



Displayed

KM



Selected Views displayed

Displayed

KM



Selected view displayed Selected view displayed

Displayed

KM



Displayed

KM



Back to Menu display

Displayed

KM



Overall Result: All views and data were displayed successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): CS01 Description:

Create Material BOM

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Material

F10001

2

Plant organization level

2000

3

BOM Usage

1

4

Alternative BOM (Optional)

1

5

Copy From: Material Plant BOM Usage Alternative BOM

Material assigned number Plant where material was assigned and maintain Areas where the BOM can be used System automatically determines the next unused alternative Details of the BOM which is used as the template

Finish 2000 1 1

Comments / Notes

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code CS01 and enter the setup data Select Copy From

Select the components and click on Copy Icon

23-Oct-08

Expected Results Initial screen displayed Enter the template material BOMs details and press enter Create Material BOM: General Item overview is displayed in Change mode

Actual Results

Tester

Displayed

KM



KM



KM



Displayed

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4 5

6

Add components, change quantities as required. To Change details, select the item/items and click on the Item Details Icon Change details as required and click SAVE

Done

KM



Create Material BOM: Item: All Data screen is displayed

Displayed

KM



Material BOM for the plant and Usage is Saved

Material BOM saved

KM



Overall Result: Material BOM for F10001 saved successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): CS02 Description:

Change Material BOM

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Material

F10001

2

Plant organization level

2000

3

BOM Usage

Material assigned number Plant where material was assigned and maintain Areas where the

23-Oct-08

Wipro Infotech - Confidential

Comments / Notes

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

BOM can be used If more then one alternatives are available for the BOM

Alternative BOM (Optional)

Transaction Steps: Sl No 1

2 3

4

Business Process Steps Go to transaction code CS02 and enter the setup data Add components, change quantities as required. To Change details, select the item/items and click on the Item Details Icon Change details as required and click SAVE

Expected Results Change Material BOM: Genaral Item Overview screen displayed

Actual Results

Tester

OK

Displayed

KM



Done

KM



Change Material BOM: Item: All Data screen is displayed

Displayed

KM



Material BOM for the plant and Usage is Saved

Material BOM saved

KM



Overall Result: Material BOM for F10001 saved successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): CS03 Description:

Display Material BOM

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Material

F10001

2

Plant organization level

2000

3

BOM Usage

4

Alternative BOM (Optional)

Material assigned number Plant where material was assigned and maintain Areas where the BOM can be used If more then one alternatives are available for the BOM

Comments / Notes

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code CS03 and enter the setup data To Display details, select the item/items and click on the Item Details Icon Press Exit or Back (F3) to return to the main menu

Expected Results Display Material BOM: General Item Overview screen displayed Display Material BOM: Item: All Data screen is displayed

Actual Results

Tester

OK

Displayed

KM



Displayed

KM



Done

KM



Overall Result: Display data successful. Remarks: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): CRC1 Description:

Create Resource

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Plant

2000

Plant where resource is to be maintained

2 3

Resource Resource Category

R10001 0008

4

Copy From: Plant Resource

2000 PDH01

Comments / Notes

Resource category determines the type of data to be maintained in the resource master record Reference Plant and resource

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code CRC1 and enter the setup data and press enter

23-Oct-08

Expected Results Prompt showing “Copy From” data selection screen appears

Actual Results

Tester

Displayed

KM

Wipro Infotech - Confidential

OK

Version: A



Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 2

3

4

5

Select the Data to be copied and click on the Copy Icon Change the Description and person responsible as required Check Default values, Capacities, Scheduling and costing Tabs and Change data as required Save the Resource

Create resource: Basic data screen displayed

Resource created in Plant

Displayed

KM



Done

KM



Done

KM



Resource created

KM



Overall Result: Resource R10001 created successfully Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): CRC2 Description:

Change Resource

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Plant

2000

Plant where resource is to be maintained

2

Resource

R10001

Comments / Notes

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code CRC2 and enter the setup data and press enter Check Basic data, Default values, Capacities, Scheduling and costing Tabs and Change data as required Save the Resource

Expected Results Basic Data tab Displayed

Resource in Plant changed

Actual Results

Tester

OK

Displayed

KM



Done

KM



Changes saved

KM



Overall Result: Changes saved successfully

Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

_________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): CRC3 Description:

Display Resource

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Plant

2000

Plant where resource is to be maintained

2

Resource

R10001

Comments / Notes

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code CRC3 and enter the setup data and press enter Check Basic data, Default values, Capacities, Scheduling and costing Tabs

23-Oct-08

Expected Results Basic Data tab Displayed

Actual Results

Tester

Displayed

KM



Done

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 3

Press Back (F3) to return to main menu

Return to SAP main menu

KM



Overall Result: All views and data displayed successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C201 Description:

Create Master Recipe

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object Recipe Group Or Material Plant

23-Oct-08

Value / Code

Description

F10001 2000

Wipro Infotech - Confidential

Comments / Notes Enter either Recipe group or Material and plant If not assigned, an internal Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM number will be generated for the recipe group 2

Profile

3

Template: Recipe Group

PI01

The profile is used to define values that are often used in fields and settings in recipes as defaults. If copied from a master recipe

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code C201 and enter the setup data Press Enter OR Choose Template

Expected Results

3

Select Master Recipe and press enter

4

Enter the recipe group and plant and press Enter

5

Assign a Status and Press enter

6

Change the existing copied data or enter new data as required

7

Go to Materials Tab and enter the Material Number, Production version and BOM data

2

23-Oct-08

Actual Results

Tester

Done

KM



Select Type Prompt is displayed

N.A.

KM



Create using Copy function: Select object screen is displayed Copy Master Recipe: Recipe screen displayed

N.A.

KM



N.A.

KM



KM



Done

KM



Done

KM



Create master recipe screen is displayed

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 8

Check and Save the master recipe

Master recipe saved

Recipe saved with group no: 50000489



KM

Overall Result: Master recipe for F10001 created successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C202 Description:

Change Master Recipe

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Recipe Group Or Material Plant

50000489

Description

Comments / Notes The recipe group can be found by pressing F4

F10001 2000

Transaction Steps: Sl No 1

Business Process Steps Go to transaction

23-Oct-08

Expected Results

Actual Results

Tester

Done

KM

Wipro Infotech - Confidential

OK

Version: A



Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

2

code C202 and enter the setup data Press Enter

3

Change the existing data or enter new data as required

4

Check and Save the master recipe

Change Master recipe: recipe screen is displayed in the Operation tab

Master recipe changed

Displayed

KM



Done

KM



Recipe saved with changes

KM



Overall Result: Master Recipe for F10001 changed successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C203 Description:

Display Master Recipe

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM S l.N o 1

Data Object

Value / Code

Recipe Group Or Material Plant

50000489

Description

Comments / Notes The recipe group can be found by pressing F4

F10001 2000

Transaction Steps: Sl No 1

2

3

4

Business Process Steps Go to transaction code C203 and enter the setup data Press Enter

Check the existing data and press Back to return to main menu Check and Save the master recipe

Expected Results Initial screen displayed

Actual Results

Tester

Displayed

KM



Display Master recipe: recipe screen is displayed in the Operation tab

Displayed

KM



Done

KM



N.A.

KM



Master recipe changed

OK

Overall Result: All views and data displayed successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): C251 Description:

Print Master Recipe

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Comments / Notes

Task List Type

2

2

Material

F10001

3

Plant

2000

Enter either Recipe group or Material and plant

4

Recipe Group

50000489

Enter either Recipe group or Material and plant

2 : Master recipe Enter either Recipe group or Material and plant

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code C251 and enter the setup data Select display component Assignment

Expected Results Master recipe print list screen displayed

Selection of Objects to be used

Select all options

23-Oct-08

Actual Results

Tester

Displayed

KM



Done

KM



Done

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

Options for component assignment output

For all BOMs

Done

KM



5

Execute (F8)

The Print list is displayed

Displayed

KM



6

Select: list->Print or (Ctrl + P)

The master recipe will be printed

Screen shot captured.

KM



Overall Result: The print list was displayed successfully (printing not done as printer not configured here). Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C298 Description:

Delete Master Recipe

Run Number:

1

Prepared By:

Madhavan Krishnamoorthy

23-Oct-08

Date: 24.03.2008

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Comments / Notes

Task List Type

2

2

Material

F10001

3

Plant

2000

Enter either Recipe group or Material and plant

4

Recipe Group

50000489

Enter either Recipe group or Material and plant

2 : Master recipe Enter either Recipe group or Material and plant

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code C298 and enter the setup data Select “Complete Task Lists” and Log

Expected Results Deletion of Task list without archiving displayed

3

Execute (F8)

4

5

2

Actual Results

Tester

Displayed

KM



Done

KM



“Delete Task List Completely?” Prompt displayed

Displayed

KM



Select “Yes”

Delete Task list objects screen displayed

Displayed

KM



Select the task list and press Continue

Deletion of task list without archiving displayed showing the list of reorganized task lists

Displayed

KM



23-Oct-08

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Overall Result: Deletion without archiving done successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C223 Description:

Maintain Production Versions (mass Processing)

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Description

Comments / Notes

Material

F10001

Enter either Recipe group or Material and plant

2

Plant

2000

Enter either Recipe group or Material and plant

3

Recipe Group

50000489

Enter either Recipe group or Material and plant

4

MRP Controller

PDH

Optional

Wipro Infotech - Confidential

Version: A

Transaction Steps:

23-Oct-08

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Sl No 1

Business Process Steps Go to transaction code C223 and enter the setup data in selection conditions Click Refresh (F5)

Expected Results Production Version :Mass Processing screen displayed

Actual Results

Tester

Displayed

KM



Maintained Production versions will be displayed

Displayed

KM



3

Select any production Version and click “Detail View”

Displayed

KM



4

Change Data if required and Check

Maintain Production Version: detail Screen is displayed Check status should be green

Status displayed green

KM



2

OK

Overall Result: Production Version maintained successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): C252 Description:

Print Production Versions

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM S l.N o 1 2 3

Data Object

Value / Code

Material Plant Production Version

F10001 2000 0001

Description

Comments / Notes

Optional

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code C252 and enter the setup data

2

Execute

3

Select List  Print or Ctrl + P

Expected Results Print list for Production Versions with consistency check screen displayed Maintained Production versions will be displayed

Actual Results

Tester

OK

Displayed

KM



Displayed

KM



List will be printed

Screenshot captured

KM



Overall Result: The print list was displayed successfully (printing not done as printer not configured here).

Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MD61 Description:

Create Planned Independent Requirements

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1 2

Data Object

Value / Code

Material Requirement Plan Number

F10001

3 4

Plant Version

2000 00

5 6

Planning Horizon Planning Period

Description

Comments / Notes If requirements to be saved for more than one material under one plan Version 00 is the active version

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code MD61 and enter the setup data Press Enter

Enter the requirements for the periods

23-Oct-08

Expected Results Create PIR: Initial screen displayed

Actual Results

Tester

Displayed

KM



PIR Create: Planning Table displayed

Displayed

KM



Done

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

Goto Schedule line stab

Requirements date, Quantity is displayed

Displayed

KM



5

Split the schedule lines if required, by selecting the desired Split in the Split column Save

Requirements Split

Done

KM



The requirements are saved

Requirements saved

KM



6

Overall Result: Requirements for F10001 saved successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MD62 Description:

Change Planned Independent Requirements

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Material

F10001

Material number or

Wipro Infotech - Confidential

Version: A

23-Oct-08

Description

Comments / Notes

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Requirement plan number If requirements to be saved for more than one material under one plan

2

Requirement Plan Number

3 4

Plant Requirement type

2000

5

Version

00

6 7

Planning Horizon Planning Period

Optional, required in case more then one requirement type is used Can choose form the versions available, only one version is active

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MD62 and enter the setup data Press Enter

Expected Results Change PIR: Initial screen displayed

Actual Results

Tester

OK

Displayed

KM



PIR Change: Planning Table displayed

Displayed

KM



Done

KM



3

Change the requirements for the periods

4

Goto Schedule line stab

Requirements date, Quantity is displayed

Displayed

KM



5

Split the schedule lines if required, by selecting the desired Split in the Split column

Requirements Split

Done

KM



23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 6

Save

The requirements are changed

Requirements saved with changes

KM



Overall Result: Requirements were saved successfully after changes were made. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MD63 Description:

Display Planned Independent Requirements

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Material

F10001

2

Requirement Plan Number

3 4

Plant Requirement type

23-Oct-08

Description

Comments / Notes Material number or Requirement plan number If requirements to be saved for more than one material under one plan

2000 Optional, Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

5

Version

6 7

Planning Horizon Planning Period

required in case more then one requirement type is used Can choose form the versions available, only one version is active

00

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code MD63 and enter the setup data Press Enter

Expected Results Display PIR: Initial screen displayed

Actual Results

Tester

Displayed

KM



PIR Display: Planning Table displayed

Displayed

KM



3

Goto Schedule line stab

Requirements date, Quantity is displayed

Displayed

KM



4

Press Back (F4) to return to main menu

Return to main menu

Done

KM



2

OK

Overall Result: All values were displayed successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MD02 Description:

Material Requirement Planning – Single Item, Multi Level

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1 2

Material Plant

F10001 2000

3

Processing key

NETCH

4

Create purchase req.

1

5

Schedule lines

3

6

Create MRP list

1

Material ID Plant where planning entry required Specifies type of planning Indicator control whether the system creates purchase requisitions for the total planning horizon or within the opening period and planned orders outside of the opening period or creates planned orders for the total planning horizons Whether during the planning run the system Never creates delivery schedules or only creates delivery schedules in the opening period or creates delivery schedules in the planning horizon. Whether the system always creates an MRP list for all Planned material or for certain material

23-Oct-08

Wipro Infotech - Confidential

Comment s / Notes

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

7

Planning mode

3

8

Scheduling

2

9

Planning date

10

Process control parameters “Display result before they are saved”

depending on exception messages or never creates MRP lists. Indicator controls how order proposals (PR, Planned Orders, Delivery sched.) from the last planning run are dealt with when quantities and end dates still correspond to the new requirements situation. Determines whether only the basic dates are determined for the newly crated planned order, or whether lead time scheduling is carried out as well Date MRP run is to be run Section Header

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code MD02 and Click Enter or Press “Return/Enter” Enter the setup data

Click “Enter” button or Press “Enter/Return”

23-Oct-08

Expected Results Display “SingleItem, Multi-Level” screen with fields are open for entry Accept entries and displayed entered data on “SingleItem, Multi-Level” screen “Planning Result: Individual Lines” screen is displayed

Actual Results Displayed

Tester KM



Displayed

KM



Displayed

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

Click on SAVE to accept the planning Results

The planning Statistics screen is displayed

Displayed



KM

Overall Result: MRP run was successful and displayed the MRP result for F10001 and its component 2000351. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MD03 Description:

Material Requirement Planning – Single Item, Single Level

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1 2

Material Plant

F10001 2000

3

Processing key

NETCH

4

Create purchase req.

1

Material ID Plant where planning entry required Specifies type of planning Indicator control whether the system creates purchase requisitions for the

23-Oct-08

Wipro Infotech - Confidential

Comment s / Notes

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

5

Schedule lines

3

6

Create MRP list

1

7

Planning mode

2

8

Scheduling

2

9

Planning date

24.03.2008

10

Process control

Selected

23-Oct-08

total planning horizon or within the opening period and planned orders outside of the opening period or creates planned orders for the total planning horizons Whether during the planning run the system Never creates delivery schedules or only creates delivery schedules in the opening period or creates delivery schedules in the planning horizon. Whether the system always creates an MRP list for all Planned material or for certain material depending on exception messages or never creates MRP lists. Indicator controls how order proposals (PR, Planned Orders, Delivery sched.) from the last planning run are dealt with when quantities and end dates still correspond to the new requirements situation. Determines whether only the basic dates are determined for the newly crated planned order, or whether lead time scheduling is carried out as well Date MRP run is to be run Section Header

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM parameters “Display result before they are saved”

Transaction Steps: Sl No 1

2

3 4

Business Process Steps Go to transaction code MD03 and Click Enter or Press “Return/Enter” Enter the setup data

Click “Enter” button or Press “Enter/Return” Click on SAVE to accept the planning Results

Expected Results Display “SingleItem, Single-Level” screen with fields are open for entry Accept entries and displayed entered data on “SingleItem, Single-Level” screen “Planning Result: Individual Lines” screen is displayed The planning Statistics screen is displayed

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Displayed

KM



Displayed

KM



Overall Result: MRP run was successful for F10001. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MD04 Description:

MRP Display – Stock Requirement List

Run Number:

1

Date: 24.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1 2

Material Plant

F10001 2000

Description

Comments / Notes

Plant where planning entry required

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MD04 and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”

3

Click “Enter” button or Press “Enter/Return”

4

Click “Exit” Icon and Press “Shift+F3”

Expected Results Display “Stock/Requireme nts List: Initial Screen” Accepted entries on screen and displayed entered data from “Stock/Requireme nts List: Initial Screen” MRP display stock requirement list from the “Stock/ Requirement list as of **:** Hrs” screen. Exit to transaction and back Main Menu

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Displayed

KM



Done

KM



Overall Result: Display was successful with all data for F10001. 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): MD11 Description:

Create Planned Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Planned Order Profile

LA

Profile that determines the order type, the procurement type, the special procurement type as well as the account assignment type for processing planned orders

2

Reference: Planned order

0000281533

3 4

Material Plant

F10001 2000

Comments / Notes

Optional: if copy function is used Plant where planning entry required

Transaction Steps: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Sl No 1

2

3 4 5

Business Process Steps Go to transaction code MD11 and Click Enter or Press “Return/Enter” Enter the profile and reference if required and press enter Enter “Material”, “Plant” Enter the Order Quantity Enter the Order finish/start date and press enter

6

Schedule the Planned Order

7

Save the order

Expected Results Create Planned Order: Initial Screen is displayed Create Planned order: Stock order screen displayed (for profile LA)

The dates are calculated and other master data displayed Detailed Scheduling Tab displayed with scheduling results Planned order saved and order number generated

Actual Results Displayed

Tester

OK

KM



Displayed Ref pl. order: 0000281533 N.A.

KM



KM



20

KM



Displayed

KM



Displayed

KM



Planned order 281535 created

KM



Overall Result: Planned order 281535 created for F10001 successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): MD12 Description:

Change Planned Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1

Planned Order

281535

Description

Comments / Notes

Transaction Steps: Sl No 1

2

3 4

5

Business Process Steps Go to transaction code MD12 and Click Enter or Press “Return/Enter” Enter the planned order number press enter Change the Order Quantity Schedule the Planned Order Save the order

Expected Results Change Planned Order: Initial Screen is displayed Change Planned order: Stock order screen displayed (for profile LA) Detailed Scheduling Tab displayed with scheduling results Planned order changed

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Done

KM



Displayed

KM



Planned order saved with changes

KM



Overall Result: Planned order 281535 saved successfully after changes. Remarks:

_______________ Consultant-Wipro 23-Oct-08

_______________ Power User – TASNEE Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): MD13 Description:

Display Planned Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1

Planned Order

281535

Description

Comments / Notes

Transaction Steps: Sl No 1

2

3

4

Business Process Steps Go to transaction code MD13 and Click Enter or Press “Return/Enter” Enter the planned order number press enter Click on the component overview button to display the components Select Back (F4) to exit

Expected Results Display Planned Order: Initial Screen is displayed Display Planned order: Stock order screen displayed (for profile LA) Component Overview screen displayed Return to main menu

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Displayed

KM



Done

KM



Overall Result: All values displayed successfully. 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): COR1 Description:

Create Process Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1 2

Material Production Plant

F10001 2000

3

Planning Plant

4

Process Order Type

23-Oct-08

Description

Comments / Notes

Plant where material to be produced

PI01

Wipro Infotech - Confidential

Optional entry: If planning is done at different plant then production plant Parameters that influence Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

5

Process Order

6

Copy From: Process Order

the processing of the order are defined in the order type If external numbering defined for Order Type If copy function to be used

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code COR1 and Click Enter or Press “Return/Enter”

2

Enter the Order Quantity Change the scheduling type if required Enter the Order finish/start date depending on the scheduling type and press enter Execute Material Availability Check by clicking on the ICON

3 4

5

6

7 8

Execute Capacity Availability Check by clicking on the ICON Release the order by clicking on the Release ICON Save the order

23-Oct-08

Expected Results

Actual Results Displayed

Tester KM



10

KM



Current date

KM



Displayed

KM



Displayed (also missing parts info displayed for higher header qty) Displayed

KM



KM



Release Carried out

Released

KM



Process order saved and order number generated

Process order 1008161 generated

KM



Create Process Order: Header -General Data Screen is displayed

The dates are calculated and scheduling carried out message is displayed Status displayed

Status displayed

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Overall Result: Process order 1008161 generated for F10001 successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): COR2 Description:

Change Process Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1

Process Order

1008161

Description

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code COR2 and Click Enter or Press “Return/Enter”

2

Change the Order

23-Oct-08

Expected Results Change Process Order: Header -General Data Screen is displayed

Actual Results Displayed

Tester KM



Done

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4 5

Quantity Schedule the Process Order Save the order

Scheduling carried out Process order changed

Scheduling carried out Process order saved with changes

KM



KM



Overall Result: Process order 1008161 saved with changes successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): COR3 Description:

Display Process Order

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1

Process Order

1008161

Description

Comments / Notes

Transaction Steps: Sl

Business Process

23-Oct-08

Expected Results

Actual

Wipro Infotech - Confidential

Tester

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM No 1

Steps Go to transaction code COR3 and Click Enter or Press “Return/Enter”

2

View the Order details, operation details and material details Select Back (F4) to return to main menu

3

Display Process Order: Header -General Data Screen is displayed

Return to main menu

Results Displayed

KM



Displayed

KM



Done

KM



Overall Result: All values displayed successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): CORK Description:

Confirm Process Order

Run Number:

1

Prepared By:

Madhavan Krishnamoorthy

23-Oct-08

Date: 25.03.2008

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Set Up Data: Sl.No

Data Object

Value / Code

1

Process Order

1008161

Description

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code CORK

2

Press Enter

3

Select Final Confirmation, Clear reservation Confirm/Change the yield Select Goods Movement

4 5

6

Enter the storage location, Batch if required

7

Save the confirmation

Expected Results Create process order confirmation Screen is displayed Process Order confirmation Create :Actual Data Screen is displayed

Confirmation of process order create: Goods Movement screen displayed

Confirmation Saved with Zero goods movements failure

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Done

KM



Done

KM



Displayed

KM



Batch:2685 St. Loc: 2301, 4102 entered Confirmatio n saved without goods movements error

KM



KM



Overall Result: Confirmation for order 1008161 saved successfully without any goods movements error. Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM _______________ Power User – TASNEE

_______________ Consultant-Wipro (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): CORT Description:

Display Process Order Confirmation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Confirmation

2

Process Order

3

Operation/Phase

4

Sec Resource

Value / Code

Description

Comments / Notes

Completion confirmation number for the operation 1008161

Either Confirmatio n no or process order number Optional restriction Optional

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code CORT

2

Enter the setup

23-Oct-08

Expected Results Display process order confirmation Initial Screen is displayed Display Process

Actual Results Displayed

Tester KM



Displayed

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM data and press enter 3

Select operation counter and click Details

4

Press Back (F3) to return

Order confirmation Operation/Phase overview Screen is displayed Process Order confirmation display: Actual Data screen is displayed

Displayed

KM



Done

KM



Overall Result: All values displayed successfully for order 10008161. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): CORS Description:

Cancel Process Order Confirmation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Sl.No

Data Object

1

Confirmation

2

Process Order

3

Operation/Phase

4

Sec Resource

Value / Code

Description

Comments / Notes

Completion confirmation number for the operation 10008161

Either Confirmatio n no or process order number Optional restriction Optional

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code CORS

2

Enter the setup data and press enter

3

Select operation counter and click Details

4

Press Save to cancel the confirmation Enter the reason for cancellation Press Back (F3) to Save the cancellation

5 6

Expected Results Cancel process order confirmation Initial Screen is displayed Cancel Process Order confirmation Operation/Phase overview Screen is displayed Process Order confirmation display: Actual Data screen is displayed Change Order Confirmation Text screen is displayed Confirmation for Order is cancelled

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Displayed

KM



Displayed

KM



Done

KM



Confirmatio n cancelled with reversal of goods movements

KM



Overall Result: Confirmation cancelled for order 10008161 successfully with goods movements reversal.

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): ZPPCOR2 Description:

External Batch Numbering

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Process order

5008482

Process order number for which external batch number has to be assigned

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code ZPPCOR2

2

Enter process order number and click

23-Oct-08

Expected Results Initial screen ‘External Batch Numbering’ displayed Process order number accepted

Actual Results Displayed

Tester KM



Displayed

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Execute button 3

Next screen ‘External Batch Numbering’ appears

and the next screen displayed Message ‘Batch XXXXXXX created’ appears Message “Process order XXXX saved’ appears at the bottom of the screen

Message ‘Batch 000002670 created’ appeared Message ‘Process order 5008483 saved’ appeared

KM



KM



Overall Result: External Batch number 000002670 created successfully for the process order 5008482. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): ZMRP Description:

23-Oct-08

Material Requirement Planning Report

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Date: 25.03.2008

Run Number:

1

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Material Number

2

Material Type

ROH; FERT

Material type(s) for which the report is needed

3

Planning date

01.03.2008 – 25.03.2008

Date range for which report is needed

Comments / Notes Either single value or a range can be given (optional field) Either single value or a range can be given

Material for which the MRP report is required

4

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code ZMRP

Expected Results

2

Enter the values Material number, Material type and Planning Date in the respective fields Execute the transaction by clicking the execute button

Field values are accepted by the system and displayed

3

4

Press Back (F3) to return

23-Oct-08

Initial screen ‘Material Requirements Planning Report’ displayed

Screen ‘Material Requirements Planning Report’ with all the data like initial stock, Usage, Delivery and End stock displayed

Actual Results Displayed

Tester KM



Values ROH, FERT; 01.03.08 – 25.03.08 entered Displayed

KM



KM



Done

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Overall Result: Material Requirement Planning Report run successfully for ROH, FERT materials for the period 01.03.08 – 25.03.08. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): ZSTOCK Description:

Stock

Run Number:

Date:

Prepared By: Set Up Data: Sl.No

Data Object

Value / Code

Description

Comments / Notes

1 2 3 4

Transaction Steps: Sl No 1

Business Process Steps

Expected Results

Actual Results

Tester

OK

2 3

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4 5 6

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): ZSD4 Description: Run Number:

Date:

Prepared By: Set Up Data: Sl.No

Data Object

Value / Code

Description

Comments / Notes

1 2 3 4

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Steps: Sl No 1

Business Process Steps

Expected Results

Actual Results

Tester

OK

2 3 4 5 6

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): ZQI002 Description: Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

Comments / Notes

1 2

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 3 4

Transaction Steps: Sl No 1

Business Process Steps

Expected Results

Actual Results

Tester

OK

2 3 4 5 6

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Module:

Production Planning

Transaction Code(s): MB03 Description:

Display Material Document by Material Doc Number

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1

Material Document No.

4900148037

2

Posting Year

2008

Description

Comments / Notes

Transaction Steps: Sl No 1

2 3

6

Business Process Steps Go to transaction code MB03 and Click Enter or Press “Return/Enter” Enter “Document date”, “Posting Year”. Click “Enter” button or Press “Enter/Return” Click “Exit” Icon and Press “Shift+F3”

Expected Results “Display Material Doc.” is Displayed Entered data accepted and Displayed “Displays Material Doc. for PO and quantity and Movt. Type used.” Exit to transaction and back to Main Menu

Actual Results Displayed

Tester

OK

KM



Displayed

KM



Displayed

KM



Done

KM



Overall Result: All data displayed successfully. Remarks:

_______________ 23-Oct-08

_______________ Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Power User – TASNEE

Consultant-Wipro (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB1A Description:

Goods Withdrawal

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 Document date 2 Posting date 3 Movement type 4 Plant 5 Storage location 6 GR/GI Slip 7 Cost Center 8 Order 9 Material 10 Quantity Transaction Steps:

23-Oct-08

Value / Code

Description

Comments / Notes

24.03.2008 24.03.2008 261 2000 4102 1008161 2000351 5

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Sl No 1

2

3 4 5

6 7

8

Business Process Steps Go to transaction code MB1A and Click Enter or Press “Return/Enter” Enter “Document date”, “Posting date”, “Movement type”, “Plant”, “Storage location”, GR/GI Slip “Individual Slip” Click “Enter” button or Press “Enter/Return” Ignore; Click “Enter” button or Press “Enter/Return” Enter “Cost Center”, “Recipient”, “Material”, “Quantity to be issued”

Click “Enter” button or Press “Enter/Return” Review the entries on “Enter Goods Issue: Collective Processing” and Click “Save” Icon or Press “Ctrl+S” Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results Displayed

Tester KM



Entered data accepted and Displayed

Displayed

KM



Display pop-up “Display WM parameters” Display “Enter Goods Issue: New Items” screen Entry accepted and display. Some of the information entered by the system from the given information on the previous screen. Display “Enter Goods Issue: Overview” screen Document posted and Display “Document posted” at the bottom.

N.A. Displayed

KM



Order no:1008161 entered; Displayed

KM



Displayed

KM



Document 4900148042 posted

KM



Exit to transaction and back to Main Menu

Done

KM



Display “Enter Goods Issue: Initial Screen”

OK

Overall Result: Document 4900148042 posted successfully. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MB1B Description:

Transfer Posting

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3 4 5 6 7 8 9 10 11

Document date Posting date Doc. Header text Movement type Plant Storage location GR/GI Slip Recipient Recv. Storage Location Material Quantity

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code MB1B and Click Enter or Press “Return/Enter” Enter “Document date”, “Posting date”, “Doc. Header text”, “Movement type”, “Plant”, “Storage location”, GR/GI Slip “Individual Slip” Click “Enter” button or Press “Enter/Return”

23-Oct-08

Expected Results

Actual Results

Tester

OK

Display “Enter Transfer Posting: Initial Screen” Entered data accepted and Displayed

Display “Enter Transfer Posting: New Items” screen open fields ready for data Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

Enter “Recipient”, “Recv. SLoc”, “Material”, “Quantity”

5

Click “Enter” button or Press “Enter/Return”

6

Review the entries and Click “Save” Icon or Press “Ctrl+S”

7

Click “Exit” Icon and Press “Shift+F3”

acceptance Entry accepted and displayed. Some of the information entered by the system from the given information on the previous screen. Verifies correctness of the entered data on the “Enter Transfer Posting: New Items” screen Document posted and Display “Document 4900000030 Posted” at the bottom. Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Module:

Production Planning

Transaction Code(s): MB1C Description:

Goods Receipt for Other Activities

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Document date

2

Posting date

3

Movement type

4

Plant

5

Storage Location

6

GR/GI Slip

7

Material

8

Quantity

Value / Code

Description

Comments / Notes

Default is current system date Default is current system date Goods movement type Assign plant who maintains the material on the PO. Storage Location Goods receipt/issue slip number Material Number Quantity of the material to be received.

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MB1C and Click Enter or Press “Return/Enter” Enter “Document date”, “Posting date”, “Movement

23-Oct-08

Expected Results

Actual Results

Tester

OK

Display “Enter Other Goods Receipts: Initial Screen” Entered data accepted and Displayed Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

3

4 5

type”, “, “Plant”, “Storage location”, GR/GI Slip “Individual Slip” Click “Enter” button or Press “Enter/Return”

Enter “Material”, “Quantity” Click the “Overview” button

6

Click “Save” Icon or Press “Ctrl+S”

7

Click “Exit” Icon and Press “Shift+F3”

Display “Enter Other Goods Receipts: New Item” fields filled in with information from the Purchase Order some of them are open to for entry. Entry accepted and display See the whole entry of information to the document. Thru the display “Enter Other Goods Receipts: Overview” screen Document posted and Display “Document Posted” at the bottom. Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): MB21 Description:

Create Reservation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Base date

25.03.2008

2

Check against calendar

Yes

3

Movement type

201

4

Plant

2000

5

Cost Center

38100

6

Goods recipient

7

Material

2000351

8

Quantity

10

Date for which the goods movement is planned Specify the system to verify whether the date is relevant on the factory calendar Goods movement type Assign plant who maintains the material on the PO. Chart of account to where the material to be charge Goods receipt/issue slip number Material Number Quantity of the material to be received.

Comments / Notes

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code MB21 and Click Enter or Press

23-Oct-08

Expected Results Display “Create Reservation: Initial Screen”

Actual Results Displayed

Wipro Infotech - Confidential

Tester

OK

KM

Version: A



Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 2

3

4

5

“Return/Enter” Enter “Base date”, “Check against calendar”, “Movement type”, “, “Plant” Click “Enter” button or Press “Enter/Return”

Enter “Cost Center”, “Goods recipient”, “Material”, “Quantity” Click “Enter” button or press “Enter/Return”

6

Click “Save” Icon or Press “Ctrl+S”

7

Click “Exit” Icon and Press “Shift+F3”

Entered data accepted and Displayed

Displayed

KM



Display “Create Reservation: New Item” fields filled in with information from the Purchase Order some of them are open to for entry. Entry accepted and display

Displayed

KM



Displayed

KM



See the whole entry of information to the document. Thru the display “Create Reservation: New Item 0001” screen Document posted and Display “Document ------Posted” at the bottom. Exit to transaction and back to Main Menu

Displayed

KM



Document: 0000282347 posted; message displayed Done

KM



KM



Overall Result: Reservation created and document 0000282347 posted successfully for material 2000351. Remarks: _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): MB22 Description:

Change Reservation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Reservation

282347

2

Goods recipient

3

Quantity

10

4

Material

2000351

Reservation number Goods receipt/issue slip number Quantity of the material to be received. Material number on the reservation

Comments / Notes

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MB22 and Click Enter or Press “Return/Enter” Enter “Reservation”

3

Click “Enter” button or Press “Enter/Return”

4

Enter “Material”

5

Click “Enter” button or press “Enter/Return”

23-Oct-08

Expected Results Display “Change Reservation: Initial Screen” Entered data accepted and Displayed Display Pop-up screen asking information help find reservation Entry accepted and display See the whole information from the reserved document. Thru the display “Change

Actual Results Displayed

Tester KM



Displayed

KM



Displayed

KM



Displayed

KM



Displayed

KM



Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

6

Enter acceptable changes and Click “Save” Icon or Press “Ctrl+S”

7

Click “Exit” Icon and Press “Shift+F3”

Reservation -----Collective Processing” screen Changes on the field accepted and displayed. Document posted and Display “Document ------Posted” at the bottom. Exit to transaction and back to Main Menu

Value 10 changed to 5; accepted and saved; message displayed

KM



Done

KM



Overall Result: Chnages made to reservation 282347 and saved successfully. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MB23 Description:

Display Reservation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

Description

1

Reservation

282347

Reservation number

Comments / Notes

Transaction Steps: Sl No 1

2

3 4

5

Business Process Steps Go to transaction code MB23 and Click Enter or Press “Return/Enter” Enter “Reservation” if known or use the match code button to help finding reservation Click “Enter” button or Press “Enter/Return” Highlights an item and Click “Header” Icon

Click “Details from item” Icon

23-Oct-08

Expected Results

Actual Results Displayed

Tester KM



Entered data accepted and Displayed

Displayed

KM



Display “Display Reservation---Overview” screen Display more information on the highlighted items contained within the reservation thru “Display Reservation--------:Header” screen Display more information on the items contained within the reservation thru

Displayed

KM



Displayed

KM



Displayed

KM



Display “Display Reservation Initial Screen”

Wipro Infotech - Confidential

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

6

Click “Exit” Icon and Press “Shift+F3”

“Display Reservation -----------Details 0001/0001” screen Exit to transaction and back to Main Menu

Done

KM

Overall Result: All values displayed successfully for reservation 282347. Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A



Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM UNIT TESTING Module:

Production Planning

Transaction Code(s): MB25 Description:

List Display Material Reservation

Run Number:

1

Date: 25.03.2008

Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

Value / Code

1 2 3

Material Number Plant Requirement Date

2000351 2000 01.01.08 30.03.08

Description

Comments / Notes

Transaction Steps: Sl No 1

2

3

4

Business Process Steps Go to transaction code MB25 and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”, “Requirement Date “ Click “Execute ” button or Press “F8” Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results Displayed

Tester KM



Accepted entries on screen and displayed

Displayed

KM



Reservation No. Requirement Date, Quantity, Movt. Type Exit to transaction and back to Main Menu

Displayed

KM



Done

KM



“Display Material Reservation” is Displayed

OK

Overall Result: All the list of reservations for material 2000351 were displayed successfully.

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB51 Description:

Display Material Document by Material Number

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2

Material Number Plant

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MB51 and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”,

3

Click “Execute ” button or Press “F8”

4

Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Material Doc. List” is Displayed Accepted entries on screen and displayed List of Material Document with Posting dates. Exit to transaction and back to Main Menu

Overall Result: Passed Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM _______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Materials Management

Transaction Code(s): MB52 Description:

Display Warehouse On-Hand Stock

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2

Material Number Plant

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MB52 and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”,

3

Click “Execute ” button or Press “F8”

4

Click “Exit” Icon and Press

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Display Warehouse Stock of the Material” is Displayed Accepted entries on screen and displayed Stock of Material in Warehouse is Displayed Exit to transaction and

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM “Shift+F3”

back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MBRL Description:

Return Delivery Material Document

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

23-Oct-08

Data Object

Value / Code

Description

Wipro Infotech - Confidential

Comments / Notes Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 1

Material Document Number Material Doc. Year Reason For movt.

2 3

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code MBRL and Click Enter or Press “Return/Enter” Enter “Material doc. no., year of Posting”, Reason for movt. Press the Adopt option,

4

Click Save Button or Press Control F3

5

Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Enter Return Delivery initial screen ” is Displayed Accepted entries on screen and displayed Purchase order No. and material with quantity which is to be returned, vendor no., Movt. Type. Return Material Document is created Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Module:

Production Planning

Transaction Code(s): MBSM Description:

List Display Cancelled Material Docs

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3

Material Number Plant Posting Date

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2 3 4

Business Process Steps Go to transaction code MBSM and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”, Posting Date. Click “Execute ” button or Press “F8” Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Cancelled Material Document” is Displayed Accepted entries on screen and displayed Cancelled Material Document List is Displayed Exit to transaction and back to Main Menu

Overall Result: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): MBST Description:

Cancel Material Document by Material Doc Number

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3 4

Material Document No. Document year Posting Date Reason For Movt.

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2 3

Business Process Steps Go to transaction code MBST and Click Enter or Press “Return/Enter” Enter “Material Doc. No.”, “Document Year”, Posting Date. Press Adopt Button

3

Click Save Button or Press Control F3

4

Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Cancel Material Document initial screen” is Displayed Accepted entries on screen and displayed Purchase order No. and material with quantity which is to be returned, vendor no., Movt. Type Return Material Document is created Exit to transaction and back to Main Menu

Overall Result:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MIGO_GR Description:

Goods Receipt for Purchase Order

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Purchase Order

2

Document date

3

Posting date

4

Vendor

23-Oct-08

Value / Code

Description

Comments / Notes

The number of the purchase order known. Default is current system date Default is current system date Entity who sold goods or services to the plant Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 5

Movement type

6

Item number

7

Material

8

Material Description

9

Quantity

10

Unit of entry

11

Plant

12

Storage location

13

Currency

14

Date of production

15

Item Indicator

Goods movement type Item number of the purchasing document Material assign number Material Description Maybe a full or portion of the total quantity of mat’l actually received from the PO. Unit of measure from the actual PO Assign plant who maintains the material on the PO. Storage Location Currency key assign Date of production of the batch To receive quantity for the line item

Transaction Steps: Sl No 1

2 3

Business Process Steps Go to transaction code MIGO_GR and Click Enter or Press “Return/Enter” Enter “Purchase Order” Click “Enter” button or Press “Enter/Return”

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Goods Receipt Purchase Order: Author” Initial screen display Entered data accepted and Displayed Display details of information on each fields to “Goods Receipt Purchase Order: Author” screen base on the

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 4

4

Enter or change base on the actual PO. “Vendor”, “Movement type”, “Quantity” received, “Unit of Measure” “Plant”, “Storage Location”, “Date of Production” Tick “Item OK” Check box

5

Click “Save” Icon or Press “Ctrl+S”

6

Click “Exit” Icon and Press “Shift+F3”

selected PO Entered data accepted and Displayed

Tick “Check” entered and display Document posted Remarks Display at bottom of “Goods receipt Purchase order – Author” Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

23-Oct-08

Production Planning

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Code(s): MR51 Description:

Display Accounting Documents for Material

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3 4 5

Material Number Company Code Valuation area Posting Date Document Type

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2 3

4

Business Process Steps Go to transaction code MR51 and Click Enter or Press “Return/Enter” Enter “Material”, “company code “, “Posting Date”. Click “Execute ” button or Press “F8”

Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

Accounting Documents For Material is Displayed Accepted entries on screen and displayed Amount in Local currency for Document type and Document no. is Displayed. Exit to transaction and back to Main Menu

Overall Result: Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM _______________ Power User – TASNEE

_______________ Consultant-Wipro (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module: Production Planning Transaction Code(s): ME23N Description: Display Purchase Order Run Number:

Date:

Prepared By: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Display Purchase Order

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1 2

Business Process Steps Go to transaction code ME23N Enter the set up data as mentioned above

23-Oct-08

Expected Results

Actual Results

Initial Screen display

Displayed

Tester

O K

Display Screen-I Material, Vendor Quantity, Dely Date, Net price, Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

3

Click “Exit” Icon and Press “Shift+F3”

material Group, Plant #, Store location Exit to transaction and back to ASAP Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager (Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module: Production Planning Transaction Code(s): ME51N Description: Create Purchase Requisition

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Date: 03.10.02

Run Number: Prepared By: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Document Type

2 3 4 5

Material Delivery date Plant Purchase Group

Value / Code

Description

Comments / Notes

PR manual Standard

Transaction Steps: Sl No 1 2

3

Business Process Steps Go to transaction code ME51N Enter the set up data as mentioned above Click Save Button or Press Control S.

Expected Results

Actual Results

Tester

O K

Initial Screen display Display Screen

Purchase requisition is created

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module: Production Planning Transaction Code(s): ME52N Description: Change Purchase Requisition. Run Number: 1

Date: 01.10.02

Prepared By: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Purchase Requisition

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1 2

3 4

Business Process Steps Go to transaction code ME52N Enter the PR number by selecting the other Pur. Req. No. in Header Part Change quantity Save

Expected Results

Actual Results

Tester

O K

Initial screen displayed Display of the PR in Change Mode

Changed PR

Overall Result: Remarks:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module: Production Planning Transaction Code(s): ME53N Description: Display Purchase Requisition Run Number:

Date:

Prepared By: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Purchase Requisition

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1 2

Business Process Steps Go to transaction code ME53N Enter the PR number by selecting the other Pur. Req. No. Button in Header Part

23-Oct-08

Expected Results

Actual Results

Tester

O K

Initial screen displayed Display of the PR in Display Mode

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

3

or Press Shift F5 Return to Main menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module: Production Planning Transaction Code(s): ME54N Description: Release Purchase Requisition Run Number:

Date:

Prepared By: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Purchase Requisition

Value / Code

Description

Comments / Notes

Transaction Steps:

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Sl No 1 2

3

4

Business Process Steps Go to transaction code ME54N Enter the PR number by selecting the other Pur. Req. No. Button in Header Part or Press Shift F5 Release The PR Save The PR

Expected Results

Actual Results

Tester

O K

Initial screen displayed Status Release possible

Status changes to Release effected PR Released

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

23-Oct-08

Production Planning

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Code(s): LB11 Description:

Display Transfer Requirements for Material

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3 4

Warehouse Number Material Plant Processing Complete

Value / Code

Description

Comments / Notes

selection criterion used to generate a transfer requirement list for display purposes or further processing

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LB11 and Click Enter or Press “Return/Enter” Enter the setup data and press enter

Expected Results

Actual Results

Tester

OK

Display Transfer requirement: List for Material is Displayed Transfer requirements for Material is displayed

Overall Result: Remarks:

_______________ Consultant-Wipro

23-Oct-08

_______________ Power User – TASNEE

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LS01N Description:

Create Storage Bin Manually

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Warehouse Number

2

Storage Type

3

Storage Bin

4

Storage Section

5 6

Storage Bin Type Storage Location

7

Maximum Weight

23-Oct-08

Value / Code

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Subdivision of a complex physical warehouse The smallest addressable unit in a warehouse. Identification of the subdivision of the storage type SPC Plant General Chemicals Total capacity allowed in the storage bin Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM without affecting the stability transaction Transaction Steps: Sl No 1

2

3 4

Business Process Steps Go to transaction code LS01N and Click Enter or Press “Return/Enter” Enter “Warehouse Number”, “Storage Type” and “Storage Bin” required data Click on the “Enter” Icon or press “Return/Enter” Enter “Storage Section”, “Storage Bin Type” and Maximum Weight

5

Click on the “Enter” Icon or press “Return/Enter”

6

Click “Save” Icon or Press “Ctrl+S”

Expected Results

Actual Results

Tester

OK

“Create Storage Bin Screen” display Display Warehouse Number, Storage Type and Storage Bin entered data Display the “Create Storage Bin: Data Screen” Display Storage Section, Storage Bin Type and Maximum Weight entered data Displayed all accepted data entered on the “Create Storage Bin: Data Screen” Displayed “Create Storage Bin: Initial Screen” with message at the bottom “Storage Bin “33-01-01” has been created

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi ) 23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali) Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LS02N Description:

Change Storage Bin Single Bin

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Warehouse Number

2

Storage Type

3

Storage Bin

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Subdivision of a complex physical warehouse The smallest addressable unit in a warehouse.

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LS02N and Click “Enter” Icon or Press “Return/Enter” Enter “Warehouse Number”, “Storage Type” and “Storage

23-Oct-08

Expected Results

Actual Results

Wipro Infotech - Confidential

Tester

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 3 4

5 6 7

Bin” required data Press Enter or Click “Enter” button Do the necessary acceptable changes on the “Change Storage Bin: Data Screen”. Press Enter or Click “Enter” button Press “Save” button or Press “Ctrl S” to save the changes Press “Exit” button or Press “Shift F3” to exit

Changes saved Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

23-Oct-08

Production Planning

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Code(s): LS03N Description:

Display Storage Bin

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Warehouse Number

2

Storage Type

3

Storage Bin

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Subdivision of a complex physical warehouse The smallest addressable unit in a warehouse.

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LS03N and Click “Enter” Icon or Press “Return/Enter” Enter “Warehouse Number”, “Storage Type” and “Storage Bin” required data

3

Press Enter or Click “Enter” button

4

Click on the “Statistic Icon.

5

Click on the “Bin Sectioning” Icon

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Display Storage Bin Screen” displayed Display Warehouse Number, Storage Type and Storage Bin entered data Display “Display Storage Bin: Data Screen” information Display “Storage Bin Statistics” Information Display “Bin Sectioning for the Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Storage Bin” 6

Press “Exit” button or Press “Shift F3” to exit

Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LS24 Description:

Bin Stock per Material

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1 2

Data Object

3 4 5 23-Oct-08

Value / Code

Description

Comments / Notes

Material Warehouse Number Storage Type Plant Storage Location Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 6

Storage Category

Transaction Steps: Sl No 1

2

3 4

Business Process Steps Go to transaction code LS24 and Click “Enter” Icon or Press “Return/Enter” Enter “Material” “Warehouse Number”, “Storage Type” “Plant” Storage Category required data Press Enter Button Press “Exit” button or Press “Shift F3” to exit

Expected Results

Actual Results

Tester

OK

“Stock Per Material Screen” displayed Display Warehouse Number, Material, Storage Type,Plant Stock as per Material Displayed Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LS26

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Description:

Stock Overview per Material

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1 2

Data Object

Value / Code

Description

Comments / Notes

Material Warehouse Number Storage Type Plant Storage Location Storage Category

3 4 5 6

Transaction Steps: Sl No 1

2

3 4

Business Process Steps Go to transaction code LS26 and Click “Enter” Icon or Press “Return/Enter” Enter “Material” “Warehouse Number”, “Storage Type” “Plant” Storage Category required data Press Enter Button

Expected Results

Press “Exit” button or Press “Shift F3” to exit

Back to Menu display

Actual Results

Tester

OK

“Stock Overview Screen” displayed Display Warehouse Number, Material, Storage Type, Plant

Overall Result: Remarks:

_______________ Consultant-Wipro 23-Oct-08

_______________ Power User – TASNEE Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM (Madhavan Krishnamoorthy) _______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT01 Description:

Create Transfer Order

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Warehouse Number

2

Movement Type

23-Oct-08

Value / Code

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Movement type Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

3

Material

4 5

Quantity Requested Plant

6

Storage Location

7

Src. Ty.

8

Src. Sec

9

Src. Bin

10

Dest. Ty

11

Dest. Sec

12

Dest Bin

associated with the warehouse posting change Alphanumeric key uniquely identifying the material Quantity to be transferred Key uniquely identifying the plant Storage location where the material is stored Storage type from where the material to be transferred is removed Storage section is a logical or physical subdivision of a storage type Smallest addressable unit in the warehouse Storage type into which the material is to be placed A logical or physical subdivision oa a storage type Smallest addressable unit in the warehouse

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LT01 and Click Enter or Press “Return/Enter” Enter “Warehouse Number”, “Movement Type”, “Material”, “Quantity requested”, “Plant/Storage Location” required

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Create Transfer Order: Initial Screen” display Warehouse Number, Movement type, Material, Quantity requested and Plant/Storage Location data Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 3

4

5

6

data Click on the “Enter” Icon or press “Return/Enter” Enter “Src. Ty”, “Src. Sec.”, “Src. Bin”, “Dest. Ty.”, “Dest. Sec.” and “Dest. Bin” Click on the “Enter” Icon or press “Return/Enter”

Click “Save” Icon or Press “Ctrl+S”

Entered Display the “Create Transfer Order: Generate Transfer Order Item” Screen Entered and Display Entries

Displayed all accepted data entered on the “Create Transfer Order: Generate Transfer Order Item” Data Screen” Displayed “Transfer order No.------” Created.

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT03 Description:

23-Oct-08

Create Transfer Order for Delivery

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Date:

Run Number: Prepared By:

Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Warehouse Number

2 3 4

Plant Delivery Foreground/backgrou nd

Value / Code

Description

Comments / Notes

Warehouse to which the document relates “Foreground ”

Determines whether the transaction is done in the foreground or background

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code LT03 and Click Enter or Press “Return/Enter” Enter “ “Warehouse number” “Plant” “Foreground/Backgr ound” data Click on the “Enter” Icon or press “Return/Enter”

Expected Results

Actual Results

Tester

OK

“Create TO for Delivery note :Initial screen” Screen display “Warehouse number” “Plant” “Foreground/Back ground” data Entered

4 5 6

Click on the “Enter” Icon or press “Return/Enter”

6

Click “Save” Icon or Press “Ctrl+S”

23-Oct-08

Entered and Display Entries Displayed all accepted data entered on the “Create TO for TR Number Prepare for Put away” Screen Displayed “Transfer order from TR no.-----” Created. Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 7

Click “Exit” Icon or Press “Shift+F3”

Exit to transaction and back to ASAP Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

Module:

Production Planning

Transaction Code(s): LT06 Description:

Create Transfer Order for Material Document

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Material Document

2

Mat. Document year

3

Warehouse Number

4

Foreground/backgrou nd

23-Oct-08

Value / Code

Description

Comments / Notes

Number from inventory management Year when the material document was created Warehouse to which the document relates Determines whether the Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM transaction is done in the foreground or background

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LT06 and Click Enter or Press “Return/Enter” Enter “Material document”, “Mat document year”, “Warehouse number” and “Foreground/Backgr ound” data

3

Click on the “Enter” Icon or press “Return/Enter”

4

Click on the “Palletization” Icon Enter “Dest. Ty.”, “Dest. Sec.” and “Dest. Bin” or leave as per system suggestion Click on the “Enter” Icon or press “Return/Enter”

4

5

6

Click “Save” Icon or Press “Ctrl+S”

7

Click “Exit” Icon or Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Create TO for Material Document” Screen display “Material document”, “Mat document year”, “Warehouse number” and “Foreground/Back ground” data Entered Display the “Create TO for Material Document” screen. Display Entered and Display Entries

Displayed all accepted data entered on the “Create TO for Material Document Prepare for Putaway” Screen Displayed “Transfer order Created. Exit to transaction and back to Main Menu

Overall Result: Remarks: 23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT12 Description:

Confirm Transfer Order in One Step

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Transfer Order Number

2

Warehouse Number

3

Foreground/background

23-Oct-08

Value / Code

Description

Comments / Notes

Number that identifies the transfer order within a warehouse Warehouse to which the document relates Determines whether the transaction is done in the foreground or Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 5

Confirmation

6

Difference Indicator

7

C

8

Actual Quantity

9

Destination Difference Quantity

10

Target Remaining Quantity

background Selection of one step or two step and quantity to be confirmed Classifies the difference by cause; defines the storage type and storage bin where difference is posted Controls how the difference for the destination subitem of the corresponding transfer order item can be entered. Actual quantity to be confirmed Difference between original quantity and quantity to be confirmed Left quantity from the target after the transfer was done

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code LT12 and Click Enter or Press “Return/Enter” Enter “Transfer order no.”, Warehouse number”, “Control” and “Confirmation” Click on the “Execute” Icon

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Confirm Transfer Order: Initial Screen” Displayed Entered Transfer order no.”, Warehouse number, Control, and Confirmation Displayed Display the “Confirm Transfer Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

4

Select the indicator and click on the “Confirm internally” Icon.

5

Enter “Difference Indicator”, “C”, “Actual Quantity”, “Destination Difference Quantity” Click “Enter” Icon

6

7

8

9 10

Enter the remaining quantity on Target and Confirm Rem. Quantity. Click “Confirm difference” Icon

Click “Save” Icon or Press “Ctrl+S” Click “Exit” Icon or Press “Shift+F3”

Order: Overview of Transfer Order Items” Screen Item screen is process on the foreground; display “Confirm Transfer Order: Confirm Single Item” Entered data and displayed

Receive a pop-up window asking to confirm item: Carry Out Zero Stock Check. Receive a pop-up window asking to confirm the difference Return display “Confirm Transfer Order: Overview of Transfer Order Items” screen Displayed “Transfer order ---Exit to the process back to the Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT15 Description:

Cancel Transfer Order Single Document

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Transfer Order Number

2

Warehouse Number

3

Screen Control (Foreground/backgrou nd)

23-Oct-08

Value / Code

Description

Comments / Notes

Number that identifies the transfer order within a warehouse Warehouse to which the document relates Determines whether the transaction is done in the foreground or background

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Transaction Steps: Sl No 1

2

3

4

5

Business Process Steps Go to transaction code LT15 and Click Enter or Press “Return/Enter” Enter “Transfer order no.”, Warehouse number”, “Scrn Control” Click on the “Execute” Icon

Review the transfer order from the “Cancel Transfer Order: Overview of Transfer Order Items” screen. Click “Save” Icon or Press “Ctrl+S” Click “Exit” Icon or Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Cancel Transfer Order: Initial Screen” Displayed Entered Transfer order no.”, Warehouse number, Scrn Control; Displayed Display the “Cancel Transfer Order: Overview of Transfer Order Items” Screen Display “Cancel Transfer Order: Initial Screen” and at the bottom appears “1 items cancelled” Exit to the process back to the Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT21 Description:

Display Transfer Order for Single Document

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Transfer Order Number

2

Warehouse Number

Value / Code

Description

Comments / Notes

Number that identifies the transfer order within a warehouse Warehouse to which the document relates

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code LT21 and Click Enter or Press

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Display Transfer Order: Initial Screen” Displayed Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 2

3

4

5

“Return/Enter” Enter “Transfer order no.”, Warehouse number” Click on the “Execute” Icon Navigate General View Scroll to see more data by clicking the up and down arrow key. Click the data view and navigate. The To-data view and navigate Click “Exit” Icon or Press “Shift+F3”

Entered Transfer order no.”, Warehouse number; Displayed Display the “Display Transfer Order: Item List” Data View Screen Display selected View and Navigate

Exit to the process back to the Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LT31 Description:

Print Transfer Order Manually

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Transfer Order Number

2

Warehouse Number

3

Transfer Order Item

4

Print code

5

Printer

6

Spool control data

7

Print

23-Oct-08

Value / Code

Description Number that identifies the transfer order within a warehouse Warehouse to which the document relates Line item of the transfer order Code that defines format Name of the printer concerned Spool control data for printing a transfer order Indicator prints out on this printer.

Wipro Infotech - Confidential

Comments / Notes

01 – Single Print

Tick “check”printing out Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM on the printer else on the screen 8

Print documents as selected

9

Document selection “TO Document(s)”

Ignore switch for no printing during TO Print Code for print transfer document

Transaction Steps: Sl No 1

2

3

10

Business Process Steps Go to transaction code LT31 and Click Enter or Press “Return/Enter” Enter “Warehouse number”, “Transfer order no.”, “Transfer order item”, “Print control data”, “Document selection” Click on the “Execute” Icon Click “Exit” Icon or Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

“Print Transfer Order” screen Displayed Entered data accepted and Displayed

Printed document of selected document information Exit to the process back to the Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali) UNIT TESTING

23-Oct-08

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Module:

Production Planning

Transaction Code(s): LT24 Description:

Display Transfer Order for Material

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1

Warehouse Number

2

Material

3 4

Confirmation Status Program Parameters

Value / Code

Description

Comments / Notes

Number that identifies the transfer order within a warehouse Warehouse to which the document relates

Transaction Steps: Sl No 1

2

3

Business Process Steps Go to transaction code LT24 and Click Enter or Press “Return/Enter” Enter “Material No.”, Warehouse number” and Select Confirmation option, Program Parameter. Click on the “Execute” Icon

Expected Results

Actual Results

Tester

OK

“Display Transfer Order: Initial Screen” Displayed Entered “Material No.” Warehouse number; Selected All TO items radio button and Transfer Date Displayed Display the “Displays all Transfer Order for the material “

4 5

Click “Exit” Icon or Press “Shift+F3”

23-Oct-08

Exit to the process back to the Main Menu

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LX02 Description:

WM Stock

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

23-Oct-08

Warehouse Number

Value / Code

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 2

Storage Type

3

Storage Bin

Subdivision of a complex physical warehouse Number of storage bin that you would like to have displayed.

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LX02 and Click “Enter” Icon or Press “Return/Enter” Enter “Warehouse Number” and “Storage Type” required data or add No. of storage bins.

3

Press Execute or Press F8 Button

4

Press “Exit” button or Press “Shift F3” to exit

Expected Results

Actual Results

Tester

OK

WM Stock Initial Screen displayed Display Warehouse Number, Storage Type and No. of Storage Bins entered data WM Stock with Material Description Displayed Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LX03 Description:

Bin Status Report

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Warehouse Number

2

Storage Type

3

Storage Bin

4

Program Parameter

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Subdivision of a complex physical warehouse Number of storage bin that you would like to have displayed.

Transaction Steps: Sl No

Business Process Steps

23-Oct-08

Expected Results

Actual Results

Wipro Infotech - Confidential

Tester

OK

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 1

2

3 4

Go to transaction code LX03 and Click “Enter” Icon or Press “Return/Enter” Enter “Warehouse Number” and “Storage Type” required data in Prog. Parameter or add No. of storage bins. Press Execute or Press F8 Button Press “Exit” button or Press “Shift F3” to exit

“Displays Bin Status report: Initial Screen” displayed Display Warehouse Number, Storage Type and No. of Storage Bins entered data

Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): LX27 Description:

SLED Control List

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o 1

Data Object

Value / Code

Warehouse Number

2 3 4

Material Plant Storage Type

5

Remaining Shelf life

Description

Comments / Notes

Number that identifies a physical warehouse structure within the warehouse management system Subdivision of a complex physical warehouse

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code LX27 and Click “Enter” Icon or Press

23-Oct-08

Expected Results

Actual Results

Tester

OK

SLED Control List Initial screen is displayed Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 2

3 4

“Return/Enter” Enter the setup data.

Press Execute or Press F8 Button Press “Exit” button or Press “Shift F3” to exit

Display Warehouse Number, Storage Type and No. of Storage Bins entered data List Displayed Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): LU04 Description:

Display Posting Change

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: S l.N o

Data Object

23-Oct-08

Value / Code

Description

Wipro Infotech - Confidential

Comments / Notes

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 1

Warehouse Number

2

Movement Type

3

Status of Posting Change

Number that identifies a physical warehouse structure within the warehouse management system Optional restriction Optional restriction

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code LU04 and Click “Enter” Icon or Press “Return/Enter” Enter the setup data and execute

3

Select any item and click display posting change

4

Press “Exit” button or Press “Shift F3” to exit

Expected Results

Actual Results

Tester

OK

Display Posting Change Notice: Overview List of posting change notices displayed Display posting change Notice: Item screen displayed Back to Menu display

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB53 Description:

Display Plant Stock Availability

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2

Material Plant

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2

Business Process Steps Go to transaction code MB53 and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”,

3

Click “Execute ” button or Press “F8”

4

Click “Exit” Icon and Press “Shift+F3”

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Plant availability: Initial Screen” is Displayed Accepted entries on screen and displayed Availability of Material in Particular Stock Exit to transaction and back to Main Menu

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB56 Description:

Display batch Where Used List

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2

Material Plant

23-Oct-08

Value / Code

Description

Wipro Infotech - Confidential

Comments / Notes

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM 3

Batch

Transaction Steps: Sl No 1

Business Process Steps Go to transaction code MB56 and Click Enter

2

Enter the setup data

3

Click “Start Analysis ” button or Press “F8”

4

Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

Display Batch Where used list screen is Displayed Accepted entries on screen and displayed Display Batch where used list Analysis screen is displayed Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB5B Description:

Stocks for posting date

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3 4 5

Material Company Code Plant Storage Location Posting Date

Value / Code

Description

Comments / Notes

Transaction Steps: Sl No 1

2 3

4

Business Process Steps Go to transaction code MB5B and Click Enter or Press “Return/Enter” Enter “Material”, “Plant”, “Company Code”. Click “Execute ” button or Press “F8” Click “Exit” Icon and Press “Shift+F3”

23-Oct-08

Expected Results

Actual Results

Tester

OK

“Stock on the Posting Date” is Displayed Accepted entries on screen and displayed Availability of Material Stock By Posting dates is Displayed Exit to transaction and back to Main Menu

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

_______________ TASNEE Project Manager (Mohammad R. Ali)

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB5M Description:

Shelf Life List

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3

Material Plant Storage Location

4

Batch

5

Scope of list

23-Oct-08

Value / Code

Description

Comments / Notes Optional restriction Optional restriction As required

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Transaction Steps: Sl No 1 2 3 4

Business Process Steps Go to transaction code MB5M and Click Enter Enter Setup data Click “Execute ” button or Press “F8” Click “Exit” Icon and Press “Shift+F3”

Expected Results

Actual Results

Tester

OK

Initial screen is Displayed Accepted entries on screen and displayed Shelf Life list is displayed Exit to transaction and back to Main Menu

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

UNIT TESTING Module:

Production Planning

Transaction Code(s): MB5C Description:

Pick-Up List for Batch

Run Number: Prepared By:

Date: Madhavan Krishnamoorthy

Set Up Data: Sl.No

Data Object

1 2 3

Material Batch Optional Restrictions and scope

Value / Code

Description

Comments / Notes Optional As required

Transaction Steps: Sl No 1 2

Business Process Steps Go to transaction code MB5C and Click Enter Enter Setup data

3

Click “Execute ” button or Press “F8”

4

Click “Exit” Icon and Press “Shift+F3”

23-Oct-08

Expected Results

Actual Results

Tester

OK

Initial screen is Displayed Accepted entries on screen and displayed Pich_Up list for Batch where used list is displayed Exit to transaction and back to Main Menu

Wipro Infotech - Confidential

Version: A

Project Code: SEPC-SAPWAL-H8101101 Document ID: PP_UNIT _TEST_FORM

Overall Result: Remarks:

_______________ Consultant-Wipro (Madhavan Krishnamoorthy)

_______________ Power User – TASNEE

_______________ Wipro Project Manager ( Farrukh Z Hashmi )

23-Oct-08

_______________ TASNEE Project Manager (Mohammad R. Ali)

Wipro Infotech - Confidential

Version: A

Related Documents

Unit Test Cases Pp
November 2019 15
Designing Of Unit Test Cases
November 2019 18
Test Cases
November 2019 14
Unit Test
November 2019 23
Test Unit
May 2020 10
Unit-test
May 2020 12