Tugas Ilmu Ukur Tanah Kelas A.docx

  • Uploaded by: Ri Ze
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tugas Ilmu Ukur Tanah Kelas A.docx as PDF for free.

More details

  • Words: 743
  • Pages: 6
TUGAS ILMU UKUR TANAH

NAMA: ELIZABETH A.C SARAGIH NIM: 20180611014045

UNIVERSITAS CENDRAWASIH 2018/2019

TUGAS ILMU UKUR TANAH KELAS A 1. PERHITUNGAN TAMBAHAN DAN BIAYA Info: 1. Lokasi digambar dengan skala 1:500 di kertas millimeter blok 2. Tanah akan ditimbun setinggi Jl. Naga (+203 m dpl) 3. Jarak kapling tanah dengan jalan 10 m 4. Lebar jalan semuanya adalah 8 m 5. Kapasitas Truck 3 m3 6. Elevasi titik A = +202,ab m dpl 7. Harga timbunan satu ret dilokasi = RP. 200.000,8. Angka ab ambil dua angka NIM terakhir Instruksi : 1. Hitung volume timbunan yang dibutuhkan 2. Hitung biaya timbunan DATA-DATA UKUR Tempat Berdiri A

B

Tinggi Instrument (TI) (m) 1,470

1,465

Diamatai

Pembacaan Benang Ba

Bt

Bb

Jarak (d) (m)

Beda TInggi (m)

(BaBb)x100

TI-Bt Btb-Btd

Elevasi (m)

1 19 2

0,750 1,576 2,073

0,650 1,495 1,970

0,550 1,414 1,867

20 16,2 20,6

0,820 0,845 0,475

202,ab TGB =Elevasi+Ti =202,45+1,470 =203,92 Elevasi =TGB-Bt 203,270 202,425 201,950

3

2,163

1,960

1,757

40,6

0,010

201,960

4

2,533

2,380

2,227

30,6

0,420

201,540

20 15

2,403 2,391

2,270 2,272

2,137 2,153

26,6 23,8

0,110 0,002

201,650 201,648

16

2,416

2,182

1,948

46,8

0,090

201,738

17

1,836

1,770

1,704

13,2

0,412

202,150

18

1,033

0,970

0,907

12,6

0,800

202,950

B

3,325

3,070

2,815

51

2,100

200,850

C

5 6 7 10 C

1,273 2,118 2,676 1,609 1,632

1,165 1,965 2,472 1,475 1,482

1,057 1,812 2,268 1,341 1,332

21,6 30,6 40,8 26,8 30

0,300 0,800 0,507 0,997 0,007

202,755 201,955 201,448 202,445 202,438

8

2,687

2,450

2,213

47,4

1,000

201,47

9 11 12 13

2,136 2,371 2,877 1,886

1,960 2,200 2,650 1,800

1,784 2,029 2,423 1,714

35,2 34,2 45,4 17,2

0,490 0,240 0,450 0,850

201,96 201,72 201,27 202,12

14

1,181

1,100

1,019

16,2

0,700

202,82

1,450

Volume timbunan yang dibutuhkan: V1= 20x90

= 1800

V2=30x(90+30) = 3600 V3=30X(90+10) = 3000 Vtotal

= 8400

∆hA=+203 m dpl – 202,45= 0,550 ∆h1=+203 m dpl –203,270= 0,270 ∆h19=+203 m dpl -202,425= 0,575 ∆h2=+203 m dpl – 201,950= 1,050 ∆h3=+203 m dpl – 201,960= 1,040 ∆h4=+203 m dpl – 201,540= 1,460 ∆h20=+203 m dpl – 201,650= 1,350 ∆h15=+203 m dpl – 201,648= 1,352 ∆h16=+203 m dpl – 201,738= 1,262 ∆h17=+203 m dpl – 202,150= 0,850 ∆h18=+203 m dpl – 202,950= 0,050

∆h5=+203 m dpl - 202,755= 0,245 ∆h6=+203 m dpl – 201,955= 1,045 ∆h7=+203 m dpl – 201,448= 1,552 ∆h10=+203 m dpl – 202,445= 0,555 ∆hC=+203 m dpl - 202,438= 0,562

∆h8=+203 m dpl – 201,47= 1,530 ∆h9=+203 m dpl – 201,96= 1,040 ∆h11=+203 m dpl – 201,72= 1,280 ∆h12=+203 m dpl – 201,27= 1,730 ∆h13=+203 m dpl – 202.12= 0,880 ∆h14=+203 m dpl – 202,82= 0,180

B=+203 m dpl – 200,850= 2,150 ∑∆h= 22,558 ∆H rata-rata

= 22,558 : 23 =0,98707826087

V

= Vtotal x ∆H rata rata = 8.400 x 0,98707826087= 8.238,5739130435 m3 Biaya timbunan

Jumlah ret =8.238,5739130435 m3: 3m3 = 2,746.1913043478 Harga=2,746.1913043478 x Rp. 200.000,-= Rp. 549.238.260,86956,-

2. PERHITUNGAN LEBAR DAN KEDALAMAN SALURAN Info : 1. Hasil digambar dengan skala H = 1 : 200 dan V = 1 : 100 di kertas millimeter blok 2. Alat berdiri di titik 1 3. Kedalaman rata-rata = a+b/2 Ditanya 1. Berapa lebar sungai dari titik 2 ke titik 3 2. Berapa lebar genangan air dari titik a ke titik d 3. Berapa kedalaman rata-rata sungai diukur dari titik 2 DATA-DATA UKUR Tempat Berdiri 1

Tinggi Instrument (TI) (m) 1,460

Diamatai

Pembacaan Benang Ba

Bt

0,750 1,576 2,073 2,163 3,496 2,403

0,650 1,495 1,970 1,960 3,360 2,270

0,550 1,414 1,867 1,757 3,224 2,137

20,0 16,2 20,6 40,6 27,2 26,6

0,810 0,845 0,475 0,010 1,400 1,090

4

2,391

2,272

2,153

23,8

0,002

249,188

= 26,6 – 20,6 = 6,6 m

2. Lebar genangan air dari titik a ke titik d

= 27,2 – 16,2 = 7,2 m

Elevasi (m)

2 a b c d 3

= (Ba-Bb) titik 3- (Ba-Bb) titik 2

=jarak titik a ke titik d

Beda Tinggi (m)

250,00 TGB =Elevasi+Ti =250+1,460 =251,460 Elevasi =TGB-Bt 250,810 249,965 249,490 249,500 248,100 249,190

1. Lebar sungai dari titik 2 ke titik 3 =jarak titik 2 ke titik 3

Bb

Jarak (d) (m)

(BaBb)x100

TI-Bt BtbBtd

3. a

b

= elevasi titik 2 – elevasi titik a = 250,81 – 249,965 = 1,32 m = elevasi titik 2 – elevasi titik b = 250,81 – 249,5 = 1,31 m

Kedalaman rata-rata sungai diukur dari titik 2= a+b/2 = (1,32 + 1,31) : 2 = 2,63 m : 2 = 1,315 m

Related Documents


More Documents from "azmir"