Tugas 3_ekotek_mutiara_102416061_lg 16.xlsx

  • Uploaded by: mutiara saputri
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tugas 3_ekotek_mutiara_102416061_lg 16.xlsx as PDF for free.

More details

  • Words: 393
  • Pages: 7
1. Diketahui masa kontrak 8 tahun sewa tahun pertama $1000 dan kenaikan $100. Maka : n A G Ditanya

8 $1000 $100 Nilai P, F dan A

End of Year 1 2 3 4 5 6 7 8

Hasil Interpolasi P/A 6.185 P/G 19.736 A/P 0.161 F/A 9.933

Cashflow $ $ $ $ $ $ $ $

1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700

CashFlow $1,800 $1,600 $1,400 $1,200 $1,000 $800 $600 $400 $200 $-

1

2

3

4 Cas hflow

Present Value (P) = PV Annual + PV Gradien PV Annual

1000 (P/A,i,n) 1000 ( P/A ; 6,1% ; 8 ) 6185

PV Gradien

100 (P/G,i,n) 100 ( P/G ; 6,1% ; 8 ) 1973.6

Ekuivalensi Present value (P)

6185 + 19736 8158.6

5

6

7

8

Ekuivalensi Annuity Value (A)

Ekuivalensi Future Value (F)

8158,6 ( A/P ; 6,1% ; 8 ) 1313.5346 1313,5346 ( F/A ; 6,1% ; 8 ) 13047.3391818

7

8

2. Hokkian meminjam uang sebesar semester 1 : $4000 dengan bunga 4,06% semester 3 : $5000 dengan bunga 3,42% semester 5 : $6000 dengan bunga 5,23% semester 7 : $7000 dengan bunga 6,03% menyelesaikan dengan menyicil 20 tahun dengan bunga 5%

Semester 1 3 5 7

Hutang 4000 5000 6000 7000 Total

Hutang pada titik 0 Hutang pada titik 20

Bunga 4.06% 3.42% 5.23% 6.03%

Future 4690.242 5530.745 6644.012 7422.1 24287.1

24287.1 64440.96243

Hasil Interpolasi titik 20 (F/P ; 5% ; 20) (A/F ; 5% ; 20)

Nilai A : (A/F ; 5% ; 20) 1948.6947038832 Rencana Pembayaran Tahun Annuity 1 1948.69 2 1948.69 3 1948.69 4 1948.69 5 1948.69 6 1948.69 7 1948.69 8 1948.69 9 1948.69 10 1948.69 11 1948.69 12 1948.69 13 1948.69 14 1948.69 15 1948.69 16 1948.69 17 1948.69 18 1948.69 19 1948.69 20 1948.69

Timeline Hutang 8000 7000

6644

6000 5000 4000

4690.2422830188

5530.74460844 5000

6000

4000

3000 2000 1000 0

1

2 Huta ng

3 Future

TIMELINE PEMBAYARAN

Annuity 2500.00 2000.00 1500.00 1000.00 500.00

Annuity 2500.00 2000.00 1500.00 1000.00 500.00 0.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 Tahun Pembayaran Ke-

Interpolasi titik 20 2.6533 0.03024

6644.01174 5530.74460844 5000

6000

2 Huta ng

7422.1

7000

3

4

Future

Annuity

Annuity

Annuity

7 8 9 10 11 12 13 14 15 16 17 18 19 20

un Pembayaran Ke-

Annuity

Related Documents

Tugas
October 2019 88
Tugas
October 2019 74
Tugas
June 2020 46
Tugas
May 2020 48
Tugas
June 2020 45
Tugas
August 2019 86

More Documents from "Luci xyy"