Tahap+1+menara+astra+development.pdf

  • Uploaded by: Yan Lethe
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tahap+1+menara+astra+development.pdf as PDF for free.

More details

  • Words: 238
  • Pages: 1
LEMBAR PENILAIAN DOKUMEN TEKNIS STRUKTUR ATAS KE I 1.

DATA BANGUNAN a Nama Proyek b Jenis Bangunan c Lokasi Bangunan d Jumlah Lantai e Perencana Struktur SIPTB No

f g 2.

Penilaian Struktur Atas Tanggal

: : : : : : : :

MENARA ASTRA DEVELOPMENT Beton Bertulang Jl. Jend. Sudirman No. 5 Jakarta Pusat 50 Lantai +5 lantai podium+ 6 Basement Ir. Suyandra Gunawan 0775/P/GA/DPPB/I-2012 Pemeriksaan ke 1 06 November 2013

HASIL PEMERIKSAAN Jenis Evaluasi I. Pembebanan Kami mohon penjelasan berapa besar beban untuk Helipad

II. Pemodelan dan Analisis Struktur: 1. Perencanaan ANNEX sebaiknya menggunakan SRPMK sehingga mempunyai daktilitas maksimum 2. Partisipasi Massa Tower dan Annex mohon dicantumkan secara lengkap termasuk rasio (%) untuk ragam torsi. Ratio Partisipasi Massa dari Tabel ETABS yang mencapai minimal 90% mohon dilampirkan . Mode 1 dan 2 harus dominan arah lateral tidak boleh dominasi dalam arah torsional. 3. Pada Tabel Bab 2.8.5.2 disebutkan = 0,17 seharusnya = 0,18 sebab Jakarta termasuk Wilayah 3. Untuk gedung Annex maksimum T = 0,18 x 5 =0,9 detik padahal T1= 1,05 detik > 0,9 detik sehingga tidak memenuhi syarat. Dengan demikian dimensi struktur harus di revisi. 4. Untuk gedung tinggi > 200 m maka harus diperhitungkan C min (C=0,01) dalam perhitungan Vb static ragam 1 (V1) dalam memperhitungkan factor skala, sesuai dengan standar UBC 1997 (kompatibilitas dengan SNI 17262002). Kami mohon di check kembali V1 dengan C minimum. Jakarta, 06 November 2013

Bambang Budiono

Ket.

More Documents from "Yan Lethe"