JUN 02 '98 14:37 TO-12136241188

,

FAX

.

TRANSMITTAL SHEET DATE:

TO: FAX NUMBER:

. . _.P- 2.-1B

..

_.__..........

_

..._........................................_....-.......-.............

k",.. 1'" ? -1 f:..~12I:L............_ _......._ .._ ............__......................_ ..............._...

r-{J-~1.£1. :...?9..?.f?......---...- ..----...........--..--.-...................................

1-.

---

S. .J'.. ,..­ ...... lC K Z. - C....M __.....A_............................

OFFICE: PROJECT NUMBERI

_ _. ._ . _.....

·~

.....• . . . . . . . . . . . _ _............ I . . . . . . . . . . . ., . . . U . .

OlsB~o

OVERHEAD ACCT:

_.r:.

FROM:

M .....tl~~~~L(. ..............._...._..;_...._.._._..._........................._....................

Sv.rdrup Civil, Inc.

Two Center Plazi aolton. M•• i.chuI.ne 02108·1908

FAX:

(617) 142-8830

NUMBER OF PAGES (Including cov.r sh••t): MESSAGE

.-. _.-

-.

...

...

n.J.,,.A1J

T05 olM-sf,

.

-­ FROM

_

j2-­

_.. ...

.

..

1

-:f":d t2.:d. _,J,.Ipff

...

DATE

co

SVERDAUPOORPORA~ON

TIME

DEPT

OFFICE

" PAGES PHONE

FAX (U~)624- II SB FAX'

..-

<.e_

.shArMA

TO

.

---"

-

....... ....

FROM

I

CO NArA(;..,4 """''''''41( SVERDRUP CORPORATION DEPT OFFICE FAX # ~."c

~'/

FAX.

-

. ...

(1

.- -- ..

,

..

DATE TIME , PAGES

PHONE

I

NOTE:

..

IF MESSAGE IS RECEIVED UNCLEAR OR INCOMPLETE.

PLEASE CALL SENDER AT (617) 742-8060

JUN-02-1998

11:48

+617 742 8830

96%

P.01

JUN 02 '98 14:37 TO-12138241188

T-298 P,02/12 F-999

FROM-SVERDRUP CIVIL, INC,

Sverdrup Civil, Inc.

Boston, MA. June 2, 1998

MEMORANDUM TO:

Kurt Lanon (SVC - San Juan)

FROM:

Jim O'Donnell (SvC - Boston)

cc:

Mike Morrissey (SvC - Boston)

Somesh Debnath (AVA-LA)

Jeff Walsh (SvC - Boston) Peter Lalas (SvC - Boston)

Sharma Narasimlw"ajan (SvC-NY)

David Leymeister (SvC-NY)

---

""

Dom D'Eramo (SvC - Boston)

Luis DeLeon (SvC - San Juan)

SUBIECT:

013850 - Trcn Urbano CADD Management Plan Update.

,

We need to have the KKZlCMA CADD Management Plan updated. This update will have to be approved by TUO. Three items need revising.

1)

Section S.2.B. needs additional alphabetic modifier codes for Mechanical and Electrical. These are meant to be insened with the existing alphabetic modifier codes.

Meehanleal

Fire Protection

FP

Fire Protection Tunnels

FPT

"',

J , f:

Electrical

Lighting Power Power Tunnels 2) . i-

L

P

II

PT

it

Appendix A, -Layer Lists" needs to have the Architectural, Mechanicall Plumbing and Structural listings replaced. The listings are attached.

3)' Appendix. B, "Standard Graphic Symbols" needs to have the break line and graphic scale symbols included. The symbols are attached.

I "1 if

,.

,

The drawings are being drafted incorPorating these additions. to the CADD Management Plan '. in anticipation of approval from roO. .... ~

.," 'I

, '.n' ••.•.•••

. "/

f

\ \CIVBOSADMI \SYS\PROJ\013850\ WORD6\CADD MANUAL UPDATE.DOC06/02/98

JUN-02-1998

11:48

+617 742 8830

97%

...

P.02

T-298 P.03/12 F-999

FROH-SVERDRUP CIVIL, INC.

JUN 02 '98 14:37 TO-12136241188

013880 • Rio Piedras Prolect AutoCAD LlIyer Convention. $trur;turlll Orllwlnga

Lay.rName SAXIS SAXISTE SBARS SBARSTE

DescriptIOn

Structural Axis Structural AxIs Text Reinforcinn Bars Reinforclna Bars Text Centerlines Centeriine& Telet stn.Ictural CokJmns StnIcturai Co/uml'\S Text Concrete Concrete ODeninas Concrete Green Concrete Green Hidden It",

seEN

~~·Outllne

Concrete Stairs Concrete Text Concrete Yenow Concrete Yellow Hidden DImensions Mise. Electrical Conduits etc. Misc. Electric;al Condua etc.Text GeotelCtiles Wat8fl)roofino Go01.eXtiloa Waterproofing Text Finish arade Finicn gnade Text structural Grid lines Structural Grid Text & Bubble Hatch Hatch Text Mined TUMSI Drifts Mined Tunnel Drifts Text St:ruc:tural main title StnJc:tura1 Note Text Pile P~e Text Pipes Drainage Inlets & o1t1er AaDurtenancec Pipes Drainage Inlets & other ADDur1enances Text DetaH.: Cr~8otiDn & Profilec-{CCIII-outs\ Structural sub-title Steel

steel Framina Steel. Maaenta Hidden Steel Outline Steel Text SvrnbolG

JUN-02-1998

11:48

+617 742 8830

SCENTE SCOL SCOlTE SCONC SCONC-OPEN SCONC-GREEN SCONe-GREEN-HIO SCONC-Ol SCONC-STAIR SCONCTE SCONC·YELLOW SCONC·YELLOW·HIO SOIM SELEC SELECTE SGEO SGEOTE SGRAQE SGRAOETE SGRID SGRIDID SHATCH SHATCHTE SMDT SMDTIE SMT SNT SPILE SPILETE SPIPE SPIPETE SSBOE SST SSTEEL SSTEEl-RED SSTEEL-HID SSTEEL-Ol SSTEElTE SSY

97%

Color maaenta levan red levan areen cYan t:lree"

evan red red ICII'lIfm

lareen lareen !evan !yellow vellow evan Yellow eVen Cvan Cvan red /!Van

evan areen blue evan cireen evan

red evan vellow ,evan

White Maaema V.Uow

lareen red maaeme loreen levan levan

Unetype center continuous continuous continuou& center2 continuous COl'ltiI'lUD_ conllnuous continuous continuO\JS continllolJ8 hidden 8 comlnuous continuous continuous continuous hidden condnuous Continuous Continuoue Continuous ContinuDU& continuous continuous center eontinuous continuous continuous continuous continuous con~ous

contiR..lous continuous continuous Contlnuouc Continuous Continuouc continuous

l"..,..rttI", ,t'I, ..

continuoua hidden continuous continuous continuous

P.03

JUN 02 '98 14:38 TO-12136241188

T-298 P,04/12 F-999

FROH-SVERDRUP CIVIL, INC,

Ani! Verma Associates, Inc.

COLOR 10

LAYER

CONTAINS

AARE AAXJD AAXJS ACLGR ACLOP ACLOS ACLOT ACLPA ACLSU ACMC ACRoe ADI ADI-50 ADI-75 ADO ADOHE ADOID ADOWE ACTIO ADTIO-HID AEEIO AEHATA AELCA AELFI AELFI-HIO IAEL.FITE AELFN AEUTE AELMB1 AELMB1--HIO AELMB2 AELMB3 AELOT AELOT-HID AELOV AELOV-H I0

Area calculations

Architectural axis 10 (bubble)

Architectural Axls

Ceiling grid Ceiling opening (hatch to tracks etc.) Center line of station Centerline of traok Ceiling grid pattern Ceiling, suspended elements Ceiling mounted casework curbs Dimensions Architectural Dimensions, scale 1:50 Dimensions, Scale 1:75 Doors Door headers Door 10 (bubble) Doorwedaes Detail 10 (bubble) Detail 10, hidden exterior Elevation 10 (bubble) Emergency exit hatch, emergency access Wall mounted ~seworX Miscellaneous fixtures Miscellaneous Fixtures, hidden Miscellaneous FiXlUteS text Finishes, woodwork and trim Architectural Lighting Material beYond. thickness 1 Material beyond, thickness 1, hidden Material beyond, thickness 2 Material beyond. thickness 3 Building outline Building outline, hidden Edge lights Edge lights. hidden

AELPA

Textures and hatch patterns

10

AELSI AELSOV AELSOV-HID AELSS AELST AELST-50 AEQFI AEQFI-HID AEOM AEQM-HID AFOR AFFLD AFFLDTE

Signage 10 (bubble) Edge light suppons Edge light suPPOrts, hidden Signage schedule or table Signage text Signage text, Scale 1:50 Shaft ooeniOQ Shaft opening, hidden Mechanical equip., damper, louver Mechanical Equipment, damper, etc., hidden Floor Drain Ladders Ladders text

Cyan

Sverdrup Civil

JUN-02-1998

Cyan Cyan

Yellow

12 13 13 Cyan Green

12 Blue Cyan Cyan Cyan Cyan Blue Cyan Blue cyan Cyan Cyan 13 13 magema Magenta Cyan 13 Magenta

13 13 areen 15 ~

Yellow 13

13 13

13 White Cyan Cyan Magenta Magenta 13 13 M~g_enta

Blue Cyan

1 of 3

11:49

+617 742 8830

LINETYPE continuous continuous Center center hidden center oenter continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous Hidden continuous continuous continuous continuous Hidden continuous continuous continuous continuous Hidden continuous continuous contrnuous Hidden continuous Hidden continuous continuous continuous Hidden continuous continuous continuous continuous Hidden continuous Hidden continuous continuous continuous

ALAYERS,xls, 612/98

96%

P.04

JUN 02 '98 14:38

TO-12136241188

T-298 P.05/12 F-999

FROM-SVERDRUP CIVIL, INC,

Anil Verma Associates, Inc. AFHOTE AFlAP AFLEL. AFlEL·HID AFLELTE AFLEO AFLEO-HID AFLEP AFLES AFLES-HID AFLESTE AFLHR AFLHR-HID AFLIO AFLLE AFLOV AFLPA AFLSO AFLST AFLSTE AFLST-HID AFLWD AFOL AFU AFUTe AGLEX AGL.IN AGLMU AGRATING AIEIO ALCA ALPE ALPL AlSF AlWA. ALWP AMT ANT APKNG APRD APRDO ARNA ARNID AROOT AS BE A.SCO ASEGN ASEMB1 ASEMB1-HID ASEMB2 ASEMB3

Flro Hydrant text Appliances Elevators Elevators, hidden Elevators text Escalators/elevators outline Escalators/Elevators- outline, hldde" Ed~e Paver Escalators steps Escalator steps. hidden Escalators text Hand rails Hand railS· hidden Floor 10 (bubble) Level changes,ranlps OVerhead elements Paving patterns Stairs outline Stairs stairs text stairs -hidden Archftectural wood work Floor outline Fumiture Fumiture text Exterior glazing .

JUN-02-1998

12 Yellow Iyellow Cyan Magenta Magenta 10 10 10 Cyan 10 Cyan Cyan Yellow yellow

10 Magenta

Blue Cj'an cyan 12 Magenta yellow White 13 Yellow

Interior aJazlnQ

Mullions Street grating Interior elevation 10 (bubble) Landscape ca~ Landscape people Landscape plants landscape sport fields Landscaped walks and steps Walk and step patterns Architectural main title Architectural general notes Pari(ing lots Proposed roadc Proposed roads by others

12

10 Cyan Blue Blue Blue Blue 10 10 red cyan Blue magenta

Room names

Room 10 (bubble) Roof above StRlctuml beams structural colunlns Ground cut-lloe Material beyond section cut, thickness 1 Material beyond section cut. hidden Material beyond section cut. thickness 2 Material beyond section cut, thickness 3

Sverdrup Civil

cyan

cyan Cyan Cyan green 8 9 blue blue blue

yellow cyan

20t3

11:49

+617 742 8830

continuous continuous continuous Hidden continuous continuous Hidden continuous continuous Hidden continuous eontlnuou& Hidden continuous continuous Hidden continuous continuous continuous continuous Hidden continuous continuous contInuous continuous contInuous continuous continuous continuous continuous contInuous continuous continuous continuous continuous continuous continuous continuous continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous Hidden continuous continuous

ALAYERS.Xls, 612198

97%

P.05

JUN 02 '98 14:38 TO-12136241188

T-298 P.06/12 F-999

FROM-SVERDRUP CIVIL, INC.

Anil Venna Associates, Inc.

ASEMC1 ASEMC2 ASEMC3 ASGOS ASSW AST ASWBA ASY ASY-SO ASY-75 ASYTE ASYTE-75 ATEXT ATEXT-50 ATEXT-75 AWAFU AWAFUIN AWAHA AWAHAOU AWAID AWALW AWAMO AWFOS AWIN AWINID AWPID AWPT AWSID

Sverdrup

Material cut by :section, thickness 1 Material cut by section, thickness 2 Matenal cut by section. thickness 3 Structural grid 10 (bubble) Structural Shear wailS Architectural subtitles Shaft wall (above or below) IsYmbols Symbols, Scale 1:50 Symbols. Scale 1:75 Symbol text Symbols text. Scale 1:75 Architectural general text Architectural text, Scale 1:50 Architectural text, Scale 1:75 Full height walls Full height interior walls Wall hatch (poche) Wall hatch outline Wall type (10 bubble) Low walls Movable partitions Wall openings windows Windows 10 (bubble) Wall partition 10 (bubble) Wall partition Wall section 10 (bubble)

Civil

JUN-02-1998

green

8 9 green magenta green Magenta cyan cyan Cxan cyan Cyan Cyan Cyan Cyan 9

8 16 white cyan magenta 12 10 yellow

cyan Icyan Cyan

Cyan

30f3

11:49

+617 742 8830

continuous continuous continuous continuous continuous continuous Hidden continuous Hidden continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous contlnuous continuous continuous continuous

ALAYERS.Xls, 612198

9?y.

P.06

JUN 02 '98 14:39 TO-12136241188

F: PROJ\EXECEL\o13850\ MlayersJeIs

sverdrup Corp.

Sverdrup corp.

JUN-02-1998

11:50

T-298 P.07/12 F-999

FROH-SVERDRUP CIVIL, INC,

Page 1

+617 742 8830

812198

97Y.

P.07

F: PROJ\EXECEL\o138S0\ Mlayers.xls

Sverdrup Corp. MMAEQTE MMT MNT MSPEQ MSPEQTE MSPPI MSPPITE MST MSTRUC MSTTE MSY MSVTE MTE PACPI PACPITE PCSPE PCSPETE POI PDOEQ PDOPI-COLD POOPI-HOT POOPI·2-CONT POOPI-3-CONT POOPI-5-CONT PDOPITE POORI POORI-2-CONT POORI-3-CONT PFGPI PFGPITE ?FI PFITE PFSAFI PFSAFITE

4

CO~NUOUS

3 3

CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS COLD--WATER HOT-WATER CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS DASHED CONTINUOUS CONTINUOUS CONTINUOUS DASHED CONTINUOUS CONTINUOUS CONTINUOUS DASHEDX2 CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS

4

mechanical main title mechanical general notes speCial system eQuipment text for specIal system eQuJpmem special system piping text for special system pjPing mechanical sub-title mechanical strudural walls text for mechanical sub-title symbols (for HVAC) text for HVAC symbols text for diagrams, details acid alkaline, and oil waste piping text for acid, alkaline, and 011 waste piping chemical supply lines text for chemical supply lines IPlUmbing dimensions domestic hot and cold water dimensions domestic cold water piping domestic hot water oipina domestic hot and cold water piping, yellow domestic hot and cold water oioina areen domestic hot and cold water pipina. blue text for domestic hot and cold water oigina domestiC hot and COld water risers

8

domestic hot and cold water risers. yellow domestic hot and cold water risers.-green

4

e

4

4

4 4 3

1 4 1 4 4

4 1 1 2 3 5 4

1 .2

3 1 4 3

4 3 4 1

4 1 5 1 4

1 S 1 4 3

storm drain ri:sers, blue

vent piping

text for vent pipinn symbols Cfor olumbina) text for plumbing sYmbol+B31

.

text for callouts • diagrams. details

Sverdrup Corp.

JUN-02-1998

1

CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS

text for machIne shop eQuipment

fire. water. and gas piping text for fire, water, and gas piping Iplumbing fixtures text for plumbing fixtures sanltarv Plumbing fixtures text for sanitary plumbing fIXtures sanitary piping PSAPI text for sanitary piping PSAPITE PSARI sanitary risers PSARI-S-CONT sanitaN risers. blue storm drain piping PSTPI PSTPITE text for storm draIn ololno PSTRI storm drain risers PSTRI-6-CONT PSVPI PSVPITE PSY PSYTE PTE

T-298 P.08/12 F-999

FROM-SVERDRUP CIVIL. INC.

JUN 02 '98 14:39 TO-12136241188

3

Page 2

11:50

+617 742 8830

6J2J98

97Y.

P.08

JUN 02 '98 14:40 TO-12136241188

FROH-SVERDR

Site Power Power Wall-Mounted Power Circuit Electrical Sub-Title

E E E: E, EI EI EI E

SYmbols

E:

Svmbols Text Details and Diagrams

E: E'

Power Conduits Up Power Conduits Down Embedded Conduits Conduit Text

ELECLAY.xlS

JUN-02-1998

11:51

+617 742 8830

T-29&

FROH-SVERDRUP CIVIL, INC,

JUN 02 '98 14:40 TO-121362411&8

P.11/12

F-999

GENERAL SYMBOLS

N:\SYM BOLS\

BLOCK NAME

SYMBOL DESCRIPTION

SYMBOL

GEN22

BREAK LINE

0

GRAPHIC SCALE 1 '.5

.5

!

I

2m

I

1 :25

GEN23

GRAPHIC SCALE FOR 1:15

GEN24

GRAPHIC SCALE FOR 1: 10

GEN25

GRAPHIC SCALE FOR 1:20

GEN26

GRAPHIC SCALE FOR 1:4

GEN27

GRAPHIC SCALE FOR

1 :25

a

I

GRAPHIC SCALE 750 1000

500

,

250

:

;

i500mm

:

I , : 15

0

I

GRAPHIC SCALE 500

250 I

750

1000mm

!

I 1: 10

,

1.5

I

I

GRAPHIC SCALE

0

I

.S :

2m

, :20

GRAPHIC SCALE 125 250

o

I

I

1

375mm

I

, :4

JUN-02-1998

11:51

+617 742 8830

97Y.

P.11

T-298 P,12/12 F-999

FROM-SVERDRUP CIVIL, INC,

JUN 02 '98 14:40 TO-12136241188

GENERAL SYMBOLS

N:\SYMBOLS\

SYMBOL DESCRIPTION

SYMBOL

,

,5

0

BLOCK NAME

GRAPHIC SCALE

3m

2;

~-;-!

GRAPHIC SCALE FOR 1:30

GEN28

GRAPHIC SCALE FOR 1:40

GEN29

GRAPHIC SCALE FOR 1:5

GEN30

1:30

GRAPHIC SCALE

0

;

I

j

3m

2

1

i , :40

GRAPHIC SCALE

0

100

200

I

I

I

300 !

400

500mm

i

1:5

.-

~--

'JUN~132-1998

11: 51

+617 742 88313

96%

P.12

- - "-

-

-

-

--­

SEP 10 \991

AN\L VERMA

ASSOCIATES, lNC.

Architectural CAD Standards Quick Reference Guide

Supplement to KKZ/CMA CAD Management Plan

Sverdrup Civil, Inc.

Sverdrup Civil, Inc.

San Juan, Puerto Rico

September 09, 1997

013850 - Rio Piedras Project ARCHITECTURAL DRA WING & FILE NAMING­ QUICK REFERENCE

GENERAL RULES File name: ABBXXXC.DWG A=

Architectural

BB = "RP" for Rio Piedras Station "UP" for University of Puerto Rico Station No modifier is to be used when generating drawings relating to both Stations XXX =Numeric Designation 100 Series - General Plans 101-109 - Track Level Plans 111 - 119 - Platform Level Plans 121-129 - Mezzanine Level Plans ~31-139 - Upper Mezzanine Level Plans ~ -,1-41 149 Roof Level Plans - " .. 151-159 - Street Level Plans H" - Rbi ~.'~. 200 Series - General Sections and Elevations 2.11- '2..\.<j 200 -219 - Transverse Sections ~ ~ '2.00· '1-0"1 220 - 229 - Longitudinal Sections 1~ \0 - 2.(,

p, tPT -

1'"

300 Series and Up - Details, referenced from general plans, sections, and elevations, or for tables, charts, and schedules that contain information directly related to the general plans, sections, and elevations.

C=

Alphabetic modifier only to be used when inserting sheets between two consecutive existing sheets .

•DWG= AutoCAD drawing file extension.

GENERAL PLANS All plans shall be drawn in real world coordinates at full scale. This means that the final drawing sheets shall be cut from a full-scale plan file. The name of the plan drawings that get x-referenced to the drawing sheets shall start with "X" and the name of the individual drawing sheets shall start with "A". The last character of the name of the real world plan file should be a zero.

h:\public\sverdrup\cad_ wp\ARCHQ R.DOC

ELECTRICAL & MECHANICAL DRA WING & FILE NAMING

QUICK REFERENCE

For example, for a Structural track level plan for the University of Puerto Rico Station, the full-scale plan name would be XAUPIOO.DWG. If 125-scale plan sheets were to be cut from this drawing, there would be a total of four sheets for this station, one for each site. The last character of the name of the drawing sheets should correspond to the site number of the cut area the drawing sheet shows. The name of the drawing sheets would be AUPI 01.DWG, AUPI02.DWG, AUPI03.DWG, and AUP1 04.DWG.

GENERAL TRANSVERSE SECTIONS General transverse sections shall be drawn at full scale. The drawing files shall exist in model space in the full scale drawing file. The file names shall start with "A" and the last character shall start with "I" beginning with the southernmost sections and increase towards the north.

GENERAL LONGITUDINAL SECTIONS General longitudinal sections should be drawn at full scale. Using a full-scale section, drawing sheet should be generated. The name of the full-scale drawings that get x-referenced to the drawing sheets shall start with "X" and the name of the individual drawing sheets shall start with "A". The last character of the name of the real world plan file should be a zero. The last character of the drawing sheets should be sequentially numbered starting at "I" at the southernmost area of the station.

DRAWING NUMBERS Drawing numbers shall correspond to the drawing file names with a dash inserted after the first alphabetic character "A". For example, drawing "A-UP 101 "would be the plot of AutoCAD file AUPI 0 l.DWG.

GRAPmc SYMBOLS (WBLOCKS) Standard graphics symbols have been developed for Tren Urbano drawings and are sho\Vll in Appendix B of the KKZlCMA CAD Management Plan. Electronic blocks for these symbols are filed by discipline as follows: Block name: W AXXAAAA. DWG W=

WBLOCK

2

ELECTRICAL & MECHANICAL DRA WING & FILE NAMING

QUICK REFERENCE A=

Discipline (Architectural)

xx =

Station "RP" for Rio Piedras Station "UP" for University of Puerto Rico Station

AAAA= Descriptive abbreviation WBLOCKS shall be stored in N:ARCIDSYMBOLS.

REF: KKZlCMA CAD Management Plan

3

-.--.-----=---

Sverdrup Civil, Inc. MEMORANDUM TO:

Rio Piedras CAD Staff

FROM:

D.J. Burroughs/ I. Sankar

SUBJECT:

013850 - Rio Piedras Project - Creation of TUSEED.DWG

San Juan, P.R. August 19, 1997

In order to facilitate drawing creation and production, a file called TUSEED.DWG has been created. It is located in N:GENERAL\. When creating new fIles on the Tren Urbano Rio Piedras Project, this me should either be copied to the new fIle name or should be set as the prototype drawing when creating new files using the File- > New command in the AutoCAD menu. Several settings of TUSEED.DWG have been made project specific. Below is a list of features that have been customized in this file: 1. BORDERII.DWG has been attached in Paper space. It has been inserted at point 0,0,0 and at scale 1. 2. KKZ-INF.DWG has been inserted at point 0,0,0 in Paper space. The correct Contract Number has been edited into the border. The remaining infonnation is drawing specific and should be edited as needed. A sample border is included with the CAD Quick Reference guides. 3. Associative dimensioning has been set-up with the project standard settings for various scales. To select a dimension setting, choose Settings- > Dimension Style from the AutoCAD menu. 4. VISRET AIN has been set to < 1 > so that changes to reference me layering displays stays saved when exiting and re-entering a drawing. 5. The text styles have been created named for the LEROY type (ie: L100,L120 ... ) with font ROMANS. See Section 10, Page 10-8 of the KKZ/CMA CADD Management Plan. When placing text, set the proper text height and set the corresponding text style as active.

h:\public\sverdrup\cad_ wp\TUSEED.DOC

09/09/97

Sverdrup Civil, Inc.

San Juan, P.R.

MEMORANDUM TO:

Rio Piedras CAD Staff

FROM:

D. J. Burroughs/J. Sankar

SUBJECT:

013580 - Rio Piedras Project

July 29, 1997

To create a border (paper) space for AutoCAD flies on the Rio Piedras project, follow the outline below: 1. Open CAD file 2. Set new layer BORD and make it current 3. Set drawing to paper space (tilemode = 0) 4. Xrefborder file N:\GENERAL\BORDERll.DWG 5. Set new layer MV(#) for mview you want to create. The # for the mview depends on what mview you are creating as you can have multiple mviews on one border sheet. 6. Thaw layer on BORDERII ICUT. This will display a block delineating maximum drawing area on the border. 7. Define window for mview by keying-in mview. Define limits as lower left-hand and upper right -hand corners of Cut sheet view delineating maximum drawing area. 8. Set current layer as BORD 9. Set drawing to paper space 10. Insert project title block infonnation by keying-in insert. For flie name, key-in n:\KKZ-INF. Insert at point 0,0,0 and answer prompts to follow.

h:\puhlic\sverdrup\cad_wp\brdset.doc

08/18/97

KKZ / CAlA Design Team

AUTOCAD ORAWING LOG

Package

Drawing Type:

Title:

Number: Scale: Prepared by: Drawn by: Company:

File name and path:

XREF

XREF

File names and paths

Descriptions

ACADDLOG.DOC

Levels: ON/OFF

08118/97

Sverdrup Civil, Inc.

San Juan, P.R.

MEMORANDUM

August 14, 1997

TO:

Rio Piedras CAD Staff

FROM:

D. J. Burroughs

SUBJECT:

013850 - Rio Piedras General Plan View Rotation.

It is important for all CAD users to be aware of the importance of maintaining the geographic location of Station Structures coincident to the ASC5 Project Site Aligrunent. In order to do this, use the DVlEW and TWIST commands to rotate ues World coordinate view and orient the Station structures properly. Note: this will not change the world coordinates, which would happen if graphics were rotated to achieve the same view results. Use the following twists

Rio Piedras Station: The view rotation Le.: "DVIEW" twist is 284.3131

University Puerto Rico Station:

'284·1>051.9 91\ (-

'15 . ',\412.2)

The view rotation Le.: "DVIEW" twist is 275.75

H:\PUBLIC\SVERDRUP\CAD WP\ VIEWROT A.DOC

08/18/97

Sverdrup Civil, Inc.

San Juan, P.R.

August 18, 1997

MEMORANDUM TO:

Rio Piedras CAD Staff

FROM:

J. Sankar

SUBJECT:

013580 - Rio Piedras Project - Linetype Scales

In order for line styles to display correctly in AutoCAD. the ltscale must be set and varies with different scales. Below is a chart showing what the ltscale factor is for various scales. To set the ltscale, key-in ltscale and use the corresponding factor to the desired scale as shown below.

Unetype Scale Quick Reference SCALE

LTSCALE

1 10 15 20 25 30 33.33 40 50 60 70 75 80 96 100 150 200 250 300 333.33 400 500 1000 2000 5000

0.01 0.1 0.15 0.2 0.25 0.3 0.3333 0.4

h:\public\sverdrup\cad_ wp\ltscale.doc

0.5

0.6 0.7 0.75 0.8 0.96 1 1.5 2 2.5

3 3.3333 4 5 10

20 50

08/18/97

Sverdrup Civil, Inc.

San Juan, P.R.

August 16, 1997

MEMORANDUM

TO:

Rio Piedras CAD Staff

FROM:

D.J. Burroughs, J. Sankar

SUBJECT:

013850 - Rio Piedras Project - ZoomXP Reference Chart

Below is a chart to be used as a reference when showing plans and details from model space at a desired scale through a viewport paper space. Pick the ZoomXP ratio corresponding to the scale you want to show the detail or plan on the fmal drawing and key-in the value after creating the mview through which the detail is shown by using the zoom command. NOTE: All objects must be drawn at full-scale in model space. ZOOM XP Quick reference chart ZoomXP

Plot Factor 1 to 1.0 1 to 10.0 1 to 15.0 1 to 20.0 1 to 25.0 1 to 30.0 1 to 33.333 1 to 40.0 1 to 50.0 1 to 60.0 1 to 70.0 1 to 75.0 1 to 80.0 1 to 100.0 1 to 125.0 1 to 150.0 1 to 200.0 1 to 300.0 1 to 333.333 1 to 400.0 1 to 500.0 1 to 1000.0 1 to 2000.0 1 to 5000.0

h:\public\sverdrup\cad_wp\zoornxp.doc

3.937 2.624666667 1.9685 1.5748 1.312333333 1.1811 0.98425 0.7874 0.656166667 0.562428571 0.524933333 0.492125 0.3937 0.31496 0.262466667 0.19685 0.131233333 0.11811 0.098425 0.07874 0.03937 0.019685 0.007874



08/18/97

CADD Standards Appendices

KKZ I CMA Design Team

May 1997 ARCHITECTURAL LAYERS

LAYER AARE AAXID ACLGR ACLOP ACLOT ACLPA ACLSU ACMC ACROC ADI ADO ADOHE ADOID AELCA AELFI AELFN AELMB1 AELMB2 AELMB3 AELOT AELPA AELSI AELSS AELST AFLAP ~AFLEL t.AFLEO AFLEO AFLES AFLHR AFLID AFLLE AFLOV AFLPA AFLSO AFLST AFLWD AFU

CONTAINS

COLOR.

LlNETYPE

area calculations 10 architectural axis 10 (bubble) cyan ceiling grid yellow ceiling opening 12 centerline of track 13 ceiling grid pattern cyan ceiling, suspended elements green ceiling-mounted casework 12 curbs blue dimensions cyan doors cyan doors head res blue door 10 (bubble) cyan wall-mounted casework 13 miscellaneous fixtures magenta finishes, woodwork and trim 13 material beyond, thickness 1 13 material beyond, thickness 2 green material beyond, thickness 3 15 building outline 9 textures and hatch patterns 10 signage 10 (bubble) cyan signage schedule or table white signage text cyan appliances 12 elevators l" '~ ~ 0.:'" ~ 'f. f yellow elevators outline €,L, .;J( ','" 1(.''''''-:' ~~: magenta escalators outline 0'>:<~t . d ' v' • r"',,:~1"< cyan escalators steps A f ~ .. ? ...... )<. r 10 10 hand rails cyan floor 10 (bubble) yellow level changes, ramps yellow overhead elements 10 paving patterns magenta stairs outline blue stairs Ar ~ r, \ . \ i f ~; c,,-~-.... ;.:..." ';" 12 architectural wood work yellow furniture

continuous continuous continuous phantom continuous continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous hidden continuous continuous hidden continuous continuous

"'A'S\..., N t1E~ A-7

1-,.( '" .,!:

p,le,;;?

CADD Standards Appendices

KKZ /..eMA Desig..n Team May 1997

LAYER AFUTE . AGLEX AGLIN AGLMU AIEIO ALCA ALPE ALPL ALSF ALWA ALWP AMT ANT APKNG APRD APRDO ARNIO AROOT ASCO ASEGN ASEMB1 ASEMB2 ASEMB3 ASEMC1 ASEMC2 ASEMC3 ASGOB ASSW AST ASY ASYTE AWAFU AWAFUIN AWAHA AWAHAOU AWAIO AWALW AWAMO AWIN AWINID AWPIO

CONTAINS

COLOR.

LlNETYPE

furniture text white continuous exterior glazing 13 continuous interior glazing yellow continuous mullions 12 continuous interior elevation 10 (bubble) continuous . cyan landscape cars blue continuous landscape people blue continuous landscape plants blue continuous landscape sports fields blue continuous landscaped walks and steps 10 continuous walk and step patterns 10 continuous architectural main title red continuous architectural general notes cyan continuous parking lots blue Ap ~ c - "' i continuous magenta K'J OcL;. {:;< t ~ proposed roads continuous proposed roads by others cyan dashed room 10 (bubble) ~~ Tl.l)lc MT1-f cyan continuous roof outline above green continuous structural columns gray continuous ground cut-line continuous blue material beyond section cut, thickness 1 13 continuous material beyond section cut, thickness 2 green continuous material beyond section cut, thickness 3 gray continuous material cut by section, thickness 1 continuous 13 material cut by section, thickness 2 green continuous material cut by section, thickness 3 gray continuous structural grid 10 (bubble) green continuous structural shear walls magenta continuous continuous architectural sub-titles green . continuous symbols cyan symbol text continuous cyan gray continuous full height walls gray continuous full height interior walls continuous wall hatch (poche) 16 continuous white wall hatch outline continuous cyan wall type 10 (bubble) magenta continuous low walls 12 hidden movable partitions yellow continuous windows cyan continuous windows 10 (bubble) cyan continuous wall partition 10 (bubble) -j.

A-8

CADD Standards Appendices

KKZ I CMA Design Team May 1997

COLOR. LlNETYPE

LAYER

CONTAINS

AWPT AWSIO

wall partition wall section 10 (bubble)

A-9

cyan cyan

continuous continuous

Sverdrup Civil, Inc.

San Juan. Puerto Rico August 18, 1997

LETTERING REQUIREMENTS For full-size (22 in. X 34 in. Or 559 mm x 864 mm format)

PEN No.

GENERAL TEXT (EXISTING)

2

PEN SIZE (mm) 0.18

GENERAL TEXT (PROPOSING)

4

0.25

#100

0.00254

7

0.35

#175

0.004445

ROMANS

1

0.70

#240

0.006096

ROMANS

TYPE OR USE

-

SUBTITLE

./

TITLE

LEROY STYLE #100

TEXT HEIGHT (M) 0.00254

AUTOCAD SYSTEM FONT ROMANS ROMANS

The following is automatically filled in by keying-in ·OOAne" and serecting inserted block "KKZ-INF.OWG·. DRAWING TITLE BLOCK LINE 1(and line 2 if required)

7

0.35

#175

0.0044

ROMANS

SUBLINES 3

4

#200

0.00508

ROMANS

SUBLINES 4 AND 5

4

O.SO O.SO

#200

0.00508

ROMANS

DRAWING SCALE

4

0.25

#175

0.0044

ROMANS

CONTRACT NO.

4

O.SO

#175

0.0044

ROMANS

DRAWING DATE

4

0.25

#100

0.00254

ROMANS

DRAWING NUMBER

4

0.0044

ROMANS

4

O.SO O.SO

#175

CONTRACT SHEer NO.

#175

0.0044

ROMANS

TEXT SCALE CONVERSION FACTORS

1:1

100 0.002540

120 0.003048

175 0.004445

200 0.005080

240 0.006096

290 0.007366

0.025

MODEL SPACE PLOT FACTOR 39.37=1

1:10

0.0254

0.Q305

0.0445

0.0508

0.0610

0.0737

0.254

39.37=10

1:15

0.0381

0.0459

0.0669

0.0762

0.0915

0.1107

0.381

39.37-15

1:20

0.0508

0.0610

0.0889

0.1016

0.1219

0.1473

0.508

39.37=20

1:25

0.0635

0.0752

0.1111

0.1270

0.1524

0.1841

0.635

39.37=25

1:30

0.0762

0.0918

0.1338

0.1524

0.1830

0.2214

0.762

39.37=30

-

-

39.37=33.33

LEROY RULES

INSERT FACTOR

SCALE

1:33 113

-

-

-

-

-

1:40

0.1016

0.1220

0.1778

0.2032

0.2438

0.2946

1.016

39.37=40

1:50

0.1270

0.1524

0.2222

0.2540

0.3048

0.3682

1.2700

39.37=50

1:60

0.1524

0.1830

0.2667

0.3048

0.3657

0.4419

1.524

39.37=60

1:70

0.1778

0.2135

0.3115

0.3556

0.4270

0.5159

1.778

39.37=70

1:75

0.1905

0.2286

0.3333

0.3810

0.4572

0.5523

1.9050

39.37=75

1:80

0.2032

0.2440

0.3556

0.4064

0.4876

0.5892

2.032

39.37=80

1:100

0.2540

0.3048

0.4445

0.5080

0.6096

0.7366

2.540

39.37=100

1:125

0.3175

0.3810

0.5555

0.6350

0.7620

0.9205

3.175

39.37=125

1:150

0.3810

0.4572

0.6666

0.7620

0.9144

1.1046

3.8100

39.37=150

1:200

0.5080

0.5096

0.8890

1.0160

1.2192

1.4732

5.080

39.37=200

1:250

0.6350

0.7620

1.1110

1.2700

1.5240

1.8410

6.350

39.37=250

1:300

0.7620

0.9144

1.3335

1.5240

1.8288

2.2098

7.620

39.37=300

1:333.33

0.0847

1.8470

2.2470

2.7470

8.466

39.37=333.3

1.0160

1.0470 1.2192

1.5970

1:400

1.7780

2.0320

2.4384

2.9464

10.160

39.37=400

1:500

1.2700

1.5240

2.2225

2.5400

3.0480

3.6830

12.700

39.37=500

1:1000

2.5400

3.0480

4.4450

5.0800

6.0960

7.3660

25.400

39.37=1000

14.7320

50.800

39.37=2000

36.8300

127.000

39.37=5000

1:2000

5.0800

6.0960

8,8900

10.1600

12.1920

1:5000

12.7000

15.2400

22.2250

25.4000

30.4800

H:\PUBLlc\sYERDRUP\CAD_WP\TEXTrBL.OOC

Sverdrup Civil, Inc. MEMORANDUM TO:

Rio Piedras CAD Staff

FROM:

1. Sankarl D. J. Burroughs

SUBJECT:

013580 - Rio Piedras Project - AutoCAD Lineweights

San Juan, P.R. July 30, 1997

The attached sheets provide a guideline for lineweights when plotting from AutoCAD. One sheet shows lineweights for full-size plots and the other for half-size plots. For this project, AutoCAD is configured to plot line weights based on color only.

h: \public\sverdrup \cad_ wp\linewts. doc

07/30/97

c_-'

fULL .0,,-6 '"

RED

.001.11\

YELLO'W

.

GREEN

• D,&.\ '"

zI; 10 af4 In

,(}(f!) It'

,o~

.n

.0\ ,~

CYAN

Jol

'n

'005 In

BLUE

,{)Ol

1(\

MAGENTA

,014

,01

If'

,0\

In

lOA,,,,

'WHITE

GRAY

In

,OA If\ 6 (1.,...-1 01"~oE

DARK RED DARK YELLO'W

DARK GREEN DARK CYAN

DARK BLUE DARK MAGENTA

DARK GRAY DARK BRO'WN

~\ ~'~F • Oltl \n

,oo~5

. 00/ 1( \

/'.

'DO?

,n

IOD'-5~~ ----'-=" ""

.OO~ln

.l)~ In

.D lin

.

, dIS '"

DARK RED

,0025 11\

DARK YELLO'W

,01

1(\

DARK GREEN

CYAN

.oD5

It,

BLUE

.DO"!6,,,

RED

'1'\

S \!-b

. YELLO'W

GREEN

MAGENTA 'WHITE

GRAY

,001 ."

,0 I .n

6fl.~'" '51.\1\Oe:

-~ --~--.-----

DARK CYAN DARK BLUE DARK MAGENTA

DARK GRAY DARI< BROW'N

KKZ / CMA Design Team May 1997

CADD Standards

Section 10 - Drawing Graphics

DIRECTION OF LETTERING. 10-3

;.:.-: 77·?~~:;~?=·~··:-r-:.,·:··:,:· .:.7~~-:-. ~:. ". ( ..

..

-

.....

-

.

·..· f ..·:··

.". . .7..;. ~

~~:.~~:~~t~~;~~~-7_:,

_ _ _ _ _1..

~

... .:. - ...

.--­

'

"

.

DIRECTION O-F"'~::L-E~TTE'RY~~TG~~~~~-'~:-~~~~1: ' -,--,':'

10-10

J\.A.L.,

CADD Standards Section 10· Drawing Graphics

I CMA lJeslgn "leam

May 1997

DIMENSION LINE SPACING - FIGURE 10-4

Dimension Line

Q)

C

QJ

>

0 .0 0

QJ

>

Q)

0 .0 C 0

CD

c

~

(Il

(Il

QJ

C

C .0

0 0

QJ

QJ

.~

.~

0

0

-~~~.:~:.:.•.:'.~......~~~'~~ . ~:::·SX~~.~~~~:~:-·:-

- 0-=..­

c 0

> o CD .oc

"0 C 0

c o

~.

. .

":::.".::t . ~~;.,.~:~~-:"

0:· ._

:'~~:"::~:;>~;};~:f

'0; 1) .

c.o

-L~~

QJ

__~____~__~~__~__-J~_~_

E"O

.- C

00

OJ

,, ,

.." .... .. . .-... "

.

.

:

~~~:': /,:~~--.:

.

-

.

-

.. -. .. .:.

DIMENSION ';'LINE

10-11

SP·A·CI·NGi;;t~2~!i};;:··~:. ",.....":..•.-:..-.a.- ..• ' •• ~ .•._--_'.

CADD Standards

Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997

DIMENSIONING PRACTlCE - FIGURE 10-5

-- -;- .'--:--- ­ - '..

.

.

.

.

.

.

'

''': :',1- "~

100

....

. ..." . -

130

"CORREcr' .'

.'

..,~.,.~-~.~~~:~:}7f:-'~:.. INCOR.REC.I

t~~.~~~~~~~~~~~~&~~~~:~

<. '.: "::' ·· . CO~~ECT-=::~_~;~..._.,.,._-:: 10-12

KKZ I CMA Design Team

CADD Standards

Section 10 - Drawing Graphics

May 1997

HATCH PATTERNS -FIGURE 10-6

HATCH PATTERNS MATERIAL

HATCH PATTERN

t> '.~ •• '.

: " . f1'."

"'-- I>

.-..: '•• ,'\>. .q

.'

~~.'

"

......

..

Crout

Dots

Earth

Earth

(Rotation

'

..

~~,!9Ie, .. ,,: -

'45')

..

'0

Eorth

"Rock

.'

~-

._

;.,

(Rotation ·.'A.ngie - .0') (.,

:.::: .......

.

.. :..:'.

- '::'_:.:'::~-:-'..~~::~.':"'~:~~ .• :~'-::. ..:":"":~. ~.'. '.:. -

General Hotch : _:-0.;;.0:. . . ........ "

.

-.:.

'

Steel :

~ '<""". ..

....

.

~".

. .........

':··c··· '.- cnsi.3S· ·k:m..'"}CL~J'·"';-.~""

Aluminu m' '. :

~...~::. :t:C:;':'f:j~~~~;:~;C;~~J: t;~J~~~~i~~~j~f.i -'

"

,.' '';. ':-:': ····Ruboer-· Plastic';'" :':-,;'":""';~--onsi34' ~:"·;~~«i::>..~~:"'*:i~~

:..:/·:~:J:~~4,~:. .',. :.' ,--::./r;"

Co.',

10-13

:,,:~~~ ···~'·~~fl.;,;.:~~·:,,~~·::7:~~\S~~~~~:;r~:~~ :;

GENERAL SYMBOLS N:\Te;.IP' \ Cgr IDV.b\SYMBOLS\ 8EtIER,AcL SYMBOL

. , .= ELEVATION

SYMSJL DESCRIPTION

BLOCK NAME

NORir-! ARROW

GENOS

VERTICAL DISTANCE MARK

GENO!

REVlS:CN INFORMATION (FOR TiTLE BLOCK)

GENOa

REVISION IDENTIFICATION (FOR REVISION BUaelE)

GEN09

IHS. POlleT

o

2

2!-OCT-95

REMARKS

CHANGE NOTICE/CHANGE ORDER OR .. "BY USER'"

AFTER-THE-FACT "REVISION INFORMATION"

(FOR REVISION BUB9lE).

~ 2

02-SE"-96

REMARKS

r6~i (8)

---Tn--­ MATCH LINE

.

MATCH LINE

1ll'b (\)

BEGIN OF ~

PLATFORMR

IN$. POINT

J

;

CHANGE NOTICE/CHANGE ORDER OR • AFTER-THE-FACT .. REVISION INFORMATION"

(FOR TITLE BLOCK).

"BY USER"

MATCH LINE (UNE SHAll BE PHANTOM IN .70mm PEN THICK; TEXT SAALC Be.

~EROY 175 IN .SOmm PEN THICK AS

EXT HEIGHT).

"BY USER'"

BEGIN OF PLATFORM (USER MUST DRAW THE CENTER UNE IN .35mm PEN THICK).

GEN10

END OF PLATFORM (USER MUST DRAW THE CENTER LINE IN .35mm PEN THICK).

GEN 1 1

GENERAL SYMBOLS ~: s'(~eOLS

SYtJ.80L

R

J

.x·.,cX)(4'oo)( IllS. POINT

SYMBOL DESCRIPTION

BLOCK NAME

SECTION IDENTIFICATION aUBBLE

GENO'

ELEVATION IDENTIFICATION BUBBLE

GEND2

~:~nJtt t.lo. O\...l ~lc:M DETAIL l~:r.t:Ie:tlnFl£D

.A.~DF..OovJ(~~ NO. o~ WI..HCa.t ~

"'\L~

. ,

-t::(3)

OETAlL.. APPEA~S

SECTION AND/OR ElEVAnON ARROW

GEN03

SECTION CUT DIRECTION INDICATOR (EXTENDED UNE SHALL BE CONTINUOUS IN .35mm PEN THICK),

GEN04

DETAil IDENTIFICATION BUBBl::

GENOS

I

.....

IllS. POINT

'"

\

\

\

\

..... )..--, I . ,

I

I \

\

,

; .....

I

CIRCLE AND OR ELLIPSE ENCLOSING

THE DETAILED DRAWING (HIDDEN LINE

SHAll BE ,35mm PEN THICK).

. . . - - ' - Ga.EE~ l:;)

App. B-2

App,rulkes

May 1997

GENERAL SYMBOLS N:SYMBOLS\ SYMBOL

SYMBOL DESCRIFTION

GRAFHIC SCALE 2

o

3m

:

GRAPHIC SCALE FOR t :50

VEP..~~O_R_._ _ -

GRAPHIC SCALE 1 2 .3

o

I . :

BLOCK NAME

4

GENtZ

INSERT POINT (UP) SCALE FACTOR 39.37 FOR 22x34 UNIT PLOT SHEET Sm

GRAPHIC SCALE FOR 1: 100

GEN13

GRAPHIC SCALE FOR 1:200

CEN14

GRAPHIC SCALE FOR t :250

GENIS

GRAPHIC SCALE FOR 1:500

GENI6

GRAPHIC SCALE FOR 1:1000

GEN17

GRAPHIC SCALE FOR 1: 125

GEN20

GRAPHIC SCALE FOR 1:75

GEN21

VER./HOR.

GRAPHIC SCALE 2 1 0 1 2 :3 4 5 6 7 8 9 1Om

~~ VER./HOR.

GRAPHIC SCALE

4



0

2

4

6

810m

~JIi"J VER./HOR.

10

GRAPHIC SCALE 0 5 10

::

15

20m

•L£~~TI ad.lira •LI a 11iiiiI1I1i1iHlh I ILl!! !I_I! '_!II! VER./HOR.

20

GRAPHIC SCALE 0 10 20

10

30

40m

fI1t&~ VER./HOR.

VER.jHOR. GPAF HIC SCALE ()

1

2

.3

_ _~~~_~~~

4m

'1EP./HQR.

App.8-4

GENERAL SYMBOLS l'f. 0'iMtJOlS" S~'/.80L

S:A"::= 1:200

SYMBOL

OESCRIPTIO~

BLOCK NAME

CLOUD BuBBLE FOR REVIS!ONS

.. BY PROGRAM"

TITLE SYMBOL (EXTENDED LINE SHALL BE CONTINUOUS IN .SOmm PEN THICK. TEXT SHALL BE .70mm PEN THICK &: LEROY 240 AS A TEXT HEIGHT). SCALE I EX I SHALL BE LEROY 100 I~ .2Smm PEN THICK. BOTH III LE AND tALE TEXT SHALL BE LEFT JUSTIFIED.

GEN1 18

App.6-5

Sverdrup Civil, Inc.

San Juan, Puerto Rico

MEMORANDUM

TO:

Anil Verma (AVA-LA)

FROM:

Kurt Larson (SvC - San Juan)

SUBJECT:

Rio Piedras Contract

January 23, 1998

tv

1)4

CADD MAl~AGEMENT PLA.N

lfJ rn ®rn O\\H~ W JAN 26 1995

ANIL Vt.RMA

ASSOCIATES, INC

We have received some initial verbal comments from the QA Audit of your firm. One commen.t was, there are no CADD Manuals being kept current in your office. To date the only official addendum to the CADD Manual was in August 1997. Enclosed are two copies of a current CADD Manual. Please compare these to the copies previously sent to you. The yellow pages are from the Addendum, white are unchanged from the original. Please ensure that all your designers and CADD operators are aware of the manual. Please contact me ifyou have any questions.

CC:

W/O 1. Anthony (SvC-Q/A)

File

CADDMANAGEMENTPLAN

MAY 1997

Prepared by the KKZ / CMA~Team for the

RIO PIEDRAS CONTRACT

TRENURBANO

Contract Number AC - 500083

Illirn@mOW~~i JAN 2 6

lqC\~

ANIL "c.t<M", ASSOCIATES, U~L

CADD Standards

Table of Contents

KKZ I CMA Design Team May 1997 CADD DESIGN MANUAL TABLE OF CONTENTS

TABLE OF CONTENTS .......................................................................................................-.................... i

REVISION PAGE .................................................................................................................................... ii

INTRODUCTION ................................................................................................................................. 1-1

2

CADD ENVIRONMENT, CADD CONTACT ........................................................................................ 2-1

2.1 Project Designer's CADD Environment... ............................................................................... 2-1

2.2 Project Designer's CADD Contact Personnel ........................................................................ 2-2

3

RESPONSIBILITIES ........................................................................................................................... 3-1

3.1 Project Design Manager ......................................................................................................... 3-1

3.2 CADD Leader ......................................................................................................................... 3-2

3.3 CADD User.............................................................................................................................. 3-3

3.4 Technical Support Manager ................................................................................................... 3-4

3.5 Office CADD Coordinator ....................................................................................................... 3-5

4 PROJECT SET UP ................................................................................................................................. 4-1

4.1 CADD Directories ................................................................................................................... 4-1

5

FILE SET UP ....................................................................................................................................... 5-1

5.1 General Conditions ................................................................................................................. 5-1

5.2 Drawing Numbers and File Names ........................................................................................ 5-1

5.3 External References ............................................................................................................... 5-5

5.4 Drawing Logs and Lists .......................................................................................................... 5-6

6

LAYERING .......................................................................................................................................... 6-1

6.1 Layering Conventions ............................................................................................................. 6-1

6.2 Layer Lists .............................................................................................................................. 6-1

7

PLOTTING ........................................................................................................................................... 7-1

7.1 Plotted Drawings .................................................................................................................... 7-1

7.2 Pen Assignments ................................................................................................................... 7-1

7.3 Plotting Conventions .............................................................................................................. 7-2

7.4 Drawings Sizes ....................................................................................................................... 7-3

8

DELIVERABLES ................................................................................................................................. 8-1

8.1 General Submittal Requirement ............................................................................................. 8-1

8.2 Design Submittals .................................................................................................................. 8-1

9

DRAWING BORDER AND TITLE BLOCK .......................................................................................... 9-1

9.1 Authority and Contractor Identification Block ......................................................................... 9-1

9.2 Submittal Identification ........................................................................................................... 9-1

9.3 Submittal Information ............................................................................................................. 9-1

9.4 Designer Seal ......................................................................................................................... 9-4

9.5 Submitted By .......................................................................................................................... 9-4

9.6 Sheet Number ........................................................................................................................ 9-5

9.7 Revisions ................................................................................................................................ 9-4

10 DRAWING GRAPHICS ..................................................................................................................... 10-1

10.1 General .......................................................................................................................... 10-1

1

10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 10.10 10.11 10.12

Standard Graphic Symbols and Elements ..................................................................... 10-1

Abbreviations and Symbols ........................................................................................... 10-1 Line Work ............................................... ········ .. ·· .. · .... ··· .. ·· .. ············ .... · .................... ·.. ··.· 10-2

Screening of Existing Conditions ................................................................................... 10-2

Match Lines ................................................................................. :................................. 10-2

North Arrow ............................................................. · .... ··.·· ............................................. 10-3

Scale .............................................................................................................................. 10-3

Lettering ......................................................................................................................... 10-4

Dimensions .................................. ...................................................................... : ........... 10-4

Notes ............................................................................................................................. 10'-7

Hatching ......................................................................................................................... 10-7

11 DRAWINGFORMAT AND CONTENT.............................................................................................. 11-1

11.1 General .......................................................................................................................... 11-1

Plans .............................................................................................................................. 11-1

11.2 11.3 Section ........................................................................................................................... 11-2

11.4 Elevations ...................................................................................................................... 11-2

11.5 Details ............................................................................................................................ 11-3

11.6 Notes ............................................................................................................................. 11-3

11.7 Dimensions ....................... ............................................................................................. 11-3

11.8 Scale .......................................................................................................................~ ...... 11-4

12 DRAWING PROCEDURES............................................................................................................... 12-1

12.1 . 8acking Up and Archiving .............................................................................................. 12-1

12.2 Transferring Files ........................................................................................................... 12-4

12.3 Issuing Drawings ........................................................................................................... 12-6

12.4 Revisions ....................................................................................................................... 12-6

12.5 Accounting ..................................................................................................................... 12-9

12.6 Quality ............................................................................................................................ 12-9

APPENDIX A - LAYER LISTS ................................................................................................................... A-1

General ......................................................................................................................................... A-2

Civil Layers ...................................................................................................................................A-3

Utility Layers .................................................................................................................................A-4

Architectural Layers ......................................................................................................................A-5

Structural Layers .... ........................................................................................................................ A-8

Mechanical Layers ........................................................................................................................ A-9

Electrical Layers ..........................................................................................................................A-11

APPENDIX 8 - STANDARD GRAPHIC SYM80LS................................................................................... 8-1

General Purpose Symbols .. .......................................................................................................... 8-2

Right-Of-Way Symbol ........ ........................................................................................................... 8-6

Utility Symbols .............................................................................................................................. 8-7

.Civil Symbols ............................................................................................................................... 8-10

Landscape Symbols ................................................................................................................... 8-14

Architectural Symbols .. :.............................................................................................................. 8-27

Structural Symbols ...................................................................................................................... 8-33

Geotechnical Symbols ................................................................................................................ 8-35

Mechanical Symbols ............................. :..................................................................................... 8-38

Electrical Symbols ...................................................................................................................... 8-43

Trackwork Symbols .................................................................................................................... 8-46

Traffic Symbols .. ......................................................................................................................... 8-48

END OF TABLE OF CONTENTS

1

CADD MANAGEMENT PLAN

ADDENDUM 1

15 August 1997

Remove Page No.

Insert Page No.

--5-7­ -.6,1

~

»--6 /

A~-4



Description of Change Additional Key Contact information Additional CADD Contact Personnel information Remove the Tunnels alphabetic modifier and add Mined Tunnels and Circular Earth Tunnel alphabetic modifiers File Transfer Form updated Bullet number 3 should read BLOCLKed Edits to Plotting Conventions Line 3 now reads, "20" blocks Drawing Border and Title Block modified Additions to General Symbols

REVISION PAGE

Draft ·Release .................................................................................... May 1, 1997

May 23, 1997

Initial Release

ii

KKZ I CMA Design Team

1

CADD Standards

NTRODUC11ON To insure consistency in the computer generated drawings that will be produced by the various design Design Team Members on the KKZ I CMA Design Team, this manual prescribes computer aided design and drafting (CADD) criteria for the production of contract Drawings by the KKZ I CMA Design Team. The Contract Drawings as defined by Section 1.1 of the Special Provision, are the drawings developed by the team that illustrate and graphically detail the work for the Rio Piedras Contract ASC 5. This Manual represents the minimum information required to utilize the computing facilities of the KKZ I CMA Project Office. All Design Team Members shall follow this manual in their respective CADD work. This is to be considered a "living" document, additional information will be made available as it is developed or requested, to maintain a consistent and concise guide to production in this environment

Key Contacts:

Revision 1 August1997

Kiewit CMA Sverdrup Civil Jacobs Woodward Clyde

Mick Muller Ricardo Herrera D.J. Burroughs Richard Coffin Eric Eisold

Page 1-1

CADD Standards Section 2 - CADD Environment, CADD Contact

KKZ / CMA Design Team May 1997

2.

CADD ENVIRONMENT, CADD CONTACT 2.1

Project designer's CADD ENVIRONMENT

A.

Project Design Team Office; Sverdrup Civil, Inc., San Juan, Puerto Rico 1. Hardware 1

Pentium Network Server

4

-

Pentium, 32 Mb CADD Work Stations

8

-

Pentium, 16 Mb Engineering Work Stations

1

Zip Drive and CD-ROM Reader, writer (San Juan)

1

Modem 28800 or better

1

81/2" X 11" Laser Printer

1

11" X 17" Laser Printer

2. Software

Novell Network license

AutoCAD 12 or higher, all files should be saved as AutoCAD v. 12 files.

Microsoft Office Suite

Primavera Project Planner (P3)

B.

Remote Design Team Offices; (Any off-Island Office) (Minimum Standards for hardware and software) 1. Hardware -

Pentium/66 Network Server

-

486/66, 16MB, Work Stations Zip Drive and/or CD-ROM Reader Modem 28800

2. Software

AutoCAD 12

Microsoft Office Suite

2-1

KKZ I CMA Design Team

2.2

PROJECT DESIGNER'S CADD CONTACT PERSONNEL

A.

~

'-f

CADD Standards

CMA. San Juan. Puerto Rico Phone: (787) 792-0687 CADD Coordinator: Civil:

Utilities:

Structural:

fax: (787) 782-0687 Ricardo Herrera

B.

Sverdrup Civil. San Juan, Puerto Rico fax: (787) 787-0687 Phone: (787) 792-1509 D.J. Burroughs CADD Coordinator. Structural: Architectural:

C.

Sverdrup Civil. Inc. Boston, MA fax: (617) 742-8830 Phone: (617) 742-8060 Norman Brennick CADD Coordinator: Structural: Architectural: Mechanical: Electrical:

D.

Jacobs Associates. San Francisco. CA fax: (415) 956-8502 Phone (415) 434-1822 Richard Coffin CADD Coordinator:

E.

Woodward Clyde Phone (787) 782-5663 CADD Coordinator:

fax: (787) 782-5682 Eric Eisold

LOAD/MASS., S.P.

G. BRIAN HUNTER 8 SIMON MAOERA AVE. Ala PIEDRAS

PUERTO RICO 00924·2200 PO BOX 71513 SAN JUAN. puarro RICO 00936·8614 FAX 17871 763·3320 TEU7871 758·4040

E·MAlL: BHUNTERMEC@AOLCOM A JOINT VENTURE

Revision 1 August1997

PROJECT DIRECTOR

c.l>P "'~I?O

e.w;e:1..

j

t

1

I

Page 2-2

CADn Standards

Section 3 - Responsibilities

KK.Z / CMA Design Team May 1997

3.

RESPONSIBILITIES

3.1.

PROJECT DESIGN MANAGER

"3.1.1.

Secure Authority Standards

The Project Design Manager shall secure all necessary documents outlining Authority standards as they pertain to CADD production. These standards shall then be compiled and distributed to all users working on the project. The Design Project Design Manager shall obtain any updates/changes to the Authority standards throughout the life of the project. The Authority's base CADD Standards for the Rio Piedras Contract are found in the TREN URBANO DESIGN CRITERIA Part B Section 14.

3.1.2.

Request Required Software/Hardware

The Project Design Manager and CADD Leaders (see 2.2) shall determine what the CADD software/hardware needs for the project.

The Authority

requires the use of a specific software, which will be used for all information electronically delivered to the Authority. Any additional software will be fully compatible with the Authorities selected software.

3.1.3.

Development of Resource Requirements

The Project DeSign Manager shall review with each team member the appropriate personnel resources needed with regard to the Tren Urbano's CADD specifications.

It is antiCipated personnel used for the Rio Piedras

Contract will be experienced AutoCAD users.

Any additional training

requirements will be reviewed on an as needed basis. The Project Design Manager (or Office CADD Coordinator) shall define the level of proficiency required by the project utilizing the software.

3.1.4.

Distribution of Files to Design Team Members

3·1

CADD Standards Section 3 - Responsibilities

KKZ / CMA Design Team May 1997

The Project Design Manager shall supply all necessary files to the Design



Team Members working on the project in the agreed upon formats and media.

3.1.5.

Receivable/Deliverables

The Project Design Manager shall identify the delivery platform on which the Authority requires and the file transfer media (Le. CD-ROM, ZIP DRIVE, diskette, Internet, etc.). The outline of CADD files from survey Design 'Team Members is given in Section 5.

3.1.6.

Accounting

The Project Design Manager shall verify each design team member has an accounting system, available to monitor the CADD machine hours used for the Rio Piedras Contract.

3.1.7.

Desig nation of a CADD Leader

The Project Design Manager, and the Design Team Members shall designate the CADD Leader and Office CADD Coordinators, for the project. These persons shall be responsible to oversee daily CADD operations and drawing production as well as help facilitate communication between team members.

3.2.

CADO LEADER

3.2.1.

Coordination/Management

The CADD Leader is responsible for the production of CADD generated documents.

He/she shall act as a coordinator between the Users, Site

Manager, Office CADD Coordinators, and the Project Design Manager. When new files, software, hardware, or standards are received, the CADD Leader is responsible for informing project personnel of the changes/updates. The CADD Leader is responsible for informing the Project Design Manager

3-2

CADD Standards Section 3 - Responsibilities

KKZ / CMA Design Team May 1997

how the charges will impact the project production and schedule prior to acceptance and implementation.

3.2.2.

Enforcement of CADD Standards

The CADD Leader is responsible for review of project documents for compliance with the CADD standards. This includes the implementation of file naming conventions, directory structures, level structures, and maintenance of drawing logs.

The CADD Leader is responsible to keep the standards

updated and distributed to all team members.

3.2.3.

CADD File Management

The CADD Leader shall oversee the transfer of files between offices, Design Team Members, and the Authority as requested by the Project Design Manager.

3.2.4.

CAOD Drawing Logs

CADD drawing logs are required for the Rio Piedras Project.

These logs

shall contain the information as defined in Section 5.2. These logs may also be stored electronically in a directory accessible to all team members. The log shall be developed by the CADD Leader and maintained and updated by the CADD Users.

3.2.5.

Troubleshooting

When problems occur, the CADD Leader must take the information given to him/her by the User and work with the Site Manager towards resolution.

3.2.6.

Symbol Libraries

The CADD Leader shall be responsible for maintaining the project symbol library. This includes adding symbol to the library, and distributing the added

3-3

CADD Standards

Section 3 - Responsibilities

KKZ / CMA Design Team May 1997 symbols to the remote offices as required.

3.2.7.

File Fixing

The CADD Leader shall periodically check files for integrity and shall report any problems to the Office CADD Coordinator as required.

3.3.

CADD USER

3.3.1.

Adhere to CADD Standards

CADD Users must follow project criteria and keep track of updates. This includes adhering to naming conventions, level structures, drafting standards as well as other procedures outlined in the CADD Procedures Manual. The CADD Leader is responsible for updating and distributing standards to all team members.

3.3.2.

Maintain CADD Drawing Logs

CADD users shall maintain CADD drawing logs (see 2.2.4). This includes updating logs and creating new logs when necessary. These logs shall be kept in the project directory.

3.3.3.

Problems

When problems occur, the CADD user shall notify the designated CADD Leader immediately.

This includes clarification of the CADD Procedures

Manual and problems with software and hardware.

3.4

TECHNICAL SUPPORT MANAGER

3.4.1.

General

3-3

CADD Standards Section 3 - Responsibilities

KKZ / CMA Design Team May 1997

The Technical Support Manager shall maintain CADD Workstations, plotters and other peripherals for the office and their projects. The TSM must see that the workstations and network are up and running properly. If there are problems with system or a workstation, it is the TSM responsibility to see that they go back on· line in a reasonable amount of time.

3.4.2.

Daily Backup

The Site Manager shall back-up the project directory daily as directed by the Project Design Manager.

When necessary, Site Manager shall recover

currently deleted or corrupted files from the daily back·ups.

3.4.3.

Archiving

As directed by the Project Design Manager, the Site Manager shall make an archive of the project directory(ies). The interval and media of the archive shall be as specified in section.

3.4.4.

Software/hardware Upgrades

The Site Manager shall upgrade software and hardware as required. When new software is delivered, it is the Site Manager's responsibility to see that the ongoing project will not be adversely affected by changes in the software. When new hardware is delivered it is the Site Manager's responsibility to see that it will not affect the pro.ject with regard to compatibility with the existing

LAN and Software. The new hardware must provide a seamless transition for ongoing projects.

3.4.5.

Set up Accounting

The CADD Manager shall control the accounting of CADD hours using the WBS

numbers given by the Project DeSign Manager.

3.4.6.

Off Site Back·up

3-4

CADD Standards Section 3 - Responsibilities

KKZ / CMA Design Team May 1997

The Project requires off site backup of all CADD files, the Site Manager shall provide the files on the specified media (i.e. CD-ROM, 8mm tape, etc.)

3.5.

OFFICE CADD COORDINATOR

3.5.1.

General

The

Office

CADD

Coordinator

shall

be

responsible

for

CADD

communications between his/her particular office and the CADD Leader. All CADD information, file and standard updates will pass through the Office CADD Coordinator.

3.5.2.

Enforcement of CADD Standards

The Office CADD Coordinator is responsible for review of project documents produced in his/her office for compliance with the CADD standards. This includes the implementation of file naming conventions, directory structures, level structures, and maintenance of drawing logs.

The Office CADD

Coordinator is responsible to keep the standards updated and distributed to all team members.

3.5.3.

CADD File Management

The Office CADD Coordinator shall oversee the transfer of files between his/her

office, and other Design Team Members offices.

3.5.4. CADD Drawing Logs

CADD drawing logs are required for the Rio Piedras Project. These logs shall

contain the information as defined in Section 5.2. These logs may also be stored electronically in a directory accessible to all team members. The log shall be developed by the Office CADD Coordinator and maintained and updated by

3-5

~he

CADD Users.

CADD Standards Section 3 - Responsibilities

KKZ / CMA Design Team May 1997

3.5.5.

File Fixing The Office CADD Coordinator shall periodically check files produced in his/her office for integrity and shall be responsible for fixing corrupted CADD files for the office personnel.

3-5

CADD Standards Section 4 - Project Set Up

KKZ / CMA Design Team May 1997

4.

PROJECT SET UP The objective of the directory and file naming conventions is to be able to identify ·and retrieve information with minimal effort, and to maintain consistency among the various KKZlCMA Design TeamtJIembers. Project Designers will keep a current electronic file information spreadsheet, and an individual file information sheet See Section 5.4.

4.1

CADD DIRECTORIES A. Host Directories All base AutoCAD drawing files will be transmitted to Design Team Members in the following host directories:

N:\TEMP

N:\FINAL

1. PROJECT Directory The PROJECT directory will contain general-purpose drawing files to be used in the preparation of the Contractor Drawings. These files include border/title file, blocks, north arrows, graphic scales, and other standard graphic elements which are discussed further in Sections 9 and 10. These general purpose files shall be placed in a general-purpose subdirectory, named DATA, as follows: N:\TEMP\GENERAL

The contractors shall also use the directory for files of in-progress drawings.

Drawings files in the PROJECT directory should be broken down into

subdirectories according to contract package and design discipline as follows:

N:\TEMP\PACKAGE\DISCI PLI NE

2. FINAL Directory Contractor Drawings to be formally submitted to the Authority shall be moved to the FINAL directory. The FINAL directory shall include only those drawings that will be submitted to facilitate copying onto diskettes. The following is an example of a typical organization for Contractor Drawing files.

4-1

CADD Standards

KKZ / CMA Design Team

Section 4 - Project Set Up

May 1997 N:\FINAL:\ASCS\ARCH\ARP1 01 A

8.

ASCS

=Contract Package Subdirectories

ARCH

=Discipline directory

Contract Package Subdirectory

Following are the Tren Urbano contract packages and corresponding directory names.

Package

Directory

Rio Piedras ASC

ASC5

The Contract Package Subdirectory may be further subdivided by adding an additional subdirectory if required by a Design Team Member.

For example, the

ASC5 Design Team Member and the alignment section may wish to subdivide its project by station, or other subcontract packages.

Any additional subdirectories

must be approved by the Authority.

C.

Discipline Subdirectory

Following the ·Package" subdirectory, drawings are to be further subdivided by design discipline.

Listed below are the design disciplines, and corresponding

. "Discipline" subdirectory names and alphabetic code, that are to be used.

Discipline

Directory Name

Alphabetic Code

General Purpose

GENERAL

G

Right-of-Way

ROW

R

Demolition

DEMO

D

Utilities

UTIL

U

Civil Engineering

CIVIL

C

4-2

CADD Standards

Section 4 - Project Set Up

KKZ I CMA Design Team May 1997

Landscape

LAND

L

Architecture and Urban Design

ARCH

A

Structural Engineering

STRUC

S

Mechanical Engineering

MECH

M

Electrical Engineering

ELEC

E

Systems

SYSTEMS

Y

Escalators and Elevators

ESCELEV

SL

Signage and Graphics

SIGNAGE

SG

Environmental

ENVIR

N

Instrumentation

INSTR

Plumbing

PLUMB

p

If the need for any subdirectories is identified, new subdirectories shall be proposed by the Contractor to the Authority for acceptance.

4-3

CADD Standards

Section 5 - File Set Up

KKZ / CMA Design Team May 1997

5.

FILE SET UP 5.1

GENERAL CONDITIONS

_ All Drawings are to be produced using AutoCAD software, Release 12 (or higher), therefore. the CADD criteria prescribed in this section specifically addresses AutoCAD standard and procedures. This includes reference to type styles,

line types.

color/thickness. section cuts & titles. and layer conventions.

5.2

DRAWING NUMBERS AND FILE NAMES

A drawing number and file name system has been developed to facilitate locating drawings within a package together with locating drawings within a file directory. The conventions for assigning drawing numbers and file names are similar so that there is a direct correlation between the two to further facilitate drawing location.

Drawing numbers and file names

A drawing number and file name system has been developed to facilitate locating drawings within a drawing package together with locating drawings within a file directory.

A. Drawing Numbers

Drawing numbers shall be assigned as follows:

A-BBXXXC

Where:

A

==

AlphabetiC discipline code

B == AlphabetiC modifier code (where necessary. discussed later in this section) X == Numeric designation (discussed later in this section),

5-1

CADD Standards Section 5 - File Set Up

KKZ / CMA Design Team May 1997

C = Alphabetic designation (where necessary. indicates drawing is one of a series of two or drawings with the same number, or it is an inserted drawing).

Example:

A - RP101A

A

=

RP =

Architecture discipline Drawing related to the Rio Piedras Station

101

=

First drawing in a series of plans

A

=

Indicates that this drawing is one of two or more plan drawings numbered 101, or it was a late-developed drawing inserted between existing drawings numbered "101" and "102".

B. Drawing File Names Drawing file names are the same as drawing numbers with the exception that there is no hyphen, as follows:

ABBXXXC A B X C

= = = =

Alphabetic discipline designator Alphabetic modifier code (where necessary) Numeric designation Alphabetic designation (where necessary)

Example:

ARP101A would be the filename for the drawing described in the drawing number example mentioned above.

Reference file names are created in the same way, but always starting with "X". Eg XARP101, XARP201, XARP301

5-2

KKZI CMA Design Team

C.

CADD Standards

Alphabetic Modifier· Many drawings, but not all, will have an alphabetic modifier following the alphabetic discipline code in order to further distinguish the type of drawing, or its content, within the design discipline. In the example drawing A-RP101A, "RP" was used to distinguish that drawing, together with the others in its series, as a drawing related to the Rio Piedras station. The following are the Tren Urbano stations and the corresponding alphabetic modifier codes that are to be used.

Segment Name Rio Piedras University of Puerto Rico Cut and cover Mined Station Circular Tunnel Mined Tunnel

Alphabetic Code

RP

UP

CC

MS

CT

MT

In addition to the stations, there are other cases where drawings must be further distinguished within the disciplines. The following is a listing of the additional modifiers by discipline and their corresponding alphabetic codes. Any modifiers other than those listed must be approved by the Authority.

General Purpose No Modifiers used.

Alphabetic Code

RP

Right-of.Way

No modifiers used

Demolition

No modifiers used

Revision 1 August1997

Page 5-3

CADD Standards

Section 5 - File Set Up

KKZ / CMA Design Team May 1997 Utilities

Existing Electrical

EE

Existing Telephone and Cable TV

ET

Existing Water and Sanitary Sewer

EW

Existing Storm Drainage

ED

Proposed Electrical

E

Proposed Telephone and Cable TV

T

Civil

No modifiers used for alignment drawings.

Directives

o

Grading and drainage drawings

G

S

Sitework

Landscape No modifiers used for alignment drawings

Architectural

Architectural drawings for stations use the alphabetic code for the pertinent station.

Drawings for the M/SF buildings use the following modifiers:

Other modifiers for architectural drawings are:

Architectural site plans (prepared by

U

urban designers)

Urban design directives

UD

Architectural directives

D

Structural No modifier is used for guideway structural drawings pertaining to the various alignment sections.

5-4



CADD Standards

Section 5 - File Set Up

KKZ / CMA Design Team May 1997

Structural drawings for the stations and M/SF buildings use the pertinent alphabetic codes, see above.

o

Structural directives

Mechanical

o

Mechanical directives

Electrical

o

Electrical directives

Systems

Trackwork

T

Traction power

W

Communications

Z

Train Control

D.

B

Numeric Designation

The numeric-designation element of the drawing numbers is to be assigned as follows:

100 series numbers are for general plans

200 series numbers are for general sections and elevations 300 series numbers are for details directly referenced in the general plans, sections, and elevations, or for tables, charts, and schedules that contain information directly related to the general plans, sections, elevations and details.

Drawings are to be numbered consecutively within the series.

5.3

EXTERNAL REFERENCES

All drawings must use decimal units.

5-5

CADD Standards Section 5 - File Set Up

KKZ / CMA Design Team May 1997

All external reference drawings (XREF's) shall have an insertion base point of 0,0.0. The scale of the XREF shall be full size.

XREF is the means AutoCAD provides for cross referencing drawing files. XREF files are to be kept independent from the current drawing files so that changes made to the XREF drawing will automatically appear in the current file.

IMPORTANT: When using XREF files, all XREF drawings referenced by a drawing must be included on diskettes when transmitting electronic files.

Along with these files, the

applicable drawing log should also be transmitted, so that the recipients of the diskettes can reconstruct the drawings sent to them.

Nested reference drawings shall not be used.

5.4

DRAWING LOGS AND LISTS

Drawing logs are mandatory and must be continuously kept current. The Design Team Members are responsible for preparing a drawing log sheet for each drawing created, using the form shown in Figure 5-1. The completed forms are to be kept in a notebook. The individual file information sheet will include reference file level turned 'on' or ·of. Project Designers will submit a hardcopy of their file information spreadsheet monthly to Sverdrup.

Project Designers will keep a current electronic file information spreadsheet, along with drawing logs (Figure 5-2). The spreadsheet will be in Microsoft Excel format and will be provided to the Project Designers by Sverdrup. The file information spreadsheet should be a current list of all CADD files, design files and reference files, on the Project Designer's system. The list does not need to include files created by Authority, but should be include Authority's files being used as reference files by the Project DeSigner. The spreadsheet will include drawing numbers, sheet numbers, revision numbers, description, scale, attached reference files, and date of transfer lupdate, if file originated by others.

5-6

KKZ I CMA Design Team

CADD Standards

FILE TRANSFER FORM SECTION DESIGNER TO:,_ _ _ _ __ DATE RCVD.: INITIAL:,_ _ __ .- SEcnON DESIGNER FROM:,_ _ _ __ DATE SENT: INITIAL:,_ _ __

CADDCOORDmATOR:,_________

CADDCOORDmATOR~:

FOR GENERAL CONSULTANT

SUBMITTAL TYPE:

_ _ _ _ __

_ _ _FOR SEcnON DESIGNER

_ _BACKUP/ARCHIVE, TAPE 11 _ _ _ _ _ _ _ _ _ _ __ PLATFORM:

DOS

_ _CLIX 3. 5" FLOPPY

MEDIA:

CD-ROM

ZIP DISK

MODEM

E-MAIL

_ _ _FTP

BBS

SOURCE/DIRECTORY

FILENAME

FILE DESCRIPTION

mTERNET: QUANTITY:

COMMENTS: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___

REQUESTED BY: _ _ _ _ _ __

Revision 1 August1997

DATE:,____

Page 5-7

KKZ I CMA Design Team May 1997

CADD Standards

Section 5 - File Set Up

FILE TRANSFER FORM

SECTION DESIGNER TO: _ _ _ _ _ _ __ DATE RCVD: _ _ _ _ _ _ INITIAL: _ __

CADD COORDINATOR: _ _ _ _ _ _ __

SECTION DESIGNER FROM: _ _ _ _ _ _ CADD COORDINATOR: _ _ _ _ _ _ _ __ DATE SENT: _-_ _ _ _ _ INITIAL: _ __ SUBMITTAL TYPE:

_ _FOR GENERAL CONSULTANT _ _FOR SECTION DESIGNER USE SUBMITTAL _BACKUP/ARCHIVE, TAPE # _ _ _ _ _ _ _ _ _ __

PLATFORM:

_ _DOS

MEDIA:

_ _3 1/2" FLOPPY _ _CD-ROM _ZIP DISK _ _MODEM

_ _CLlX

QUANTITY:

SOURCE/DIRECTORY

FILE NAME

FILE DESCRIPTION

COMMENTS:._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

_ _ _ _ _ _ _ _ _ _ REQUESTED BY: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ DATE:_ _ _ _ _ _ __

5-7

CADD Standards

KKZ / CMA Design Team May 1997

Section 5 - File Set Up AUTOCAD DRAWING LOG

Package

Drawing Type:

Title:

Number: Scale: Prepared by: Drawn by: Company:

File name and path:

)

XREF

XREF

File names and paths

Descriptions

FIGURE 5-1

5-8

Levels: ON/OFF

KKZ / CMA Design Team May 1997

CADD Standards

Section 5 - File Set Up

4-21-97

RIO PIEDRAS ASC5 (KKZJCMA)

Tren Urbano

DRAWING LIST: UNIVERSITY OF PUERTO RICO STATION

DWO

SHEET

REV

NO.

NO.

DESCRIPTION

FILENAME

DATE OF TRANSFER

OWO.

UPDATE

EXT

SCAlE

EXTERNAL REFERENCES

CML C-TOOI

I

0

MAINTENANCE OF TRAFFIC PLAN DATA SHEET

CRPTOOI

.OWG

N.T.S.

XCRP102.DWG. XCRPI I I.OWG.

C·TlOl

MAINTENANCE OF TRAFFIC PLAN SHEET 1 OF 3

CRPTlOl

.DWO

N.T.S.

XCRP103.DWG

ARCHITECTURAL A-RP102

PARTIAL PLATFORM PLAN SOUTH

ARP102

.OWG

1:200

XARP 102.OWG

A-RP103

PARTIAL PLATFORM PLAN NORTH

ARPl03

.OWG

1:200

XARP103.OWG

)

STRUCTURAL S-RP102

SOUTH SHAFT MEZZANINE LEVEL PLAN

SRP102­

.OWO

1:125

XSRP102.OWG

S-RP103

SOUTH SHAFT CONCOURSE LEVEL PLAN

SRP103

.OWG

1:125

XSRP103.OWG

ELECTRICAL E-RP101

TYPICAL ONE LINE DIAGRAM

ERP10l

.DWG

N.T.S.

XERP102.OWG

E-RP102

TYPiCAl ONE LINE DIAGRAM NORTH END

ERP102

.DWG

N.t.S.

XERP103.OWG

FIGURE 5-2

5-9

KKZ I CMA Design Team

6

CADD Standards

LA'YERtG 6.1

LAYERING CONVENTIONS AutoCAD layering conventions have been developed for Tren Urbano drawings based on industry standards established by the American Institute of Architects. The American Society of Civil Engineers, and the International Facility Management Association. Following are key features of the Tren Urbano CADD layer conventions: Colors shall be assigned to blocks by layer, except for dimensioning Most symbols are created using two layers-one for graphics and the other for text. When a drawing is WBLOClKed; unused layers, blocks, and linetypes are automatically purged from the drawing. Some drawings may need to be purged more than once. A template will be provided to the Tren Urbano Design Team Members that will include all approved layers . . Unnecessary layers should be purged from drawings in order to conserve memory.

6.2

LAYER LISTS layer lists by discipline are found in Appendix A. The Design Team Members will keep these lists current, and must advise the Authority if new layers need to be added . .layer "MV', color

=0., Linestyle =0., must be used to show the limits of Viewport.

There is more than one viewpoint, use layer MV1, MV2 ... consistently.

Revision 1 August1997

Page 6-1

CADD Standards Section 7 - Plotting

KKZ / CMA Design Team May 1997

7.

PLOTTING 7.1

PLOTTED DRAWINGS

_ All final drawings shall be drawn at full size and have the drawing limits set to the actual size of the final sheet size. This facilitates an unattended batch plotting of a project for submittals. All relative blocks shall be scaled down to fit on the full size drawing. All papers pace mview ports shall be scaled using the ZOOM XP command.

7.2

PEN ASSIGNMENTS

Due to the large quantity of drawings that will be produced for the Rio Piedras project, an HP Design Jet or equivalent electrostatic plotter should be used with an AutoCAD

software package to set pen widths. Whenever possible, use line thickness similar to standard drafting pen millimeter sizes.

The correlation to be followed between pen plotting and electrostatic plotting for use with pen plotting is as follows:

US EOUIV.

PEN TIP (mm)

ELECTROSTATIC PEN

0.18

0000

0.25

000

0.35

a

5

0.5

1

8

0.7

2.5

11

1

3

A direct correlation between millimeter size and equivalent US size of technical ink pens is as follows:

PEN TIP (mm)

US EOUIV.

0.13

0000000

(6 x 0)

0.18

0000

(4 x 0)

0.25

000

(3 x 0)

0.3

00

(2 x 0)

7-1

CADD Standards

KKZI CMA Design Team

o

0.35 0.5 0.6 0.7 0.8 . 1.0 1.2

1 2 2.5 ·3 3.5 4

6 7

1.4 2.0

7.3

PLOmNGCONVENTIONS Use the table below to assure that drawings are in accordance with appropriate plotting conventions. FULL SIZE COLOR NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

7.4

COLOR RED YELLOW GREEN CYAN BLUE MAGENTA WHITE GRAY DARK RED DARK YELLOW DARK GREEN DARK CYAN DARK BLUE DARK MAGENTA DARK GRAY DARK BROWN

PEN NUMBER 7 7 7 7 7 7 7 7 7 7 7 7 13 7 7 254 (Gray Shade)

PEN WEIGHT (mm) FULL SIZE PLOT 0.70 .028 in. 0.18 .007 in. 0.35 .014 in. 0.25 .010 in. 0.13 .005 in. 0.25 .010 in. 0.25 .010 in. 0.50 .020 in 0.65 .026 in 0.13 .005 in. 0.50 .026 in 0.25 .010 in. 0.18 .007 in. 0.35 .014 in 0.50 .020 in 0.25 .020 in.

HALF SIZE PEN WEIGHT (mm) FULL SIZE PLOT 0.50 0.13 0.18 0.13 0.13 0.13 0.13 0.25 0.50 0.13 0.25 0.13 0.13 0.18 0.25 0.25

.014 in. .0035 in. .007 in. .OOS in. .005 in. .005 in . .005 in. .010 in. .013.in. .0025 in. .010 in. .0035 in. .0035 in . .007 in. .010 in . .010 in.

DRAWING SIZES Full size plots are 559 mm x 864 mm (22 in. X 34 in.), and half-size plots are 279 mm x 432 mm (11 in. X 17 in.). Drawings are to be electronically set up for full-size plots. Half-size plots must be conspicuously indicated as such.

Revision 1

August1997

Page 7-2

CADD Standards Section 8 - Deliverables

KKZ / CMA Design Team May 1997

8.

DELIVERABLES 8.1

GENERAL SUBMITIAL REQUIREMENTS

1.

Transmittal Form. Submittals shall be accompanied by a standardized transmittal'

form in duplicate containing the following information:

(i) The Consultant's name, address, and telephone number; (ii) Submittal number and date;

(iii)Contract title and number;

(iv) Supplier's, manufacturer's, or Subcontractor's name, address, and telephone number; (v) Subject identification including Contractor Drawing and Technical Provision references; (vi) Contractor's stamp and signature certifying its review.

2.

Supplemental Submittals.

Supplemental Submittals initiated by the Contractor for

consideration of corrective procedures shall contain sufficient data for review. Supplemental Submittals shall be made in the same manner as initial Submittals.

8.2

DESIGN SUBMITIALS

All Submittals related to the design of the work ("Design Submittals") shall be submitted to the Authority's Representative for review.

Design Submittals may be for complete

facilities, individual compone'!ts, or elements of such components as may be required to expedite the Work. Design Submittals shall be clearly marked as to the type of Submittal (i.e.. Progress or Final) and the stage or percentage complete, as determined by the Design Team Member.

1.

Requirements for Design Submittals.

Design Submittal requirements for Fixed

Facilities are set forth below, and include (i) Progress Design Submittals, and (ii) Final Design Submittals.

8·1

CADD Standards Section 8 - Deliverables

KJ(Z / CMA Design Team May 1997

(i) Packaging and Marking. Design Submittals shall be delivered in bound sets, indexed and clearly marked to indicate the date of issue and stage of development (e.g., Progress Design Submittal). All half-size drawings shall be marked "Half-Size" on each sheet.

(ii) Format. The format of all Design Submittals shall include a title block, consistent with the Standard Authority drawing format. with the following information:

Date and revision dates; Contract title and number, The names of the Contractor, KKZJCMA and Subcontractors, as applicable Identification of product by either description, model number or style number, if applicable; and Subject identification by Contractor Drawing, Technical Provision or Contractor Specification reference.

(iii) Professional Seal Required.

All Design Submittals required under Applicable

Laws to be sealed and signed shall be sealed and signed by the Contractor's Designer, who shall be ,a professional engineer or architect, currently licensed in Puerto Rico under Applicable Laws.

(iv) Quantities. Design Submittals shall include the following design documents in the formats and quantities specified:

Full-size Drawings: 1 reproducible and 2 blueline or blackline sets. Half-size Drawings: 1 reproducible and 12 blacklines (photo-copies). Design Calculations: 4 copies.

Final Submittals shall also include the following:

Review comments from previous Submittal with Contractor's Action Column completed: 2 copies. AutoCAD electronic files (diskettes) for all final drawings. shall include an index of its contents.

8-2

Each diskette

KKZ / CMA Design Team May 1997

2.

CADD Standards

Section 8 ~ Deliverables

Progress Design Submittals

(i) Level of Design: Progress Design Submittals, including all disciplines relevant· to that Progress Design Submittal, shall be made at two stages of design development - the first Progress Design Submittal (the "Basic Design Submittal") at approximately 30% to 40% design completion level, and the second at approximately 60% to 80% design completion level.

(ii) Design Documents:

Progress Design Submittals shall include Contractor

Drawings, Contractor Specifications, reports, calculations and such other.

3.

Final Design Submittal

(i) Check Prints: A set of check prints shall be developed for the Final Design' Submittal to demonstrate that every design feature on each drawing has been checked for completeness, correctness, coordination, and compliance with all Applicable Laws, compatibility with specifications, proper interface with other design disCiplines, satisfactory format of presentation, and that corrections to the drawings have been made as required.

Check prints shall include the .

following:

A set of full-sized prints of the corrected Progress Design Submittal drawings (representing the final design) shall constitute the "check prints".

8·3

KKZ I CMA Design Team

9

CADD Standards

DRAVVN3BORDERAN>1T1l...EBLOCK A base drawing border and title block will be provided to contractors, filed as follows: N:\TEMP\GENERAL\BORDER.DWG Figure 9-1 shows the standard Tren Urbano Contractor Drawing border/title block and the location of 20 blocks which shall contain information discussed below.

9.1

AUTHORITY AND CONTRACTOR IDENTIFICATION BLOCK The base border/title block contains Authority and Tren Urbano identification in Block 1 which shall not be changed. Space is provided in Block 2 for design team mem.bers identification and signature. Information to be inserted in this block must be approved by the Authority. The Contractor shall then insert the information into Block 2 of the Contractor's base border and title block and it shall remain constant throughout the project.

9.2

SUBMITTAL IDEN11FICATION The type of submittal e.g., "PROGRESS DESIGN", shall be entered in Block 3. After the Final Design has been conditionally accepted by the Authority and the drawings have been signed, sealed and issued for construction, Block 3 will be left blank. Later, the space can be used for version identification (Block 18, 19 and 20 discussed later) if necessary.

9.3

SUBmTALINFORMATION The base border/title block contains 11 "block" that must be filled in electronically for each drawing prior to its initial submittal to Authority. When a border/titJe block is inserted into a drawing as a block, a template is attached to it which allows the drafter to add the appropriate information to the blocks .

."-.-­

Revision 1 August1997

Page 9-1

CADD Standards Section 9 - Drawing Border and Title Block

KKZ / CMA Design Team May 1997

'--­ Information to be inserted into those blocks is discussed below.

A.

File Name and Plot Date

The drawing's electric file name and complete file path shall appear in Block 4 and the plot date shall appear in Block 5. The base border/title block file contains a program that automatically includes the file information and plot date every time the drawing is plotted. This program shall not be altered by the Contractor.

B,

Prepared by

Enter the first initial and last name of the designer principally responsible for the preparation of the drawing in Block 6.

C. Drawn By

Enter the first initial and last name of the drafter in Block 7,

D. Checked by

Enter the first initial and last name of the drawing checker in Block 8. Checker must be someone other than principal designer.

E. Submittal Date Enter date of submittal, expressed as DAY·MONTH·YEAR. in Block 9 as shown in the following example:

28-AUG-95

F.

Drawing Title

There are five lines available for the drawing title in Block 10.

For Contractor

Drawings, the first line identifies the contract package and is therefore the same for

9·2

CADD Standards

Section 9 - Drawing Border and Title Block

KKZ / CMA Design Team May 1997 every drawing in that package.

The second line shall not be used to identify a

volume of drawings for a discrete work package, e.g., drawings prepared for a particular station, and will be the same for drawings contained within that volume of drawings.

To ensure conformity, the information in the first two lines should be completed by the Contractor's CADD management and copies of the border/title block for all drawings to be included in a contract package should be located in the "GENERAL" subdirectory of the contract package subdirectory.

The last three lines are for the specific drawing title. The information in the drawing title should be general to specific, i.e., the first of these lines are to be used to indicate the type of drawing, e.g. "Floor Plan", "Site Section", "Typical Site Wall Section", and uTrackwork Details", and the last of those lines are to further describe the type of drawing and/or indicate its location.

The following are examples of'

correct drawing titles:

RIO PIEDRAS CONTRACT

UNIVERSITY OF PUERTO RICO STATION

FLOOR PLAN

NORTH STATION ENTRANCE

SHEET 1 OF 3

*.**** ..... ** •••

G.

Contract Number

The Authority's Contract number will be inserted in Block 11 by the Contractor, together with other constant drawing-title information discussed in Subsection 9.7. The contract number for Rio Piedras contract is AC-500083.

H.

Drawing Number

9-3

KKZ / CMA Design Team May 1997

CADD Standards

Section 9 • Drawing Border and Iitle Block

Enter drawing number in Block 12 as described in Subsection 5.2.

I.

Revision Number

Revision number is left blank until a drawing is issued for construction. At that time the revision number ·0" (zero) will be inserted in Block 13. When revised drawings are issued as addenda, the appropriate revision number will be entered (discussed further in Section 9.7).

J.

Scale

The drawing scale will be entered in Block 14 and should be one of the following:

. "N/A" when no graphic information is presented, e.g., index of drawings.

"NTS" when graphic information is not drawn to a particular scale, such as in a

)

schematic line diagram. or when the scale is not recognized or pertinent, such as in a key plan.

"AS SHOWN" when information is drawn at more than one scale or 1:1.

For informa'tion drawn to scale where only one scale is used, indicate actual scale based on a ·full-size" (559 mm by 864 mm, or 22 inch by 34 inch format) plot of the drawing. Scale is to be expressed as ratio, e.g., 1:500.

9:4

DESIGNER SEAL The designers of record will place their seals in Block 15.

9.S

REVIEWED BY Signature of the Contractor's officer will be entered in Block 16 for reviewing agency identification and Signature.

9~

SHEET NUMBER

9-4

CADD Standards Section 9 - Drawing Border and Title Block

KKZ / CMA Design Team May 1997

The Contractor shall enter the sheet numbers in Block 17 by hand or electronically when drawings are signed, sealed and· issued for construction.

Sheets are to be numbered

consecutively within a volume of drawings.

9.7

REVISIONS Information related to drawing revisions made after being issued. for construction will be entered into Blocks 18, 19 and 20.

Procedures for revisions are discussed further in

Subsection 12.2.

'.­

9-5

CADD StandardS

KKZ I CMA Design Team

I.__________________-----------C~==~

FIGURE 9-1

-­....

Revision 1 August1997

Page ....

CADD Standards

Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997

10.

DRAWING GRAPIDCS

10.1

GENERAL

_The use of acceptable industry drafting standards is required to produce clear. complete high quality drawings.

Adequate space between views on a drawing shall be provided to allow dimensions and notes to be added without overlapping or crowding between views.

10.2

STANDARD GRAPHIC SYMBOLS AND ELEMENTS

Standard graphics symbols have been developed for Tren Urbano drawings and are shown in Appendix B.

Electronic blocks for these symbols are filed by discipline as

follows:

N:\TEMP\GEN ERAL\Discipline

Discipline - Project symbol library may be created and must be named as the following:

WARP ..... DWG

W = RELATE to WBLOCK

A

=DISCIPLINE (ARCHITECT)

RP

10.3

=STATION (RIO PIEDRAS)

ABBREVIATIONS AND SYMBOLS

Abbreviations and symbols used on contract drawings shall be identical in size and form to those indicated on the Standard Abbreviations and Symbols Sheets to be included in the contract drawing package.

10-1

CADD Standards Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997

10.4

LINE WORK

Line work shall be uniform in width and the image clear, crisp and precise. Line work shall be done to assure legibility when the drawings are reduced to half-size. Closely spaced lines shall have a space beween them of at least as great as the line width itself.

The thinnest lines on a drawing are extension, center, leader, dimension, long break and sectioning lines. Medium lines are used for hidden datum and phantom lines.

Heavy

lines indicate such items as the visible edge of a new object. The thickest lines are the short break, match lines and cutting or viewing plane lines.

The weights or thicknesses of all lines shall be drawn so that each weight is easily distinguished, refer to Subsection 7.3.

10.5

SCREENING OF EXISTING CONDITIONS

Details of the background work shall be omitted unless required for reference or other essential purpose. Building columns and equipment deSignations shall be given where required. Outlines of structures and buildings shall be subordinated in plant design and electrical layouts.

Details of structural steel shall not be shown on mechanical or

electrical drawings unless required for plant design or electrical reference.

Where existing conditions on project drawings are to be distingUishable from proposed work, the existing conditions shall be shown in contrast by a 40 percent screening process or by a specified line weight and/or form.

10.6

MATCH LINES

When a complete plan or elevation cannot be shown on anyone drawing. a match line must be used to indicate a continuation to the next sheet. A drawing number at a match line shall be shown to identify the sheet on which the drawing is continued. On civil and utility-line drawings, the match shall also be identified by station as well as drawing

10-2

CADD Standards Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997 number.

If a complete plan or elevation is divided to fit on the same sheet, a match line must also be used together with an alpha character identifying the match line.

10.7

NORTH ARROW

The standard north arrow shall be displayed in the upper right-hand corner of plan drawings.

The standard north arrow is a general-purpose graphic element shown in

. Appendix B.

10.8

SCALE

The scale used for a drawing or drawing view shall be selected to ensure the clarity of a print when reduced in size and to allow reasonable space between views.

The scale·

used on a drawing shall be noted in the title block (see Subsection 9.3.J). A graphic scale for each scale used will also be placed on the drawing, generally placed in the lower right hand corner. Standard graphic scales are general-purpose graphic elements shown in Appendix 8.

10.8.1 Drawing Scales

Drawing Scale is the real world scale of the drawing when plotted.

The

Drawing Scale is the ratio of Plotted Units to Drawing Units. When the Drawing Scale is 1 the Plotted Units equal the Drawing Units. The typical scale notation reflects this concept: 100 Final Size equals 1 in Drawing Units.

10.8.2 Linetype Scales Ltscale refers to tinetype scale. Linetypes need to be scaled so the line definition is displayed at the same size, no matter what the plot scale is. Currently the Ltscale is used in the text insertion routines to make text at the right size.

The Ltscale is the total number of Drawing Units per Plotted Unit. DWG SCALE

LlNETYPE

10-3

KKZ / CMA Design Team May 1997

CADD Standards Section 10 - Drawing Graphics

SCALE

10.9

1:100

1

1:200

2

1:75

0.75

1:125

1.25

LEITERING

Lettering requirements for notes, titles and the like, are prescribed in Figure 10-1, and must be adhered to unless otherwise noted in this manual.

All lettering shall be capitalized in

"ROMANS" font. Spacing between lines of lettering shall be no less than 60 percent of the height of the letters (AutoCAD default). The width factor to be used is "1" (AutoCAD default); however, at the drafters' discretion, a width factor of "0.75" is allowed for text of notes on drawings only if space is constrained. To ensure that lettering is legible wht;m reduced by 50 percent, text scale conversion factors prescribed in Figure 10-5 must be adhered to.

Arrows from notes to applicable details shall be drawn to prevent confusion with object or dimension lines.

Text in the vertical plane shall be oriented to read from the right of the

drawing. Lettering shall be originally oriented with drawing borders, with the only exception being screened background lettering on X-referenced basemaps.

The orientation of text is an important consideration and should be consistent throughout the project. Sometimes the orientation of lettering must conform to the orientation of the object being detailed.

The "Direction of Lettering" Figure 10-3 graphically indicates acceptable

practice.

10.10

DIMENSIONS

The following guidelines relate to placement of dimensions on drawings.

A.

Dimensions generally shall be placed outside the object being dimensioned, above the dimension line and inside the extension line.

B.

Dimension texts and baselines should always be parallel to the dimensioned element and between perpendicular limit lines.

'-­

104

KKZ / CMA Design Team May 1997

CADD Standards

Section 10 - Drawing Graphics

C. Crossing of dimension lines shall be avoided.

D. Dimensions shall be adequate and clear for field interpretation.

E.

Dimensions of like objects on anyone part of a drawing shall be lined up in chain fashion.

F.

Dimensions shall be placed so that they may read from left to right when the sheet is laying horizontally with title block in the lower right hand corner, or when rotated 90 degrees clockwise.

ALL DIMENSIONS SHOULD BE PLACED IN MODEL SPACE.

Associative Dimensioning for a sample 125 scale dwg is below. Changes to these variables may cause some unexpected results. The following list provides the settings for variables. First set style to dimtxt, font

=Romans, Height =0.3175.

125 SCALE DRAWING DIMENSIONING VARIABLES

Variable

Default Setting

dimalt

OFF

dimaltd

2

dimaltf

25.4000

dimapost

dimaso

ON

dimasz

0.3175

dimblk

dimblk1

dimblk2

dimcen

0.2700

dimclrd

BYBLOCK

dimclre

BYBLOCK

dimclrt

BYBLOCK

10-5

KKZ / CMA Design Team May 1997

CADD Standards

Section 10 - Drawing Graphics

dimexo

0.1500

dimgap

0.1500

dimlfac

1000

dimlim

OFF

dimpost

mm

dimrnd

0.0000

dimsah

OFF

dimscale

1.0000

dimse1

OFF

dimse2

OFF

dimsho

ON

dimsoxd

OFF

dimstyle

D1M125

dimtad

ON

dimtfac

1.0000

dimtih

OFF

dimtix

ON

dimtm

0.0000

dimtofl

ON

dimtoh

OFF

dimtol

OFF

dimtp

0.0000

dimtsz:

0.0000

dimtvp

0.0000

dimtxt

0.3175

dimzin

3

Dimension lines shall be offset whenever possible one inch (25mm) minimum from the object line. When dimensioning text is only above the line, the spacing between dimension lines shall be 9.5mm. If the dimensioning text is above and below the line, the dimensions shall be 5mm. Witness lines should not touch the object and the ends should be at least 2mm away from the closest object line.

For a graphic representation, see the "Dimensioning Line

Spacing" diagram on Figure 10-4.

10-6

CADD Standards Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997

The placement of the dimension text shall be on the side the arrows are located.

If the

arrowheads are inside pointing out, the dimension text should be inside the dimensioned area and if the arrowheads are outside pOinting in, the dimension text should be located outside the dimensioned area. For a graphic representation, see the "Dimension Practice" diagram on Figure 10-5.

10.11

NOTES

Notes within the main body of a drawing shall conform to the following guidelines.

A.

General notes shall be grouped together along the right edge above the title block. Notes specific to the drawing on which they are located shall be placed on the drawing below the general notes.

B.

When a note is removed from an approved drawing, the note number shall remain in its position and the note area clouded. The note number shall not be used again.

C. Leaders from object descriptions should touch the object.

10.12

HATCHING

Use the following as guidelines to hatching. * Use only the standard AutoCAD hatching shall be used on projects.

This will

assure the availability of the hatch pattern for future use.



Whenever possible, use the LTSCALE as the scale for hatch patterns .

*

When using a complex polyline shape as a hatch border, save the border on a layer utilizing an "X" for the Item Type (H?????X)

The following "Hatch Patterns" Figure 10-6, shows the most frequently used hatch patterns and the rotation angles.

10-7

KKZ / CMA Design Team

CADD Standards

Section 10 - Drawing Graphics

May 1997

LETTERING REQUIREMENTS

For full-size (22 in. X 34 in. Or 559 mm x 864 mm format)

PEN

TEXT

PEN

SIZE

LEROY

TEXT HEIGHT

AUTO CAD

No.

(mm)

STYLE

(M)

SYSTEM

GENERAL TEXT (EXISTING)

2

0.18

#100

0.00254

ROMANS

GENERAL TEXT (PROPOSING)

4

0.25

#100

0.00254

ROMANS

SUBTITLE

7

0.35

#175

0.004445

ROMANS

TITLE

1

0.70

#240

0.006096

ROMANS

7

0.35

#175

0.00254

ROMANS

SUBLINES 3

4

0.50

#200

0.0044

ROMANS

SUBLINES 4 AND 5

4

0.50

#200

0.00508

ROMANS

DRAWING SCALE

4

0.25

#175

0.00508

ROMANS

CONTRACT NO.

4

0.50

#175

0.0044

ROMANS

DRAWING DATE

4

0.25

#100

0.0044

ROMANS

DRAWING NUMBER

4

0.50

#175

0.00254

ROMANS

CONTRACT SHEET NO

4

0.50

#175

0.0044

ROMANS

TYPE OR USE

DRAWING TITLE BLOCK LINE 1 (and line 2 if required)

To determine scale factor see Figure 5.

10-8

KKZ / CMA Design Team May 1997

CADD Standards Section 10 - Drawing Graphics TEXT SCALE CONVERSION FACTORS

LEROY RULES

INSERT

PLOT

SCALE

10(3

120

175

200

240

290

FACTOR

FACTOR

1:1

0.002540

0.003048

0.004445

0.005080

0.006096

0.007366

0.025

39.37=1

1:10

0.0254

0.0305

0.0445

0.0508

0.0610

0.0737

0.254

39.37=10

1:15

0.0381

0.0459

0.0669

0.0762

0.0915

0.1107

0.381

39.37=15

1:20

0.0508

0.0610

0.0889

0.1016

0.1219

0.1473

0.508

39.37=20

1:25

0.0635

0.0752

0.1111

0.1270

0.1524

0.1841

0.635

39.37=25

1:30

0.0762

0.0918

0.1338

0.1524

0.1830

0.2214

0.762

39.37=30

1:33 113

-

-

-

-

-

-

-

39.37=33 113

1:40

0.1016

0.1220

0.1778

0.2032

0.2438

0.2946

1.016

39.37=40

1:50

0.1270

0.1524

0.2222

0.2540

0.3048

0.3682

1.2700

39.37=50

1:60

0.1524

0.1830

0.2667

0.3048

0.3657

0.4419

1.524

39.37=60

1:70

0.1778

0.2135

0.3115

0.3556

0.4270

0.5159

1.778

39.37=70

1:75

0.1905

0.2286

0.3333

0.3810

0.4572

0.5523

1.9050

39.37=75

1:80

0.2032

0.2440

0.3556

0.4064

0.4876

0.5892

2.032

39.37=80

1:100

0.2540

0.3048

0.4445

0.5080

0.6096

0.7366

2.540

39.37=100

1:125

0.3175

0.3810

0.5555

0.6350

0.7620

0.9205

3.175

39.37=125

1:150

0.3810

0.4572

0.6666

0.7620

0.9144

1.1046

3.8100

39.37=150

1:200

0.5080

0.5096

0.8890

1.0160

1.2192

1.4732

5.080

39.37=200

1:250

0.6350

0.7620

1.1110

1.2700

1.5240

1.8410

6.350

39.37=250

1:300

0.7620

0.9144

1.3335

1.5240

1.8288

2.2098

7.620

39.37=300

1:333.33

0.0847

1.0470

1.5970

1.8470

2.2470

2.7470

8.466

39.37=333.33

1:400

1.0160

1.2192

1.7780

2.0320

2.4384

2.9464

10.160

39.37=400

1:500

1.2700

1.5240

2.2225

2.5400

3.0480

3.6830

12.700

39.37=500

1:1000

2.5400

3.0480

4.4450

5.0800

6.0960

7.3660

25.400

39.37=1000

1:2000

5.0800

6.0960

8.8900

10.1600

12.1920

14.7320

50.800

39.37=2000

1:5000

12.7000

15.2400

22.2250

25.4000

30.4800

368300

127.000

39.37=5000

FIGURE 10·5

10-9

KKZ / CMA Design Team May 1997

CADD StQndards

Section 10 - Drawing Graphics

DIRECTION OF LETTERING -10-3

-

-

'.~

~

-.-,.,­ ...

'

-...

.-_":'

,,::: ..:.

.

.

DIRECTION OF LETTERING

. ~~r~~r. t.~i~~i~adl;~.~1e",,·'.r -.' . '.. . .

. . /

a Flog or. Billing .' I

.

.

,'.,

,'.

..

.'

­

.

0:0

• _ _ End

.,;'

'.

Start

­

o·reader .' .":":-:.:'

Always from the Beginning or··

Flog or

~ .

B~,

INCORRECT> .'.

:FLAGS·····& BILLINGS ".:

;. - '~:":' -~'

Note: ,_NEVER CROSS LEADER.L1NES!!!!!!!!!!!!!

:":::.:.,.- -: -'.,..~, - ,.,.

~ '~-.

.. --"

".: .:<.~~I;>.:~~~~-~~:~~-· __.-:. ...

0.12" Hjgh.~~Obliqui~g . . . . . '­ -~. ~- --:.~ ~ ~~: <". ~ '-:;'.-: ~'

.JH IS .-.1 S•• ~ .SU~B TITLE·TEX T.-..

Standard

Font

10-10

"""

~'

.

'0:175..~·HIg~·:\'~rtic·~i·:-~o:;u·nderiin~

CADD Standards Section 10 - Drawing Graphics

KKZ / CMA Design Team May 1997

DIMENSION LINE SPACING· FIGURE 10-4 .

Dimension Line Dimension above line

r

.. CIl

C CIl

Q)

Q)

>

>

>

0 .D 0

0 Q) .D C 0

0 .D 0

c

c

c

Vl

Vl

0

0

c(1)

c(1)

E

a

~

0

(1)

.D

E "'0C

a

0

Q)

c:

-

~.

0

0··

Vl

~··I

C (1)

.~

a

r~ject

,, ,

Line

-.

DIMENSION:

10-11

I I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

KKZ / CMA Design Team May 1997

CADD Standards

Section 10 - Drawing Graphics

DIMENSIONING PRACTICE - FIGURE 10-5

o1M EN SI ON IN GP RA'C TrCE

100

,·460"

WHERE SPACE IS LIMITED

j

.

CORRECT"'

.

..,

....

CORRECT

13_0--:-_--···•..;1

INCORRECT.·. . '.

..

.

-

~.

. INCORRECT?

:-.,;;'~~.

.-.

2.5

INCOR.RECJ -."'"

10-12

50 ~ '_

KKZ I CMA Design Team

CADD Standards

Section 10 - Drawing Graphics

May 1997

HATCH PATIERNS - FIGURE 10-6

HATCH PATTERNS

".

~. ~"'.J "

~.

MATERIAL

HATCH PATTERN

Concrete

Block . --:.'..

Grovel Backfill·.·

... - '.

. .

"conc"

."

·f



,

-..

Block ~--:

_

'.-­

- - -. =. "" .

:- ..:..

.

....

Grout

Dots

Earth

Earth (Rotation Angle = 45-) -:

Rock

, L..I_=_"_E_'_'_'-=-_'_--'

General Hatch

Earth (Rotation

...

·ot"!si31

.. '-.



.;

Steel

~~"--"

...

Aluminum

10-13

-. ..:,

.::...

Steel

,

,"

·Ar:g ie = 0")

CADD Standards Section 11 - Drawing Format and Content

KKZ / CMA Design Team May 1997

11.

DRAWING FORMAT AND CONTENT 11.1

GENERAL

_Every drawing which is not complete in itself will be adequately cross-referenced. Necessary references to standard details will be noted on the drawings.

A drawing that requires references to other drawings or data shall be adequately cross­ referenced to other drawings or documents to allow clear interpretation. References to other drawings will be made to the drawing number, not a contract sheet number.

Each dimension and note shall be clear in meaning or reference.

Notes must be

referenced at least one time.

Identification of different views on a drawing shall appear directly under the view.

11.2

PLANS

A plan is a view from above an object or an area in orthographic projection. Every plan shall be arranged on the sheet so that project north is toward the top or right hand side of the sheet, with the exception of alignment plans. Alignment plans should be oriented so that stationing progresses from left to right across the sheet.

As applicable, a plan drawing shall show shapes, sizes, and materials of the object, its relation to the foundation or superstructure, and its elevation with reference to such items as the fixed datum plane,

location of walls,

partitions,

bulkheads,

stanchions,

companionways, openings, columns, stairs, shapes and sizes of roofs, parapet walls, drainage, sky lights, and ventilators. A plan shall specify materials, construction, and the arrangement of structural framing.

The location of equipment or furniture may be

indicated. A plan drawing for utilities may have individual layouts for heating, plumbing, air conditioning, electrical, or other utility systems, Right-of-Way drawings may show proposed track and property lines; existing structures; existing contours and topographic features; existing, proposed, and/or required utility easement; and proposed construction limits.

11·1

CADD Standards

Section 11 - Drawing Format and Content

KKZ / CMA Design Team May 1997

Plat plans shall show property lines, existing structures, required planimetric topographic features, utilities apparent from a field survey, encroachments and easements,

11.3

SECTIONS

Sections and other views shall be arranged to show the work clearly in relation to column lines, floor elevations, existing grades. ROW lines and track center lines. Sections drawn on the same sheet where they are cut are preferred. Sections cut to top are preferred for plan and cut to bottom are preferred for elevation. Sections cut across track lines should look toward ascending stations regardless of direction. Sections shall be taken to show essential details to best advantage. Where several sections appear on the same drawing, they shall be aligned to the same elevation when possible.

Section

call~uts

shall be

designated with letters, omitting "I" and ·0·, and entered in the upper half of the circle in the section reference symbol.

Where possible, sectional views shall be placed on the same drawing with the plan from which they are referenced. Title identification of these sections shall be centered directly under the section.

Where sections appear on the same drawing. a dash shall be entered in the lower half of the circle in the section-reference symbol. Where sections appear on a different drawing, that drawing number shall be shown in the lower half of the circle in the section-reference symbol. On the sheet where the section view appears, the section reference letter shall be entered in the top half of the circle in the section-reference symbol in the title line below the section, and the drawing number on which it appears shall be entered in the lower half of the circle.

The drawing

number from which the section was taken shall

appear to the right of the lower half of the circle and below the title line.

NOTE: A section cut or an elevation should be avoided on a detail or section.

11.4

ELEVATIONS

An elevation drawing depicts vertical projections of buildings or structures. The drawing

11·2

CADD Standards Section 11 - Drawing Fonnat and Content

KKZ / CMA Design Team May 1997 generally shows configuration,

shapes and sizes of features,

walls,

bulkheads,

compartments, assignments of space, location and arrangement of machinery or fixed equipment. An elevation drawing may indicate materials of construction.

11.5

DETAILS

Detail call-outs shall be designated with numerals which shall be entered in the upper half of the circle in the detail-reference symbol. The drawing number on which the detail is drawn shall appear in the lower half. If the detail is on a different sheet than where it is referenced, the detail number shall be entered in the top half of the circle in the detail­ reference symbol in the title line below the detail, and the drawing number on which it appears shall be entered in the lower half of the circle. The drawing number from which it is referenced shall appear to the right of the lower half of the circle and below the title line.

The orientation of the detail drawing shall be identical to that of the drawing, such as the plan or elevation, where it is identified.

11.6

NOTES

Notes within the main body of a drawing shall conform to the following guidelines.

A.

General notes shall be grouped together along the right edge above the title block. Notes specific to the drawing on which they are located shall be placed on the drawing below the general notes.

Specific note numbers associated with object

descriptions and leaderlines shall be circled.

B.

When a note is removed from an approved drawing, the note number shall remain in its position and the note area clouded. The note number shall not be used again.

C. Leader lines from object descriptions should touch the object.

11.7

DIMENSIONS

The following guidelines relate to the use of dimensions on drawings.

11-3

CADD Standards

Section 11 - Drawing Format and Content

KKZ / CMA Design Team May 1997

A.

Dimensions shown shall be exact unless specifically noted otherwise.

B.

Dimension and elevation repetitions shall be avoided to reduce chances for error when drawings require revision.

C. Dimensions shall be shown to finite points only, and the points shall be clearly identifiable.

D. Dimensioned features shall be drawn to scale unless specifically noted otherwise.

E.

Dimensions shall be adequate and clear for field interpretation.

F. Horizontal dimensions shall be shown on plan views to the greatest extent practical. Vertical dimensions shall be shown on sections and elevations to the greatest extent practicable.

G. Dimensions shall be expressed in millimeters with the exception of Civil plans.

Dimensions for Civil plans shall be expressed in meters and shall be so designated (e.g. 6.30 m).

11.8

SCALE

The scale used for a drawing or drawing view shall be selected to ensure the clarity of a print when reduced in size and to allow reasonable space between views.

The scale

used on a drawing shall be noted in the title block (see Subsection 9.3.J). A graphic scale for each scale used will also be placed on the drawing. general-purpose graphic elements shown in Appendix B.

11-4

Standard graphic scales are

CADD Standards

Section 12 - Drawing Procedures

KKZ / CMA Design'Team May 1997

12.

DRAWING PROCEDURES 12.1

BACKING UP AND ARCHIVING

_ Making back-up copies of user-created files is an important part of managing the work. I

Back-ups provide insurance against accidental toss of data, e.g., mistakenly erased files or unreadable hard disks.

The procedure for making back-ups in San Juan will be as follows. Remote locations will use a similar system.

A.

Back-up copies of file shall be made no less frequently than once a month.

B.

Back-ups are made using the "copy· command to copy files from the hard drive to diskettes or ZIP DRIVE or CD ROM. Files that are too large to fit on one diskette require use of the "back-up" command, or PKZIP.EXE. If back-ups take more space than 5 diskettes, Design Team Member should submit CD ROM or ZIP disk.

C. Keep at least two back-up copies of each file on diskettes.

Diskettes sometimes

become unreadable, and if the same happens to the hard drive simultaneously, the second diskette will become very important.

D. Identify on each diskette label the file name and complete file path.

CD ROM or ZIP disk containing current files created or modified along with a reproducible hard copy shall be submitted to the Authority per the contract. The compilation on these files will provide Authority with a history of versions and evolution of the project.

12.1.1

Daily Backups

1.

Monday - Thursday Project data only (partial).

2.

Tapes will be recycled every two weeks.

12-1

CADD Standards

Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

3. KKZJCMA daily backup tapes will be stored at the local office in a fire resistant storage box. Project Designers with a fire resistant storage box should also store daily backups in this manner.

12.1.2

Weekly Backups

1. Friday all projects and application data (full).

2. Weekly backups tapes will be taken off site overnight and returned the next a.m.

3. Tapes will be recycled every two weeks.

4. Design Team Members will give a weekly backup tape to San Juan, every two weeks for storage at the San Juan office in a fire resistant storage box. Weekly tapes should be submitted to Sverdrup at the Project Designer bi­ weekly meetings. Project Designer's weekly backup from two weeks prior will be returned at this time for recycling.

12.1.3

Monthly Backup/Archive

1. The last weekly backup of the month will be labeled monthly and saved permanently. A duplicate tape should be made of the monthly backup.

2. One tape will be kept on site, the second tape will be stored offsite. Project Designers will give a monthly backup tape to San Juan for offsite storage at the San Juan office in a fire resistant storage box.

12.1.4

Image Backup I Archive

At the system manager's request prior to major system/software upgrade to allow for rebuilding the system, with one tape being kept on site and a second tape given to San Juan for offsite storage.

12·2

KKZ / CMA Design Team May 1997 12.1.5

CADD Standards Section 12 - Drawing Procedures

Project Backup I Archive

1. Three tapes will be made at all major contract submittals and project completion. One tape being kept on site, two tapes given to Sverdrup for offsite storage.

2. When selection designers begin plot file creation for submittal. all files should be locked, tagged read only. This will ensure an accurate submittal archive. A full backup CD or ZIP disk should be made of all files including. plot files.

12.1.6

Project Designers may choose media for daily/weekly backup and archive. Monthly, image and project archives should be given to KKZlCMA on CD-ROM or ZIP disk.

12.1.7

All backup tapes will be labeled with the following Archive # format:

Archive # = Office 1.0. - Date-Backup type

Office 1.0.:

Sverdrup Civil, Inc.

SVC CMA WCC JA

AVA

Date:

Numeric format, month day year.

Backup type:

D

Daily

W

Weekly

M

Monthly Image Project

P

Original

Copy:

12-3

K.KZ I CMA Design Team

CADD Standards Section 12 - Drawing Procedures

May 1997 C

Copy

CC

Copy

Example:

SVC-030397 -W

Weekly backup on March 3, 1997 by Sverdrup, original.

AVA-032997 -M-C

Monthly backup on March 25, 1997 by Anil Verma, copy.

As tapes are recycled previous archive numbers should be crossed through with a single line and new archive number written underneath.

12.1.8

All tapes will be labeled with the following tape # format

8 daily tapes I, II, III, IV, V, VI, VII, VIII

6 weekly tapes 1, 2, 3, 4, 5, 6

When a weekly tape is saved for permanent monthly archive a new tape will be added to the weekly rotating set and given a new tape # (6,7, etc.)

12.1.9

Backup/Archive logs will be kept current and will be submitted to Sverdrup at the end of the month with each Project Designers monthly backup tape.

12.1.10 A directory list shouid be printed on the day of the weekly, monthly, project and image backup. The directory list and a file transfer form should accompany all backup/archival tape transfer to Sverdrup.

12.2

TRANSFERRING FILES

Drawings prepared by KKZ1CMA shall be electronically filed according to the procedures described in Section 5 to facilitate transferring of files between offices.

12-4

CADD Standards

Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

A.

Authority to KKZlCMA

1. When significant changes have been. made by the Authority which will affect· Project Designer's work. the DSN Manager will request updated files from the Authority. These files will then be transferred to the Project Designers.

B.

Design Team Member to Design Team Member

1. The requests for transfer of data will be discussed at Project Designer's bi~weekly meetings. CADD coordinators should inform their Project Design Managers prior to these meetings of requests for transfer of data and progress of their disciplines' files. Files with significant progress should be taken to the meetings for transfer to other disciplines. Project Designers are not to transfer files to other Project Designers.

Updated files will be transferred from the Project Designer to

KKZlCMA. KKZlCMA will then redistribute the updated files to the other Project Designers. At any point in the project all Project Designers will be working with the same set of files. with the exception of their own discipline which will be in progress.

2. File transfer will either be done by use of modems or by CD-ROM. or ZIP DRIVE. 3 1/2" disks will not be used unless less than five disks are required.

3. The amount of information being transferred will determine which process will be most cost effective and expedient.

4. All files transferred will be accompanied by the file transfer form. page 5-7. Files transferred to KKZlCMA should include a copy of the file information spreadsheet and an individual file information sheet for all files transferred. See Figure 2. page 5-6.

5. Electronic file information spreadsheets will note date of last update/transfer and files shared by other Project Designer as references. See Figure 2, page 5-6.

12·5

CADD Standards Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

12.3

ISSUING DRAWINGS

The Contractor shall submit Progress Design and Final Design drawings to the Authority for review as described in the Special Provisions. The level of design completion shall be indicated on the drawings as prescribed in Section 9. After the Final Design drawings have been conditionally accepted by the Authority. they are to be sealed by the designers of record and issued for construction. At that time the "Package" subdirectory shall be "frozen" and a record CD shall be made. Changes that are necessary after the Final Design drawings have been conditionally accepted by the Authority will be strictly controlled as described in Subsection 12.5 below.

A.

KKZlCMA to Authority 1. All submittals of files will be sent to Authority on ZIP disk or CD ROM. 2. When a few files are requested a 3 1/2" diskette will be used.

12.4

REVISIONS

This section addresses procedures for making changes to Final design drawings after they have been signed and sealed and given conditional acceptance by the Authority. The revised drawings would be reissued as a result of a Change Order, and the changes must be clearly identified.

A.

Access to Drawings

Once it has been determined that changes will be made to a specific drawing. the Contractor will provide a controlled process to release the "frozen" electronic file of the specific drawing to be changed to the designer and drafter responsible for implementing the revision.

B

Identification of Revisions

12·6

CADD Standards Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

All revised information must be clearly identified on drawings using "clouds" to indicate what information was changed, and "triangles· to reference the revision. A brief description of the revision will be included in the appropriate location in the drawing title block.

All graphics and text used to identify revisions are to be

implemented on discrete layers found in. the "General" layers in Appendix A and discussed below.

1. Identification on Drawing

The revision number is established when a drawing is reissued as the result of a Change Order. For example, all changes made to drawings reissued the first time would be "Revision 1". Subsequent changes made to those same drawings would be "Revision 2", and so on. If new drawings are issued subsequent to the conditional acceptance of the Final Design, the drawing revision number is zero. Therefore, the revision number always corresponds to the number of revisions made to a specific drawing.

The revision number to be indicated on the drawing where the changes are made, and the number shall be placed on a triangle that is located next to and touching the cloud, or clouds (if information is revised in more than one area of the drawing, a cloud must be drawn around each area with a triangle placed adjacent to it), drawn around the revised infonnation.

When a drawing is reissued more than once, clouds and their adjacent triangles from previous issues will be removed, but the triangle in the revision number block will remain.

2. Identification in Title Block

When a drawing is reissued, the following information must be included in the title block.

A.

The revision number in Block 13, Figure 3, Section 9, must be changed to

12-7

CADD Standards Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

the next highest number (refer to Subsection 9.3.1).

B.

A triangle is to be placed in the block at the lower left corner of the drawing title block, Block 18 in Figure 3, Section 9.7. This triangle will have the appropriate revision number inside and next to it, on the right side, will be a number indicating how many revisions there are on that particular drawing.

C.

The revision date is to be entered in Block 19, Figure 3, Section 9.7. The revision date will be the date the drawing is reissued, and shall be expressed as follows:

D.

The revision description is to be entered in Block 20, Figure 3 Section 9.7, using the appropriate text (discussed in Subsection 10.9).

The revision

description will include the Change Order number with which the drawing is issued and a brief description of the changes made to the drawing. For example:

(1) CHANGE ORDER 1, REVISED AS SHOWN

(2) CHANGE ORDER 1, COMPLETE DRAWING REVISED

In Example 1, one or more specific revisions were made to a drawing reissued, and the revisions were indicated by clouds and triangles.

In

Example 2, the revisions to the drawing were extensive enough that identifying the drawing as having been completely revised was warranted.

3. Revision Graphics

All revision graphics and text are to be placed in the proper layers as indicated in the "General" layers list in Appendix A.

Standard symbols have been created for the triangles and are shown in the "General" layers list in Appendix B.

12-8

CADD Standards Section 12 - Drawing Procedures

KKZ / CMA Design Team May 1997

A LISP routine must be developed for drawing clouds around revised information and be used to ensure graphic consistency.

12.5

ACCOUNTING

A.

12.6

Monthly reports will be generated and should be kept in the CADD Quality Notebook.

QUALITY

A.

Project Designers will follow all procedures as outlined in the project procedures manual, and the design quality control procedures.

B.

Project Designers shall be responsible for confirming that design file settings, file naming convention and leveling setup follow guidelines as outlined in the CADD Design Criteria.

C. Pre-submittal checks by KKZlCMA DES Manager will be performed to ensure that files are being setup in accordance with the Drafting Standards Manual and the CADD Plan.

D. Project Designers will submit a test file and test plot file to Sverdrup for plotting in house and by reprographics service to insure the integrity.

E. Project Designer CADD quality control leaders ­

1. CMA.­ 2. Sverdrup Civil, Inc. - D.J. Burroughs 3. Jacobs.- Richard Coffing 4. Woodward Clyde.­

F.

Project Designer's CADD quality control leader to perform in-house checks monthly. A log of the quality check should include extent of check, problems, action to resolve problem, date and sign off when action completed and files found to be following all CADD standards.

12-9

CADD Standards Section 12 - Drawing Procedures

KKZ I CMA Design Team May 1997

G. All Project Designers should have a CADD Quality Notebook containing file information sheets, file transfer forms, backup/archive logs, quality che~k logs and monthly accounting reports.

The notebook should be kept current and easi1y

assessable. - H.

A copy of the file information spreadsheets, the month's backup logs, quality check logs and monthly accounting reports will be given to Sverdrup with the monthly archive tape.

Checking shall be performed in accordance with the Contractor's Authority-approved Design Quality Control Procedures.

Revisions or changes to previously checked drawings shall be checked in the same manner as original drawings.

12-10

KKZ I CMA Design Team May 1997

CADD Standards

Appendices

APPENDIX A

LAYER LISTS

,,--..

A-I

CADD Standards

Appendices

KKZ I CMA Design Team May 1997 GENERAL PURPOSE LAYERS

LAYER

CONTAINS

0

layer created and needed by AutoCAD sheet border block layer created and needed by AutoCAD .match line revision (cloud) #1 paper limits time, date, x-ref and drawing information

BORD DEFPOINTS MATCH REV1* SHEET STAMP

*

COLOR

LlNETYPE

white red white red grey blue yellow

continuous continuous continuous phantom continuous continuous continuous

REV1 is the first revision set for a specific package. For a second revision, REV2 will be the correspondence layer name, REV3 for the third, and so on.

A-2

KKZ I CMA Design Team May 1997

CADD Standards Appendices

CIVIL LAYERS

LAYER

CONTAINS

COLOR

LlNETYPE

ASC1 ASC2 ASC3 ASC4 ASC5 ASC6 CBLTE CCULTE CCULV CELOT CFT CFTTE CKEYP CKEYPTE CMT CNT CONS-LIM CPKST CPKSTE CPNDR CPPARK CPR CPRBR CPSCFS CPSCFTE CPSCG CPSCGTE CPSDE CPSDI CPSFN CPSFTE CPSLD CPSLDTE CPSNO CPSPA CPSPK CPSPKTE CPSR

*section 1 (match line) *section 2 (match line) *section 4&5 (match line) *section 6 (match line) *section 7 (match line) *section 8&9 (match line) building and structures, text culverts, headwalls and drainage inlets, text culverts, headwalls and drainage inlets building and primary structures fountains fountains, text key plan key plan, text civil main title civil general text *construction limit marking and striping (roads and parking lots) marking and striping text natural drainage and river park I facilities boundary Iproperty lines boundary Iproperty lines, text cut Ifill slopes . cut Ifill slopes, text coordinate grid coordinate grid, text details, cross-sections, profiles dimensions fences, masonry walls fences, masonry walls, text landscaping, vegetation landscaping, vegetation, text callouts and misc. text cross hatching parking lot (limits, edge) parking lot (limits, edge) text road

14 14 14 14 14 14 cyan cyan white cyan cyan cyan white white red cyan 11 yellow cyan blue green yellow cyan yellow cyan yellow red yellow cyan white cyan yellow cyan cyan 15 yellow magenta magenta

Phantom Phantom Phantom Phantom Phantom Phantom continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous

A-3

KKZ!.. CMA Desig.n Team May 1997

LAYER

CADD Standards Appendices

CONTAINS

road text CPSRTE tram road CPSTR tram road. text CPSTRTE water features CPSWAT water features, text CPSWTE curb and gutter CROCG curb and gutter, text CROCGTEroad centerline CROCl CROClTE road centerline, text CROMAJ major contours wI text (existing, proposed) CROMIN minor contours wI text (existing, proposed) CROSSOVER *crossover CROSSTRACK *crosstrack CSBBOT bottom half of sheet grid CSBBTTE bottom half of sheet grid, text CSBT civil sub-title CSY symbols CSYTE symbols text CTORT retaining walls CTORTE retaining walls, text CTOSP spot elevations CWK walks and trails CWKTE walks and trails, text CYTRK *cytrk FUT-PLAT "'future station l-CURVE "'left curve i.d. (text) L-S "'left spiral (text & mark) l-STA *Ieft stationing (text &mark) l-TRACK *Ieft track alignment lEO . "'left stationing equatioins PLATFORMS *platforms location R-CURVE *right curve i.d. (text) R-S *right spirals (text & mark) R-STA *right stationing (text & mark) R-TRACK *right track alignment REO "'right stationing equations San-Alfonso-Sta "'San Alfonso Station SECTION3 "section 3, STTT (match line & text) STAEOU *station equations symbols STRUCT *structure TEXT "text

A-4

COLOR

LlNETYPE

magenta white red yellow red 10 magenta magenta magenta cyan yellow green green yellow cyan green cyan cyan cyan red red yellow cyan red 11, red cyan cyan cyan red 11 red, 11 cyan cyan cyan red 11 red, 11 cyan yellow 11, 12 red

continuous continuous continuous continuous continuous continuous continuous center continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous

CADD Standards Appendices

KKZ LeMA Design Team May 1997

UTILITY LAYERS LAYER

CONTAINS

COLOR

L1NETYPE

CATVS CATVO CCB CCMPE CCMPP CCMTE CCWEQ CCWPE CCWPI CELAG CELBG CELDS CELDBTE CELDO CEPOLE CGAG CGAS CGTEAG CGTESG CSCCTE CSS CSSUN CST CSTTE CSTUN CTCAG CTCBG CTCDB CTCDBTE CUMT CUNT CUST CUSY CUSYTE CUTC CUTCG CUTCGT CUTCTE

cable TV burial cable TV aerial catch basin compressed air foundation at grade compressed air lines with text compressed air foundations, text chilled water foundation at grade chilled water foundations, text chilled water lines with text elect. surface features (manholes, pullboxes) elect. ductbank with text elect. lines - direct burial elect. line - direct burial, text elect. Lines aerial elec I pole gas line valves at grade gas I structure gas line text at grade gas lines with text sanitary sewer text at grade sanitary sewer manholes at grade sanitary sewer lines with text storm sewer manholes at grade storm sewer text at grade storm sewer lines with text telecomm surface features (MH, HH, PS) telecomm ductbank with text telecomm lines, direct burial telecomm lines, direct burial, text utilitiy main title utility general text utility sub-title symbols symbols text utility corriDors coordinate grid coordinate grid, text utility corriDors, text

magneta cyan white green cyan cyan green cyan cyan cyan red white red cyan white cyan white red red cyan cyan cyan cyan cyan cyan magenta magenta magenta magenta red cyan green cyan cyan red yellow cyan red

dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous . continuous continuous continuous dashed dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous

A-5

CADD Standards Appendices

KKZ LCMA Desigp Team May 1997

LAYER CUTDI . CUTFEN CUTFTE CUTNO CUTPA CUTVVAT CUTVVTE CVCEQ CVCPE CVCPI CWA CWABG CWATE

CONTAINS

COLOR

LlNETYPE

dimensions fences, masonry walls fences, masonry walls, text callouts and misc. text cross hatching water features water features, text vacuum cash foundation at grade vacuum cash foundations, text vacuum cash lines with text water line valves at grade water lines with text water line text at grade

magenta red red cyan

continuous continuous continuous continuous continuous' continuous continuous continuous continuious continuous continuous continuous continuous

A- 6

15 white red magneta magenta magenta cyan cyan cyan

t.

KKZ CMA Design Team May 1997

CADD Standards Appendices

ARCHITECTURAL LAYERS

LAYER

CONTAINS

COLOR.

L1NETYPE

AARE AAXID ACLGR ACLOP ACLOT ACLPA ACLSU ACMC ACROC ADI ADO ADOHE ADOID AELCA AELFI AELFN AELMB1 AELMB2 AELMB3 AELOT AELPA AELSI AELSS AELST AFLAP AFLEL AFLEO AFLEO AFLES AFLHR AFLID AFLLE AFLOV AFLPA AFLSO AFLST AFLWD AFU

area calculations architectural axis 10 (bubble) ceiling grid ceiling. opening centerline of track ceiling grid pattern ceiling, suspended elements ceiling-mounted casework curbs dimensions doors doors head res door 10 (bubble) wall-mounted casework miscellaneous fixtures finishes, woodwork and trim material beyond, thickness 1 material beyond, thickness 2 material beyond, thickness 3 building outline textures and hatch patterns sign age 10 (bubble) signage schedule or table signage text appliances elevators elevators outline escalators outline escalators steps hand rails floor 10 (bubble) level changes, ramps overhead elements paving patterns stairs outline stairs architectural wood work furniture

10 cyan yellow 12 13 cyan green 12 blue cyan cyan blue cyan 13 magenta 13 13 green 15 9 10 cyan white cyan 12 yellow magenta cyan 10 10 cyan yellow yellow 10 magenta blue 12 yellow

continuous continuous continuous phantom continuous· continuous continuous dashed continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous hidden continuous continuous hidden continuous continuous

A- 7

KKZ L. CMA Desig.n Team May 1997

CADD Standards Appendices

LAYER

CONTAINS

COLOR.

AFUTE AGLEX AGLIN AGLMU AIEIO ALGA ALPE ALPL ALSF ALWA ALWP AMT ANT APKNG APRO APROO ARNIO AROOT ASCO ASEGN ASEMB1 ASEMB2 ASEMB3 ASEMC1 ASEMC2 ASEMC3 ASGOB ASSW AST ASY ASYTE AWAFU

furniture text exterior glazing interior glazing mullions interior elevation 10 (bubble) landscape cars landscape people landscape plants landscape sports fields landscaped walks and steps walk and step patterns architectural main title architectural general notes parking lots proposed roads proposed roads by others room 10 (bubble) roof outline above structural columns ground cut-line material beyond section cut, thickness 1 material beyond section cut, thickness 2 material beyond section cut, thickness 3 material cut by section, thickness 1 material cut by section, thickness 2 material cut by section, thickness 3 structural grid 10 (bubble) structural shear walls architectural sub-titles symbols symbol text full height walls full height interior walls wall hatch (poche) wall hatch outline wall type 10 (bubble) low walls movable partitions windows windows 10 (bubble) wall partition 10 (bubble)

white continuous 13 continuous yellow continuous 12 continuous cyan continuous blue continuous blue continuous blue continuous blue continuous 10 continuous 10 continuous red continuous cyan continuous blue continuous magenta continuous cyan dashed cyan continuous green continuous gray continuous blue continuous 13 continuous green continuous gray continuous 13 continuous green continuous gray continuous green continuous magenta continuous green continuous cyan continuous cyan continuous gray continuous gray continuous 16 continuous white continuous cyan continuous magenta continuous 12 hidden yellow continuous cyan continuous cyan continuous

AWAF~N

AWAHA AWAHAOU AWAIO AWALW AWAMO AWIN AWINID AWPID

A- 8

LlNETYPE

CADD Standards Appendices

KKZ I CMA Design Team May 1997

LAYER AWPT . AWSID

COLOR. L1NETYPE

CONTAINS wall partition wall section 10 (bubble)

A- 9

cyan cyan

continuous continuous

KKZ LCMA Design Team

CADD Standards Appendices

May 1997

STRUCTURAL LAYERS

LAYER

CONTAINS

COLOR

LlNETYPE

SAXIS SBARS SeOl SeONC SOIM SGRAOE SHATCH SMT SPllE SSBOE SST SSTEEl SSY SSYTE STEXT

structural axis reinforcing bars structural column concrete dimensions finish grade hatch structural main title pile details, cross-section, profiles structural sub-title steel symbols symbols text structural general text

magenta red green red cyan red blue red yellow red green magenta cyan cyan cyan

continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous

A - 10

KKZ L CMA Design Team May 1997

CADD Standards Appendices

MECHANI.CAL LAYERS LAYER

CONTAINS

MCOTH MCOWI MCWEQ MCWPI MOl MOUOU MOUEQ MELEQ MENEQ MENWI MEWEQ MEXOU MEXRF MHOEQ MHOPI MHVCO MHVEQ MHVNO MHVOO MHVRA MHVRQ MHVSA MHVSQ MMAEQ MMT MNT MSPEQ MSPPI MST MSY MSYTE MTE PACPI PCSPE

thermostats low voltage wiring chilled water equipment chilled water piping mechanical dimensions dust and fume ductwork dust and fume coil. equip. electrical heat equipment energy management equipment energy management wiring exhaust system equipment exhaust system ductwork rooftop exhaust equipment hot water equipment hot water piping HVAC ceiling diffusers HVAC equipment callouts, key notes HVAC, other diffusers return system ductwork return system equipment supply system ductwork supply system equipment machine shop equipment mechanical main title mechanical general notes special system equipment special system piping mechanical sub-title symbols (for HVAC) symbol text (for HVAC) diagrams, details acid, alkaline, and oil waste piping chemical supply lines plumbing dimensions domestic hot and cold water equipment, dimensions domestic hot and cold water piping domestic hot and cold water risers

POI POOEQ POOP I POORI

COLOR

A-II

L1NETYPE

red red yellow cyan cyan blue yellow yellow yellow red white blue yellow yellow cyan yellow yellow cyan yellow blue yellow cyan blue yellow red cyan yellow cyan green cyan cyan white cyan yellow cyan cyan

continuous hidden continuous continuous . continuous continuous continuous

continuous

continuous

hidden

continuous

continuous

continuous

continuous

continuous

hidden

continuous

continuous hidden continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous center

green green

center

center

KKZ LCMA Design Team May 1997

CADD Standards Appendices

LAYER

CONTAINS

COLOR

L1NETYPE

PFGPI PFI PFSAFI PSAPI PSARI PSTPI PSTRI PSVPI PSY PSYTE PTE

fire, water, and gas piping plumbing fixtures sanitary plumbing fixtures sanitary piping sanitary risers storm drain piping storm drain risers vent pipine symbols (for plumbing) symbol text (for plumbing)+831 callouts, diagrams, details

. white blue blue cyan cyan cyan cyan magenta cyan cyan yellow

continuous continuous slash slash slash slash slash continuous continuous continuous continuous

A - 12

KKZ I CMA Design Team May 1997

CADD Standards Appendices ELECTRICAL LAYERS

'----­

LAYER

CONTAINS

ECCTV ECCTVS ECOMM ECOMS -EDESG EDI EFIRE EFIRP EFIRS ELlCL ELIEM ELI EX ELIPA ELISI ELISP ELITE ELIWA EMT ENT EPOCL EPOPA EPOSI EPOWA EPOWR EST ESY ESYTE ETE1

CCTV circuit CCTV symbols communication circuit communication symbols electrical designation electrical dimensions fire alarm circuit fire alarm panel fire alarm symbols lighting, ceiling-mounted power, wall-mounted exit lighting lighting panel site lighting special lighting lighting circuit lighting, wall-mounted electrical main title electrical general notes power, ceiling-mounted power panel site power power, wall-mounted power circuit electrical sub-title symbols symbol text details and diagrams

A-13

COLOR

LlNETYPE

magenta green magenta green magenta green magenta blue white magenta green green blue magenta magenta white white red cyan green grey magenta green magenta green red yellow red, green

continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous continuous, hidden

APPENDIXB

STANDARD GRAPHICS SYMBOLS

App. B-1

GENERAL SYMBOLS

/ @ / @

sYrJ30L

SYMBOL DESCRIPTION

BLOCK NAME

SECTION IDENTIFICATION aUBBLE

GENO'

ELEVATION IDENTIFICATION BUBBLE

GEN02

SECTION AND/OR ELEVATION ARROW

GEN03

SECTION CUT DIRECTION INDICATOR (EXTENDED LINE SHALL BE CONTINUOUS IN .35mm PEN THICK).

GEN04

DETAIL IDENTIFICATION BUBBLE

GEN05

CIRCLE AND OR ELLIPSE ENCLOSING THE DETAILED DRAWING (HIDDEN LINE SHALL BE .35mm PEN THICK).

"BY USER"

A

'~

~E1 ~L..ET E~ N

'-'=-=-, '

- - '

INS. POINT

A

'~

~R

Elz:E _NU HEE,

N

INS. POINT

/\..

\"\L

"

/

'-~~::: \ \

\ \

,

/

).--

/.

.....

"\

\ \

I

"

'-

-_

/ ...... /

'

App. B-2

GENERAL SYMBOLS N:\ TEMP\GENERAL\SYMBOLS\GENERAl SYMBOL

G . "., ELEV.

=ELEVATION

SYf/38L DESCRIPTION

BLOCK NAME

NORir-! ARROW

GEN06

VERTICAL DISTANCE MARK

GEN07

REVIS::JN INFORMATION (FOR TiTLE BLOCK)

GEN08

REVISION IDENTIFICATION (FOR REVISION BUBBLE)

GEN09

CHANGE NOTICE/CHANGE ORDER OR .. AFTER-THE-FACT "REVISION INFORMATION" (FOR REVISION BUBBLE).

"BY USER"

CHANGE NOTICE/CHANGE ORDER OR .. AFTER-THE-FACT "REVISION INFORMATION" (FOR TITLE BLOCK).

"BY USER"

MATCH LINE (LINE SHALL BE PHANTOM IN .70mm PEN THICK; TEXT SHALL BE LEROY 175 IN .50mm PEN THICK AS TEXT HEIGHT).

"BY USER"

BEGIN OF PLATFORM (USER MUST DRAW THE CENTER LINE IN .35mm PEN THICK).

GEN10

END OF PLATFORM (USER MUST DRAW THE CENTER LINE IN ..35mm PEN THICK).

GEN11

INS. POINT

0

2

27-0CT-95

REMARKS

~'''''''' ill .6

2

02-SE;::>-96

I

!MATCH '=.!N.I _'_ _ '

I

REMARKS

~A:!:.CH

II BEGIN OF PLATFORM

LINE

INS. POINT

END OF PLATFORM INS. POINT

App. B-3

APR 06 '98 09:40

FROM-SVERDRUP CIVIL, INC.

TO-12136241188

T-296 P.01/04 F-448

FAX

TRANSMITTAL SHEET DATE: April 6, 1998

TO: ShinaMehta FAX NUMBER: (213) 624-1188

Phone: (213) 624-6908

OFFICE: Anil Venna Associates PROJECT NUMBER: 013850 FROM: Jim O'Donnell Sverdrup Civil, Inc. Two Center Plaza Boston. Massachusetts 02108-1906 FAX: (617) 742-8830

Phone: (617) 742-8060

No. of Pages (including cover sheet): \4

MESSAGE Shina Attached are graphic scales created by ruo and Sverdrup Civil for use on Tren Urbano. Pleaso roviaw the graphic sca.les created by Sverdrup Civil to be 8ure they are adequate for your needs. I want to send the new graphic scales to TUO for acceptance for use on the project. Jim

.

NOTE: IF MESSAGE IS RECEIVED UNCLEAR OR INCOMPLETE

PLEASE CALL SENDER AT (617) 742-8060

H:\OOCS\WO~D6\rAXFRM,OOC

APR-06-1998

01:48

+617 742 8830

96%

P,01

-------- --------

..

---~--- ~

APR 06 '98 09:40

TO-12136241188

lCJ.L. , l.MJl v~""

FROM-SVERDRUP CIVIL, INC.

I.C"WI'.

T-296 P.02/04 F-448 Appetulkes

May 1997

GENERAL SYMBOLS N;SYMBOLS\ $Yt.!SOL DESCRI~TION

SYMBuL GRAPHIC SCALE 123m . :~~j

o j



GRAPHIC SCALE FOR 1;50

GEN12

Ve:R ..(~._O_k._ _ INS(PT PI)INT (TfP,

SCALE F.l.CTO," J9.37 J:'OR 22kJ4 UNIT PLOT SHEET

CRAPI'IIC SCALE

.)

1

:3

2

~;.--'-10.'_



5m

;

CRAPHIC SCALE F'OR 1; 100

GEN13

GRAPHIC SCAlE fOR 1:200

C£N14

CRAPHIC SCALE F'OR 1;250

GEN1S

VEP../HOR.

~RAPHIC ~

1 ,) 1 Z J 4

. H

H

SCALE ,

~ 6 7 8 9 '0,.,.,

H ' ...

~ VER./HOR.

4

2

Gj;APHIC SCALE

0 2 4 6

810m

,..~ VER./HOR.

"~A~HIC

~.

.1 0

0

SC"'-t

5

10

IS

20m

. ~~.•"*.AJ'

I~RAPHIC

SCALE F'OR 1:500

VE~ ../HOR.

CP.AI=o!o1IC SCALE

:0

10

0

10

20

JO

40m

flj'fiiJiflllmll~

. GRAPI-IIC

SCAI.E F'OR I: 1000

GEN17

VER./HOR.

GR-lPHIC

2 ~

I

0

I

.

1

2 ;

!

I

~CALE

!

5m

4

I

GRAPHIC SCAI.E F'OR 1:125

GENZO

VER./HClF!.

C,PAFH1C ~

SCAL~

.,

.., T

~ "E:F

4m G~"PHIC SCA.l.E F'OR 1, '5

:HO~

App.8-4

APR-06-1998

07=48

+617 742 8830

96%

P.02

T-296 P.03/04 F-448

FROM-SVERDRUP CIVIL, INC.

APR 06 '98 09:40 TO-12136241188

GENERAL SYMBOLS

N:\SYMBOLS\

SYMBOL DESCRIPTION

SYMBOL

BLOCK NAME

BREAK LINE

GEN22

GRAPHIC SCALE FOR 1:25

GEN23

GRAI=lHIC SCALE FOR 1: 1 5

GEN24

GRAPHIC SCALE FOR 1: 10

GEN25

CRAPHIC SCALE FOR 1:20

GEN26

GRAPHIC SCALE FOR 1:4

GEN27

GRAPHIC SCALE

0

I

2m

1.5

1,

.5

I

1:25

GRAPHIC SCALE

500 :

250

0

!

750 :

1500mm

1000 :

I

1: 15

GRAPHIC SCALE

0

250 :

i

500

750

!

I

1000mm

1: 10

a

.5

i

I

GRAP HIC SCALE 1 :

2m

1.5

I

1:20

o

GRAPHIC SCALE '25 250

~i_ _ _ _

375mm

'L.-_ _ _ l

I

--J

1:4

RPR-06-1998

07:48

+617 742 8830

96%

P.03

-~----

APR 06 '98 09:40 TO-1213S241188

FROH-SVERDRUP CIVIL, INC.

T-296 P.04/04 F-448

GENERAL SYMBOLS

N:\SYM80LS\

SYMBOL DESCRIPTION

SYMBOL

BLOCK NAME

GRAPHIC SCALE 1

0

3m

2

!=j

I

GRAPHIC SCALE FOR 1:30

GEN28

GRAPHIC SCALE FOR 1:40

GEN29

GRAPHIC SCALE FOR , :5

GEN30

1:30

GRAPHIC SCALE 1 2

0

;

!

I

3m

,

, :40

0

GRAPHIC SCALE 200 300 ;

100

,

I

400 ;

500mm

I 1 :5

APR-06-1998

07:48

+617 742 8830

96%

P.04

JUf.L. / LMA LJeSlgn leam May 1997

L../lLIU "UUIUUI~

Appendices

GENERAL SYMBOLS

NSYMBOLS\ SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

GRAPHIC SCALE

o

3m

2

~I~~iiiiiiiiiiiiii:~~

GRAPHIC SCALE FOR 1:50

GEN12

VER<~OR. ' - - - - INSERT POINT (TTP) SCALE FACTOR 39.37 FOR 22x34 UNIT PLOT SHEET

GRAPHIC SCALE t)

3:

2

5m

4

GRAPHIC SCALE FOR 1: 100

GEN13

GRAPHIC SCALE FOR 1:200

GEN14

GRAPHIC SCALE FOR 1:250

GEN15

GRAPHIC SCALE FOR 1:500

GENIE

GRAPHIC SCALE FOR 1:1000

GEN17

GRAPHIC SCALE FOR 1: 125

GEN20

GRAPHIC SCALE FOR 1: 75

GEN21

VER.jHOR.

GRAPHIC SCALE 2 1 0

1 2 3 4 5 6 7 8 9 1Om

r-.~ VER./HOR.

2

4

GRAPHIC SCALE 0 2 4 6

- -=- -

810m

~"""",er_~

-~.~

VER./HOR.

10

GRAPHIC SCALE 0 5 10

::.

15

20m

' .III . . I ~~~ "'" ~' . .~ I _I _I 1..I ~' • IlIII__ _III I 1 IlIrl IjI__~ _

IIER/HOR.

20

10

GRAPHIC SCALE 0 10 20

30

40m

'jlimj~ V£R./HOR.

GRAPHIC SCALE

2

0

2

345m

VER/HOR.

GRAPHIC SCALE

01')

3

~~!iiI_~~~ iiii_~-~

4m

'IEP /HOR.

App.8-4

GENERAL SYMBOLS

SYI/BOL

S::A.::= 1:200

SYMBOL

DESCRIPTIO~

BLOCK NAME

CLOUD BUBBLE FOR REVIS!ONS

"BY PROGRAM"

TITLE SYMBOL (EXTENDED LINE SHALL BE CONTINUOUS IN .50mm PEN THICK. TEXT SHALL BE .70mm PEN THICK & LEROY 240 AS A TEXT HEIGHT), SCALE TEXT SHALL BE LEROY 100 IN .25mm PEN THICK. BOTH TITLE AND SCALE TEXT SHALL BE LEFT JUSTIFIED.

GEN 118

App.8-5

RIGHT -OF -WAY'. SYMBOLS

SYMBOL DESCRIPTION

alOCK NAME

PARCEL NUMBER

ROW01

AERIAL EASEMENT

ROW02

UTILITY EASEMENT

ROW03

EXISTING ROW OR CONTROL MONUMENT OR MARKERS

ROW04

EXISTiNG STREET RIGHT-OF-WAY LINE (EXTENDED LINE SHALL BE CONTit\;UOUS IN ..35mm PEN THICK).

"' BY USER"'

---------R/W--------­

"BY USER"

---------R/W--------­

PROPOSED RIGHT-OF-WAY LINE (EXTENDED LINE SHALL BE CONTINUOUS IN .70mm PEN THICK. TEXT SHALL BE LEROY 100 IN .35 PEN THICK).

"BY USER"

----Jt---­

EXISTING PROPERTY LINE (EXTENDED LINE SHALL BE PHANTOM IN .50mm PEN THICK. TEXT SHAi..L BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

------E----­

PROPOSED EASEMENT LINE (EXTENDED LINE SHALL BE DASHED IN .70mm PEN THICK. TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

SYMBOL

~'NS'POINT

~'NS.

POINT

App. B-6

UTILITIES SYMBOLS

SYMBOL

SYM30L DESCRiPTrON

BLOCK NAME

.MH

NEW SANITARY MANHOLE

UTLOl

EXISTING OR TO REMAIN SANITARY MANHOLE

UTL02

EXISTING SANITARY MANHOLE TO BE DEMOLISHED.

UTL03

NEW STORM SEWER MANHOLE

UTL04

EXISTING OR TO REMAIN STORM SEWER MANHOLE

UTL05

POINT

EXISTING STORM SEWER MANHOLE TO 8E DEMOLISHED.

UTL06

POINT

EXISTING OR TO REMAIN TELEPHONE MANHOLE

UTL07

POINT

SOLID CONNECTION SLEEVE

UTLOB

NEW AIR VENT

UTL09

EXISTING AIR VENT

UTL10

TELEPHONE CABIN

UTL11

TELEPHONE CABINET

UTL12

EXISTING OR TO REMAIN WATER VALVE

UTL1.3

~'NS.

POINT

(QjMH

~'NS.

POINT

ffiMH

~'NS.

POINT

(,;;)NSSM

~'NS.

POINT

(QjMH

~'NS.

~~N~. TMH

, ,,

~'NS.

I



~INS.

POINT

" ' - . I N S . POINT

~'NS.

POINT

~'NS.

POINT

~TC

~INS.

~'NS.

POINT

POINT

App. B-7

UTILITIES SYMBOLS SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

~'NS.

NEW WATER VALVE

UTL14

EXISTING WATER LINE TO REMAII\

"BY USER"

NEW WATER LINE

"BY USER"

EXISTING WATER LINE TO BE ABANDONED.

"BY USER"



EXISTING SANITARY LINE TO REf//.. \

"BY USER"

S

NEW SANITARY LINE

"BY USER"

EXISTING SANITARY LINE TO BE ABANDONED.

"BY USER"

EXISTING AERIAL CABLE TV LINE

"BY USER"

EXISTING UNDERGROUND CABLE TV LINE

"BY USER"

G

EXISTING GAS LINE

"BY USER"

T

EXISTING AERIAL TELEPHONE LINE.

"OINT

W

• W

•• W

••• S

•• S

••• ! i

I

TV

I

!I

I

- -

--TV­

-

-

-

i

II

"BY USER"

-T-

EXISTING UNDERGROUND

-- - -- T -- - --

AERIAL TELEPHONE LINE IN HANGER SYSTEM.

"BY USER"

-------- T --------

TELEPHONE LINE IN CONCRETE ENCASEMENT

"BY USER"



I

I

App. B-8

TELEPHO~E

LINE.

"BY USER"

UTILITIES SYMBOLS

SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

------ P ----­

EXISTiNG PETROLEuM BY-PRODUCTS

"BY USER"

------50-----­

EXISTiNG STORM DRAINAGE

"BY USER"

! --------­ I

NEW STORM SEWER PIPE

"BY USER"

I: -------. W or S ----­

EXISTING WATER OR SANITARY liNE

TO REMAIN.

"BY USER"

I

.. - - - - ­ ...-----­

W or S

------

W or S

-----

NEW WATER OR SANITARY LINE

"BY USER"

EXISTING WATER OR SANITARY LINE TO BE: ABANDONED.

"BY USER"

App.8-9

CIVIL SYMBOLS SYMBOL

~'N5 ~'N5. ~'NS.

POINT

~'NS.

~'NS.

~'NS.

~ ~ I) I

!

I

CVL02

BORING

CVL03

HEADWALL

CVL04

EXISTING TREE

CVL05

NEW WATER VALVE

CVL06

EXISTING WATER VALVE

CVL07

WATER METER

CVL08

STRAW BALES (TEMPORARY DITCH BLOCKS).

CVL09

I'OINT

POINT

INS. POINT

STRAW BALES (INLETS)

CVL10

INS. I'OINT

~'''S.POINT

~~'" ~'NS.

I

STATIONII\:G EQUATIONING

POINT

~ ,

CVLOl

POINT

~iNS.POINT

I

HORIZONTAL AND VERTICAL CONTROL POINTS

POINT

CB

I'

BLOCK NAME

POINT

==E--INS. POINT

~'NS.

SYMBOL DESCRIPTION

CATCH BASIN

CVLll

ENERGY DISSIPATOR BASIN & RIP RAP CHANNEL

CVL12

INLET TYPE 4

CVL13

INLET TYPE 4 (DOUBLE APRON)

CVL14

INLET TYPE 4 (MODIFIED)

CVL15

POINT

~'NS'PO'NT

I'

I

App.8-10

CIVIL SYMBOLS SYMBOL _NGI --

~'NS.

SYN'80L DESCRIPTION

BLOCK NAME

NEW GRATE INLET

CVL:6

EXISTiNG GRATE INLET

CVLi7

TOP OF CUT

"BY USER"

TOP OF SLOPE

"BY USER"

EXISTING WALL

"BY USER"

PRO?OSED RAILROAD TRACKS

"BY USER"

EXISTING DRAIN

"BY USER"

PROPOSED DRAIN

"BY USER"

PROPOSED ROAD (THIS CONTRACT)

"BY USER"

PROPOSED ROAD (N.I.C.)

"BY USER"

EXISTING UNDERDRAIN

"BY USER"

PROPOSED UNDERDRAIN

"BY USER"

BARBED WIRE FENCE

"BY USER"

GUARD RAIL

"BY USER"

POINT

T.O.C. ---------------T.O.S.

- - - - - WALL - - - - -

........ -----:(

/-----

)

--



- - - EU -

- --

-- -

-- -

- - - - - - - PU - - - - - - -

)( )( )( )( )( )( )( X )( X X

.:.

..!.

..!.

~

I I I I I I I

1

App.8-11

CIVIL SYMBOLS SYMBOL DESCRIPTION

BLOCK NAME

DRUMS (5 MiS. C. TO C.)

"BY USER"

TEMPORARY CONCRETE BARRIER

"BY USER"

TEMPORARY GUARDRAIL

"BY USER"

EXISTING CHAIN LINK FENCE

"BY USER"

PROPOSED CHAIN LINK FENCE

"BY USER"

- - - - - SF - - - - ­

SILT FENCE

"BY USER"

- - - - - FT - - - - - - ­

FLOATING TURBIDITY BARRIER

"BY USER"

-----NSS-------­

NEW STORM SEWER PIPE

"BY USER"

EXISTING STORM SEWER PIPE

"BY USER"

SYMBOL


e

e

e

® (J) r..L

1.,

e

e

0

e

e

. __-_e-_e-_e-_e­

1- - -

-ESS- ­

~

VZZJ

~

~

[j

~



EXISTING

ROAD TO BE REMOVED

"BY USER"

PROPOSED STATION PLATFORM

"BY USER"

EXISTING STRUCTURE TO BE DEMOLISHED

"BY USER"

PROPOSED STRUCTURE

"BY USER"

EXISTING STRUCTURE

"BY USER"



WATER COURSE (RIVER, CREEK)

App.B-12

"BY USER"

CIVIL SYMBOLS . SYMBOL

------

--------//-------­ 125+50 74.8

SYMaOL DESCRIPTION

BLOCK NAME

CONTOUR LINES

"BY SOFTWARE"

FENCE ON WALL (SIDE LINES SHALL CONTINUOUS IN .25mm PEN THICK

AND CENTER LINE SHALL BE DASHDOT

IN .35mm PEN THICK).

"BY USER"

SOUND BARRIER (EXTENDED LINE SHALL BE CONTINUOUS IN .35mm PEN THICK).

"BY USER"

STATION

"BY PROGRAM"

SPOT ELEVATION

"BY PROGRAM"

CONCRETE PAVED WATERWAY (LINE SHALL BE DIVIDE IN .35mm PEN

THCIK).

"BY USER"

App.8-13

LANDSCAPE SYMBOLS Existing Plant Matenal Trees: Show existing tree canopy spread if mature; otherwise delineate canopy size consistent with relative size of proposed trees. Label caliper size and common name. Show existing plant matenal with small solid circle Signifying center of plant If large quantities of trees or shrubs exist, the center circle may be deleted for clarity.Tree and plant matenal symbols can be found on the following pages. Additional symbols may be found in the architectural section.

App. B-14

proposed plant Material Trees: Show proposed tree canopies at 3/4 size of nominal mature spread. Show proposed trees with a small cross signifying the center of plant Label quantity (if more than one) and full common name. Of more than one size is used on project, show size after name, or signify ''Type A", etc" Showing size in Plant List only. Leader lines should not have an arrow. Connect similar tree types with sweeping curved leader line using pen #00 to differentiate it from base sheet construction data. Specify multi-trunk trees in Plant List Plans should still show Single cross for center. "Multi-trunk" should ~ppear on drawing after the plant name only if necessary to locate it within a single trunk tree of same size and species also exists under same contract

Tree - Large:

--CedarElm Pen #0

Pen #1

Tree - Small:

Crapemyrtle

App.8-15

Shrubs: Show shrubs at 3/4 to full size on drawings. Show individual plants of spacing is 600 mm on center or greater. ~how shrubs as simple circles and indicate plant centers with large dots. Other center symbols may be used such as a cross or small open dot Use these other center symbols only when graphic delineation due to adjacency requires it, that is, one kind of shrub next to a different kind of shrub. Label quantity, full common name and on center spacing. Always show spacing with plant label. Do not show spacing in plant list Shrub masses should be touching at maturity; therefore, delineation should indicate the edge of the mass without the interior over1aps of circles as shown. Shrubs with spacing less than 600 mm on center should be delineated as groundcovers.

14 Indian Hawthorm @ 600 Pen #0

Pen #1 Groundcover: Show groundcover using Format (trademark) screen No. 7087. If different groundcovers occur adjacent to each other, use a broken line to distinguish one from the other. Do not use irregular lines to define edge. Allow paving edge or steel edging to serve as limit of groundcover. Label quantity, full common name and on center spacing, Always show spacing with plant label, not in Plant List Grass: Show grass using stippling method with concentration of dots adjacent to material changes as shown. Use a No. pen. Label grass type.

a

. ....

Hydromulch Bermudagrass ~

..... .

674 Purpleleaf Honeysuckle @450

....

436 Asian Jasmine @ 300 Steel Edging

App.8-16

LANDSCAPE SYMBOLS SYMBOL DESCRIPTION

SY~.;1g0L

BLOCK NAME

I I

, I

I

I

, I

I

~ ~ :I i

II i Ii ! I ! IIII

't.

".NS

~'NS

PAViNG PATTERN (DATTERN=AR-888; ROTATION=O')

"BY USER"

PAVING PATTERN (PATTERN=ANSI37; ROTATION=O')

"BY USER"

PEDESTRIAN AREA (PATTERN=ANSI31; ROTATION=O')

"BY USER"

CROSSWALK (PATTERN =LINE; ROTATION=90')

"BY USER"

SURFACE TREATMENT (PATTERN=GRASS; ROTATlON=90')

"BY USER"

TRANSIT ARROW No.1

LAN01

TRANSIT ARROW No.2

LAN02

TRANSli ARROW No.3

LAN03

SPORT CAR No.1

LAN04

POINT

POINT

App.8-17

I

LANDSCAPE SYMBOLS

SYMBOL..

~[l:! DJ

SYMBOL DESCRIPTION

BLOCK NAME

SPORT CAR No.2

LANDS

SPORT CAR No.3

LAND6

SPORT CAR No.4 (RIGHT SIDE VIEW)

LAND?

SPORT CAR No.5 (FRONT VIEW)

LANDS

SPORT CAR No.6 (REAR VIEW)

LAND9

SEDAN CAR No.1

LAN1D

SEDAN CAR No.2

LAN11

SEDAN CAR No.3

LAN12

COMPACT CAR No.1

lAN1.3

l-1'liS. POINT

§~"'"

~D~

'-'1>5. POINT

rj;;~ L ',-

,NS . POINT

~ L,NS.

POINT

bO gIJ =

~POINT

1~-tqJL bO [J ~;NS.

POINT

aGQ ])

L-..'NS. POINT

App.8-18

LANDSCAPE SYMBOLS

SYMBOL..

b:(C : [~I

SYMBOL DESCRIPTION

BLOCK NAME

STATION WAGGON No.1

LAN14

STATION WAGGON No.2

LAN15

STATION WAGGON No.3

LAN16

L-'NS. POINT

~

L , N s . POINT

[1:3::n

L-/IIIS.



STATION WAGGON No.4

LAN17

VAN No.1

LAN18

TRUCK No.1

LAN19

TRUCK No.2

LAN20

POINT

Q . POIIIIT

'!-IU rl:l I L..--,NS. POINT

App. B-19

LANDSCAPE SYMBOLS

SYMBOL

-l..," '"

-t,~~"

t .,""

t .,''

~

SYMBOL DESCRIPTION

BLOCK NAME

OLD WOMAN No.1

LAN21

WOMAN No.1 (BACK)

LAN22

WOMAN No.2 (FRONT)

LAN23

WOMAN No.3 (FRONT)

LAN24

OLD MEN No.1 (SIDE)

LAN25

OLD MEN No.2 (BACK)

LAN26

YOUNG MEN No.1 (BACK)

LAN27

TREE No.1 (FROM A. GONZAl.EZ AQUINO)

LAN2B

~'---- ..,- "", ~'NS.

~

~INS.

POINT

POINT

Q""',"

App.B-20

LANDSCAPE SYMBOLS SYMBOL

~ ~'NS'POINT

~'NS.

SYMBOL DESCRIPTION

BLOCK NAME

TREE No.2

LAt\29

TR::::

No.3

LAN3:J

TREE No.4

LAN31

POINT

' - - - - - I N S . POINT

App.8-21

LANDSCAPE SYMBOLS

SYMBOL DESCRIPTION

BLOCK NAME

I TREE No.8

LAN35

TREE No.9

LAN36

TREE No.10

LAN37

I

I

.

II

I

~'~'"'

App.8-23

LANDSCAPE SYMBOLS

SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

TREE No.14

LA.N4l

TREE No.15

LA.N42

TREE No.15

LA.N43

'------INS. POINT

'----INS_ POINT

. " ' - - - , N S . POINT

App.8-25

LANDSCAPE SYMBOLS

SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

TREE No.17

LAN44

TREE No.18

LAN45

" ' - - , N S . POINT

,, .

~--INS

POINT

App.8-26

ARCHITECTURAL SYMBOLS SYMBOL

SYMBOL DESCRIPTiON

BLOCK NAME

INTERIOR ELEVATION IDENTIFICATION

ARC01

INTERIOR ELEVATION ARROW

ARC02

WALL SECTION IDENTIFICATION

AReO.3

WALL SECTION ARROW

ARC04

DOOR IDENTIFICATION

ARCOS

AXIS IDENTIFICATION BUBBLE (AXIS RUNNING FROM BonOM TO TOP SHALL BE DENOTED BY LETTERS. AND NUMBERS FOR THOSE AXIS RUNNING FROM LEFT TO RIGHT).

ARC06

INS. POINT

~ \

'-

----

/

/

INS. POINT

HARD

~ R

ROUP INS. POINT

A~.. ",,,

App.9-27

ARCHITECTURAL SYMBOLS SYMBOL

RO~

SYMBOL DESCRIPTION

BLOCK NAME

ROOM NUMBER IDENTiFICATlON

ARC07

EXTERIOR WALL TYPE IDENTIFICATION (SHALL BE A NUMBER).

ARC08

WINDOW IDENTIFICATION (SHALL BE A LEDER).

ARC09

WALL PARTITION TYPE IDENTIFICATION (SHALL BE A LEDER).

ARC10

SIGN PANEL SYMBOL USED ONLY ON ELEVATIONS

ARC11

SITE SIGN INDICATOR

ARC12

SIGN BAND INDICATOR

ARC13

SIGN SYMBOL INDICATOR

ARC14

INS. POINT

EXT._wfL~'D INS. POINT

WIN~ INS. POINT

OART!TIO~TTER INS. POINT

..

~'" "'"

­

S~

SiA._

TYP INS. POINT

t~

5T4_&_

GN

s~

ST



GN

INS. POINT

INS. POIN;

App.6-28

ARCHITECTURAL SYMBOLS

SYMBOL

SYMBOL

S~N_T E & GN

DESC~IPTION

SIGN IN SERVICE MODULE

ST

BLOCK NAME

ARC15

INS. POINT

d /

SIGN TYPE SYMBOL

"EXAMPLE"

SIGN DESCRIPTION - A GROUP OF SIGNS SIMILAR IN FUNCTION, S~APE OR SIZE. REFER TO SIGN DESC:;:PTION.

" EXAMPLE"

SIGN No. - INDICATOR OF A S:J::CIFIC SIGN OF THE SAME TYPE.

"EXAMPLE"

STATION No. STATION.

"EXAMPLE"

INDICATOR OF A SPECIFIC

LEADER LINE CONNECTED TO T:-i:: FACE OF SIGN ON WHICH THE MESSAGE: IS DISPLAYED (EXTENDED LINE SHt.._L BE .35mm PEN THICK).

"BY USE:R"

SIGN FACE

"EXAMPLE"'

SIGN SYMBOL - SHOWN AT APPROXIMATE LOCATION ON LOCATION PLAN.

"EXAMPLE"'

SIGN DESCRIPTION N

STATION NAME

"EXAMPLE"'

B

STATION NAME WITH BRAILLE Cr.ARACTER

"EXAMPLE"

App.8-29

ARCHITECTURAL SYMBOLS

SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

SIGN DESCRIPTION (CONT.)

D

DIRECTION/INFORMATION

"EXAMPLE"

R

RESTRICTION

"EXAMPLE"

T

TVM IDENTIFICATION

" EXAMPLE"

M

MAP CASE IDENTIFICATION

"EXAMPLE"

E

EMERGENCY TELEPHONE IDENTIFICATION

"EXAMPLE"

V

VEHICLE INFORMATION

"EXAMPLE"

P

TELEPHONE IDENTIFICATION

"EXAMPLE"

SITE MARKER

"EXAMPLE"

U

VMS UNIT

"EXAMPLE"

F

REMOVABLE BLANK PANEL FOR FUTURE SIGN.

" EXAMPLE"

CONCRETE (PATIERN=AR-CONC; ROTATION=O')

"BY USER"

C.M.U. (PATIERN=ANSI31; ROTATION=O')

"BY USER"

GRANITE (PATIERN=ANSI33; ROTATION=O')

"BY USER"

COMPACTED FILL (PATIERN=AR-SAND; ROTATION=O')

"BY USER"

SM

I:' ",

~ ,~I

~



App.8-3O

I

. I

!

ARCHITECTURAL SYMBOLS

SYM30L DESCRIPTION

BLOCK NAMe:

EART~ (PATTERN=EARTH: . ROTA"T"ION=4S")

"BY USER"

TILE (PATTERN=GRATE: ROTATION =0')

"BY USER"

INSULATION (PATTERN=INSUL; ROTATION=O')

"BY USER"

PLAYWOOD (PATTERN=ZIGZAG; ROTA-:-,ON= 135")

"BY USER"

~

GYPSUM BOARD (PATTERN=ANSI37; ROTATION=O")

.. BY USER"

~

STEEL (PATTERN=ANSI32; ROTATI8N=0")

"BY USER"

~

STAINLESS STEEL OR ALUMINIUM (PATTERN=ANSI34; ROTATION=O")

"BY USER"

~~

GLAZING (PATTERN=AR-RROOF; ROTATION= 135')

"BY USER"

MARBLE:· (PATTERN=HOUND; ROTATioN=O")

"BY USER"

SYMBOL..

I I ~·:-----------:I ------------

c============

App.8-31

ARCHITECTURAL SYMBOLS SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

II

METAL (PATTERN=CORK; R:)TATION=O·)

App.

~32

"BY USER"

STRUCTURAL SYMBOLS

SYMBOL

SYMBOL DESCRiPTION

BLOCK NAME

CONSTRUCTION JOINT (KEYED)

"BY USER"

App.8-34

GEOTECHNICAL SYMBOLS SYMaOL

~INS. ~INS.

~'NS. ~INS. ~INS.

~INS.

SYMaOL DESCRIPTION

BLOCK NAME

TEST BORING LOCATION

GEOOl

TEST PIT

GEOO2

WELLPOINT PiEZOMETER

GEOO3

OBSERVATION WELL

GEOO4

INCLINOMETER CASING

CEOOS

DEEP BENCHMARK

GEOO6

WELL GRADE GRAVELS (PATIERN=HONEY ROTATION=O").

"BY USER"

LOW PLASTICITY ORGANIC SILTS AND CLAYS (PATIERN=ANSI3.3; ROTATlON=O·).

"BY USER"

HIGH PLASTICITY ORGANIC SILTS AND CLAYS (PATIERN=ANSI.32; ROTATION=O").

"BY USER"

SILTY SANDS (PATTERN=AR-SAND: ROTATION=O").

"BY USER"

SILTY GRAVELS (PATTERN=AR-CONC: ROTATION=a).

"8Y USER"

CLAYEY SANDS (PATTERN=INSUL; ROTATION=4S").

"BY USER"

POINT

POINT

POINT

POINT

POINT

POINT

~ ~

~ I

1

r·.

•"

4

4

"I

App.8-35

GEOTECHNICAL SYMBOLS

SYMBOL

~ ~~

I

!

! I : I !Ii!

:i ! I !I

i

I ~ ~ ~ I :::::::::ooooocoooo 0000000000000 ;:)000000000000

-

--

SYMBOL DESCRiPTION

BLOCK NAME

CLAYEY GRAVELS (PATTERN =CLAY; ROTATION= US').

"BY USER"

TYPICAL DUAL CLASSIFICATION (PATIERN=BRASS; ROTATION=90').

"BY USER"

POORLY GRADED GRAVELS (PATTERN=HEX ROTATION=O').

"BY USER"

FILL (PATIERN =EARTH; ROTATION= US').

"BY USER"

LOW PLASTICITY INORGANIC CLAYS (PATTERN=ANSI31; ROTATION=90').

• BY USER"

HIGH PLASTICITY INORGANIC CLAYS (PATTERN=ANSI32; ROTATION=90').

.. BY USER"

LOW PLASTICITY INORGANIC SILTS AND VERY FINE SANDS. (PATTERN=ANS!38; ROTATION= 135").

"BY USER"

HIGH PLASTICITY INORGANIC SILTS (PATTERN =CLAY; ROTATION=O').

"BY USER"

POORLY GRADED SANDS (PATIERN=CORK; ROTATlON=O').

"BY USER"

WELL GRADED SANDS (PATIERN=SOUARE; ROTATION =0').

"BY USER"

DECOMPOSED ROCK - A TRANSITIONAL ~~ATERIAL BETWEEN SOIL AND ROCK WHICH RETAINS THE RELIC STRUCTURE OF THE PARENT ROCK. (PATTERN=ZIGZAG; ROTATlON=90').

"BY USER"





App.8-36

GEOTECHNICAL SYMBOLS SYMBOL

1111

i I;:~ i I111 ! III

SYMBOL DESCRIPTION

BLOCK NAME

SANDSTONE

"BY USER"

(PATTERN=NET; ROTATION=O').

App.8-37

MECHANICAL SYMBOLS

SYMBOL

~'" ~'"

~INS.

SYMBOL DESCRIPTION

BLOCK NAME

THERMOSTAT -

MECD1

REMOTE BULB

HUMIDISTAT

MEC02

THERMOSTAT

MEC03

FIRESTAT

MEC04

FLOW SENSOR

MECOS

MOTOR OPERATOR

MECD6

POINT

~INS.

POINT

~INS.POINT ~INS.POINT .

~INS.

POINT

~INS.POINT

~INS.

POINT

~

~INS.

POINT OF CONNECTION TO EXISTING WORK. DEMOLITION ENDS HERE PIPING & DUCTS.

NEW WORK

eAP

MEe07

MEeos

EOUIPMENT CALLOUT

MEC09

RISER CALLOUT

MEC1Q

THERMOMETER

MEC11

ORIFICE (FLOWMETER)

MEC12

GAUGE

MEC13

PUMP

MEC14

POINT

~INS'

POINT

~INS'

-1 d~INS. ­ ;

POINT

POINT

App.8-38

MECHANICAL. SYMBOLS

~_______ SY_M_,8_0_L_________S_Y_M_B_O_L_D_E_S_C_R_IP_T_IO_N_____________a_~_O_C_K__N_A_M_E~I.

~IIllS.

~'IIIS.

~------------

t

i

+ I

I

I

"DUCT SiZ~'

-? I

C2

I

I'!'

I

.;> I i

i

, l' '-

t

t t l

r-'-'-'--~ ,

oJ

I~CH LETIER INS. POIIliT

IIliS. POINT)

~'NS.

POSITIVE PRESSURE

M:::C15

DUCT SECTION -

NEGATIVE PRESSURE

MEC16

POINT

~---------- --------------­ ---------~

~

DUCT SECTION POINT

POINT

ACOUSTICALLY LINED DUCT DASHED LINE SHALL BE ..35mm PEN THICK).

"BY USER"

DIRECTION OF AIR FLOW IN DUCT

"BY USER"

DUCT SIZE. FIRST FIGUR!: IS SIDE SHOWN SHOWN TEXT SHALL BE LEROY 100 IN ..35mm PEN THICK).

"BY USER"

DUCT TRANSITION. ROUND TO RECTANGULAR (CENTER LINE SHALL BE .35mm PEN THICK).

"BY USER"

DUCT TRANSITION

"BY USER"

MANUt>,L DAMPER

"BY USER"

PITCH OF PIPE (R-RISE. 0- DROP) (USER MUST USE LETIER "R" OR "

MEC17

0")

CAP (EXTENDED LINE SHALL BE CONTINUOUS IN .70mm PEN THICK).

MEC1S

BUSHING (EXTENDED LINE SHALL BE CONTINUOUS IN .70mm PEN THICK).

MEC19

App.8-39

MECHANICAL SYMBOLS SYMBOL

SYMBOL DESCRIPTION

BLOCK NAME

PIPE SLEEVE (EXTENDED LINE SHAL.L BE CONTINUOUS IN .70mm PEN THICK).

MEC20

PLUG (EXTENDED LINE SHALL BE CONTINUOUS IN .70mm PEN THICK).

•. BY USER"

---------RL--------

REFRIGERANT LIQUID (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

---------RG--------

RErRIGERANT HOT GAS (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND

TEXT SHALL BE LEROY 100 IN .35mm

PEN THICK).

"BY USER"

---------RS--------

REFRIGERANT SUCTION (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

---------GL--------

GLYCOL (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL LEROY 100 IN .35mm PEN THICK).

"BY USER"

--------- G- - - - - - -

NATURAL GAS (LINE SHALL BE CONT:NIJOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

- - - - - - - CHWS - - - - - - -

CHILLED WATER SUPPLY (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

----11~~ -

:~I"'S.

~I"'S.

POINT

POINT

App. B-4O

MECHANICAL SYMBOLS I.

SYMBOL

SY~30L

DESCRIPTION

BLOCK NAME

-----0---­

CONJENSATE DRAIN (LINE SHALL BE CON7:NUOUS IN .70mm PEN TH[CK

AND TEXT SHALL BE LEROY 1.00 IN

35rr:m PEN TH[CK).

- - - - - HWS---­

HEATING HOT WATER SUPPLY (LINE SHALL BE CONTINUOUS IN .70mm

PEN THICK AND TEXT SHALL BE LEROY

100 [N .35mm PEN THICK).

-----HWR----­

HEATING HOT WATER RETURN (LINE SHALL BE CONTINUOUS IN .70mm

PEN THICK AND TEXT SHALL BE LEROY

100 IN .35mm PEN THiCK).

"BY USER"

------------ CHWR ----------­

CHILLED WATER RETURN (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK

AND TEXT SHALL BE LEROY 100 IN

.35mm PEN THICK).

"BY USER"

- - - - CWS - - - - - ­

CONDENSER WATER SUPPLY (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK

AND TEXT SHALL BE LEROY 1 00 IN

.35mm PEN THICK).

.. BY USER"

- - - - CWR - - - ­

CONDENSER WATER RETURN (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK

AND TEXT SHALL BE LEROY 100 IN

.35mm PEN THICK).

"BY USER"

- - - - RHS - - - ­

REHEAT WATER SUPPLY (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK

AND TEXT SHALL BE LEROY 100 IN

.35mm PEN THICK).

"BY USER"

App.8-41

.. BY USER"

U

BY USER"

MECHANICAL SYMBOLS

SYMBOL

--------RHR------­

---------A-------­ - - - - - - M ------­

SY~;'30L

DESCRIPTION

BLOCK NAME

RE::-i::AT WATER RETURN (LINE SHALL BE CONTINUOUS IN .70mm PE:N THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

COMPRESSED AIR (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

MAKE-UP WATER SUPPLY (LINE SHALL BE CONTINUOUS IN .70mm PEN THICK AND TEXT SHALL BE LEROY 100 IN .35mm PEN THICK).

"BY USER"

!

i

j

. !

App.8-42

ELECTRICAL SYMBOLS

SYMBOL I

~'NS.

POINT

E

~'NS.

POINT

E ' - , N S . POINT

R

SYMBOL DESCRIPTION

B!....OCK NAME

NEW PRIMARY CONCRETE: POLE TO BE INSTALLED.

ELEOl

EXISTING CONCRETE POWER POLE TO REMAIN.

ELE02

EXISTING WOOD POWER POLE

ELE03

TO REMAIN.

EXISTING CONCRETE POWER POLE TO BE REMOVED.

ELE04

~'NS.

EXIS;ING WOOD POWER POLE TO BE REMOVED.

ELEOS

~'NS.

NEW POWER TRANSFORMER TO BE NSTALLED (No. DENOTES KVA).

ELE06

EXISTING POWER TRANSFORMER

ELE07

~'NS.

POINT

R POINT

POINT

E

~'NS.

POINT

R

~'NS.

POINT

I

~INS.

TO REMAIN. EXISTING POWER TRANSFORMER

ELE08

TO BE REMOVED. NEW PAD MOUNTED TRANSFORMER TO BE INSTALLED.

ELE09

EXISTING PAD MOUNTED TO REMAIN

ELE10

POIIiIT

~'NS.

POINT

App.6-43

ELECTRICAL SYMBOLS SYMBOL DESCRIPTION

BLOCK NAME

EXISTING PAD MOUNTED TO BE REMOVED

ELEll

NEW STREET LIGHTING TO BE INSTALLED.

ELE12

POINT

EXISTING STREET LIGHTING TO BE REMAIN.

ELEU

POINT

~'NS.

EXISTING STREET LIGHTING TO BE REMOVED.

ELE14

POINT

~INS.

POINT

EXISTING POWER TOWER

ELE15

ELECTRICAL MANHOLE TO BE INSTALLED.

ELE16

NEW AERIAL ELECTRICAL LINE TO BE INSTALLED (LINE SHALL BE

CONTINUOUS IN .70mm PEN THICK;

TEXT SHALL BE .35mm PEN THICK

AND LEROY 100 AS A TEXT HEIGHT).

"BY USER"

---------ER----------

EXISTING AERIAL ELECTRICAL TO. REMAIN (LINE SHALL BE IN .50mm PEN THICK; TEXT BE .35mm PEN THICK AND AS A TEXT HEIGHT).

"BY USER"

------R-----­

EXISTING AERIAL ELECTRICAL LINE TO BE REMOVED (LINE SHALL BE CONTINUOUS IN .50mm PEN THICK; TEXT SHALL BE .35mm PEN THICK AND LE80Y 100 AS A TEXT HEIGHT).

sY~aOL

R

~'NS. ~'NS. ~'NS.

POINT

~

App. B-44

LINE CONTINUOUS SHALL LEROY 100

"BY USER"

ELECTRICAL SYMBOLS

SYMBOL

'----1---­ i

-

-

-ER- -



,----R---­

SYMBOL DESCRIPTION

BLOCK NAME

NEW UNDERGROUND ELECTRICAL c.INE TO 9E INSTALLED (LINE SHALL aE DASrlED IN .70mm PEN THICK; TE:XT SI-iA:"L BE . .35mm PEN THICK A\D LEROY 100 AS A TEXT HEIGHT).

··BY USER"

EXiSTING UNDERGROUND ELECTR!CAl LINE TO REMAIN (LINE SHAll BE DASHED IN .50mm PEN THICK; TEXT SHALL BE .35mm PEN THiCK AND LEROY 100 AS A TEXT HE!C:-1T)

"BY USER"

EX'STING UNDERGROUND ELECTRCAL LINE TO BE REMOVED (LINE SHA'..'­ BE DASHED IN .50mm PEN THIC,-(; TC:X: SHALL BE .35mm PEN TH;C-< AND LEROY 100 AS A TEXT HEiGC,T).

"BY USER"

App.845

TRACKWORK SYMBOLS SYMBOL DESCRIPTION

SYMBOL

BLOCK NAME

CURVE NUMBER

str01

SPIRAL NUMBER

str02

GRADE CROSSING

"BY USER"

II

INSULATED RAIL JOINT-BOTH RAILS

• BY USER"

I,

INSULATED RAIL JOINT - L RAIL

"BY USER"

INSULATED RAIL JOINT - R RAIL

"BY USER"

NON INSULATED RAIL JOINT

"BY USER"

INSULATED RAIL JOINT

"BY USER"

~

LEFT HAND CURVE

"BY USER"



RIGHT HAND CVRVE

"BY USER"

POINT OF SWITCH-LOCATION OF SWITCH MACHINE

"BY USER"

TURNOUT, L.H. SHOWN

"BY USER"

DOUBLE CROSSOVER

"BY USER"

BUMPING POST

"BY USER"

PI / PVI

"BY USER"

q , N S . POINT

~'NS.

POINT

:::::=::J

\1

II '---..)

,.....----, 9

9

,/

Z

6

$X $ ~

~

App. B-46

TRACKWORK SYMBOLS SYMBOL

"

I"

SYMBOL DESCRIPTION

:

," . ,: I ,

BLOCK NAME

CONCRETE (PATTERN=AR-CONC; ROTATION = 0').

"BY USER"

TIMBER (PATIERN=ANSI33; ROTATION=Q').

"BY USER"

ASPHALT (PATIERN=NET3; ROTATION =0').

"BY USER"

STEEL (PATIERN=ANSI32; ROTATION=O').

"BY USER"

BALLAST (PATIERN=HONEY; ROTATION=O').

"BY USER"

SUS-BALLAST (PATIERN=HEX; ROTATlON=O').

"BY USER"

SUBGRADE, EARTH (PATIERN=EARTH; ROTATION= 135').

"BY USER"

App.8-47

TRAFFIC SYMBOLS

""

BLOCK

SIGN

TRFOl

TRMoFIC CONTROL BOX

TRF02

TRAFFIC LIGHT POLE

TRF03

TRAFFIC SIGNAL COMPUTER

TRF04

LOCATION AND CODE NUMBER

TRF05

SWSL

SINGLE WHITE SOLID LINE

"BY USER"

SWEL

SINGLE WHITE EDGE LINE

"BY USER"

SYEL

SINGLE YELLOW EDGE LINE

"BY USER"

SWSLL

SINGLE WHITE SKIP LANE LINE

"BY USER"

DWSL

DOUBLE WHITE SOLID LINE

"BY USER"

DYSL·

DOUBLE YELLOW SOLID LINE

"BY USER"

SWTLL

SINGLE WHITE TURNING LANE LINE

"BY USER"

SYSLL

SINGLE YELLOW SKIP LANE LINE

"BY USER"

SYSL

SINGLE YELLOW SOLID LINE

"BY USER"

:

~INSo POINT

~1~So POINT

~NSo POINT TSC L-<-~,tolSo POltolT

@"'~~

''-...--

NAME

SYMBOL DESC~IPTION

SYMBOL

Appo B-048

Related Documents

Cadd Centre
November 2019 12
Cadd Commands- Word
May 2020 5
Cadd Assoc Photo
December 2019 8
Civil
November 2019 44

More Documents from ""