Analyze Stability
Analyze Capability
Processes that are "out of control" need to be stabilized before they can be improved using the problem-solving process. Special causes require immediate cause-effect analysis to eliminate variation.
When Cp, the process capability index, and Cpk, the centering index, are over 1.0, the process is capable, but most manufacturers require Cp>1.33. Lower Spec Limit
The following diagram will help you evaluate stability in any control chart. Unstable conditions can be any of the following:
Upper Spec Limit
Waste
Capable Cp>1 Cpk>1
Rework Target
3σ 2σ 1σ
-1σ -2σ -3σ
SPC Simplified
Cpk 1.0 1.33 1.66 2.0
How to Plug the Leaks In Your Cash Flow! SPC SIMPLIFIED
Sigma 3 4 5 6
Use the problem solving process to identify and prevent the root causes of waste (usually below the lower specification limit) and rework (usually above the upper specification limit). The goal, is to reduce variation so that all of your points fit within the specification limits, clustered around a target.
Time to Install (Before) Any of these conditions suggests that an unstable condition may exist. Consider investigating the special cause of variation. The QI Macros automatically identify these for you. Use the Ishikawa diagram to analyze potential root causes. Once you've eliminated the special causes, you can turn your attention to using the problem solving process to reduce the common causes of variation: BEFORE
Problem Solving AFTER
8 7 6 5 4 3 2 1 0
11 10 9 8 7 6 5 4 3 2 1 0
LSL
SPC Made Easy
USL
SPC Made Easy Quick Reference Card For SPC Video © 2006 Jay Arthur
Time to Install (After) LSL
KnowWare® International, Inc. 2244 S. Olive St. Denver, CO 80224-2518
USL
(888) 468-1537 or (303) 756-9144 (888) 468-1536 or (303) 753-9675 (fax) $3.00
[email protected] www.qimacros.com
Choosing The Right Chart
Sustain the Improvement
QI Macros Sample Data
Sample Size
Purpose: Stabilize and Sustain the Improvement
Defect Data
Key Tools Flowchart: Show the flow of work through a process including all activities, decisions, and measurement points.
Count Defective Items?
X
Defective? Yes/No
Defective
Step Activity
Defects People Events
X
X
How many defects?
X
1 Refine the process
Define Measure
2 Identify the critical to quality indicators (CTQs)
Improve Measure
3 Implement the critical to quality indicators
Sustain Control
4 Check the process for stability and capability
Honor
5 Review, recognize, and refocus
SPC Training Video To learn more about SPC, consider our 1 hr video: www.qimacros.com/sixsig267.html
u Chart
Varies errors/orders components/assemblies Patient falls/days
Count Number of Defects Per Item
More than one defect per item
Rates or Ratios?
Services & Manufacturing
XmR Individuals
Cycle Time
XbarR
(Measured) decimal: 1.3 Time
Length Weight
Variable Data
1 length or weight per item time/project cost/project infections/1000 patient days 2-10 diameters, lengths tensile strength resistance
Variable
Height
Focus
c Chart
Constant injuries/month Patient falls/month
(counted) integer: 1,2
Sustain The Improvement (Control) FISH
p Chart
Varies wrong orders/orders medication errors infections/patient days
Attribute
Control Chart: Help analyze, sustain, and monitor the current levels of process stability and to identify key issues for problem solving or root cause analysis. Histogram: Determine the capability (i.e., the level of performance the customers can consistently expect) of the process and the distribution of measurable data.
Constant defects/100
np Chart
Cost
11-25 diameters, lengths tensile strength resistance
$ XbarS
Samples used to analyze large runs of product
Manufacturing
Download a FREE 30 day evaluation copy To automate these charts, try the QI Macros for Excel. www.qimacros.com/freestuff.html.
Control Chart Wizard The QI Macros can analyze your data and select and run the right control chart for you.