Sunrise Symphony

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Sunrise Symphony as PDF for free.

More details

  • Words: 485
  • Pages: 11
A Joint venture of Sureka Group & West Bengal Housing Board

Sunrise Symphony

Newtown Action Area-II

Mas ter plan

Second floor plan

3rd to 12th floor plan

S UNR IS E S YMPHONY S PE C IFIC ATIONS – AT R HYTHM A ir ConditioningApartments fitted with VRV/VRF R oom F inishBedroom, Living/Dinning Floor – Mirror finish Vitrified floor tiles Master Bedroom Floor – Laminated Wooden flooring Walls – Plaster of Paris K itchenModular kitchen with granite counter and chimney T oilet – Fittings – Branded CP fittings with hot & cold mixing arrangement Glass screen at Shower area in MBR toilet D oors Main entrance – Steel door Internal – Flush doors

   

S UNR IS E S YMPHONY AMENITIE S – AT R HYTHM  L arge air conditioned m ultipurpose hall cum B adminton court

   Open air stage facing central landscaped lawn and garden  I nfinity edge swimm ing pool on landscaped plaza on first floor level   L ounge cum library  H ome theatre room  G ymnasium, Y oga room, T oddlers’ play room ,Cards room , I ndoor games

room / B illiard room , G uest rooms with attached toilets

 D octor’s chamber

   E lectronic S urveillance  A dequate numbers of high speed elevators with provision

F or stretcher-cum-goods elevators in each tower  Centralized gas bank at extra cost & G enerator for power back up at extra

cost

 

Price and Payment S chedule of R HYTHM as on 7th Aug us t 2009 I N STA L M E N T P L A N B ase P rice- R s.2700 per sqft plus R s.10 as you go up D OW N P A Y M E N T P L A N B ase P rice-R s.2550 per sqft plus R s.10 as you go up

Car P ark ing S pace   Covered in Ground Floor=R s.3,00,000 Covered in Basement=R s.2,50,000 Open =R s.2,00,000   Club   Per Apartment=R s.60,000.00   M aintenance Cor pus D eposit   Per Sq. Foot=R s.30

.

Payment S cedule – Ins talment

Particulars Application Fee

Due on On Application

Amount 10% of Apartment Price

Allotment Money

15% of Apartment Price

1st Installment

Within 30 days from the date of allotment On completion of Foundation

2nd Installment

On casting of 3rd Floor

10% of Apartment Price

3rd Installment

On casting of 5th Floor

10% of Apartment Price

4th Installment

On casting of 8th Floor

10% of Apartment Price

5th Installment

On casting of 11th Floor

10% of Apartment Price

6th Installment

On casting of 14th Floor

10% of Apartment Price

7th Installment

On casting of the Roof

10% of Apartment Price

Final Installment

On or before the date of possession

10% of Apartment Price

5% of Apartment Price

For more information about booking Please Call,

Sourabh Sarkar Homebay ( a subsidiary of JLL Meghraj)

+91 983093428

[email protected]

Related Documents

Sunrise Symphony
June 2020 6
Sunrise
June 2020 7
Sunrise
December 2019 12
Sunrise
November 2019 21
Borobudur Sunrise
July 2020 9
The Sunrise
June 2020 8