WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

TABEL DAFTAR HARGA BAHAN BANGUNAN Periode Jenis Bangunan Klasifikasi Proyek Lokasi Wilayah

No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

: : : : : :

Jenis Bahan Bangunan

Accessories, Talang PVC Alkasit, Kalle Aluminium Foil Amplas Besi Amplas Dinding Amplas Kayu Amplas Kayu Balok Kayu, Borneo Balok Kayu, Kamper Samarinda Balok Kayu, Kamper Singkil Balok Kayu, Meranti Bambu Batu Bata Batako Semen Batako Kapur Batu Kali Batu Karang Batu Seplit Batu Tempel, Andesit Biasa, Polos Batu Tempel, Andesit Bakar, Alur Batu Tempel, Bali Green Batu Tempel, Breksi Batu Tempel, Candi Permukaan Rata Batu Tempel, Candi Permukaan Motif Batu Tempel, Hijau Sukabumi Batu Tempel, Pacito Roso Batu Tempel, Pacito Roso, Alur Batu Tempel, Palimanan Batu Tempel, Paras Batu Tempel, Paras, Bevel Keliling Batu Tempel, Susun Sirih Batu Tempel, Templek Garut Baut Aisan Kap Baut Gording Baja/ Besi Kanal C Benang Rami Bendrad Besi Beton Polos U.240, fy=2400kg/cm2 Besi Beton Ulir U.390, fy=3900 kg/cm2 Besi CNP Besi Wiremesh

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 1 of 93

November 2008 Bangunan Umum Menengah Renovasi - Bangun Baru Jakarta Jabodetabek

Sat

Vol

ls ktg m2 lbr lbr lbr lbr m3 m3 m3 m3 btg bh bh bh m3 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 kg bh glg kg kg kg kg kg

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Harga Satuan ( Rupiah ) Rp25,000.00 Rp17,500.00 Rp4,000.00 Rp5,000.00 Rp5,000.00 Rp5,000.00 Rp6,000.00 Rp3,500,000.00 Rp7,500,000.00 Rp6,000,000.00 Rp5,000,000.00 Rp6,000.00 Rp380.00 Rp1,500.00 Rp800.00 Rp185,000.00 Rp350,000.00 Rp185,000.00 Rp130,000.00 Rp150,000.00 Rp100,000.00 Rp80,000.00 Rp85,000.00 Rp110,000.00 Rp60,000.00 Rp95,000.00 Rp110,000.00 Rp70,000.00 Rp85,000.00 Rp110,000.00 Rp120,000.00 Rp35,000.00 Rp8,000.00 Rp1,500.00 Rp2,000.00 Rp18,000.00 Rp8,000.00 Rp8,500.00 Rp8,500.00 Rp8,500.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Besi Hollow 4x4x400cm Besi Hollow 2x4x400cm Besi Kanal C Besi Siku Besi Tempa Besi WF Beton Ready Mix K.350 Beton Ready Mix K.300 Beton Ready Mix K.275 Beton Ready Mix K.250 Beton Ready Mix K.225 Beton Ready Mix K.175 Blok Hebel T.10cm Blok Hebel T.7,5cm Box Sikring 2 Group Box Sikring 4 Group Box Sikring 6 Group Box Sikring 8 Group Buis beton, d100cm Calbond, (4L) Cat Besi, Emco Cat Besi, Glotek Cat Besi, Ftalit Cat Dasar Besi, Zinkromat Cat Duko, NIPPE Cat Kayu, Emco Cat Kayu, Glotek Cat Kayu, Ftalit Cat Lantai, TEKNOKOTE Cat Melamik, IMPRA Wood Filler (muda) Cat Melamik, IMPRA Wood Filler (tua) Cat Melamik, IMPRA Wood Stain (muda) Cat Melamik, IMPRA Wood Stain (tua) Cat Politur P0-1, IMPRA Cat Politur P0-3, IMPRA Casting, (25kg) Cat Genteng, (5L) Cat Primer Alkali Resisting ICI, Dulux Cat Tembok, Danabrite Exterior Cat Tembok, Danabrite Interior Cat Tembok, Elastometric Wall Coating Cat Tembok ICI, Catylac Warna Biasa Cat Tembok ICI, Catylac Warna Khusus Cat Tembok ICI, Dulux Exterior Cat Tembok ICI, Dulux Interior Cat Tembok Super Vinilex Cat Tembok Vinyl Matt, (5L) Cat Waterproff, AQUAPROFF Dolken Drop Hammer, Mini Pile- 28 Drop Hammer, Mini Pile- 32 Drop Hammer, Square Pile - 20 x 20 Drop Hammer, Square Pile - 25 x 25 Drop Hammer, Spun Pile - 30 x 30 Drop Hammer, Spun Pile - 35 x 35

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 2 of 93

btg btg kg kg m2 kg m3 m3 m3 m3 m3 m3 bh bh bh bh bh bh bh ltr kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg btg m' m' m' m' m' m'

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp25,000.00 Rp20,000.00 Rp8,000.00 Rp7,500.00 Rp500,000.00 Rp9,000.00 Rp577,500.00 Rp566,500.00 Rp550,000.00 Rp539,000.00 Rp528,000.00 Rp506,000.00 Rp7,000.00 Rp6,000.00 Rp60,000.00 Rp70,000.00 Rp80,000.00 Rp100,000.00 Rp100,000.00 Rp17,500.00 Rp40,000.00 Rp32,500.00 Rp35,000.00 Rp35,000.00 Rp42,500.00 Rp40,000.00 Rp32,500.00 Rp35,000.00 Rp44,000.00 Rp23,000.00 Rp28,000.00 Rp39,000.00 Rp43,000.00 Rp35,000.00 Rp37,500.00 Rp4,000.00 Rp23,000.00 Rp34,000.00 Rp40,000.00 Rp28,000.00 Rp56,000.00 Rp13,000.00 Rp15,000.00 Rp68,000.00 Rp50,000.00 Rp14,000.00 Rp19,000.00 Rp42,000.00 Rp8,000.00 Rp77,000.00 Rp87,500.00 Rp79,000.00 Rp115,000.00 Rp130,000.00 Rp148,000.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Drop Hammer, Spun Pile - 40 x 40 Drop Hammer, Spun Pile - 45 x 45 Drop Hammer, Spun Pile - 50 x 50 Drop Hammer, Spun Pile - 60 x 60 Engsel Jendela, 3x2,5", Kuningan Engsel Jendela, 3x2,5", Kuningan Engsel kupu-kupu Engsel Pintu, 3x4", Kuningan Engsel Pintu, 3x4", Kuningan Engsel Pintu, 3x5", Kuningan Fitting Lampu Plafond Floor drain, biasa KM Floor drain, khusus dak beton Floor drain, khusus KM Folding Gate Gagang Kunci KM, Kend Extra, T200x551 Gagang Kunci Pintu, SOLID Ziala HRE Gagang Kunci Pintu Utama Genteng Beton Badan Besar Genteng Beton Badan Sedang Genteng Beton Nok Genteng Keramik, Badan(Warna Standar) Genteng Keramik, Flashing Genteng Keramik, Jurai Genteng Keramik, Nok Genteng Keramik, Penangkal Petir Genteng Tanah Liat Badan Genteng Tanah Liat Nok Glassblock Uk20x20, Standar Glassblock Uk20x20, Corak Granito Lantai 40x40 Granito Lantai 60x60 GRC Board, t=4mm Grendel Jendela Grendel Pintu Grendel Tanam Pintu, Atas Grendel Tanam Pintu, Bawah Gypsum Board T.9mm, ELEPHANT Gypsum Board T.9mm, JAYA BOARD Hak Angin Jendela Hydraulic Hammer, Square Pile - 30 x Hydraulic Hammer, Square Pile - 35 x Hydraulic Hammer, Square Pile - 40 x Hydraulic Hammer, Square Pile - 45 x Hydraulic Hammer, Square Pile - 50 x Ijuk Resapan Isolasi listrik Isolasi pipa Jack In Piles, Square Pile - 20 x 20 Kaca Cermin Asahimas, t=5mm Kaca Es, t=5mm Kaca Polos, t=5mm Kaca Polos, t=6mm Kaca Polos, t=8mm Kaca Polos, t=10mm

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 3 of 93

30 35 40 45 50

m' m' m' m' bh bh bh bh bh bh bh bh bh bh m2 psg psg psg bh bh bh bh bh bh bh bh bh bh bh bh m2 m2 lbr pcs pcs pcs pcs lbr lbr pcs m' m' m' m' m' ikt glg glg m' m2 m2 m2 m2 m2 m2

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp188,000.00 Rp225,000.00 Rp288,000.00 Rp388,000.00 Rp15,000.00 Rp27,500.00 Rp7,500.00 Rp17,500.00 Rp32,500.00 Rp20,000.00 Rp15,000.00 Rp25,000.00 Rp160,000.00 Rp190,000.00 Rp400,000.00 Rp1,500,000.00 Rp350,000.00 Rp550,000.00 Rp6,900.00 Rp6,500.00 Rp13,000.00 Rp5,500.00 Rp12,000.00 Rp30,000.00 Rp14,000.00 Rp26,000.00 Rp3,500.00 Rp7,000.00 Rp17,000.00 Rp28,500.00 Rp175,000.00 Rp250,000.00 Rp45,000.00 Rp25,000.00 Rp35,000.00 Rp50,000.00 Rp75,000.00 Rp52,000.00 Rp58,000.00 Rp35,000.00 Rp120,000.00 Rp150,000.00 Rp190,000.00 Rp235,000.00 Rp280,000.00 Rp10,000.00 Rp6,000.00 Rp5,000.00 Rp125,000.00 Rp175,000.00 Rp115,000.00 Rp70,000.00 Rp95,000.00 Rp130,000.00 Rp200,000.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Kaca Polos, t=12mm Kaca Ryban, t=5mm Kaca Ryban, t=6mm Kabel NYM 2x1,5 Putih, (50m) Kabel NYM 2x2,5 Putih, (50m) Kabel NYM 3x1,5 Putih, (50m) Kabel NYM 3x2,5 Putih, (50m) Kabel NYY 4x16mm Putih, (50m) Kabel Telepon, (50m) Kabel TV, 5C Kawat BC dia 6mm Kawat Ayam Kawat Galvanized Kawat Las Kaso, Borneo Kaso, Kamper Samarinda Kaso, Kamper Singkil Kaso, Meranti Keramik Lantai 20x20, Warna Muda Keramik Lantai 20x20, Warna Muda Keramik Lantai 20x20, Warna Muda Keramik Lantai 20x20, Warna Tua Keramik Dinding 20x25, Warna Muda Keramik Dinding 20x25, Warna Tua Keramik Lantai 30x30, Warna Muda Keramik Lantai 30x30, Warna Muda Keramik Lantai 30x30, Warna Khusus Keramik Lantai 33.3x33.3, Warna Khusus Keramik Lantai 40x40, Warna Khusus Kitchen Zink, Royal SB9, 1 Lubang lengkap Kitchen Zink, Royal SB1, 1 Lubang lengkap Kitchen Zink, Royal SB2, 2 Lubang lengkap Klem Kabel Klem Pipa Listrik Kunci Gembok Kwas Cat Lakban plastik Lampu PLC 5W Lampu PLC 18W Lampu PLC 20W Lem PVC Lem Fox, (3kg) Lentrek List Keramik, 10x20 List Profil Gypsum, Kecil List Profil Gypsum, Sedang List Profil Gypsum, Besar List Profil Kayu, Kecil List Profil Kayu, Sedang List Profil Kayu, Besar Marmer Lantai 40x40 Marmer Lantai 40x60 Mata Bor U.Pek.Besi Mata Gerinda U.Pek.Besi Meni Besi

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 4 of 93

m2 m2 m2 roll roll roll roll m' m' m' m' m' kg kg m3 m3 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 pcs pcs pcs bks bh bh bh roll bh bh bh tube gln klg pcs btg btg btg btg btg btg m2 m2 bh bh kg

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp240,000.00 Rp115,000.00 Rp120,000.00 Rp250,000.00 Rp350,000.00 Rp375,000.00 Rp450,000.00 Rp15,000.00 Rp3,000.00 Rp4,000.00 Rp15,000.00 Rp15,000.00 Rp15,000.00 Rp20,000.00 Rp3,500,000.00 Rp7,500,000.00 Rp6,000,000.00 Rp5,000,000.00 Rp35,000.00 Rp32,500.00 Rp42,000.00 Rp45,000.00 Rp45,000.00 Rp48,000.00 Rp40,000.00 Rp45,000.00 Rp48,000.00 Rp58,000.00 Rp55,000.00 Rp350,000.00 Rp375,000.00 Rp570,000.00 Rp5,000.00 Rp500.00 Rp35,000.00 Rp5,500.00 Rp10,000.00 Rp22,000.00 Rp27,000.00 Rp35,000.00 Rp10,000.00 Rp110,000.00 Rp35,000.00 Rp10,000.00 Rp8,000.00 Rp10,000.00 Rp15,000.00 Rp6,000.00 Rp8,000.00 Rp10,000.00 Rp400,000.00 Rp500,000.00 Rp25,000.00 Rp20,000.00 Rp15,000.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Meni Kayu MCB Sikring, Merlin Gerin Neorefer, (2L) Paku Triplex Paku 5-7cm Paku 10-12cm Paku Seng Papan Cor, Jenjeng Papan, Borneo Papan, Kamper Samarinda Papan, Kamper Singkil Papan, Meranti Pasir Extra Beton Pasir Putih Pasir Pasang Pasir Urug Paving Block, T.6cm Paving Block, T.8cm Pintu PVC, 70x212, Warna Standard Pipa Flexible Listrik, (30m) Pipa GIP dia 1/2" Pipa PE dia 1/2" Pipa Listrik Clipsal Pipa PVC AW dia 1/2" Pipa PVC AW dia 3/4" Pipa PVC AW dia 1" Pipa PVC Type D dia 1,5" Pipa PVC Type D dia 2" Pipa PVC Type D dia 3" Pipa PVC Type D dia 4" Pipa PVC Type D dia 5" Pipa PVC Type D dia 6" Plamur Besi, SANPOLAC, 5kg Plamur Besi, ISAMU, 1kg Plamur Kayu Plamur Tembok, MATEX, (2kg) Plastik cor Plastaid HE, (4L), Incona Raya Dekabond+conbex 100, (1L) Pompa air Reng, Borneo Reng, Kamper Samarinda Reng, Kamper Singkil Reng, Meranti Rasidi Kayu Roll Cat Rooster Uk10x20cm Rooster Uk15x15cm Rooster Uk20x20cm Rumah Downlight, 3" Rumah Downlight, 4" Rumah Kunci Pintu Biasa, SOLID Rumah Kunci Pintu Utama, SOLID Sekrup Gypsum, 5cm (2000bj) Sicosol, Invisible Water_Repellent

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 5 of 93

kg bh gln kg kg kg kg lbr m3 m3 m3 m3 m3 m3 m3 m3 m2 m2 unit m' btg m' btg btg btg btg btg btg btg btg btg btg kg kg kg kg roll ltr ltr bh m3 m3 m3 m3 ltr bh bh bh bh pcs pcs bh bh bh L

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp15,000.00 Rp25,000.00 Rp30,000.00 Rp16,000.00 Rp12,000.00 Rp12,000.00 Rp16,000.00 Rp10,000.00 Rp3,500,000.00 Rp7,500,000.00 Rp6,000,000.00 Rp5,000,000.00 Rp200,000.00 Rp240,000.00 Rp185,000.00 Rp125,000.00 Rp30,000.00 Rp35,000.00 Rp350,000.00 Rp2,500.00 Rp65,000.00 Rp20,000.00 Rp10,000.00 Rp15,000.00 Rp18,000.00 Rp25,000.00 Rp38,000.00 Rp48,000.00 Rp90,000.00 Rp155,000.00 Rp260,000.00 Rp350,000.00 Rp17,000.00 Rp25,000.00 Rp12,000.00 Rp19,000.00 Rp100,000.00 Rp15,000.00 Rp45,000.00 Rp1,000,000.00 Rp3,500,000.00 Rp7,500,000.00 Rp6,000,000.00 Rp5,000,000.00 Rp5,000.00 Rp15,000.00 Rp3,500.00 Rp5,500.00 Rp11,000.00 Rp17,000.00 Rp20,000.00 Rp55,000.00 Rp55,000.00 Rp50.00 Rp40,000.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Semen PC Semen Putih Semen Grout Seng Gelombang BJLS 30 Seng Plat L.45cm Step Nosing Step Nosing Sikat Kawat Sirtu Gali Sok & Knee Besi Kuningan dia 1/2" Sok & Knee PE dia 1/2" Sok & Knee PVC AW dia 1/2" Sok & Knee PVC AW dia 3/4" Sok & Knee PVC AW dia 1" Sok & Knee PVC D dia 1,5" Sok & Knee PVC D dia 2" Sok & Knee PVC D dia 3" Sok & Knee PVC D dia 4" Sok & Knee PVC D dia 5" Sok & Knee PVC D dia 6" Splice Joint, 30x30 Splice Joint, 35x35 Splice Joint, 40x40 Splice Joint, 45x45 Splice Joint, 50x50 Stop Kran, dia 1/2" Stop Kran, dia 3/4" Stop Kran, dia 1" Stop Kran, dia 1/2" Stop Kran, dia 3/4" Stop Kran, dia 1" Stop Kran, dia 1/2" Stop Kran, dia 3/4" Stop Kran, dia 1" Saklar Tunggal Saklar Ganda Saklar Hotel Stop Kontak Biasa Stop Kontak Khusus AC Stop Kontak Khusus TEL Stop Kontak Khusus TV T Doos Listrik, Biasa T Doos Listrik Tanah Urug Talang PVC Textile Thinner, COBRA, (5L) Thinner, IMPALA, (5L) Torent air, 650L, Pinguin Plastik Torent air, 1000L, Pinguin Plastik Torent air, 1000L, Excel Plastik Torent air, 1000L, Excel Stainless Torent air, 1000L, Excel Stainless+Kaki Teakwood t=3mm, Melaminto Teakwood t=3mm, Sungkai

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 6 of 93

zak zak kg lbr m' pcs pcs bh m3 bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m3 bh roll gln gln unit unit unit unit unit lbr lbr

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp53,000.00 Rp65,000.00 Rp15,000.00 Rp40,000.00 Rp35,000.00 Rp1,500.00 Rp25,000.00 Rp7,000.00 Rp150,000.00 Rp7,500.00 Rp55,000.00 Rp4,000.00 Rp5,000.00 Rp6,000.00 Rp8,000.00 Rp10,000.00 Rp30,000.00 Rp50,000.00 Rp100,000.00 Rp110,000.00 Rp335,000.00 Rp525,000.00 Rp725,000.00 Rp900,000.00 Rp1,100,000.00 Rp90,000.00 Rp115,000.00 Rp150,000.00 Rp40,000.00 Rp50,000.00 Rp75,000.00 Rp60,000.00 Rp90,000.00 Rp120,000.00 Rp20,000.00 Rp22,000.00 Rp150,000.00 Rp18,000.00 Rp65,000.00 Rp75,000.00 Rp75,000.00 Rp1,000.00 Rp2,500.00 Rp80,000.00 Rp25,000.00 Rp5,000.00 Rp25,000.00 Rp20,000.00 Rp650,000.00 Rp1,100,000.00 Rp900,000.00 Rp1,650,000.00 Rp1,700,000.00 Rp70,000.00 Rp95,000.00 STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika 316 317 318 319 320 321 322 323 324 325 326 327 328

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Triplex 3mm Triplex 4mm Triplex 6mm Triplex 9mm Triplex 12mm Triplex 15mm Vernis Batu Alam, Bitasol Batu Alam Wallfiller, Dulux, (4L) Wallfiller, MOWILEX, (4L) Waterproffing Coating, Incona Raya, 5L Waterproffing Membrane, Incona Raya Waterproffing Membrane, CSM Water Repellent, Bitasil

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 7 of 93

lbr lbr lbr lbr lbr lbr kg kg kg gln m2 m2 m2

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp40,000.00 Rp48,000.00 Rp65,000.00 Rp110,000.00 Rp150,000.00 Rp180,000.00 Rp45,000.00 Rp17,000.00 Rp14,000.00 Rp80,000.00 Rp62,000.00 Rp60,000.00 Rp35,000.00

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

AR HARGA BAHAN BANGUNAN

Keterangan Spesifikasi Material

MOWILEX Uk 1,2x45 m2

Niken Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.5.00m Uk 5x10x20 Uk 10x20x40 Uk 7.5x14x28 Uk 10x15-15x20 Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk Uk

1/2 dan 2/3 15x30 15x30 15x30 15x30 15x30 15x30 15x30 15x30 15x30 15x30 15x30 15x30 3x20 Tidak Beraturan

Dia 12mm-1"

Panjang 12.00m Panjang 12.00m Panj.Ef.6.00m

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 8 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.6.00m Panj.Ef.6.00m Standar Panj.Ef.12.00m

Uk 60x20x10cm Uk 60x20x7,5cm Hanger Hanger Hanger Hanger INCONA RAYA

Kansai Paint

ds = 1,5-2m2/kg (3x kuas) Propan Propan Propan Propan Propan Furniture JAYA BOARD MOWILEX ds = 7-10m2/L (1x kuas) Danapaits Danapaits MOWILEX ICI Paints ICI Paints ICI Paints ICI Paints NIPPON PAINTS Cendana MOWILEX ds = 1m2/L (2x kuas) Panj.Ef.4.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 9 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Boss Solid Boss Solid Boss DL Standar TOTO TOTO Standar Standar Standar Cisangkan Cisangkan Cisangkan Kanimuri Kanimuri Kanimuri Kanimuri Kanimuri

Mulia Mulia Niro Granite Niro Granite SOLID SOLID SOLID SOLID Uk 1,2X2,40 m2 Uk 1,2X2,40 m2 SOLID Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m Panj.Ef.6.00m

Panj.Ef.6.00m

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 10 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Eterna Eterna Eterna Eterna Eterna

Tembaga

Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Asia OK Roman Gress Roman Gress Roman Gress Roman Gress Hercules Roman Roman Royal Roman Gress Roman Royal Royal Royal Royal

PHILLIPS PHILLIPS PHILLIPS

Panjang 2.00m Panjang 2.00m Panjang 2.00m Uk 3 x 3 cm Uk 5 x 5 cm Uk 7,5 x 7,5 cm Standar Standar

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 11 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m Panj.Ef.4.00m

PLATINDO

CLIPSAL WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN Isamu Matex 0,35L/50kg INCONA RAYA SHIMIZU Panjang 4.00m Panjang 4.00m Panjang 4.00m Panjang 4.00m

SOLID SOLID Propan TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 12 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Uk 10cm Uk 10X60cm

WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN WAVIN Square Pile Square Pile Square Pile Square Pile Square Pile KITZ KITZ KITZ ONDA ONDA ONDA SAN EI SAN EI SAN EI BROCO BROCO BROCO BROCO BROCO BROCO BROCO BIASA CLIPSAL KELAS 1

COBRA IMPALA PINGUIN PINGUIN EXCEL EXCEL EXCEL Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 13 of 93

STANDAR

WIJAY A TAR A ESTETI KA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 Uk 1,21X2,42 m2 BITAL ASIA ICI Paints MOWILEX ds = 3-4m2/L (2x kuas) Uk 1,0x22x1.02mm Screed=Rp30000 BITAL ASIA

TABEL DAFTAR HARGA BAHAN BANGUNAN

Page 14 of 93

STANDAR

WIJAYA TARA ESTETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

TABEL DAFTAR UPAH HARIAN PEKERJA Periode Jenis Bangunan Klasifikasi Proyek Lokasi Wilayah

No

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Daftar Keahlian

Kenek Kenek Baja Kenek Gypsum Kepala Tukang Mandor Baja Mandor Batu Mandor Gypsum Tukang Baja Tukang Batu Halus Tukang Batu Kasar Tukang Besi Tukang Cat Tukang Gali Tanah Tukang Gypsum Halus Tukang Gypsum Kasar Tukang Kayu Halus Tukang Kayu Kasar Tukang Listrik Tukang Pipa

TABEL DAFTAR UPAH HARIAN PEKERJA

: : : : : :

November 2008 Bangunan Umum Menengah Renovasi - Bangun Baru Jakarta Jabodetabek

Sat

Vol

hari " " " " " " " " " " " " " " " " " "

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Page 15 of 93

Upah Harian ( Rupiah )

Waktu Kerja ( Jam )

40,000.00 7 Jam Kerja 60,000.00 " 45,000.00 " 60,000.00 " 100,000.00 " 65,000.00 " 65,000.00 " 75,000.00 " 55,000.00 " 50,000.00 " 55,000.00 " 55,000.00 " 60,000.00 " 55,000.00 " 50,000.00 " 55,000.00 " 50,000.00 " 55,000.00 " 55,000.00 "

STANDAR

WIJAYA TARA ESTETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

TABEL DAFTAR HARGA SEWA ALAT, PERAWATAN ALAT BANTU DAN JASA PEKERJAAN Periode Jenis Bangunan Klasifikasi Proyek Lokasi Wilayah

No

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

No 1

: : : : : :

November 2008 Bangunan Umum Menengah Renovasi - Bangun Baru Jakarta Jabodetabek

Nama Alat Bantu Pekerjaan

Sat

Vol

Bar Binder Bar Cutter Blencong Concrete Mixer Crawler Crane Ember Aduk Genzet 20KVa Mesin Bor Mesin Bor Untuk Pondasi Mesin Gurinda Pacul Aduk Pahat Besi Pengki Pompa Beton Sekop Sendok semen Timbrisan Tanah Timbrisan Mesin Travo Las Vibrator

kg kg bh m3 Jam bh unit unit Jam unit bh bh bh m3 bh bh bh m3 unit m3

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Jasa Pekerjaan

Sat

Vol

Jasa Pemancangan

m'

Harga Satuan ( Rupiah )

Kap.Prod Alat

500.00 500.00 40,000.00 60,000.00 190,000.00 6,000.00 70,000.00 50,000.00 160,000.00 50,000.00 35,000.00 25,000.00 15,000.00 100,000.00 40,000.00 7,500.00 30,000.00 60,000.00 37,50M3/hari 70,000.00 40,000.00

Harga Satuan Keterangan ( Rupiah ) 1.00 42,500.00 HH, 7 Ton

TABEL DAFTAR HARGA SEWA ALAT Page 16 of 93 DAN PERAWATAN ALAT BANTU

STANDAR

WIJAYA TARA ESTETIKA Berkarya untuk estetika

2 3 4 5 6 7 8 9 10 11 12 13 14 15

Jasa Pemancangan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Jasa Pengelasan Loading & Unloading Loading & Unloading

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

m' bh bh bh bh bh bh bh bh bh bh bh m' m'

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

27,500.00 60,000.00 80,000.00 100,000.00 120,000.00 150,000.00 100,000.00 125,000.00 150,000.00 175,000.00 200,000.00 225,000.00 3,500.00 3,000.00

DH, 3.5 Ton SQ 30 X 30 SQ 35 X 35 SQ 40 X 40 SQ 45 X 45 SQ 50 X 50 SP 30 X 30 SP 35 X 35 SP 40 X 40 SP 45 X 45 SP 50 X 50 SP 60 X 60 SQ SP

Ket : HH = Hydraulic Hammer, Kapasitas Alat = 7 Ton DH = Drop Hammer, Kapasitas Alat = 3.5 Ton SP = Spun Pile SQ = Square Pile

TABEL DAFTAR HARGA SEWA ALAT Page 17 of 93 DAN PERAWATAN ALAT BANTU

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

DAFTAR ANALISA HARGA SATUAN PEKERJAAN Perihal : ANALISA HARGA SATUAN PEKERJAAN Periode : November 2008 Bangunan : Bangunan Umum Klasifikasi: Menengah

NO.

URAIAN PEKERJAAN

Pembersihan Lapangan/m2 a Bahan : - Pacul aduk - Pengki

bh bh

0.050 0.025

35,000.00 15,000.00 Jumlah.a

b. Upah : - Kenek - Tukang Batu Kasar

ht ht

0.020 0.010

40,000.00 50,000.00 Jumlah.b Jumlah.a+b

m3 m3 glg kg

0.005 0.006 0.100 0.100

3,500,000.00 3,500,000.00 2,000.00 12,000.00 Jumlah.a

ht

0.280

40,000.00 Jumlah.b Jumlah.a+b

Galian Tanah/m3 a Upah : - Tk.Gali Tanah

ht

0.750

60,000.00 Jumlah.a

b Alat Bantu : - Pacul - Benang Rami

bh glg

0.025 0.015

35,000.00 2,000.00 Jumlah.b Jumlah.a+b

A.

PEK.PERSIAPAN

2 a -

Pas. Bouwplank/m' Bahan : Kaso 5/7, Kayu Borneo Papan 2/20, Kayu Borneo Benang Rami Paku 7cm

b Upah : - Kenek

1

2

HARGA SATUAN Rp

KOEF

STRUKTUR

B.

: Struktrur : Jakarta : Jabodetabek

SAT

I.

1

Pekerjaan Lokasi Wilayah

PEKERJAAN TANAH

Urugan Tanah Kembali/m3

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 18 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

3

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

a Upah : - Tk.Gali Tanah

ht

0.350

60,000.00 Jumlah.a

b Alat Bantu : - Pacul - Pengki

bh bh

0.025 0.015

35,000.00 15,000.00 Jumlah.b Jumlah.a+b

Perataan Tanah/m2 a Upah : - Kenek - Mandor Batu

ht ht

0.050 0.003

40,000.00 65,000.00 Jumlah.a

b Alat Bantu : - Pacul - Pengki

bh bh

0.025 0.015

35,000.00 15,000.00 Jumlah.b Jumlah.a+b

ht ht ht ht

0.200 0.050 0.010 0.003

40,000.00 60,000.00 60,000.00 65,000.00 Jumlah.a

bh

0.125

30,000.00 Jumlah.b Jumlah.a+b

ht ht ht ht

0.200 0.050 0.010 0.003

40,000.00 60,000.00 60,000.00 65,000.00 Jumlah.a

b Alat Bantu : - Tibrisan Mesin

m3

0.250

60,000.00 Jumlah.b Jumlah.a+b

Urugan Pasir Pondasi/m3 a Bahan : - Pasir Urug

m3

1.200

125,000.00 Jumlah.a

b Upah : - Kenek

ht

0.350

40,000.00 Jumlah.b

c Alat Bantu : - Pacul - Pengki

bh bh

0.025 0.015

35,000.00 15,000.00 Jumlah.c

4 a -

Pemadatan Tanah Pondasi/m2, Manual Upah : Kenek Tk.Gali Tanah Kep.Tukang Mandor Batu

b Alat Bantu : - Timbrisan Tanah

5 a -

6

Pemadatan Tanah Pondasi/m2, Mesin Upah : Kenek Tk.Gali Tanah Kep.Tukang Mandor Batu

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 19 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a+b+c

7

8

9

Urugan Tanah Dari Luar Lokasi/m3 a Bahan : - Tanah Urug, Klas-1

m3

1.200

80,000.00 Jumlah.a

b Upah : - Kenek

ht

0.350

40,000.00 Jumlah.b

c Alat Bantu : - Pacul - Pengki

bh bh

0.025 0.015

35,000.00 15,000.00 Jumlah.c Jumlah.a+b+c

Urugan Sirtu Dari Luar Lokasi/m3 a Bahan : - Sirtu Urug, Klas-1

m3

1.200

150,000.00 Jumlah.a

b Upah : - Kenek

ht

0.350

40,000.00 Jumlah.b

c Alat Bantu : - Pacul - Pengki

bh bh

0.025 0.015

35,000.00 15,000.00 Jumlah.c Jumlah.a+b+c

Buang Tanah Keluar Lokasi/m3 a Upah : - Tk.Gali Tanah - Mandor Batu

ht ht

0.350 0.012

60,000.00 65,000.00 Jumlah.a

b Alat Bantu : - Pacul - Pengki

bh bh

0.200 0.150

35,000.00 15,000.00 Jumlah.b Jumlah.a+b

m3 zak m3 btg kg glg

1.200 2.700 0.500 0.250 0.010 0.015

185,000.00 53,000.00 185,000.00 6,000.00 18,000.00 2,000.00 Jumlah.a

ht ht ht

0.500 0.250 0.025

40,000.00 50,000.00 60,000.00

C.

PEKERJAAN PONDASI

C.1. PEKERJAAN PONDASI DANGKAL 1 a -

Pondasi Batu Kali 1:4/m3 Bahan : Batu Kali/Belah Semen PC Pasir Pasang Bambu Profil Kawat Beton/ bendrad Benang Rami

b -

Upah Pasang : Kenek Tk.Batu Kasar Kep.Tukang

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 20 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika - Mandor Batu

ht

0.083

65,000.00 Jumlah.b

c -

bh bh bh

1.000 0.100 0.100

6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

m3 zak m3 btg kg glg

1.200 2.500 0.500 0.250 0.010 0.015

185,000.00 53,000.00 185,000.00 6,000.00 18,000.00 2,000.00 Jumlah.a

2

Alat Bantu : Ember aduk Pacul aduk Sekop

Pondasi Batu Kali 1:5/m3 a -

Bahan : Batu Kali/Belah Semen PC Pasir Pasang Bambu Profil Kawat Beton/ bendrad Benang Rami

b -

Upah Pasang : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

0.500 0.250 0.025 0.083

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu : Ember aduk Pacul aduk Sekop

bh bh bh

1.000 0.100 0.100

6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

a -

Pas.Rollag Bata 1:4/m3 Bahan : Batu Bata Press Semen PC Pasir Pasang Bambu U. Patok Benang Rami

bh zak m3 btg m3

510 3.200 0.320 0.050 0.050

380.00 53,000.00 185,000.00 6,000.00 2,000.00 Jumlah.a

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

3.600 1.200

40,000.00 50,000.00 Jumlah.b

c Alat Bantu : - Ember aduk - Pacul aduk

bh bh

0.250 0.125

6,000.00 35,000.00 Jumlah.c Jumlah.a+b+c

Pas.Rollag Bata 1:5/m3 a Bahan : - Batu Bata Press - Semen PC

bh zak

510 2.500

380.00 53,000.00

3

4

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 21 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

- Pasir Pasang - Bambu U. Patok - Benang Rami

m3 m3 m3

0.250 0.050 0.050

185,000.00 6,000.00 2,000.00 Jumlah.a

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

3.600 1.200

40,000.00 50,000.00 Jumlah.b

c Alat Bantu : - Ember aduk - Pacul aduk

bh bh

0.250 0.125

6,000.00 35,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 22 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.c Jumlah.a+b+c

5 a -

Pas.Batako Kapur 1:3/m2 (Bekisting Pile Cap,Tie Beam) Bahan : Batako Kapur Semen PC Pasir Pasang

bh zak m3

25.000 0.300 0.030

800.00 53,000.00 185,000.00 Jumlah.a

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

0.400 0.200

40,000.00 50,000.00 Jumlah.b

c -

Alat Bantu : Kaso Profil 5/7, borneo Benang Rami Ember aduk Pacul aduk

m3 m3 bh bh

0.003 0.065 0.025 0.015

3,500,000.00 2,000.00 6,000.00 35,000.00 Jumlah.c Jumlah.a+b+c

a -

Pas.Batako Kapur 1:4/m2 (Bekisting Pile Cap,Tie Beam) Bahan : Batako Kapur Semen PC Pasir Pasang

bh zak m3

25.000 0.250 0.025

800.00 53,000.00 185,000.00 Jumlah.a

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

0.400 0.200

40,000.00 50,000.00 Jumlah.b

c -

Alat Bantu : Kaso Profil 5/7, borneo Benang Rami Ember aduk Pacul aduk

m3 m3 bh bh

0.003 0.065 0.025 0.015

3,500,000.00 2,000.00 6,000.00 35,000.00 Jumlah.c Jumlah.a+b+c

a -

Pas.Batako Kapur 1:5/m2 (Bekisting Pile Cap,Tie Beam) Bahan : Batako Kapur Semen PC Pasir Pasang

bh zak m3

25.000 0.200 0.020

6

7

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 23 of 93

800.00 53,000.00 185,000.00 Jumlah.a

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

0.400 0.200

40,000.00 50,000.00 Jumlah.b

c -

Alat Bantu : Kaso Profil 5/7, borneo Benang Rami Ember aduk Pacul aduk

m3 m3 bh bh

0.003 0.065 0.025 0.015

3,500,000.00 2,000.00 6,000.00 35,000.00 Jumlah.c Jumlah.a+b+c

a -

Pas.Batako Kapur 1:6/m2 (Bekisting Pile Cap,Tie Beam) Bahan : Batako Kapur Semen PC Pasir Pasang

bh zak m3

25.000 0.180 0.018

800.00 53,000.00 185,000.00 Jumlah.a

b Upah Pasang : - Kenek - Tk.Batu Kasar

ht ht

0.400 0.200

40,000.00 50,000.00 Jumlah.b

c -

m3 m3 bh bh

0.003 0.065 0.025 0.015

3,500,000.00 2,000.00 6,000.00 35,000.00 Jumlah.c Jumlah.a+b+c

jam jam

0.130 0.130

190,000.00 160,000.00 Jumlah.a

b Upah Pasang : - Tk. Gali Tanah - Mandor

ht ht

0.160 0.008

60,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Oli + Solar - Alat Bantu

ls ls

1.000 0.220

13,500.00 45,500.00 Jumlah.c

8

Alat Bantu : Kaso Profil 5/7, borneo Benang Rami Ember aduk Pacul aduk

C.2. PEKERJAAN PONDASI DALAM 1

Pengeboran D50cm & D60cm /m', Bored Pile a Alat Bantu : - Crawler Crane - Mesin Bor

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 24 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a+b+c Profit 10% : Total : Pembulatan :

2

3

4

Pengeboran D70cm, D80cm, D90cm, D100cm /m', Bored Pile a Alat Bantu : - Crawler Crane jam - Mesin Bor jam

0.133 0.135

190,000.00 160,000.00 Jumlah.a

b Upah Pasang : - Tk. Gali Tanah - Mandor

ht ht

0.160 0.008

60,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Oli + Solar - Alat Bantu

ls ls

1.000 0.220

jam jam

0.140 0.140

190,000.00 160,000.00 Jumlah.a

b Upah Pasang : - Tk. Gali Tanah - Mandor

ht ht

0.160 0.008

60,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Oli + Solar - Alat Bantu

ls ls

1.000 0.220

jam jam

0.155 0.155

190,000.00 160,000.00 Jumlah.a

b Upah Pasang : - Tk. Gali Tanah - Mandor

ht ht

0.180 0.009

60,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Oli + Solar - Alat Bantu

ls ls

1.000 0.220

15,000.00 54,250.00 Jumlah.c Jumlah.a+b+c

Pengeboran D110cm /m', Bored Pile a Alat Bantu : - Crawler Crane - Mesin Bor

Pengeboran D120cm & D150cm /m', Bored Pile a Alat Bantu : - Crawler Crane - Mesin Bor

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 25 of 93

14,000.00 46,870.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

14,000.00 49,000.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Profit 10% : Total : Pembulatan :

5

6

7

8

Beton Readymix D50cm /m3, Bored Pile a Bahan : - Beton Readymix K-350

m3

1.400

577,500.00 Jumlah.a

b Upah Pasang : - Tk. Batu Halus - Mandor

ht ht

0.425 0.021

55,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Alat Bantu : Pipa Tremi+Casing Pelindung

ls

1.000

Beton Readymix D60cm /m3, Bored Pile a Bahan : - Beton Readymix K-350

m3

1.300

577,500.00 Jumlah.a

b Upah Pasang : - Tk. Batu Halus - Mandor

ht ht

0.425 0.021

55,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Alat Bantu : Pipa Tremi+Casing Pelindung

ls

1.000

Beton Readymix D70cm - D100cm /m3, Bored Pile a Bahan : - Beton Readymix K-350

m3

1.200

577,500.00 Jumlah.a

b Upah Pasang : - Tk. Batu Halus - Mandor

ht ht

0.425 0.021

55,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Alat Bantu : Pipa Tremi+Casing Pelindung

ls

1.000

m3

1.150

Beton Readymix D120cm - D150cm /m3, Bored Pile a Bahan : - Beton Readymix K-350

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 26 of 93

12,500.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

12,500.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

12,500.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

577,500.00

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a

b Upah Pasang : - Tk. Batu Halus - Mandor

ht ht

0.425 0.021

c Lain-Lain : - Alat Bantu : Pipa Tremi+Casing Pelindung

ls

1.000

kg ls ls ls

1.000 1.000 1.000 1.000

8,500.00 180.00 50.00 400.00 Jumlah.a

b Upah Pasang : - Tk. Besi - Mandor

ht ht

0.005 0.000

55,000.00 65,000.00 Jumlah.b

c Lain-Lain : - Alat Bantu

ls

1.000

m'

1.000

9 a -

10

Pembesian Bored Pile /kg Bahan : Besi Beton Ulir Kawat Beton Kawat Las Kawat Gantung

Pondasi Tiang Pancang, Mini Pile 28 /m' a Bahan : - Tiang Pancang, MP-28, Drop Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, 3 D16

55,000.00 65,000.00 Jumlah.b 12,500.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

100.00 Jumlah.c Jumlah.a+b+c Profit 10% : Total : Pembulatan :

77,000.00

Jumlah.a PPN 10% : Total : Pembulatan : 11

Pondasi Tiang Pancang, Mini Pile 32 /m' a Bahan : - Tiang Pancang, MP-32, Drop Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, 3 D16

m'

1.000

87,500.00

Jumlah.a PPN 10% : Total : Pembulatan : 12

Pondasi Tiang Pancang, Square Pile 20x20 /m' a Bahan : - Tiang Pancang, SQ 20 X 20, Drop Hammer

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 27 of 93

m'

1.000

79,000.00

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, 4 D13 Jumlah.a PPN 10% : Total : Pembulatan : 13

Pondasi Tiang Pancang, Square Pile 25x25 /m' a Bahan : - Tiang Pancang, SQ 25 X 25, Drop Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, 4 D16

m'

1.000

115,000.00

Jumlah.a PPN 10% : Total : Pembulatan : 14

Pondasi Tiang Pancang, Square Pile 20x20 /m' a Bahan : - Tiang Pancang, SQ 20 X 20, Jack In Piles Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, 4 D13

m'

1.000

125,000.00

Jumlah.a PPN 10% : Total : Pembulatan : 15

Pondasi Tiang Pancang, Square Pile 30x30 /m' a Bahan : - Tiang Pancang, SQ 30 X 30, Hydraulic Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, Strand 4 d3/8

m'

1.000

120,000.00

Jumlah.a b. Jasa : - Splice Joint, (Tiap L=3m) - Loading & Unloading - Jasa Pengelasan, (Tiap L=3m)

16

Pondasi Tiang Pancang, Square Pile 35x35 /m' a Bahan : - Tiang Pancang, SQ 35 X 35, Hydraulic Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, Strand 5 d3/8

bh m' bh

1.000 1.000 1.000

m'

1.000

335,000.00 3,500.00 60,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

150,000.00

Jumlah.a b. Jasa : - Splice Joint, (Tiap L=3m) - Loading & Unloading - Jasa Pengelasan, (Tiap L=3m)

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

bh m' bh

Page 28 of 93

1.000 1.000 1.000

525,000.00 3,500.00 80,000.00 Jumlah.b Jumlah.a+b

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN PPN 10% : Total : Pembulatan :

17

Pondasi Tiang Pancang, Square Pile 40x40 /m' a Bahan : - Tiang Pancang, SQ 40 X 40, Hydraulic Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, Strand 4 d1/2

m'

1.000

190,000.00

Jumlah.a b. Jasa : - Splice Joint, (Tiap L=3m) - Loading & Unloading - Jasa Pengelasan, (Tiap L=3m)

18

Pondasi Tiang Pancang, Square Pile 45x45 /m' a Bahan : - Tiang Pancang, SQ 45 X 45, Hydraulic Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, Strand 5 d1/2

bh m' bh

1.000 1.000 1.000

m'

1.000

725,000.00 3,500.00 100,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

235,000.00

Jumlah.a b. Jasa : - Splice Joint, (Tiap L=3m) - Loading & Unloading - Jasa Pengelasan, (Tiap L=3m)

19

Pondasi Tiang Pancang, Square Pile 50x50 /m' a Bahan : - Tiang Pancang, SQ 50 X 50, Hydraulic Hammer Mutu Beton : K-450 Mutu Baja : fy=4000kg/cm2, Strand 5 d1/2

bh m' bh

1.000 1.000 1.000

m'

1.000

900,000.00 3,500.00 120,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

280,000.00

Jumlah.a

20

b. Jasa : - Splice Joint, (Tiap L=3m) - Loading & Unloading - Jasa Pengelasan, (Tiap L=3m)

bh m' bh

1.000 1.000 1.000

Pondasi Tiang Pancang, Spun Pile 30x30 /m' a Bahan : - Tiang Pancang, SP 30 X 30, Drop Hammer

m'

1.000

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 29 of 93

1,100,000.00 3,500.00 150,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

130,000.00

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2 Jumlah.a b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

21

Pondasi Tiang Pancang, Spun Pile 35x35 /m' a Bahan : - Tiang Pancang, SP 35 X 35, Drop Hammer Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2

m' bh

1.000 1.000

m'

1.000

3,000.00 100,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

148,000.00

Jumlah.a b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

22

Pondasi Tiang Pancang, Spun Pile 40x40 /m' a Bahan : - Tiang Pancang, SP 40 X 40, Drop Hammer Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2

m' bh

1.000 1.000

m'

1.000

3,000.00 125,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

188,000.00

Jumlah.a b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

23

Pondasi Tiang Pancang, Spun Pile 45x45 /m' a Bahan : - Tiang Pancang, SP 45 X 45, Drop Hammer Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2

m' bh

1.000 1.000

m'

1.000

3,000.00 150,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

225,000.00

Jumlah.a b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

m' bh

Page 30 of 93

1.000 1.000

3,000.00 175,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total :

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Pembulatan :

24

Pondasi Tiang Pancang, Spun Pile 50x50 /m' a Bahan : - Tiang Pancang, SP 50 X 50, Drop Hammer Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2

m'

1.000

288,000.00

Jumlah.a b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

25

Pondasi Tiang Pancang, Spun Pile 60x60 /m' a Bahan : - Tiang Pancang, SP 60 X 60, Drop Hammer Mutu Beton : K-600 Mutu Baja : fy=4000kg/cm2

m' bh

1.000 1.000

m'

1.000

3,000.00 200,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

388,000.00

Jumlah.a

26

27

28

b. Jasa : - Loading & Unloading - Jasa Pengelasan, (Tiap L=12m)

m' bh

1.000 1.000

3,000.00 225,000.00 Jumlah.b Jumlah.a+b PPN 10% : Total : Pembulatan :

Bobok kepala tiang < d30 /ttk, Tiang Pancang Solid a. Upah Pasang : - Kenek - Mandor

ht ht

0.600 0.060

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d30-d40 /ttk, Tiang Pancang Solid a. Upah Pasang : - Kenek - Mandor

ht ht

0.850 0.085

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d45-d50 /ttk, Tiang Pancang Solid a. Upah Pasang : - Kenek - Mandor

ht ht

1.100 0.110

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 31 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika 29

30

31

32

33

34

35

36

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Bobok kepala tiang d30-d40 /ttk, Tiang Pancang Spun a. Upah Pasang : - Kenek - Mandor

ht ht

0.650 0.065

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d45-d60 /ttk, Tiang Pancang Spun a. Upah Pasang : - Kenek - Mandor

ht ht

0.850 0.085

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d30-d40 /ttk, Bored Pile a. Upah Pasang : - Kenek - Mandor

ht ht

0.850 0.085

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d50-d60 /ttk, Bored Pile a. Upah Pasang : - Kenek - Mandor

ht ht

1.100 0.110

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d70-d100 /ttk, Bored Pile a. Upah Pasang : - Kenek - Mandor

ht ht

1.200 0.120

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d110 /ttk, Bored Pile a. Upah Pasang : - Kenek - Mandor

ht ht

1.250 0.125

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang d120-d150 /ttk, Bored Pile a. Upah Pasang : - Kenek - Mandor

ht ht

1.500 0.150

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Bobok kepala tiang > d150 /ttk, Bored Pile

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 32 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

a. Upah Pasang : - Kenek - Mandor

ht ht

1.750 0.175

40,000.00 65,000.00 Jumlah.a Jumlah.a Pembulatan :

Spesi 1:3/m3 a Bahan : - Semen PC - Pasir Extra Beton

zak m3

2.650 0.300

53,000.00 200,000.00 Jumlah.a

Spesi 1:4/m3 a Bahan : - Semen PC - Pasir Extra Beton

zak m3

2.150 0.300

53,000.00 200,000.00 Jumlah.a

Spesi 1:5/m3 a Bahan : - Semen PC - Pasir Extra Beton

zak m3

1.750 0.350

53,000.00 200,000.00 Jumlah.a

Spesi 1:6/m3 a Bahan : - Semen PC - Pasir Extra Beton

zak m3

1.550 0.350

53,000.00 200,000.00 Jumlah.a

zak m3 m3

7.200 0.500 0.700

53,000.00 200,000.00 185,000.00 Jumlah.a

D. 1

2

3

4

PEKERJAAN MORTAR & BETON

5

6

a -

Beton Site Mix 1:1,5:2,5/m3,dgn Seplit Bahan : Semen PC Pasir Extra Beton Seplit 2X3

b -

Upah: Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

3.000 0.500 0.050 0.010

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu : Concrete Mixer Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

0.500 0.500 0.200 0.200 0.200

60,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

sak

6.400

53,000.00

Beton Site Mix 1:2:3/m3,dgn Seplit a Bahan : - Semen PC

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 33 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika - Pasir Extra Beton - Seplit 2X3

m3 m3

0.550 0.800

200,000.00 185,000.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

3.000 0.500 0.050 0.010

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu : Concrete Mixer Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

0.500 0.500 0.200 0.200 0.200

60,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

a -

Beton Site Mix 1:3:5/m3,dgn seplit Bahan : Semen PC Pasir Extra Beton Seplit 2X3

sak m3 m3

4.800 0.650 0.900

53,000.00 200,000.00 185,000.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

3.000 0.500 0.050 0.010

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu : Concrete Mixer Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

0.500 0.500 0.200 0.200 0.200

60,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.350/m3 a Bahan : - Beton K.350

m3

1.150

577,500.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu Utama : Pompa beton Vibrator Ember aduk Pacul aduk

m3 m3 bh bh

1.000 1.000 0.050 0.050

100,000.00 40,000.00 6,000.00 35,000.00

7

8

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 34 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

9

10

11

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

- Sekop

bh

0.050

40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.300/m3 a Bahan : - Beton K.300

m3

1.150

566,500.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu Utama : Pompa beton Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

1.000 1.000 0.050 0.050 0.050

100,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.275/m3 a Bahan : - Beton K.275

m3

1.150

550,000.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu Utama : Pompa beton Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

1.000 1.000 0.050 0.050 0.050

100,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.250/m3 a Bahan : - Beton K.250

m3

1.150

539,000.00 Jumlah.a

b -

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

m3 m3

1.000 1.000

100,000.00 40,000.00

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

c Alat Bantu Utama : - Pompa beton - Vibrator

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 35 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

12

13

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

- Ember aduk - Pacul aduk - Sekop

bh bh bh

0.050 0.050 0.050

6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.225/m3 a Bahan : - Beton K.225

m3

1.150

528,000.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu Utama : Pompa beton Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

1.000 1.000 0.050 0.050 0.050

100,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

Beton Ready Mix K.175/m3 a Bahan : - Beton K.175

m3

1.150

506,000.00 Jumlah.a

b -

Upah : Kenek Tk.Batu Kasar Kep.Tukang Mandor Batu

ht ht ht ht

2.500 0.417 0.042 0.008

40,000.00 50,000.00 60,000.00 65,000.00 Jumlah.b

c -

Alat Bantu Utama : Pompa beton Vibrator Ember aduk Pacul aduk Sekop

m3 m3 bh bh bh

1.000 1.000 0.050 0.050 0.050

100,000.00 40,000.00 6,000.00 35,000.00 40,000.00 Jumlah.c Jumlah.a+b+c

lbr m3 m3 glg kg kg

0.250 0.007 0.007 0.050 0.200 0.200

110,000.00 3,500,000.00 3,500,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

E.

PEKERJAAN BEKISTING & PEMBESIAN

1 a -

Bekisting Poer/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Tepi, 121x242, MP9mm Kaso Klam 4x6, Kayu Borneo Kaso Stut 4x6, Kayu Borneo Benang Rami Paku 5cm Paku 7cm

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 36 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.120 0.150 0.150 0.050 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Poer/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Tepi, 121x242, MP12mm Kaso Klam 4x6, Kayu Borneo Kaso Stut 4x6, Kayu Borneo Benang Rami Paku 5cm Paku 7cm

lbr m3 m3 glg kg kg

0.250 0.007 0.007 0.050 0.200 0.200

150,000.00 3,500,000.00 3,500,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.120 0.150 0.150 0.050 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Sloof/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Tepi, 121x242, MP9mm Kaso Klam 4x6, Kayu Borneo Kaso Stut 5x7, Kayu Borneo Benang Rami Paku 5cm Paku 7cm

lbr m3 m3 glg kg kg

0.250 0.007 0.007 0.050 0.200 0.200

110,000.00 3,500,000.00 3,500,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.120 0.150 0.150 0.050 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Sloof/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Tepi, 121x242, MP12mm Kaso Klam 4x6, Kayu Borneo Kaso Stut 4x6, Kayu Borneo Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.007 0.007 0.050 0.200 0.200

150,000.00 3,500,000.00 3,500,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

2

3

4

b Upah :

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 37 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

-

Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.120 0.150 0.150 0.050 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Kolom/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Tepi, 121x242, MP9mm Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.008 0.008 0.050 0.450 0.450

110,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Kolom/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Tepi, 121x242, MP12mm Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

m3 m3 m3 glg kg kg

0.250 0.008 0.008 0.050 0.450 0.450

150,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Balok/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Tepi U Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.008 0.008 0.050 0.450 0.450

110,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

ht

0.270

40,000.00

5

6

7

b Upah : - Kenek

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 38 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

-

Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht

0.350 0.350 0.060 0.120

55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Balok/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Tepi U Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.008 0.008 0.050 0.450 0.450

150,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Plat/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Bawah Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.009 0.009 0.050 0.450 0.450

110,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Plat/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Bawah Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.009 0.009 0.050 0.450 0.450

150,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

ht ht

0.270 0.350

40,000.00 55,000.00

8

9

10

b Upah : - Kenek - Tk.Kayu Halus

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 39 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

- Kep.Tukang - Mandor Batu - Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht

0.350 0.060 0.120

60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Tangga/m2 2xpakai dgn Triplex 9mm Bahan : Triplex Bawah Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.010 0.010 0.050 0.450 0.450

110,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Tangga/m2 2xpakai dgn Triplex 12mm Bahan : Triplex Bawah Kaso Klam 4x6, Kayu Kamper Singkil Kaso Stut 5x7, Kayu Kamper Singkil Benang Rami Paku 5cm Paku 10cm

lbr m3 m3 glg kg kg

0.250 0.010 0.010 0.050 0.450 0.450

150,000.00 6,000,000.00 6,000,000.00 2,000.00 12,000.00 12,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Halus Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.270 0.350 0.350 0.060 0.120

40,000.00 55,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b Jumlah.a+b

a -

Bekisting Beton Praktis/m2 Bahan : Papan Tepi 2/20, Kayu Borneo Paku 5cm Kawat Beton/ bendrad

m3 kg kg

0.045 0.150 0.100

3,500,000.00 12,000.00 18,000.00 Jumlah.a

b -

Upah : Kenek Tk.Kayu Kasar Kep.Tukang Mandor Batu Tukang Kayu Halus (Bongkar Cetakan)

ht ht ht ht ht

0.135 0.175 0.175 0.030 0.060

40,000.00 50,000.00 60,000.00 65,000.00 55,000.00 Jumlah.b

11

12

13

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 40 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a+b

14

15

Pembesian Polos/kg a Bahan : - Besi Polos - Kawat Beton/ bendrad

kg kg

1.100 0.020

8,000.00 18,000.00 Jumlah.a

b -

ht ht ht ht

0.010 0.005 0.001 0.000

40,000.00 55,000.00 60,000.00 65,000.00 Jumlah.b

c Alat Bantu : - Bar Cutter - Bar Binder

kg kg

0.250 0.250

500.00 500.00 Jumlah.c Jumlah.a+b+c

Pembesian Ulir/kg a Bahan : - Besi Ulir - Kawat Beton/ bendrad

kg kg

1.100 0.020

8,500.00 18,000.00 Jumlah.a

b -

ht ht ht ht

0.010 0.005 0.001 0.000

40,000.00 55,000.00 60,000.00 65,000.00 Jumlah.b

kg kg

0.250 0.250

500.00 500.00 Jumlah.c Jumlah.a+b+c

Upah Buat & Pasang : Kenek Tk.Besi Kep.Tukang Mandor

Upah Buat & Pasang : Kenek Tk.Besi Kep.Tukang Mandor

c Alat Bantu : - Bar Cutter - Bar Binder

F.

PEKERJAAN BETON BERTULANG

1 a b c d

Beton Praktis /m3 Beton 1Pc:2Psr:3Spl Bekisting Praktis Pembesian Polos Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 80.000 0.050

813,000.00 96,000.00 10,200.00 90,000.00 Jumlah.a

a b c d

Pile Cap /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 4.000 150.000 0.100

933,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

m3 m2 kg

1.000 4.000 150.000

920,000.00 74,000.00 10,800.00

2

3

Pile Cap /m3 a Beton Ready Mix, K-300 b Bekisting c Pembesian Ulir

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 41 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

d Tambahan Upah Tk.Batu+Kenek

ht

0.100

90,000.00 Jumlah.a

a b c d

Pile Cap /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 4.000 140.000 0.100

901,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pile Cap /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 4.000 135.000 0.100

888,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pile Cap /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 4.000 130.000 0.100

876,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pile Cap /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 4.000 125.000 0.100

850,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tie Beam /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 220.000 0.100

933,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tie Beam /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 220.000 0.100

920,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tie Beam /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 210.000 0.100

901,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tie Beam /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 200.000 0.100

888,000.00 74,000.00 10,800.00 90,000.00

4

5

6

7

8

9

10

11

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 42 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a

12 a b c d

Tie Beam /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 180.000 0.100

876,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tie Beam /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 170.000 0.100

850,000.00 74,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 90.000 0.100

933,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 90.000 0.100

920,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 90.000 0.100

901,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 90.000 0.100

888,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 80.000 0.100

876,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Lantai /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 80.000 0.100

850,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

13

14

15

16

17

18

19

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 43 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika 20 a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 150.000 0.100

933,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 150.000 0.100

920,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 140.000 0.100

901,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 140.000 0.100

888,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 125.000 0.100

876,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Pelat Kantilever /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.500 125.000 0.100

850,000.00 109,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Anak /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 275.000 0.100

933,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Anak /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 275.000 0.100

920,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

21

22

23

24

25

26

27

28

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Balok Anak /m3

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 44 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika a b c d

Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 250.000 0.100

901,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Anak /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 240.000 0.100

888,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Anak /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 150.000 0.100

876,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Anak /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 150.000 0.100

850,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Induk /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 9.000 300.000 0.125

933,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Induk /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 9.000 300.000 0.125

920,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Induk /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 9.000 275.000 0.125

901,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Induk /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 9.000 250.000 0.125

888,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

m3

1.000

29

30

31

32

33

34

35

36

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Balok Induk /m3 a Beton Ready Mix, K-225

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 45 of 93

876,000.00

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika b Bekisting c Pembesian Ulir d Tambahan Upah Tk.Batu+Kenek

m2 kg ht

8.000 175.000 0.125

100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Balok Induk /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 175.000 0.125

850,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 350.000 0.125

933,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 350.000 0.125

920,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 300.000 0.125

901,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 275.000 0.125

888,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 225.000 0.125

876,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Kolom Beton /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 10.000 225.000 0.125

850,000.00 100,000.00 10,800.00 90,000.00 Jumlah.a

m3 m2

1.000 8.000

37

38

39

40

41

42

43

44

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Tangga Beton /m3 a Beton Ready Mix, K-350 b Bekisting

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 46 of 93

933,000.00 115,000.00

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika c Pembesian Ulir d Tambahan Upah Tk.Batu+Kenek

kg ht

180.000 0.100

10,800.00 90,000.00 Jumlah.a

a b c d

Tangga Beton /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 180.000 0.100

920,000.00 115,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tangga Beton /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 170.000 0.100

901,000.00 115,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tangga Beton /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 8.000 160.000 0.100

888,000.00 115,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tangga Beton /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 150.000 0.100

876,000.00 115,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Tangga Beton /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 6.500 150.000 0.100

850,000.00 115,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Retaining Wall Beton /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 15.000 200.000 0.125

933,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Retaining Wall Beton /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 15.000 200.000 0.125

920,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

m3 m2 kg

1.000 15.000 180.000

901,000.00 131,000.00 10,800.00

45

46

47

48

49

50

51

52

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Retaining Wall Beton /m3 a Beton Ready Mix, K-275 b Bekisting c Pembesian Ulir

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 47 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

d Tambahan Upah Tk.Batu+Kenek

ht

0.125

90,000.00 Jumlah.a

a b c d

Retaining Wall Beton /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 15.000 175.000 0.125

888,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Retaining Wall Beton /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 150.000 0.125

876,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Retaining Wall Beton /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 150.000 0.125

850,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-350 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 200.000 0.150

933,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-300 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 200.000 0.150

920,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-275 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 200.000 0.150

901,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-250 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 210.000 0.150

888,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-225 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 210.000 0.150

876,000.00 131,000.00 10,800.00 90,000.00

53

54

55

56

57

58

59

60

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 48 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jumlah.a

61 a b c d

Shear Wall Beton /m3 Beton Ready Mix, K-175 Bekisting Pembesian Ulir Tambahan Upah Tk.Batu+Kenek

m3 m2 kg ht

1.000 12.000 200.000 0.150

850,000.00 131,000.00 10,800.00 90,000.00 Jumlah.a

kg unit unit unit unit bh bh kg

1.100 0.002 0.002 0.001 0.001 0.003 0.003 0.003

9,000.00 70,000.00 70,000.00 50,000.00 50,000.00 20,000.00 25,000.00 20,000.00 Jumlah.a

G.

PEK.ATAP

1 a -

Kuda-kuda Baja dgn WF/kg Bahan : Baja WF Genzet 20KVa Travo Las Mesin Gurinda Mesin Bor Mata Gerinda Mata Bor Kawat Las

b -

Upah Buat : Kenek Baja Tukang Baja Mandor Baja

ht ht ht

0.020 0.020 0.007

60,000.00 75,000.00 100,000.00 Jumlah.b

c -

Upah Erection : Transport Kenek Baja Tukang Baja Mandor Baja

kg ht ht ht

1.000 0.010 0.005 0.002

1,047.50 60,000.00 75,000.00 100,000.00 Jumlah.c Jumlah.a+b+c

a -

Kuda-kuda Baja dgn Siku/kg Bahan : Baja Siku Genzet 20KVa Travo Las Mesin Gurinda Mesin Bor Mata Gerinda Mata Bor Kawat Las

kg unit unit unit unit bh bh kg

1.100 0.002 0.002 0.001 0.001 0.003 0.003 0.003

7,500.00 70,000.00 70,000.00 50,000.00 50,000.00 20,000.00 25,000.00 20,000.00 Jumlah.a

b -

Upah Buat : Kenek Baja Tukang Baja Mandor Baja

ht ht ht

0.020 0.020 0.007

60,000.00 75,000.00 100,000.00 Jumlah.b

c -

Upah Erection+Transport : Transport Kenek Baja Tukang Baja

kg ht ht

1.000 0.010 0.005

882.50 60,000.00 75,000.00

2

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 49 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

- Mandor Baja

3

H. 1

2

3

ht

0.002

100,000.00 Jumlah.c Jumlah.a+b+c

kg unit unit unit unit bh bh kg bh

1.100 0.002 0.002 0.001 0.001 0.003 0.003 0.003 0.150

8,000.00 70,000.00 70,000.00 50,000.00 50,000.00 20,000.00 25,000.00 20,000.00 1,500.00 Jumlah.a

a -

Gording Baja CNP/kg Bahan : Baja CNP Genzet 20KVa Travo Las Mesin Gurinda Mesin Bor Mata Gerinda Mata Bor Kawat Las Baut dia 12mm-1"

b -

Upah Buat : Kenek Baja Tukang Baja Mandor Baja

ht ht ht

0.020 0.020 0.007

60,000.00 75,000.00 100,000.00 Jumlah.b

c -

Upah Erection+Transport : Transport Kenek Baja Tukang Baja Mandor Baja

kg ht ht ht

1.000 0.010 0.005 0.002

956.75 60,000.00 75,000.00 100,000.00 Jumlah.c Jumlah.a+b+c

Urugan Tanah Lantai/m3 (Tanah Dari Dalam) a Bahan : - Tanah Urug

m3

0.000

80,000.00 Jumlah.a

b Upah : - Mengurug Tanah Padat - Pemadatan Tanah 2X, Menggunakan : Mesin Stamper

m3 m2

1.250 6.000

23,000.00 27,000.00 Jumlah.b Jumlah.a+b

Urugan Tanah Lantai/m3 (Tanah Dari Luar) a Bahan : - Tanah Urug

m3

1.250

80,000.00 Jumlah.a

b Upah : - Mengurug Tanah Padat - Pemadatan Tanah 2X, Menggunakan : Mesin Stamper

m3 m2

1.250 6.000

23,000.00 27,000.00 Jumlah.b Jumlah.a+b

PEK.LANTAI

Pemadatan Tanah Lantai/m2 (Dgn Mesin Stamper) a Upah :

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 50 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

4

- Pemadatan Tanah 2X, Menggunakan : Mesin Stamper

m2

2.000

27,000.00 Jumlah.a

b Alat : - Mesin Stamper

m3

0.053

60,000.00 Jumlah.b Jumlah.a+b

Rabat Beton T.5cm/m2, Tanpa Tulang a Bahan : - Beton 1Pc:3psr:5Spl

m3

0.050

766,000.00 Jumlah.a

ht ht ht ht

0.100 0.050 0.010 0.003

40,000.00 55,000.00 60,000.00 65,000.00 Jumlah.b Jumlah.a+b

m3

0.070

766,000.00 Jumlah.a

b -

5

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Upah : Kenek Tk.Batu Halus Kep.Tukang Mandor batu

Rabat Beton T.7cm/m2, Tanpa Tulang a Bahan : - Beton 1Pc:3psr:5Spl b -

Upah : Kenek Tk.Batu Halus Kep.Tukang Mandor

ht ht ht ht

0.150 0.075 0.015 0.005

40,000.00 55,000.00 60,000.00 65,000.00 Jumlah.b Jumlah.a+b

a b c d

Plat Duiker Pintu Masuk L.Sal.0,50M/m' (Tebal Plat 10cm) Beton 1Pc:2Psr:3Spl Bekisting Papan Besi dia 10mm, 2 Lapis Jarak 15cm Besi dia 8mm, 2 Lapis Jarak 20cm

m3 m2 kg kg

0.070 0.500 9.502 2.607

813,000.00 191,000.00 10,200.00 10,200.00 Jumlah.a

a b c d

Plat Duiker Pintu Masuk L.0,75M/m' (Tebal Plat 12,5cm) Beton 1Pc:2Psr:3Spl Bekisting Papan Besi dia 10mm, 2 Lapis Jarak 12,5cm Besi dia 8mm, 2 Lapis Jarak 20cm

m3 m2 kg kg

0.119 0.750 10.859 2.607

813,000.00 191,000.00 10,200.00 10,200.00 Jumlah.a

a b c d

Plat Duiker Pintu Masuk L.1,00M/m' (Tebal Plat 15cm) Beton 1Pc:2Psr:3Spl Bekisting Papan Besi dia 10mm, 2 Lapis Jarak 10cm Besi dia 8mm, 2 Lapis Jarak 15cm

m3 m2 kg kg

0.180 1.000 16.289 5.214

813,000.00 191,000.00 10,200.00 10,200.00 Jumlah.a

6

7

8

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 51 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

FTAR ANALISA SATUAN PEKERJAAN

JUMLAH HARGA Rp

1,750.00 375.00 2,125.00 800.00 500.00 1,300.00 4,000.00

17,500.00 19,250.00 200.00 1,200.00 38,150.00 11,200.00 11,200.00 50,000.00

45,000.00 45,000.00 875.00 30.00 905.00 46,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 52 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

21,000.00 21,000.00 875.00 225.00 1,100.00 23,000.00

2,000.00 195.00 3,000.00 875.00 225.00 1,100.00 5,000.00

8,000.00 3,000.00 600.00 195.00 11,795.00 3,750.00 3,750.00 16,000.00

8,000.00 3,000.00 600.00 195.00 11,795.00 15,000.00 15,000.00 27,000.00

150,000.00 150,000.00 14,000.00 14,000.00 875.00 225.00 1,100.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 53 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 166,000.00

96,000.00 96,000.00 14,000.00 14,000.00 875.00 225.00 1,100.00 112,000.00

180,000.00 180,000.00 14,000.00 14,000.00 875.00 225.00 1,100.00 196,000.00

21,000.00 780.00 22,000.00 7,000.00 2,250.00 9,250.00 32,000.00

222,000.00 143,100.00 92,500.00 1,500.00 180.00 30.00 459,310.00 20,000.00 12,500.00 1,500.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 54 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 5,416.67 39,416.67 6,000.00 3,500.00 4,000.00 13,500.00 513,000.00

222,000.00 132,500.00 92,500.00 1,500.00 180.00 30.00 448,710.00

20,000.00 12,500.00 1,500.00 5,416.67 39,416.67

6,000.00 3,500.00 4,000.00 13,500.00 502,000.00

193,800.00 169,600.00 59,200.00 300.00 100.00 423,000.00 144,000.00 60,000.00 204,000.00 1,500.00 4,375.00 5,875.00 633,000.00

193,800.00 132,500.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 55 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 46,250.00 300.00 100.00 372,950.00 144,000.00 60,000.00 204,000.00 1,500.00 4,375.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 56 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 5,875.00 583,000.00

20,000.00 15,900.00 5,550.00 41,450.00 16,000.00 10,000.00 26,000.00 8,750.00 130.00 150.00 525.00 9,555.00 78,000.00

20,000.00 13,250.00 4,625.00 37,875.00 16,000.00 10,000.00 26,000.00 8,750.00 130.00 150.00 525.00 9,555.00 74,000.00

20,000.00 10,600.00 3,700.00 34,300.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 57 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

16,000.00 10,000.00 26,000.00 8,750.00 130.00 150.00 525.00 9,555.00 70,000.00

20,000.00 9,540.00 3,330.00 32,870.00 16,000.00 10,000.00 26,000.00 8,750.00 130.00 150.00 525.00 9,555.00 69,000.00

24,700.00 20,800.00 45,500.00 9,600.00 520.00 10,120.00 13,500.00 10,010.00 23,510.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 58 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 80,000.00 8,000.00 88,000.00 88,000.00

25,270.00 21,600.00 46,870.00 9,600.00 520.00 10,120.00 14,000.00 10,311.40 24,311.40 82,000.00 8,200.00 90,200.00 91,000.00

26,600.00 22,400.00 49,000.00 9,600.00 520.00 10,120.00 14,000.00 10,780.00 24,780.00 84,000.00 8,400.00 92,400.00 93,000.00

29,450.00 24,800.00 54,250.00 10,800.00 585.00 11,385.00 15,000.00 11,935.00 26,935.00 93,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 59 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 9,300.00 102,300.00 103,000.00

808,500.00 808,500.00 23,375.00 1,381.25 24,756.25 12,500.00 12,500.00 846,000.00 84,600.00 930,600.00 931,000.00

750,750.00 750,750.00 23,375.00 1,381.25 24,756.25 12,500.00 12,500.00 789,000.00 78,900.00 867,900.00 868,000.00

693,000.00 693,000.00 23,375.00 1,381.25 24,756.25 12,500.00 12,500.00 731,000.00 73,100.00 804,100.00 805,000.00

664,125.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 60 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 664,125.00 23,375.00 1,381.25 24,756.25 12,500.00 12,500.00 702,000.00 70,200.00 772,200.00 773,000.00

8,500.00 180.00 50.00 400.00 9,130.00 247.50 29.25 276.75 100.00 100.00 10,000.00 1,000.00 11,000.00 11,000.00

77,000.00

77,000.00 7,700.00 84,700.00 85,000.00

87,500.00

88,000.00 8,800.00 96,800.00 97,000.00

79,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 61 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

79,000.00 7,900.00 86,900.00 87,000.00

115,000.00

115,000.00 11,500.00 126,500.00 127,000.00

125,000.00

125,000.00 12,500.00 137,500.00 138,000.00

120,000.00

120,000.00 335,000.00 3,500.00 60,000.00 398,500.00 519,000.00 51,900.00 570,900.00 571,000.00

150,000.00

150,000.00 525,000.00 3,500.00 80,000.00 608,500.00 759,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 62 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 75,900.00 834,900.00 835,000.00

190,000.00

190,000.00 725,000.00 3,500.00 100,000.00 828,500.00 1,019,000.00 101,900.00 1,120,900.00 1,121,000.00

235,000.00

235,000.00 900,000.00 3,500.00 120,000.00 1,023,500.00 1,259,000.00 125,900.00 1,384,900.00 1,385,000.00

280,000.00

280,000.00 1,100,000.00 3,500.00 150,000.00 1,253,500.00 1,534,000.00 153,400.00 1,687,400.00 1,688,000.00

130,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 63 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

130,000.00 3,000.00 100,000.00 103,000.00 233,000.00 23,300.00 256,300.00 257,000.00

148,000.00

148,000.00 3,000.00 125,000.00 128,000.00 276,000.00 27,600.00 303,600.00 304,000.00

188,000.00

188,000.00 3,000.00 150,000.00 153,000.00 341,000.00 34,100.00 375,100.00 376,000.00

225,000.00

225,000.00 3,000.00 175,000.00 178,000.00 403,000.00 40,300.00 443,300.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 64 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 444,000.00

288,000.00

288,000.00 3,000.00 200,000.00 203,000.00 491,000.00 49,100.00 540,100.00 541,000.00

388,000.00

388,000.00 3,000.00 225,000.00 228,000.00 616,000.00 61,600.00 677,600.00 678,000.00

24,000.00 3,900.00 27,900.00 28,000.00 28,000.00

34,000.00 5,525.00 39,525.00 40,000.00 40,000.00

44,000.00 7,150.00 51,150.00 52,000.00 52,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 65 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

26,000.00 4,225.00 30,225.00 31,000.00 31,000.00

34,000.00 5,525.00 39,525.00 40,000.00 40,000.00

34,000.00 5,525.00 39,525.00 40,000.00 40,000.00

44,000.00 7,150.00 51,150.00 52,000.00 52,000.00

48,000.00 7,800.00 55,800.00 56,000.00 56,000.00

50,000.00 8,125.00 58,125.00 59,000.00 59,000.00

60,000.00 9,750.00 69,750.00 70,000.00 70,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 66 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

70,000.00 11,375.00 81,375.00 82,000.00 82,000.00

140,450.00 60,000.00 201,000.00

113,950.00 60,000.00 174,000.00

92,750.00 70,000.00 163,000.00

82,150.00 70,000.00 153,000.00

381,600.00 100,000.00 129,500.00 611,100.00 120,000.00 25,000.00 3,000.00 650.00 148,650.00 30,000.00 20,000.00 1,200.00 7,000.00 8,000.00 66,200.00 826,000.00

339,200.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 67 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 110,000.00 148,000.00 597,200.00 120,000.00 25,000.00 3,000.00 650.00 148,650.00 30,000.00 20,000.00 1,200.00 7,000.00 8,000.00 66,200.00 813,000.00

254,400.00 130,000.00 166,500.00 550,900.00 120,000.00 25,000.00 3,000.00 650.00 148,650.00 30,000.00 20,000.00 1,200.00 7,000.00 8,000.00 66,200.00 766,000.00

664,125.00 664,125.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00 300.00 1,750.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 68 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 2,000.00 144,050.00 933,000.00

651,475.00 651,475.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00 300.00 1,750.00 2,000.00 144,050.00 920,000.00

632,500.00 632,500.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00 300.00 1,750.00 2,000.00 144,050.00 901,000.00

619,850.00 619,850.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 69 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 300.00 1,750.00 2,000.00 144,050.00 888,000.00

607,200.00 607,200.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00 300.00 1,750.00 2,000.00 144,050.00 876,000.00

581,900.00 581,900.00 100,000.00 20,833.33 2,500.00 541.67 123,875.00 100,000.00 40,000.00 300.00 1,750.00 2,000.00 144,050.00 850,000.00

27,500.00 22,750.00 22,750.00 100.00 2,400.00 2,400.00 77,900.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 70 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

4,800.00 8,250.00 9,000.00 3,250.00 6,600.00 31,900.00 110,000.00

37,500.00 22,750.00 22,750.00 100.00 2,400.00 2,400.00 87,900.00 4,800.00 8,250.00 9,000.00 3,250.00 6,600.00 31,900.00 120,000.00

27,500.00 22,750.00 22,750.00 100.00 2,400.00 2,400.00 77,900.00 4,800.00 8,250.00 9,000.00 3,250.00 6,600.00 31,900.00 110,000.00

37,500.00 22,750.00 22,750.00 100.00 2,400.00 2,400.00 87,900.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 71 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 4,800.00 8,250.00 9,000.00 3,250.00 6,600.00 31,900.00 120,000.00

27,500.00 45,000.00 45,000.00 100.00 5,400.00 5,400.00 128,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 190,000.00

37,500.00 45,000.00 45,000.00 100.00 5,400.00 5,400.00 138,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 200,000.00

27,500.00 45,000.00 45,000.00 100.00 5,400.00 5,400.00 128,400.00 10,800.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 72 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 190,000.00

37,500.00 45,000.00 45,000.00 100.00 5,400.00 5,400.00 138,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 200,000.00

27,500.00 54,000.00 54,000.00 100.00 5,400.00 5,400.00 146,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 208,000.00

37,500.00 54,000.00 54,000.00 100.00 5,400.00 5,400.00 156,400.00 10,800.00 19,250.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 73 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 21,000.00 3,900.00 6,600.00 61,550.00 218,000.00

27,500.00 60,000.00 60,000.00 100.00 5,400.00 5,400.00 158,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 220,000.00

37,500.00 60,000.00 60,000.00 100.00 5,400.00 5,400.00 168,400.00 10,800.00 19,250.00 21,000.00 3,900.00 6,600.00 61,550.00 230,000.00

157,500.00 1,800.00 1,800.00 161,100.00 5,400.00 8,750.00 10,500.00 1,950.00 3,300.00 26,600.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 74 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 191,000.00

8,800.00 360.00 9,160.00 400.00 275.00 60.00 21.67 756.67 125.00 125.00 250.00 10,200.00

9,350.00 360.00 9,710.00 400.00 275.00 60.00 21.67 756.67 125.00 125.00 250.00 10,800.00

813,000.00 624,000.00 816,000.00 4,500.00 2,258,000.00

933,000.00 296,000.00 1,620,000.00 9,000.00 2,858,000.00

920,000.00 296,000.00 1,620,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 75 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 9,000.00 2,845,000.00

901,000.00 296,000.00 1,512,000.00 9,000.00 2,718,000.00

888,000.00 296,000.00 1,458,000.00 9,000.00 2,651,000.00

876,000.00 296,000.00 1,404,000.00 9,000.00 2,585,000.00

850,000.00 296,000.00 1,350,000.00 9,000.00 2,505,000.00

933,000.00 481,000.00 2,376,000.00 9,000.00 3,799,000.00

920,000.00 481,000.00 2,376,000.00 9,000.00 3,786,000.00

901,000.00 481,000.00 2,268,000.00 9,000.00 3,659,000.00

888,000.00 481,000.00 2,160,000.00 9,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 76 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 3,538,000.00

876,000.00 481,000.00 1,944,000.00 9,000.00 3,310,000.00

850,000.00 481,000.00 1,836,000.00 9,000.00 3,176,000.00

933,000.00 926,500.00 972,000.00 9,000.00 2,841,000.00

920,000.00 926,500.00 972,000.00 9,000.00 2,828,000.00

901,000.00 926,500.00 972,000.00 9,000.00 2,809,000.00

888,000.00 926,500.00 972,000.00 9,000.00 2,796,000.00

876,000.00 926,500.00 864,000.00 9,000.00 2,676,000.00

850,000.00 926,500.00 864,000.00 9,000.00 2,650,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 77 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

933,000.00 926,500.00 1,620,000.00 9,000.00 3,489,000.00

920,000.00 926,500.00 1,620,000.00 9,000.00 3,476,000.00

901,000.00 926,500.00 1,512,000.00 9,000.00 3,349,000.00

888,000.00 926,500.00 1,512,000.00 9,000.00 3,336,000.00

876,000.00 926,500.00 1,350,000.00 9,000.00 3,162,000.00

850,000.00 926,500.00 1,350,000.00 9,000.00 3,136,000.00

933,000.00 800,000.00 2,970,000.00 9,000.00 4,712,000.00

920,000.00 800,000.00 2,970,000.00 9,000.00 4,699,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 78 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 901,000.00 800,000.00 2,700,000.00 9,000.00 4,410,000.00

888,000.00 800,000.00 2,592,000.00 9,000.00 4,289,000.00

876,000.00 800,000.00 1,620,000.00 9,000.00 3,305,000.00

850,000.00 800,000.00 1,620,000.00 9,000.00 3,279,000.00

933,000.00 900,000.00 3,240,000.00 11,250.00 5,085,000.00

920,000.00 900,000.00 3,240,000.00 11,250.00 5,072,000.00

901,000.00 900,000.00 2,970,000.00 11,250.00 4,783,000.00

888,000.00 900,000.00 2,700,000.00 11,250.00 4,500,000.00

876,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 79 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 800,000.00 1,890,000.00 11,250.00 3,578,000.00

850,000.00 800,000.00 1,890,000.00 11,250.00 3,552,000.00

933,000.00 1,000,000.00 3,780,000.00 11,250.00 5,725,000.00

920,000.00 1,000,000.00 3,780,000.00 11,250.00 5,712,000.00

901,000.00 1,000,000.00 3,240,000.00 11,250.00 5,153,000.00

888,000.00 1,000,000.00 2,970,000.00 11,250.00 4,870,000.00

876,000.00 1,000,000.00 2,430,000.00 11,250.00 4,318,000.00

850,000.00 1,000,000.00 2,430,000.00 11,250.00 4,292,000.00

933,000.00 920,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 80 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 1,944,000.00 9,000.00 3,806,000.00

920,000.00 920,000.00 1,944,000.00 9,000.00 3,793,000.00

901,000.00 920,000.00 1,836,000.00 9,000.00 3,666,000.00

888,000.00 920,000.00 1,728,000.00 9,000.00 3,545,000.00

876,000.00 747,500.00 1,620,000.00 9,000.00 3,253,000.00

850,000.00 747,500.00 1,620,000.00 9,000.00 3,227,000.00

933,000.00 1,965,000.00 2,160,000.00 11,250.00 5,070,000.00

920,000.00 1,965,000.00 2,160,000.00 11,250.00 5,057,000.00

901,000.00 1,965,000.00 1,944,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 81 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 11,250.00 4,822,000.00

888,000.00 1,965,000.00 1,890,000.00 11,250.00 4,755,000.00

876,000.00 1,572,000.00 1,620,000.00 11,250.00 4,080,000.00

850,000.00 1,572,000.00 1,620,000.00 11,250.00 4,054,000.00

933,000.00 1,572,000.00 2,160,000.00 13,500.00 4,679,000.00

920,000.00 1,572,000.00 2,160,000.00 13,500.00 4,666,000.00

901,000.00 1,572,000.00 2,160,000.00 13,500.00 4,647,000.00

888,000.00 1,572,000.00 2,268,000.00 13,500.00 4,742,000.00

876,000.00 1,572,000.00 2,268,000.00 13,500.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 82 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 4,730,000.00

850,000.00 1,572,000.00 2,160,000.00 13,500.00 4,596,000.00

9,900.00 140.00 140.00 50.00 50.00 60.00 75.00 60.00 10,475.00 1,200.00 1,500.00 700.00 3,400.00 1,047.50 600.00 375.00 200.00 2,222.50 16,100.00

8,250.00 140.00 140.00 50.00 50.00 60.00 75.00 60.00 8,825.00 1,200.00 1,500.00 700.00 3,400.00 882.50 600.00 375.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 83 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 200.00 2,057.50 14,300.00

8,800.00 140.00 140.00 50.00 50.00 50.00 62.50 50.00 225.00 9,567.50 1,200.00 1,500.00 700.00 3,400.00 956.75 600.00 375.00 200.00 2,131.75 15,100.00

0.00 0.00 28,750.00 162,000.00 190,750.00 191,000.00

100,000.00 100,000.00 28,750.00 162,000.00 190,750.00 291,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 84 of 93

STANDAR

WIJ AYA T ARA ES TETIK A Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN 54,000.00 54,000.00 3,198.00 3,198.00 58,000.00

38,300.00 38,300.00 4,000.00 2,750.00 600.00 216.67 7,566.67 46,000.00

53,620.00 53,620.00 6,000.00 4,125.00 900.00 325.00 11,350.00 65,000.00

56,910.00 95,500.00 96,920.40 26,591.40 276,000.00

96,503.10 143,250.00 110,763.84 26,591.40 378,000.00

146,340.00 191,000.00 166,145.76 53,182.80 557,000.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Page 85 of 93

STANDAR

WI JAYA T ARA E STETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Perihal Bangunan Klasifikasi Proyek Lokasi Wilayah

: Rekapitulasi Harga Satuan Pekerjaan : Rumah Tinggal : Menengah : Renovasi : JAKARTA : JABODETABEK

REKAPITULASI DAFTAR HARGA SATUAN PEK.STRUKTUR No

I. A. 1 2 B. 1 2 3 4 5 6 7 8 9 C. C.1. 1 2 3 4 5 6 7 8 C.2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Uraian Pekerjaan

Sat

STRUKTUR PEK. PERSIAPAN Pembersihan Lapangan Pas.Bouwplank PEK.TANAH Galian Tanah Urugan Tanah kembali Perataan Tanah Pemadatan Tanah, Manual Pemadatan Tanah, Mesin Urugan Pasir Pondasi Urugan Tanah Dari Luar lokasi Urugan Sirtu Dari Luar lokasi Buang Tanah Ke Luar lokasi PEK. PONDASI PEK. PONDASI DANGKAL Pondasi Batu Kali, 1 : 4 Pondasi Batu Kali, 1 : 5 Pas. Rollag Bata, 1 : 4 Pas. Rollag Bata, 1 : 5 Pas. Batako Kapur, 1 : 3 Pas. Batako Kapur, 1 : 4 Pas. Batako Kapur, 1 : 5 Pas. Batako Kapur, 1 : 6 PEK. PONDASI DALAM Pengeboran D50 cm & D60 cm Pengeboran D70 cm - D100 cm Pengeboran D110 cm Pengeboran D120 cm & D150 cm Beton Ready Mix K-350, D50 cm Beton Ready Mix K-350, D60 cm Beton Ready Mix K-350, D70 cm - D100 cm Beton Ready Mix K-350, D120 cm & D150 cm Pembesian Bored Pile Pondasi Tiang Pancang, Mini Pile 28 Pondasi Tiang Pancang, Mini Pile 32 Pondasi Tiang Pancang, Square Pile 20x20 Pondasi Tiang Pancang, Square Pile 25x25 Pondasi Tiang Pancang, Square Pile 20x20 Pondasi Tiang Pancang, Square Pile 30x30 Pondasi Tiang Pancang, Square Pile 35x35 Pondasi Tiang Pancang, Square Pile 40x40 Pondasi Tiang Pancang, Square Pile 45x45 Pondasi Tiang Pancang, Square Pile 50x50

Rekapitulasi Harga Satuan Pekerjaan

Page 86 of 93

Material

m2 m'

Spek.Ringkas

Papan & Kaso

m3 m3 m2 m2 m2 m3 m3 m3 m3

Dalam max.1,00M

m3 m3 m3 m3 m3 m3 m3 m3

Ps. Ps. Ps. Ps. Ps. Ps. Ps. Ps.

m' m' m' m' m3 m3 m3 m3 kg m' m' m' m' m' m' m' m' m' m'

Timbrisan Manual Timbrisan Mesin Urug Darat Tanah Sirtu

Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile M 28 M 32 SQ 20X20 SQ 25X25 SQ 20X20 SQ 30X30 SQ 35X35 SQ 40X40 SQ 45X45 SQ 50X50

Batu Kali Batu Kali Rollag Bata Rollag Bata Batako Kapur Batako Kapur Batako Kapur Batako Kapur

Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Pondasi Dalam Drop Hammer Drop Hammer Drop Hammer Drop Hammer Jack In Piles Drop Hammer Drop Hammer Drop Hammer Drop Hammer Drop Hammer

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 D. 1 2 3 4 5 6 7 8 9 10 11 12 13 E. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 F. 1 2 3 4 5 6 7 8 9

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Pondasi Tiang Pancang, Spun Pile 30x30 Pondasi Tiang Pancang, Spun Pile 35x35 Pondasi Tiang Pancang, Spun Pile 40x40 Pondasi Tiang Pancang, Spun Pile 45x45 Pondasi Tiang Pancang, Spun Pile 50x50 Pondasi Tiang Pancang, Spun Pile 60x60 Bobok Kepala Tiang < d30, Tiang Solid Bobok Kepala Tiang d30-d40, Tiang Solid Bobok Kepala Tiang d45-d50, Tiang Solid Bobok Kepala Tiang d30-d40, Tiang Spun Bobok Kepala Tiang d45-d60, Tiang Spun Bobok Kepala Tiang d30-d40, Tiang Bor Bobok Kepala Tiang d50-d60, Tiang Bor Bobok Kepala Tiang d70-d100, Tiang Bor Bobok Kepala Tiang d110, Tiang Bor Bobok Kepala Tiang d120-d150, Tiang Bor Bobok Kepala Tiang > d150, Tiang Bor PEK. MORTAR & BETON Spesi 1:3 Spesi 1:4 Spesi 1:5 Spesi 1:6 Beton Site Mix 1Pc:1,5Psr:2,5Seplit Beton Site Mix 1Pc:2Psr:3Seplit Beton Site Mix 1Pc:3Psr:5Seplit Beton Ready Mix K.350 Beton Ready Mix K.300 Beton Ready Mix K.275 Beton Ready Mix K.250 Beton Ready Mix K.225 Beton Ready Mix K.175 PEK. BEKISTING & PEMBESIAN Bekisting Poer dgn Triplex 9mm Bekisting Poer dgn Triplex 12mm Bekisting Sloof dgn Triplex 9mm Bekisting Sloof dgn Triplex 12mm Bekisting Kolom dgn Triplex 9mm Bekisting Kolom dgn Triplex 12mm Bekisting Balok dgn Triplex 9mm Bekisting Balok dgn Triplex 12mm Bekisting Plat dgn Triplex 9mm Bekisting Plat dgn Triplex 12mm Bekisting Tangga dgn Triplex 9mm Bekisting Tangga dgn Triplex 12mm Bekisting Beton Praktis Pembesian Polos Pembesian Ulir PEK. BETON BERTULANG Beton Praktis Pile Cap, K-350 Pile Cap, K-300 Pile Cap, K-275 Pile Cap, K-250 Pile Cap, K-225 Pile Cap, K-175 Tie Beam, K-350 Tie Beam, K-300

Rekapitulasi Harga Satuan Pekerjaan

Page 87 of 93

m' m' m' m' m' m' ttk ttk ttk ttk ttk ttk ttk ttk ttk ttk ttk m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

SP 30X30 SP 35X35 SP 40X40 SP 45X45 SP 50X50 SP 60X60 M, SQ M, SQ M, SQ SP SP Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile

Uk: 2/3 Uk: 2/3 Uk: 2/3

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 kg kg

1,21x2,42 1,21x2,42 1,21x2,42 " 1,21x2,42 " 1,21x2,42 " 1,21x2,42 " 1,21x2,42 " 2x20cm 12,00m 12,00m

m3 m3 m3 m3 m3 m3 m3 m3 m3

K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300

Drop Hammer Drop Hammer Drop Hammer Drop Hammer Drop Hammer Drop Hammer Tiang Pancang Tiang Pancang Tiang Pancang Tiang Pancang Tiang Pancang Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Bored Pile Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Beton.Site Mix Beton.Site Mix Beton.Site Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Tripleks 9mm Tripleks 12mm Tripleks 9mm Tripleks 12mm Tripleks 9mm Tripleks 12mm Tripleks 9mm Tripleks 12mm Tripleks 9mm Tripleks 12mm Tripleks 9mm Tripleks 12mm Kolom & Ringbalk BJTP.U.24 BJTD.U.39 Beton.1Pc:2Psr:3Spl Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix Beton.Ready Mix

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 G. 1 2 3 H.

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Tie Beam, K-275 Tie Beam, K-250 Tie Beam, K-225 Tie Beam, K-175 Pelat Lantai, K-350 Pelat Lantai, K-300 Pelat Lantai, K-275 Pelat Lantai, K-250 Pelat Lantai, K-225 Pelat Lantai, K-175 Pelat Kantilever, K-350 Pelat Kantilever, K-300 Pelat Kantilever, K-275 Pelat Kantilever, K-250 Pelat Kantilever, K-225 Pelat Kantilever, K-175 Balok Anak, K-350 Balok Anak, K-300 Balok Anak, K-275 Balok Anak, K-250 Balok Anak, K-225 Balok Anak, K-175 Balok Induk, K-350 Balok Induk, K-300 Balok Induk, K-275 Balok Induk, K-250 Balok Induk, K-225 Balok Induk, K-175 Kolom Beton, K-350 Kolom Beton, K-300 Kolom Beton, K-275 Kolom Beton, K-250 Kolom Beton, K-225 Kolom Beton, K-175 Tangga Beton, K-350 Tangga Beton, K-300 Tangga Beton, K-275 Tangga Beton, K-250 Tangga Beton, K-225 Tangga Beton, K-175 Retaining Wall Beton, K-350 Retaining Wall Beton, K-300 Retaining Wall Beton, K-275 Retaining Wall Beton, K-250 Retaining Wall Beton, K-225 Retaining Wall Beton, K-175 Shear Wall Beton, K-350 Shear Wall Beton, K-300 Shear Wall Beton, K-275 Shear Wall Beton, K-250 Shear Wall Beton, K-225 Shear Wall Beton, K-175 PEK.ATAP Kuda-kuda Baja Dengan WF Kuda-kuda Baja Dengan Siku Gording Baja CNP PEK.LANTAI

Rekapitulasi Harga Satuan Pekerjaan

Page 88 of 93

m3 m' m' m' m3 m3 m3 m' m' m' m3 m3 m3 m' m' m' m3 m3 m3 m' m' m' m3 m3 m3 m' m' m' m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175 K-350 K-300 K-275 K-250 K-225 K-175

kg kg kg

WF Siku CNP

Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready Beton.Ready

Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix Mix

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika 1 2 3 4 5 6 7 8

PROGRAM ANALISA HARGA SATUAN PEKERJAAN

Urugan Tanah Lantai Urugan Tanah Lantai Pemadatan Tanah Lantai Rabat Beton Bwh Pel.Lantai T.Tulang Rabat Beton Bwh Pel.Lantai T.Tulang Plat Duiker Pintu Masuk L.0,50m Plat Duiker Pintu Masuk L.0,75m Plat Duiker Pintu Masuk L.1,00m

Rekapitulasi Harga Satuan Pekerjaan

Page 89 of 93

m3 m3 m2 m2 m2 m' m' m'

T.5cm T.7cm T.10cm T.12,5cm T.15cm

Tanah Dari Dalam Tanah Dari Luar Dgn Mesin Stamper Beton.1Pc:3Psr:5Spl Beton.1Pc:3Psr:5Spl Beton.1Pc:2Psr:3Spl Beton.1Pc:2Psr:3Spl Beton.1Pc:2Psr:3Spl

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Jakarta, November 2008

: Rekapitulasi Harga Satuan Pekerjaan

Kesimpulan Harga Satuan Rp.

Halaman

Rp4,000.00 Rp50,000.00 Rp46,000.00 Rp23,000.00 Rp5,000.00 Rp16,000.00 Rp27,000.00 Rp166,000.00 Rp112,000.00 Rp196,000.00 Rp32,000.00

Rp513,000.00 Rp502,000.00 Rp633,000.00 Rp583,000.00 Rp78,000.00 Rp74,000.00 Rp70,000.00 Rp69,000.00 Rp88,000.00 Rp91,000.00 Rp93,000.00 Rp103,000.00 Rp931,000.00 Rp868,000.00 Rp805,000.00 Rp773,000.00 Rp11,000.00 Rp85,000.00 Rp97,000.00 Rp87,000.00 Rp127,000.00 Rp138,000.00 Rp571,000.00 Rp835,000.00 Rp1,121,000.00 Rp1,385,000.00 Rp1,688,000.00

Rekapitulasi Harga Satuan Pekerjaan

Page 90 of 93

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Rp257,000.00 Rp304,000.00 Rp376,000.00 Rp444,000.00 Rp541,000.00 Rp678,000.00 Rp28,000.00 Rp40,000.00 Rp52,000.00 Rp31,000.00 Rp40,000.00 Rp40,000.00 Rp52,000.00 Rp56,000.00 Rp59,000.00 Rp70,000.00 Rp82,000.00 Rp201,000.00 Rp174,000.00 Rp163,000.00 Rp153,000.00 Rp826,000.00 Rp813,000.00 Rp766,000.00 Rp933,000.00 Rp920,000.00 Rp901,000.00 Rp888,000.00 Rp876,000.00 Rp850,000.00 Rp110,000.00 Rp120,000.00 Rp110,000.00 Rp120,000.00 Rp190,000.00 Rp200,000.00 Rp190,000.00 Rp200,000.00 Rp208,000.00 Rp218,000.00 Rp220,000.00 Rp230,000.00 Rp191,000.00 Rp10,200.00 Rp10,800.00 Rp2,258,000.00 Rp2,858,000.00 Rp2,845,000.00 Rp2,718,000.00 Rp2,651,000.00 Rp2,585,000.00 Rp2,505,000.00 Rp3,799,000.00 Rp3,786,000.00

Rekapitulasi Harga Satuan Pekerjaan

Page 91 of 93

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Rp3,659,000.00 Rp3,538,000.00 Rp3,310,000.00 Rp3,176,000.00 Rp2,841,000.00 Rp2,828,000.00 Rp2,809,000.00 Rp2,796,000.00 Rp2,676,000.00 Rp2,650,000.00 Rp3,489,000.00 Rp3,476,000.00 Rp3,349,000.00 Rp3,336,000.00 Rp3,162,000.00 Rp3,136,000.00 Rp4,712,000.00 Rp4,699,000.00 Rp4,410,000.00 Rp4,289,000.00 Rp3,305,000.00 Rp3,279,000.00 Rp5,085,000.00 Rp5,072,000.00 Rp4,783,000.00 Rp4,500,000.00 Rp3,578,000.00 Rp3,552,000.00 Rp5,725,000.00 Rp5,712,000.00 Rp5,153,000.00 Rp4,870,000.00 Rp4,318,000.00 Rp4,292,000.00 Rp3,806,000.00 Rp3,793,000.00 Rp3,666,000.00 Rp3,545,000.00 Rp3,253,000.00 Rp3,227,000.00 Rp5,070,000.00 Rp5,057,000.00 Rp4,822,000.00 Rp4,755,000.00 Rp4,080,000.00 Rp4,054,000.00 Rp4,679,000.00 Rp4,666,000.00 Rp4,647,000.00 Rp4,742,000.00 Rp4,730,000.00 Rp4,596,000.00 Rp16,100.00 Rp14,300.00 Rp15,100.00

Rekapitulasi Harga Satuan Pekerjaan

Page 92 of 93

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya

WI JAYA T ARA E STETIKA Berkarya untuk estetika

PROGRAM ANALISA HARGA SATUAN PEKERJAAN Rp191,000.00 Rp291,000.00 Rp58,000.00 Rp46,000.00 Rp65,000.00 Rp276,000.00 Rp378,000.00 Rp557,000.00

Rekapitulasi Harga Satuan Pekerjaan

Page 93 of 93

STANDAR PROYEK WTE Estimate : Ir. Leonardy Wijaya