Proj. Name: Location: Client: Designer: Date:
2 - Storey Resd'l. Bldg. Lolita Village, Brgy. Caibaan, Tac. City Pitao BL Pitao BL 2/7/2008
General Description: Square Footing
SQUARE FOOTING DESIGN (WSD) fc' :
2,500.00 17.24 7.76 30,000.00 206.90
fc = fs :
psi Mpa psi Mpa
Es = Ec = 4730√fc' n = Es/Ec k = n/(n+fs/fc) j = 1-k/3 R = fckj/2
200,000.00 Beam Dimension: 19,640.26 b 10.18 Beam # 1 300.00 0.276 Beam # 2 250.00 0.908 Length 0.97 Slab 3.25
DEADLOAD: BEAM: SLAB: WALL: Column: TOTAL: ROOFING: SIESMIC:
14,744.43 32,520.15 45,910.80 15,362.46 108,537.84 33,150.00 35,421.96
Newton Newton Newton Newton Newton Newton Newton
33,150.00
Newton
314,935.31
Newton
Thickness Wall Ht. Col. Dimen. Col.Height Roofing
0.10 2.6 0.30 7.25 3.25
d 300.00 300.00 Width 4.25 meter meter meter meter 4.25
LIVELOAD: 2,400.00 TOTAL LOAD: P Allow. Soil Bearing Pressure:
240.00 34.78 18,896.12
Assume Weight of Footing = 6% (Load) TOTAL AXIAL LOAD =
333,831.43
Footing Area Required: L =
1.391 1.179
Try : L =
1.20
meter
NET UPWARD SOIL PRESSURE:p = MOMENT, M =
28,167.03
N -m
d = sqrt(M/Rb)
155.30
mm.
Final Depth, d =
305.30
mm. 0.24
CHECK FOR BEAM SHEAR: V = pL
Kpa Psi Newton
Newton sq.m. meter Area =
1.44
sq.m. 0.450
0.21 0.30
Critical section for Moment
68,074.60 Newton
v = V/bd
0.28 Mpa
va =.09sqrt(fc')
0.37 Mpa
0.30
1.20
If va > v, Safe Na Bay!!! Critical section for beam shear CHECK FOR PUNCHING SHEAR: d/2 Vp =
312,181.16 Newton 0.30
vp = Vp/Ap
0.422 Mpa
va = .17sqrt(fc')
0.71 Mpa
d/2
If va > vp, Safe Gyud na Kaayo Bay!!!
0.30
231,827.38 N/sq.m.
1.20
Compute Steel Rquirements: As = M/fsjd No. of Bars 4.0
491.172 sq.mm Bar Diameter Area, sq.mm 12 113.09
CHECK FOR BOND STRESS: u = V/Σojd 452.38 sq.mm
Σo = Area bn V = pL(L-d)/2
125,186.78 Newton
u =
0.998 Mpa
ua = 10.14sqrt(fc')/D
3.51 Mpa
If ua > u, Safe Gyud Na Bay !!! Check Weight of Footing: Total Depth, d
248.30
Wt. Of Footing
8,418.11
mm Newton
CHECK FOR THE REQUIRED AREA: A = Trial Area =
1.347
sq.m.
1.440
sq.m.
If Trial Area>Computed Area, It is Safe
m
or Moment
1.20 m