REKAP 1/51
PROYEK
:
BINUS VIDA BEKASI
PAKET PEKERJAAN
:
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
REKAPITULASI
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Total Harga WKC ( Rp )
Jenis Pekerjaan
I.
PEKERJAAN PERSIAPAN
Rp.
69,880,000
II.
PEKERJAAN PLUMBING
Rp.
847,761,955
III.
PEKERJAAN PEMADAM KEBAKARAN
Rp.
886,325,940
IV.
PEKERJAAN VAC, TATA UDARA
Rp.
1,310,108,040
V.
PEKERJAAN ELEKTRIKAL
Rp.
5,244,143,330
VI.
PEKERJAAN LIFT
Rp.
VII.
PEKERJAAN PIPA AIR HUJAN
Rp.
92,904,250
VIII.
PEKERJAAN RAK KABEL ELEKTRONIK
Rp.
134,134,380
IX.
PEKERJAAN PANEL FIRE ALARM
Rp.
478,781,830
X.
PEKERJAAN SOUND SYSTEM
Rp.
333,569,530
XI.
PEKERJAAN TELEPHONE
Rp.
60,434,600
XII.
PEKERJAAN CLOSE CIRCUIT TELEVISI ( CCTV )
Rp.
528,343,190
XIII
PEKERJAAN INSTALASI DATA
Rp.
85,185,330
Rp.
10,071,572,375
TOTAL SEBELUM PPN 10% PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
-
413756492.xls
REKAP 2/51
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
PS3/51
: BINUS VIDA BEKASI
PAKET PEKERJAAN : MEKANIKAL & ELEKTRIKAL PERIHAL
: PERSIAPAN
REV / TANGGAL
: 1 / 25 FEBRUARI 2015
DISIAPKAN OLEH : PT. MITRA PERDANA ENGINEERING
NO
1
URAIAN PEKERJAAN
5
6
Gambar Terlaksana (As Built Drawing) Pembuatan dan pencetakan gambar-gambar terlaksana termasuk penyimpanan, gambar harus dan sesuai dengan apa yang telah dilaksanakan, gambar harus jelas (bukan foto copy/rekalkir) dan gambar terlaksana tersebut harus diserahkan dalam rangkap 5 (lima), 1 asli dan 2 salinan uk. A0 dan 2 salinan uk. A3.Semua biaya yang timbul menjadi tanggung jawab pemborong Kantor Pemborong di Lapangan Pembuatan kantor sementara pemborong di lapangan berikut semua fasilitas yang diperlukan termasuk toilet untuk para pekerja berikut pemeliharaan selama pelaksanaan pekerjaan Gudang Bahan dan Los Kerja Pengadaan gudang sementara dan los kerja di lapangan berikut pemeliharaannya.
7
8
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
Gambar Kerja ( Shop Drawing ) Pembuatan dan pencetakan gambar-gambar pelaksanaan menjadi tanggung jawab kontraktor sampai dengan disetujuinya gambar yang diajukan ke Manajemen Konstruksi
4
TOTAL
Akomodasi Rapat Lapangan Pengadaan akomodasi untuk rapat-rapat lapangan termasuk mengkoordinasi semua pemborong yang akan mengikuti rapat.
3
HARGA SATUAN
Biaya Pembuatan Dokumen Kontrak Pembuatan dan pencetakan Dokumen Kontrak rangkap 5 (lima), 2 asli dan 3 salinan lengkap dengan gambar-gambar termasuk semua biaya-biaya yang berhubungan denganya seperti biaya materai adalah menjadi tanggung jawab pemborong
2
QTY UNIT
Pemadam Kebakaran & P3K Pengadaan peralatan P3K,peralatan pencegahan terhadap bahaya kebakaran (min 2 unit) dengan kapasitas 5 kg) yang sesuai dengan anjuran perusahaan asuransi dan menyediakan tenaga terlatih. Mobilisasi dan demobilisasi Pengangkutan peralatan, tenaga kerja dan segala sesuatu yang dibutuhkan di proyek berikut pengembaliannya merupakan tanggung jawab Pemborong
9
Penjagaan Proyek Pemborong bertanggung jawab atas penjagaan, perlindungan terhadap pekerjaan selama masa pelaksanaan saat siang atapun malam. Pemberi tugas tidak bertanggung jawab atas kehilangan atau kerusakan bahan-bahan bangunan,peralatan ataupun pekerjaan yang sedang dilaksanakan 11 Pengadaan Sumber Air Bersih Air untuk keperluan pekerjaan harus diadakan oleh pemborong dan apabila mungkin dapat dari sumber yang sudah ada di setiap lokasi tersebut.Pemborong harus membuat sambungan-sambungan sementara yang diperlukan. 12 Pengadaan Tenaga Listrik Setiap pembangkit tenaga listrik sementara atau penerangan buatan yang dipergunakan untuk pekerjaan,harus diadakan oleh pemborong termasuk pemasangan sementara dari kabel-kabel meteran.Apabila pengambilan daya dari sumber pembangkit / PLN yang sudah ada ,semua biaya pemakaian daya selama pelaksanaan proyek termasuk ijin-ijin yang diperlukan serta perapihan setelah pekerjaan selesai menjadi tanggung jawab pemborong 13 Sarana komunikasi Pengadaan 1 (satu) jalur telepon dan perlengkapannya termasuk pengurusan permohonan kepada PT. Telkom serta menghubungkan secara paralel dengan saluran telepon yang lain yang diperlukan untuk lapangan berikut pembayaran semua tagihan-tagihan dari Telkom selama pelaksanaan adalah menjadi tanggung jawab Pemborong. Untuk komunikasi selama pelaksanaan pekerjaan dengan menggunakan HT atau alat lainnya wajib disediakan oleh Pemborong
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
PS4/51
: BINUS VIDA BEKASI
PAKET PEKERJAAN : MEKANIKAL & ELEKTRIKAL PERIHAL
: PERSIAPAN
REV / TANGGAL
: 1 / 25 FEBRUARI 2015
DISIAPKAN OLEH : PT. MITRA PERDANA ENGINEERING
NO
URAIAN PEKERJAAN
QTY UNIT
HARGA SATUAN
TOTAL
14 Photo-Photo Kemajuan Pekerjaan Pembuatan photo-photo berwarna atas kemajuan pekerjaan sebanyak 4 (empat) set dan diserahkan pada Pengawas Lapangan setiap bulan hingga masa penyerahan pertama.Setiap set terdiri dari 6 (enam) lembar atau lebih sesuai keperluan yang dipotret dari berbagai obyek pekerjaan.
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
Incl. sipil
1
ls
1
ls
15 Kebersihan dan Kerapihan Pemborong harus mengangkut semua sampah secara teratur jika sudah bertumpuk dan pada waktu penyelesaian pekerjaan harus bersih dan rapih. (Catatan : dalam pengangkutan ke luar proyek, tidak mengotori jalan umum). 16 Asuransi Pemborong wajib mengasuransikan kerusakan pekerjaan (CAR),jaminan terhadap pihak ketiga (TPL) serta Jaminan untuk Tamu serta Asuransi Tenaga Kerja (ASTEK) 17 Topi Pengaman (Helm) dan Sepatu Lapangan Penyediaan topi pengaman dan sepatu lapangan sebanyak yang diperlukan untuk Pemberi Tugas,Konsultan,Pengawas Lapangan dan Tamu 18 Laporan Pembuatan laporan dan penggandaannya sesuai petunjuk Manajemen Konstruksi wajib dibuat pemborong, termasuk laporan harian, mingguan dan ataupun bulanan 19 Perijinan - Perijinan Perijinan - perijinan yang menyakut sistem mekanikal dan elektrikal yang berupa perijinan departemen tenaga kerja (Depnaker), Akli, dinas pemadam kebakaran dan biaya - biaya lain yang berhubungan dengan pekerjaan Mekanikal dan Elektrikal menjadi tanggung jawab pemborong - Ijin Konsuil 800 kva
-
Included Listrik 63,380,000 63,380,000 Included Fire Alarm By Owner 6,500,000 6,500,000 By Others Jet pump -
- Ijin PMK
Fire Hydrant
1
ls
- Ijin PMK
Fire Alarm
1
ls
- Ijin TELKOM
1
ls
- Ijin Depnaker Penangkal Petir
1
ls
- Ijin AMDAL STP
1
ls
- Ijin Deepwell
1
ls
- Ijin dan Penyambungan PLN
1
ls
By Owner
- Ijin dan Penyambungan PDAM
1
ls
By Owner
- Dana Preman
1
ls
TOTAL - PERSIAPAN
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
-
69,880,000
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 5/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
II A
Uraian
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Vol WKC
Sat
Total Harga WKC
3
Unit
1,150,200
3,450,600
1
Unit
2,500,000
2,500,000
1
Unit
2,750,000
2,750,000
2
Unit
3,750,000
37,500,000
1
Unit
10
Unit
765,450
7,654,500
2
Unit
765,450
1,530,900
1,760,000
44,000
3,608,000
52,535,000
1,382,500
53,917,500
PEKERJAAN PLUMBING PEKERJAAN PIPA AIR BERSIH I PENGADAAN + PEMASANGAN MATERIAL UTAMA Pengadaan/Pemasangan Material Utama, Harus Lengkap Dengan ACC Dan Semua material bantu lengkap dengan Dudukan/ Support DLL yang Di Perlukan. 1 Boster Pump Kapasitas Type Power Operasi
: : : :
2 Sand Filter Kapasitas Type Operasi
: 9 m3 / h : Cartridge Bag : Manual Back Wash
3 Carbond Filter Kapasitas Type Operasi
: 9 m3 / h : Cartridge Bag : Manual Back Wash
3 x @ 350 lpm ; 4 Bar End Suction Cent, C/W vsd 3 x @ 5 kW 3 Paralel Alt
4 PENGEBORAN & Pengadaan Pompa Jet Pump Kapasitas : 9 m3/Hour Type : Submersible Power : Operasi : Automatic By LS 5 Pengadaan STP, (By-Specialist) Kapasitas Type
: 90 m3 / h : Extended Aeration
6 A. SWP - 01, 02,03, 04 & 06 Kapasitas Type Operasi
: 2 x @ 150 lpm ; 3 Bar, 1,5 kW : Submersibel Pump c/w Cutter : Paralel Alt
B. SWP - 05 Kapasitas Type Operasi
15,000,000
-
-
: 2 x @ 200 lpm ; 3 Bar, 2 kW : Submersibel : Paralel Alt
7 Pompa Pond, (Pompa Sirkulasi) Kapasitas Operasi
: 50 lpm, 1 Bar, 1 kW : Duty
2
8 Grease Trap Central Kapasitas Type
: 5 m3 : Stenlis Steel
1
Unit
Sub Total I, Pekerjaan Material Utama II Intalasi Di Ruang Pompa 1. Pengadaan Foot Valve 2. Pengadaan Gate Valve
112,911,500
: : :
Ø 80 mm Ø 80 mm Ø 25 mm
4 16 2
Bh Bh Bh
3,190,000 2,929,500 421,340
40,000 30,000 10,000
12,920,000 47,352,000 862,680
3. Pengadaan Floater Valve
:
Ø 80 mm
4
Bh
3,190,500
30,000
12,882,000
4. Pengadaan Non Return Valve 5. Pengadaan Y- Strainer 6. Pengadaan Flexible Joint
: : :
Ø 80 mm Ø 80 mm Ø 80 mm
5 5 10
Bh Bh Bh
2,929,500 1,728,000 1,188,000
30,000 30,000 30,000
14,797,500 8,790,000 12,180,000
7. Pengadaan Pressure Gauge 8. Pengadaan Pipa Header, Dia 100 mm
5 15
Bh m
369,150 612,500
20,000 80,000
1,945,750 10,387,500
9. Pengadaan Water Level Switch 10. Pengadaan Water Hammer Arester 11. Pengadaan/Inst Pipa PPR-PN.10 : Ø 80 mm, (Dari Deep Well ke GWT)
4 1 20
bh bh m
800,000 49,220,000 199,500
60,000 300,000 30,000
3,440,000 49,520,000 4,590,000
: Ø 80 mm, (Dari PDAM ke GWT) : Ø 65 mm, (Dari R.Pompa ke Lt-Dsr )
50 45
m m
199,500 136,500
30,000 25,000
11,475,000 7,267,500
1
ls
9,333,000
2,333,300
11,666,300
12. Pengadaan/Inst Pipa PPR-PN.10 13. Material Bantu , Support & Fitting
Sub Total II, Pekerjaan Di Ruang Pompa
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
210,076,230
5 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 6/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Uraian
III Lantai - Dasar A. Instalasi Pipa Utama Air Bersi
Vol WKC
: Ø 80 mm : Ø 50 mm, (Menuju Zone-A) : Ø 40 mm, (Menuju Zone-A)
B. Instalasi Pipa Utama Air Koto
178
Sat
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Total Harga WKC
m m
199,500 90,130
30,000 20,000
-
m
55,300
15,000
: Ø 25 mm, (Menuju Zone-A)
m
23,450
10,000
12,478,250 -
: Ø 65 mm, (Menuju Zone-B) : Ø 40 mm, (Menuju Zone-C)
m m
136,500 55,300
25,000 15,000
-
: Ø 25 mm, (Menuju Pond-3)
m
23,450
10,000
-
: Ø 100 mm Ø 150 mm
137
m m
80,670 187,460
24,000 36,000
14,339,790 -
Ø 200 mm
158
m
314,620
48,000
57,293,960
50 5 6 1
m m bh bh
55,300 23,450 356,400 356,400
15,000 10,000 12,000 12,000
3,515,000 167,250 2,210,400 368,400
- Pengadaan Sand Filter - Pengadaan Flexibel, Dia 40 - Pengadaan Strainer, Dia 40
1 1 1
Unit bh bh
180,000 685,800
20,000 20,000
200,000 705,800
- Pengadaan Globe Valve, Dia 40
5
bh
931,540
12,000
4,717,700
17 2
m m
55,300 23,450
15,000 10,000
1,195,100 66,900
- Pengadaan Inled Viting, Dia 25 - Pengadaan Outled Viting, Dia 25
4 1
bh bh
356,400 356,400
12,000 12,000
1,473,600 368,400
- Pengadaan Sand Filter - Pengadaan Flexibel, Dia 40
1 1
Unit bh
180,000
20,000
200,000
- Pengadaan Strainer, Dia 40 - Pengadaan Globe Valve, Dia 40
1 5
bh bh
685,800 931,540
20,000 12,000
705,800 4,717,700
m m
55,300 23,450
15,000 10,000
-
bh bh
356,400 356,400
12,000 12,000
-
Unit bh
180,000
20,000
-
bh bh
685,800 931,540
20,000 12,000
-
4. -Instalasi Pipa dari Pompa P : Ø 40 mm
m
55,300
15,000
-
: Ø 25 mm
m bh bh
23,450 356,400 356,400
10,000 12,000 12,000
-
Unit bh
180,000
20,000
-
bh bh
685,800 931,540
20,000 12,000
-
5. -Instalasi Pipa dari Pompa P : Ø 40 mm
m
55,300
15,000
-
: Ø 25 mm
m bh
23,450 356,400
10,000 12,000
-
bh Unit
356,400 -
12,000 -
-
- Pengadaan Flexibel, Dia 40 - Pengadaan Strainer, Dia 40
bh bh
180,000 685,800
20,000 20,000
-
- Pengadaan Globe Valve, Dia 40
bh
931,540
12,000
-
m m
55,300 23,450
15,000 10,000
-
- Pengadaan Inled Viting, Dia 25
bh
356,400
12,000
-
- Pengadaan Outled Viting, Dia 25
bh
356,400
12,000
-
C. Instalasi Pipa (PPR-PN.10), dari Pompa Pond 1. -Instalasi Pipa dari Pompa P : Ø 40 mm : Ø 25 mm - Pengadaan Inled Viting, Dia 25 - Pengadaan Outled Viting, Dia 25
2. -Instalasi Pipa dari Pompa P : Ø 40 mm : Ø 25 mm
3. -Instalasi Pipa dari Pompa P : Ø 40 mm : Ø 25 mm - Pengadaan Inled Viting, Dia 25 - Pengadaan Outled Viting, Dia 25 - Pengadaan Sand Filter - Pengadaan Flexibel, Dia 40 - Pengadaan Strainer, Dia 40 - Pengadaan Globe Valve, Dia 40
- Pengadaan Inled Viting, Dia 25 - Pengadaan Outled Viting, Dia 25 - Pengadaan Sand Filter - Pengadaan Flexibel, Dia 40 - Pengadaan Strainer, Dia 40 - Pengadaan Globe Valve, Dia 40
- Pengadaan Inled Viting, Dia 25 - Pengadaan Outled Viting, Dia 25 - Pengadaan Sand Filter
6. -Instalasi Pipa dari Pompa P : Ø 40 mm : Ø 25 mm
- Pengadaan Sand Filter
Unit
-
-
-
- Pengadaan Flexibel, Dia 40
bh
180,000
20,000
-
- Pengadaan Strainer, Dia 40
bh
685,800
20,000
-
- Pengadaan Globe Valve, Dia 40
bh
931,540
12,000
-
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
6 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 7/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Uraian
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
Vol WKC
7 / 51
Sat
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Total Harga WKC
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 8/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Uraian
Vol WKC
7. -Instalasi Pipa dari Pompa P : Ø 40 mm : Ø 25 mm - Pengadaan Inled Viting, Dia 25
Sat
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Total Harga WKC
m m bh
55,300 23,450 356,400
15,000 10,000 12,000
-
bh Unit
356,400 -
12,000 -
-
- Pengadaan Flexibel, Dia 40 - Pengadaan Strainer, Dia 40
bh bh
180,000 685,800
20,000 20,000
-
- Pengadaan Globe Valve, Dia 40
bh
931,540
12,000
-
- Pengadaan Outled Viting, Dia 25 - Pengadaan Sand Filter
IV Area Zone - A A- Instalasi Area Toilet TK 1. Instalasi Air Bersih (PPR PN 10) - Instalasi Pipa Dia : Ø 40 mm
17
m
55,300
15,000
1,195,100
: Ø 32 mm
5
m
35,530
12,500
240,150
: Ø 25 mm
4
m
23,450
10,000
133,800
: Ø 20 mm : Ø 15 mm
45 22
m m
14,530 10,680
7,500 5,000
991,350 344,960
: Ø 40 mm
2
bh
751,010
20,000
1,542,020
1
ls
1,162,100
290,500
1,452,600
25
m
80,670
24,000
2,616,750
7 3
m bh
24,740 236,900
12,000 40,000
257,180 830,700
- Pengadaan Gate Valve
- Material Bantu , Support & Fitting 2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm - Pengadaan FCO,
: Ø 50 mm : Ø 100 mm
B. Instalasi PABKS, (PVC-AW : Ø 65 mm
5
m
36,110
15,000
255,550
- Pengadaan FCO,
: Ø 50 mm : Ø 65 mm
47 1
m bh
24,740 201,500
12,000 20,000
1,726,780 221,500
- Pengadaan FD
: Ø 50 mm : Ø 50 mm
4 8
bh bh
137,500 275,000
20,000 20,000
630,000 2,360,000
: Ø 50 mm : Ø 32 mm
5 30
m m
10,940 7,550
12,000 7,500
114,700 451,500
C. Instalasi VENT, (PVC-D)
B- Instalasi Toilet R,TUNGGU 1. Instalasi Air Bersih (PPR PN 10) - Instalasi Pipa Dia
: Ø 25 mm : Ø 15 mm
7 15
m m
23,450 10,680
10,000 5,000
234,150 235,200
- Pengadaan Gate Valve
: Ø 25 mm
1
bh
421,340
10,000
431,340
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm
5
m
80,670
24,000
523,350
: Ø 100 mm
1
bh
236,900
40,000
276,900
B. Instalasi PABKS, (PVC-AW) : Ø 50 mm - Pengadaan FCO, : Ø 50 mm
5 2
m bh
24,740 137,500
12,000 20,000
183,700 315,000
1
bh
275,000
20,000
295,000
13
m
7,550
7,500
195,650
1. Instalasi Air Bersih (PPR PN 10) - Instalasi Pipa Dia : Ø 25 mm
4
m
23,450
10,000
133,800
: Ø 20 mm : Ø 15 mm
14 8
m m
14,530 10,680
7,500 5,000
308,420 125,440
: Ø 25 mm
1
bh
421,340
10,000
431,340
- Pengadaan FCO,
- Pengadaan FD
: Ø 50 mm
C. Instalasi VENT, (PVC-D)
: Ø 32 mm
C- Instalasi Toilet Umum
- Pengadaan Gate Valve
Sub Total IV, Zone - A
V
123,777,980
ZONE - B I Lantai - Dasar A. Instalasi Air Bersih (PPR PN 10 : Ø 65 mm : Ø 50 mm - Pengadaan Gate Valve
: Ø 25 mm, (LAB) : Ø 25 mm, (LAB)
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
8 / 51
5 56
m m
136,500 90,130
25,000 20,000
807,500 6,167,280
16 8
m bh
23,450 421,340
10,000 10,000
535,200 3,450,720
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 9/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Total Harga WKC
B- Instalasi Area Toilet 1. Instalasi Pipa Air Bersih (PP : Ø 40 mm : Ø 32 mm
18 4
m m
55,300 35,530
15,000 12,500
1,265,400 192,120
: Ø 25 mm : Ø 20 mm
4 20
m m
23,450 14,530
10,000 7,500
133,800 440,600
: Ø 15 mm : Ø 40 mm
27 2
m bh
10,680 751,010
5,000 20,000
423,360 1,542,020
32 6
m bh
80,670 236,900
24,000 40,000
3,349,440 1,661,400
20
m
36,110
15,000
1,022,200
28 16
m m
24,740 80,670
12,000 24,000
1,028,720 1,674,720
- Pengadaan Gate Valve
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) - Pengadaan FCO,
: Ø 100 mm : Ø 100 mm
B. Instalasi PABKS, (PVC-AW) : Ø 65 mm : Ø 50 mm : Ø 100 mm, (LAB) - Pengadaan FCO,
: Ø 50 mm, (LAB) : Ø 65 mm : Ø 50 mm
9 2 4
m bh bh
24,740 201,500 137,500
12,000 20,000 20,000
330,660 443,000 630,000
- Pengadaan FD
: Ø 50 mm
7
bh
275,000
20,000
2,065,000
12 20
m m
8,540 7,550
9,000 7,500
210,480 301,000
A. Instalasi Air Bersih (PPR PN 10 : Ø 65 mm
5
m
136,500
25,000
807,500
B. Instalasi Pipa Air Bersih (PPR P : Ø 50 mm
30
bh
90,130
20,000
3,303,900
: Ø 40 mm
35
m
55,300
15,000
2,460,500
: Ø 15 mm C. Pengadaan Gate Valve + Water : Ø 15 mm
88 10
m bh
10,680 277,290
5,000 7,500
1,379,840 2,847,900
D- Instalasi Area Toilet 1. Instalasi Pipa Air Bersih (PP : Ø 40 mm
18
m
55,300
15,000
1,265,400
: Ø 32 mm
4
m
35,530
12,500
192,120
: Ø 25 mm
4
m
23,450
10,000
133,800
: Ø 20 mm
20
m
14,530
7,500
440,600
: Ø 15 mm : Ø 40 mm
27 2
m bh
10,680 751,010
5,000 20,000
423,360 1,542,020
: Ø 100 mm : Ø 100 mm
32 6
m bh
80,670 236,900
24,000 40,000
3,349,440 1,661,400
: Ø 50 mm B. Instalasi PABKS, (PVC-AW) : Ø 65 mm
4 20
bh m
137,500 36,110
20,000 15,000
630,000 1,022,200
C. Instalasi VENT, (PVC-D)
: Ø 40 mm : Ø 32 mm
II Lantai - Satu
- Pengadaan Gate Valve
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) - Pengadaan FCO,
- Pengadaan FCO, - Pengadaan FD
: Ø 50 mm : Ø 65 mm : Ø 50 mm
28 2 7
m bh bh
24,740 201,500 275,000
12,000 20,000 20,000
1,028,720 443,000 2,065,000
C. Instalasi VENT, (PVC-D)
: Ø 40 mm
12
m
8,540
9,000
210,480
: Ø 32 mm
20
m
7,550
7,500
301,000
5 28
m m
136,500 90,130
25,000 20,000
807,500 3,083,640
B- * Instalasi Area Toilet Locker, (Wanita) 1. Instalasi Pipa Air Bersih (PP : Ø 40 mm
4
m
55,300
15,000
246,050
: Ø 25 mm
14
m
23,450
10,000
451,575
: Ø 20 mm
5
m
14,530
7,500
110,150
: Ø 15 mm : Ø 40 mm
40 1
m bh
10,680 751,010
5,000 20,000
627,200 771,010
10 1
m bh
80,670 236,900
24,000 40,000
994,365 276,900
III Lantai - Dua A. Instalasi Air Bersih (PPR PN 10 : Ø 65 mm : Ø 50 mm
- Pengadaan Gate Valve
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm - Pengadaan FCO, : Ø 100 mm
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
9 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 10/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
Uraian
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Vol WKC
Sat
3 33 1 3
m m bh bh
36,110 24,740 137,500 275,000
15,000 12,000 20,000 20,000
127,775 1,212,420 157,500 885,000
1 20
m m
8,540 7,550
9,000 7,500
17,540 301,000
1 2 5 17 30 1
m m m m m bh
55,300 35,530 23,450 14,530 10,680 751,010
15,000 12,500 10,000 7,500 5,000 20,000
70,300 96,060 167,250 374,510 470,400 771,010
5 1
m bh
80,670 236,900
24,000 40,000
523,350 276,900
1 27 1 1
m m bh bh
36,110 24,740 137,500 275,000
15,000 12,000 20,000 20,000
51,110 991,980 157,500 295,000
: Ø 40 mm : Ø 32 mm
3 18
m m
8,540 7,550
9,000 7,500
43,850 270,900
C- Instalasi Area Toilet Make Up Room Pria 1. Instalasi Pipa Air Bersih (PP : Ø 40 mm : Ø 25 mm : Ø 15 mm - Pengadaan Gate Valve : Ø 40 mm
3 9 15 1
m m m bh
55,300 23,450 10,680 751,010
15,000 10,000 5,000 20,000
210,900 301,050 235,200 771,010
6 2
m bh
80,670 236,900
24,000 40,000
628,020 553,800
B. Instalasi PABK, (PVC-AW) : Ø 50 mm - Pengadaan FCO, : Ø 50 mm
11 2
m bh
24,740 137,500
12,000 20,000
404,140 315,000
C. Instalasi VENT, (PVC-D)
10
m
7,550
7,500
150,500
3 9 15 1
m m m bh
55,300 23,450 10,680 751,010
15,000 10,000 5,000 20,000
210,900 301,050 235,200 771,010
7 2
m bh
80,670 236,900
24,000 40,000
732,690 553,800
B. Instalasi PABK, (PVC-AW) : Ø 50 mm - Pengadaan FCO, : Ø 50 mm
9 2
m bh
24,740 137,500
12,000 20,000
312,290 315,000
C. Instalasi VENT, (PVC-D)
7
m
7,550
7,500
105,350
Ø 50 mm
5
m
90,130
20,000
550,650
Ø 25 mm Ø 20 mm Ø 15 mm
31 15 15 3
m m m bh
23,450 14,530 10,680 300,000
10,000 7,500 5,000 40,000
1,036,950 330,450 235,200 1,020,000
B. Instalasi PABKS, (PVC-AW) : : - Pengadaan FCO, : - Pengadaan FD : C. Instalasi VENT, (PVC-D)
Ø Ø Ø Ø
65 50 50 50
mm mm mm mm
: Ø 40 mm : Ø 32 mm
* Instalasi Area Toilet Locker, (Pria) 1. Instalasi Pipa Air Bersih (PP : Ø : Ø : Ø : Ø : Ø - Pengadaan Gate Valve : Ø
40 mm 32 mm 25 mm 20 mm 15 mm 40 mm
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm - Pengadaan FCO, : Ø 100 mm B. Instalasi PABKS, (PVC-AW) : : - Pengadaan FCO, : - Pengadaan FD : C. Instalasi VENT, (PVC-D)
Ø Ø Ø Ø
65 50 50 50
mm mm mm mm
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm - Pengadaan FCO, : Ø 100 mm
: Ø 32 mm
- Instalasi Area Toilet Make Up Room Wanita 1. Instalasi Pipa Air Bersih (PP : Ø 40 mm : Ø 25 mm : Ø 15 mm - Pengadaan Gate Valve : Ø 40 mm
2. Instalasi PAK, PABK (PVC-AW) & VENT (PVC-D) A. Instalasi PAK, (PVC-AW) : Ø 100 mm - Pengadaan FCO, : Ø 100 mm
: Ø 32 mm
III Lantai - Tiga A. Instalasi Air Bersih (PPR PN 10 : ( Dari Lt-2 ke Lt-3) B. Instalasi Air Bersih (PPR PN 1 : : : C. Pengadaan Kran Taman
Sub Total V, Zone - B
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
Total Harga WKC
78,092,705
10 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PL 11/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PLAMBING
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
VI
Uraian
ZONE - C I Lantai - Satu A- Instalasi Pipa Tegak B- Instalasi Area Toilet Guru 1. Instalasi Pipa Air Bersih (P
- Pengadaan Gate Valve
Vol WKC
Sat
Harga Satuan
Harga Satuan
Material ( Rp )
Upah ( Rp )
Total Harga WKC
: Ø 40 mm
m
55,300
15,000
-
: : : :
m m m bh
23,450 14,530 10,680 421,340
10,000 7,500 5,000 10,000
-
Ø Ø Ø Ø
25 20 15 25
mm mm mm mm
2. Instalasi PAK, (PVC-AW) - Pengadaan FCO,
: Ø 100 mm : Ø 100 mm
m bh
80,670 236,900
24,000 40,000
-
3. Instalasi PABK, (PVC-AW) - Pengadaan FD,
: Ø 50 mm : Ø 50 mm
m bh
24,740 137,500
12,000 20,000
-
4. Instalasi VENT, (PVC-D)
: Ø 32 mm
m
7,550
7,500
-
: Ø 40 mm
m
55,300
15,000
-
: : : :
m m m bh
23,450 14,530 10,680 421,340
10,000 7,500 5,000 10,000
-
II Lantai - Dua A- Instalasi Pipa Tegak B- Instalasi Area Toilet Guru 1. Instalasi Pipa Air Bersih (P
- Pengadaan Gate Valve
Ø Ø Ø Ø
25 20 15 25
mm mm mm mm
2. Instalasi PAK, (PVC-AW) - Pengadaan FCO,
: Ø 100 mm : Ø 100 mm
m bh
80,670 236,900
24,000 40,000
-
3. Instalasi PABK, (PVC-AW) - Pengadaan FD,
: Ø 50 mm : Ø 50 mm
m bh
24,740 137,500
12,000 20,000
-
4. Instalasi VENT, (PVC-D)
: Ø 32 mm
m
7,550
7,500
-
: Ø 40 mm : Ø 25 mm : Ø 15 mm
m m m m
55,300 23,450 10,680 300,000
15,000 10,000 5,000 40,000
-
III Lantai - Tiga A- Instalasi Pipa Tegak B- Instalasi Pipa Taman C- Pengadaan Kran Taman
Sub Total V, Zone - C VII
-
ZONE - E I Lantai - Dasar 1. Instalasi Pipa Air Bersih (PPR P : Ø 80 mm Pipa dari R.Pompa : Ø 40 mm - Pengadaan Gate Valve : Ø 40 mm II Instalasi R.Toilet Ganti 1. Instalasi Pipa Air Bersih (P
- Pengadaan Gate Valve III Instalasi Pipa Taman 1. Instalasi Pipa Air Bersih (P
56 19 3
m m bh
199,500 55,300 751,010
30,000 15,000 20,000
12,852,000 1,335,700 2,313,030
mm mm mm mm mm
5 17 25 26 2
m m m m bh
35,530 23,450 14,530 10,680 421,340
12,500 10,000 7,500 5,000 10,000
240,150 568,650 550,750 407,680 862,680
: Ø 50 mm : Ø 40 mm : Ø 20 mm
185 380 95
m m m
90,130 55,300 14,530
20,000 15,000 7,500
20,374,050 26,714,000 2,092,850
19
bh
300,000
40,000
6,460,000
: : : : :
Ø Ø Ø Ø Ø
32 25 20 15 25
2. Pengadaan Kran Taman Sub Total V, Zone - E
74,771,540
Material Bantu , Support & Fitting Testing & Commisioning
1 1
GRAND TOTAL PEKERJAAN PLUMBING
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Enginees
11 / 51
ls ls
191,731,000.00 6,774,000.00
47,933,000.00 1,694,000.00
239,664,000 8,468,000
847,761,955
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
PK 12/51
BINUS VIDA BEKASI
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
PEMADAM KEBAKARAN
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No
III I 1
2
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN PEMADAM KEBAKARAN Pengadaan & Pemasangan Peralatan Utama Electric Fire Pump ( Standart NFPA - 20 Std ) Kap Head
: 750 GPM, 7.5 Bar : 75 M
Type Operasi
: End Suction Cent : Automatic On - Manual Off
Power Include Panel Control
: 75 kW
Jockey Fire Pump ( Standart NFPA - 20 Std ) Kap : 50 GPM, 8.5 Bar Type Operasi
: Vertical Multi Stage : Automatic On - Off
Power Include Panel Control
: 7.5 kW
3
Kabel Power & Kontrol dari panel ke pompa
4
Material bantu
1
Set
4,029,750
4,029,750
1
Set
708,750
708,750
1 1
ls
3,435,000 3,323,750
3,435,000 4,570,250
ls
1,246,500
12,743,750
I - SUB TOTAL PERALATAN UTAMA II 1 2
Instalasi Di R.Pompa Pipa Header, sch.40 Pipa BS, sch.40
: Ø 250 mm : Ø 150 mm, (Pipa dari kolam renang) : Ø 150 mm : Ø 50 mm
3
Gate Valve
: Ø 150 mm : Ø 50 mm
4
Gate Valve OS&Y
: Ø 25 mm : Ø 150 mm
5
Strainer
: Ø 50 mm : Ø 150 mm
6
Flexibel Joint
: Ø 50 mm : Ø 150 mm
7
Non Return Valve
8 9
Savety Valve Foot-Valve
: Ø 150 mm
10 11
Flow Meter MCV (alarm Gong)
: Ø 150 mm : Ø 150 mm
12 13
Pressure Gauge, 16 Kg Motorized Valve
14
Material Bantu , Support & Fitting
: Ø 50 mm : Ø 150 mm : Ø 50 mm
II - Sub Total Pekerjaan Pump Room
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
6 35 20 15 4 1 1 2 1 2 1 4 2 2 1 4 2 1 1 6 1
m m m m Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah ls
876,870 555,510 555,510 116,490 6,800,000 1,680,000 1,560,000 6,800,000 1,680,000 4,210,000 920,000 1,215,000 360,000 6,800,000 1,680,000 43,677,000 5,060,000 44,987,000 22,977,000 369,150
104,000 78,000 78,000 26,000 60,000 20,000 10,000 60,000 20,000 40,000 20,000 40,000 20,000 60,000 20,000 120,000 60,000 60,000 240,000 20,000
1,055,000
2,812,000
5,885,220 22,172,850 12,670,200 2,137,350 27,440,000 1,700,000 1,570,000 13,720,000 1,700,000 8,500,000 940,000 5,020,000 760,000 13,720,000 1,700,000 175,188,000 10,240,000 45,047,000 23,217,000 2,334,900 3,867,000 379,529,520
413756492.xls
PT. Wijaya Kusuma Contractors
PK 13/51
No
Uraian
III
PEKERJAAN PEMADAM KEBAKARAN Pekerjaan Instalasi system Hydrant & Sprinkler Pipa hydrant menggunakan pipa Black Steel MEDIUM A terpasang lengkap accesoris sesuai gambar & spesifikasi teknis Pekerjaan Instalasi Hydrant/Sprinkler
III A
B
Intalasi Pipa Reeser, (Tegak) 1. Pipa Hydrant - BS, sch.40 : Ø 150 mm
Sat
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
49
m
555,510
78,000
31,041,990
21 3 37 55 45 1
bh
895,500 3,516,080 555,510 344,810 185,060 748,000
25,000 390,675 78,000 52,000 32,500 1,996,000
19,330,500 11,720,265 23,439,870 21,824,550 9,790,200 2,744,000
12 1
bh bh
895,500 3,742,200
25,000 390,675
11,046,000 4,132,875
- Ø 150 mm
54
m
555,510
78,000
33,892,785
- Ø 80 mm
4 4
m m
242,080 185,060
39,000 32,500
1,124,320 870,240
1
ls
757,000
2,019,000
2,776,000
5 2 108 4 2 1
bh bh m m m ls
895,500 3,742,200 555,510 242,080 185,060 717,000
25,000 390,675 78,000 39,000 32,500 1,911,000
4,602,500 8,265,750 68,419,080 1,124,320 435,120 2,628,000
1. Pengadaan PFE kap 3 kg, Dry Powder 2. Pengadaan IHB
5 1
bh bh
895,500 3,742,200
25,000 390,675
4,602,500 4,132,875
3. Pipa Hydrant, BS - sch.40
3 4 1
m m
242,080 185,060 26,000
39,000 32,500 69,000
843,240 870,240 95,000
2 1 4 3 1 2 3
bh
895,500 3,742,200 242,080 185,060 89,000 1,000,000 1,177,200
25,000 390,675 39,000 32,500 236,000 25,000 33,000
1,841,000 4,132,875 1,124,320 652,680 325,000 2,050,000 3,630,600
25,000 78,000 52,000 32,500 -
-
78,000 39,000
-
ZONE - A Lantai Dasar 1. Pengadaan PFE kap 3 kg, Dry Powder, Lt-Dasar 2. Pengadaan OHB 3. Pipa Hydrant, BS - sch.40
- Ø 150 mm - Ø 100 mm - Ø 65 mm
4. Material Bantu , Support & Fitting C
Vol WKC
Harga Satuan
bh m m m ls
ZONE - B Lantai Dasar 1. Pengadaan PFE kap 3 kg, Dry Powder 2. Pengadaan IHB 3. Pipa Hydrant, BS - sch.40
- Ø 65 mm 4. Material Bantu , Support & Fitting Lantai Satu 1. Pengadaan PFE kap 3 kg, Dry Powder 2. Pengadaan IHB 3. Pipa Hydrant, BS - sch.40 - Ø 150 mm - Ø 80 mm - Ø 65 mm 4. Material Bantu , Support & Fitting Lantai Dua
- Ø 80 mm - Ø 65 mm
5. Material Bantu , Support & Fitting Lantai Tiga 1. Pengadaan PFE kap 3 kg, Dry Powder 3. Pengadaan IHB 4. Pipa Hydrant, BS - sch.40
- Ø 80 mm
- Ø 65 mm 5. Material Bantu , Support & Fitting 6.Pengadaan AV, c/w Pressure Gauge dan Valve 1. Pengadaan PFE kap 5 kg, Dry Powder D
ZONE - C Lantai Dasar 1. Pengadaan PFE kap 3 kg, Dry Powder 2. Pipa Hydrant, BS - sch.40
ls
bh m m ls bh bh
- Ø 150 mm - Ø 100 mm
m m
- Ø 65 mm
m bh
895,500 555,510 344,810 185,060 -
- Ø 150 mm - Ø 80 mm
m m
555,510 242,080
3. Pengadaan OHB
bh
Lantai Satu 1. Pipa Hydrant, BS - sch.40
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors
No
III
PK 14/51
Uraian
PEKERJAAN PEMADAM KEBAKARAN - Ø 65 mm
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
Vol WKC
Sat
m
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
185,060
32,500
-
413756492.xls
PT. Wijaya Kusuma Contractors
No
III
PK 15/51
Uraian
Vol WKC
Sat
PEKERJAAN PEMADAM KEBAKARAN 2. Pengadaan IHB
bh
3. Pengadaan PFE kap 3 kg, Dry Powder
bh
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
3,742,200 895,500
390,675 25,000
-
39,000 32,500 390,675
-
Lantai Dua
2. Pengadaan IHB
bh
242,080 185,060 3,742,200
3. Pengadaan PFE kap 3 kg, Dry Powder
bh
895,500
25,000
-
bh bh
242,080 369,150
39,000 20,000
-
1 3 1 1 150 16 40 1
bh
m ls
8,325,000 3,516,080 3,947,400 4,406,400 895,500 555,510 344,810 2,461,000
231,000 390,675 390,675 390,675 25,000 78,000 52,000 6,563,000
8,556,000 11,720,265 4,338,075 4,797,075 138,075,000 10,136,160 15,872,400 9,024,000
1
Lot
3,210,000
4,815,000
8,025,000
1. Pipa Hydrant, BS - sch.40
- Ø 80 mm - Ø 65 mm
m m
Lantai Tiga 1. Pengadaan PFE kap 3 kg, Dry Powder 2.Pengadaan AV, c/w Pressure Gauge dan Valve D
ZONE - E Lantai Satu 1. Pengadaan PFE kap 25 kg, CO-2 2. Pengadaan OHB 3. Pengadaan Siamese Conection 4. Pengadaan Pilar Hydrant 5. Pipa Hydrant, BS - sch.40
- Ø 150 mm - Ø 100 mm
- Ø 65 mm 6. Material Bantu , Support & Fitting E
TESTING & COMMISIONING
bh bh bh m m
III. SUB TOTAL PEKERJAAN INSTALASI HYDRANT/SPRINKLER
494,052,670
TOTAL PEKERJAAN PEMADAM KEBAKARAN
886,325,940
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK PAKET PEKERJAAN PERIHAL REV / TANGGAL DISIAPKAN OLEH
: : : : :
BINUS VIDS BEKASI MEKANIKAL & ELEKTRIKAL VAC 1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
NO
III
Vol WKC
Uraian
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN AIR CONDITIONING & FAN Pengadaan dan Pemasangan Unit Exhaust Fant, Wall Fant, Fresh Air & Indoor/Outdoor Air Cooled Split Air Conditioner lengkap dengan accessories dan semua material bantu seperti freon, perlengkapan dudukan/support dan lain-lainnya yang diperlukan seperti terlihat dalam gambar.
I
Zone. A A. Lt. Dasar I. Pengadaan Unit VAC 1. IU/OU-D.01 s/d D.12
- Kap. 12.200, 323 cfm - Type. Split Wall Mounted
2. Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm2, Drain Pipa 25 mm2 + Isolai II. Pengadaan Unit FAN 1. TEF - D.01
28 unit
1
Ls
1 unit
- Kap. 500 cfm - Type. Axial Fan - Area, Toilet
356,420
9,979,760
34,474,740
2,906,280
37,381,020
2,993,760
449,060
3,442,820
I - Sub Total Zone. A II
50,803,600
Zone - B A. Lt. Dasar I. Pengadaan Unit VAC 1. IU/OU-D.18, D.23, D.25, D.26 & D.2 - Kap. 18.000, 500 cfm - Type. Split Wall Mounted - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm2, Drain Pipa 25 mm2 + Isolai 2. IU/OU-D.24.A, 24.B, 24.C
3. IU/OU-D.27.A, B Dan IU/OU-D.28.A- Kap. 12.200, 323 cfm - Type. Split Wall Mounted - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm2, Drain Pipa 25 mm2 + Isolai 4. IU/OU-D.18.E, 19.E, 20.E & 21.E
- Kap. 9.200, 300 cfm - Type. Split Wall Mounted - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm2, Drain Pipa 25 mm2 + Isolai
2- Pekerjaan Instalasi Ducting - Dari TEF - D.01 * Ducting Exhaust (BJLS-50), Uk
x x x x
Ls
1
Ls
19,060,560
7,812,000
57,295,980
1,565,370
3,130,740
792,900
5,814,505
356,420
1,425,680
868,000
6,366,220
279,420
1,397,100
4,922,140
777,200
5,699,340
2,993,760
449,060
3,442,820
181,720 148,680 115,640 99,120 97,750
29,700 24,300 18,900 16,200 31,050
845,680 518,940 672,700 1,383,840 772,800
49,483,980
1
Ls
* EAG, Uk. 200 x 200, 5bh
16 / 51
5,498,220
5 unit 1
4 3 5 12 6
250 200 150 150
5,021,605
4 unit
Ls
1 unit
- Kap. 600 cfm - Type. Axial Fan - Area, Toilet
300 250 200 150
1
529,460
2 unit
- Kap. 40.000, 1.100 cfm - Type. Cassete
- Inst Pipa Refrigerant, L= 3/8 mm + S= 3/4 mm2, Drain Pipa 25 mm2 + Isolai
II. Pengadaan Unit Fan 1. TEF - D.01
36 unit
m m m m bh
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
B. Lt. Satu I. Pengadaan Unit VAC A - IU/OU-1.04.A, s/d 1.04.F
- Kap. 200.000 BTU, 6.000 cfm
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
6 unit
5,680,550
34,083,300
- Type. Split Duct - Inst Pipa Refrigerant, L= 15,88 mm + S= 34,92 mm, Drain Pipa 25 mm2 + Isolasi B- Pekerjaan Instalasi Ducting 1- Dari IU/OU-1.04.A - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
950 750 750 700 500 400 300 200 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300 Pengadaan & Pemasangan FAG
2- Dari IU/OU-1.04.B - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
950 700 600 500 400 300 250 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300 Pengadaan & Pemasangan FAG
x x x x x x x x x x
350 350 300 300 250 250 250 200 350 350
x 250
x x x x x x x x x
350 300 300 250 250 250 200 350 350
x 250
3- Dari IU/OU-1.04.C - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
950 600 500 500 400 350 250 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300 Pengadaan & Pemasangan FAG 4- Dari IU/OU-1.04.D - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
950 800 500 350 250 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300
x x x x x x x x x
350 300 300 250 250 250 200 350 350
x 250
x x x x x x x
350 300 250 250 200 350 350
x 250
17 / 51
1
Ls
134,602,500
21,252,960
155,855,460
1 5 4 3 4 7 6 18 37 19 4 1 2 1
bh m m m m m m m m bh m bh m bh
1,854,380 666,900 564,300 538,650 513,000 384,750 333,450 282,150 205,200 583,050 615,600 928,630 181,720 246,680
301,880 28,350 28,350 24,300 24,300 20,250 20,250 20,250 16,200 31,050 28,350 31,050 29,700 31,050
2,156,260 3,476,250 2,370,600 1,688,850 2,149,200 2,835,000 2,122,200 5,443,200 8,191,800 11,667,900 2,575,800 959,680 422,840 277,730
1 6 7 2 6 7 11 29 17 3 1 2 1
bh m m m m m m m bh m bh m bh
1,854,380 666,900 513,000 461,700 384,750 333,450 282,150 230,850 583,050 615,600 928,630 181,720 246,680
301,880 28,350 24,300 24,300 20,250 20,250 20,250 16,200 31,050 28,350 31,050 29,700 31,050
2,156,260 4,171,500 3,761,100 972,000 2,430,000 2,475,900 3,326,400 7,164,450 10,439,700 1,931,850 959,680 422,840 277,730
1
bh
1,854,380
301,880
2,156,260
5 7 3 3 7 13 33 17 4 1 3 1
m m m m m m m bh m bh m bh
666,900 461,700 410,400 384,750 333,450 307,800 230,850 583,050 615,600 928,630 181,720 246,680
28,350 24,300 24,300 20,250 20,250 20,250 16,200 31,050 28,350 31,050 29,700 31,050
3,476,250 3,402,000 1,304,100 1,215,000 2,475,900 4,264,650 8,152,650 10,439,700 2,253,825 959,680 634,260 277,730
1 4 7 7 14 25 16 4 1 2
bh m m m m m bh m bh m
1,854,380 666,900 564,300 384,750 307,800 230,850 583,050 615,600 928,630 181,720
301,880 28,350 24,300 20,250 20,250 16,200 31,050 28,350 31,050 29,700
2,156,260 2,781,000 4,120,200 2,835,000 4,592,700 6,176,250 9,825,600 2,575,800 959,680 422,840
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
1
Pengadaan & Pemasangan FAG
18 / 51
Sat
bh
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
246,680
31,050
277,730
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
5- Dari IU/OU-1.04.E - Pengadaan Plenum Box, Uk
Sat
bh
350 300 300 250 250 200 350
1 7 3 4 4 4 14 27 18
850 x 350
4
m
Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300 x 250 Pengadaan & Pemasangan FAG
1 2 1
bh m bh
1 4 4 2 4 6 2 4 8 35 16 4 1 3 1
bh m m
- Inst Ducting Supply "PU" Uk
950 x 350
750 700 500 400 300 250 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk
6- Dari IU/OU-1.04.F - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
x x x x x x x
950 x 350 900 x 350 800 x 350
800 600 500 450 300 250 Pengadaan & Pemasangan SAG 350 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 300 Pengadaan & Pemasangan FAG II. Pengadaan Unit Fan A - TEF - 1.01
x x x x x x x x
300 300 250 250 250 200 350 350
x 250
- Kap. 600 cfm - Type. Axial Fan - Area, Toilet
B- Pekerjaan Instalasi - Dari TEF - 1.01 * Ducting Exhaust (BJLS-50), Uk
300 250 200 150
x x x x
* EAG, Uk. 200 x 200, 5bh C. Lt. Dua I. Pengadaan Unit VAC A - IU/OU-2.01.A & B
- Kap. 9.200 BTU, 300 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm2, Drain Pipa 25 mm2 + Isolai
II. Pengadaan Unit Fan B - TEF - 2.01
C - TEF - 2.02 & 2.03
2PK
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1,854,380 666,900 564,300 513,000 410,400 333,450 282,150 230,850 583,050
301,880 28,350 28,350 24,300 24,300 20,250 20,250 16,200 31,050
615,600 928,630 181,720 246,680
28,350 31,050 29,700 31,050
301,880 28,350 28,350 28,350 24,300 24,300 20,250 20,250 20,250 16,200 31,050 28,350 31,050 29,700 31,050
2,156,260 2,781,000 2,678,400
m m m m m m bh m bh m bh
1,854,380 666,900 641,250 589,950 564,300 461,700 384,750 359,100 282,150 230,850 583,050 615,600 928,630 181,720 246,680
1 unit
2,993,760
449,060
3,442,820
181,720 148,680 115,640 99,120 97,750
29,700 24,300 18,900 16,200 31,050
845,680 518,940 672,700 1,383,840 772,800
529,460
1,058,920
3,021,800
453,200
3,475,000
4 3 5 12 6
250 200 150 150
Harga Satuan
m m m m m m m bh
m
m m m m bh
2 unit 1
Ls
2,156,260 4,866,750 1,777,950 2,149,200 1,738,800 1,414,800 4,233,600 6,670,350 11,053,800 2,575,800 959,680 422,840 277,730
1,236,600 2,354,400 2,916,000 810,000 1,517,400 2,419,200 8,646,750 9,825,600 2,575,800 959,680 634,260 277,730
- Kap. 400 cfm - Type. Axial Fan - Area, Toilet
1 unit
2,993,760
449,060
3,442,820
- Kap. 500 cfm - Type. Axial Fan - Area, Toilet
2 unit
2,993,760
449,060
6,885,640
19 / 51
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
III- Pekerjaan Instalasi Ducting - Dari TEF - 2.01 * Ducting Exhaust (BJLS-50), Uk
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
2 7 5 4 1
m m m bh bh
148,680 115,640 99,120 97,750 122,130
24,300 18,900 16,200 31,050 31,050
345,960 941,780 576,600 515,200 153,180
250 200 200 150
x x x x
250 200 150 150
2 4 3 5 5 1
m m m m bh bh
165,200 132,160 115,640 99,120 97,750 122,130
27,000 21,600 18,900 16,200 31,050 31,050
384,400 615,040 403,620 576,600 644,000 153,180
250 200 200 150
x x x x
250 200 150 150
3 3 3 4 5 1
m m m m bh bh
165,200 132,160 115,640 99,120 97,750 122,130
27,000 21,600 18,900 16,200 31,050 31,050
576,600 461,280 403,620 461,280 644,000 153,180
5,292,260
31,753,560
14,753,400
108,192,360
3,276,010
3,276,010
2,243,900
16,455,000
3,975,350
7,950,700
* EAG, Uk. 200 x 200 Uk. 300 x 200 - Dari TEF - 2.03 * Ducting Exhaust (BJLS-50), Uk
Harga Satuan
250 x 200 200 x 150 150 x 150
* EAG, Uk. 200 x 200 Uk. 300 x 200
- Dari TEF - 2.02 * Ducting Exhaust (BJLS-50), Uk
Sat
* EAG, Uk. 200 x 200 Uk. 300 x 200 D. Lt. Tiga I. Pengadaan Unit VAC A - IU / OU - 3.01A s/d 3.01E dan 3.03 - Kap. 150.000 BTU, 4.600 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 15,88 mm + S= 34,92 mm, Drain Pipa 25 mm2 + Isolasi B - IU / OU - 3.02
- Kap. 100.000 BTU, 3.200 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 15,88 mm + S= 28,58 mm, Drain Pipa 25 mm2 + Isolasi
B - IU / OU - 3.04A & 3.04B
- Kap. 125.000 BTU, 4.200 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 15,88 mm + S= 28,58 mm, Drain Pipa 25 mm2 + Isolasi
I. Pekerjaan Instalasi Ducting (PU) 1- Inst Ducting Dari IU/OU-3.01 A - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk 950 800 500 350 - Pengadaan & Pemasangan VD - Pengadaan & Pemasangan BAG 600 - Inst Ducting Return "PU" Uk 850 Pengadaan & Pemasangan RAG
x x x x
350 300 250 250
x 300 x 350
2- Inst Ducting Dari IU/OU-3.01 B & C - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk 1400 x 400 1300 x 400 1000 x 350 850 x 350 700 x 300 500 x 250 300 x 250 - Pengadaan & Pemasangan VD - Pengadaan & Pemasangan BAG 600 x 300 Pengadaan & Pemasangan RAG 1.500 x 600 - Inst Ducting Fresh Air "BJLS" Uk300 x 250 - Pengadaan & Pemasangan VD
20 / 51
6 unit 1
Ls
93,438,960
1 unit 1
Ls
14,211,100
2 unit 1
Ls
31,146,320
4,917,800
36,064,120
1 16 5 4 6 6 6 5 1
bh m m m m bh bh m bh
1,854,380 666,900 564,300 384,750 307,800 123,340 583,050 615,600 928,630
301,880 28,350 24,300 20,250 20,250 31,050 31,050 28,350 31,050
2,156,260 11,124,000 2,943,000 1,620,000 1,968,300 926,340 3,684,600 3,219,750 959,680
1 13 4 4 4 4 4 14 14 14 2 4 2
bh m m m m m m m bh bh bh m bh
1,854,380 923,400 872,100 692,550 615,600 513,000 384,750 282,150 123,340 583,050 928,630 181,720 123,340
301,880 32,400 32,400 28,350 28,350 24,300 20,250 20,250 31,050 31,050 31,050 29,700 31,050
2,156,260 12,425,400 3,618,000 2,883,600 2,575,800 2,149,200 1,620,000 4,233,600 2,161,460 8,597,400 1,919,360 845,680 308,780
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
2
Pengadaan & Pemasangan FAG 600 x 300
21 / 51
Sat
bh
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
246,680
31,050
555,460
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
3- Inst Ducting Dari IU/OU-3.01 D & E - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk 1400 x 400 1.150 x 400 950 x 350 750 x 350 700 x 300 650 x 300 450 x 250 - Pengadaan & Pemasangan VD - Pengadaan & Pemasangan BAG 600 x 300 Pengadaan & Pemasangan RAG 1.500 x 600 - Inst Ducting Fresh Air "BJLS" Uk300 x 250 - Pengadaan & Pemasangan VD Pengadaan & Pemasangan FAG 600 x 300 4- Inst Ducting Dari IU/OU-3.02 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
700 400 250 - Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 - Pengadaan & Pemasangan RAG - Pengadaan & Pemasangan VD - Inst Ducting Fresh Air "BJLS" Uk250 - Pengadaan & Pemasangan VD Pengadaan & Pemasangan FAG 800 - Pengadaan & Pemasangan VD
5- Inst Ducting Dari IU/OU-3.03 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
950 850 750 650 500 350 250 250 200 - Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 850 - Pengadaan & Pemasangan RAG - Pengadaan & Pemasangan VD - Inst Ducting Fresh Air "BJLS" Uk300 500 - Pengadaan & Pemasangan VD Pengadaan & Pemasangan FAG 800 - Pengadaan & Pemasangan VD
6- Inst Ducting Dari IU/OU-3.04A - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk 950 700 650 500 400 250 - Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 - Pengadaan & Pemasangan RAG - Pengadaan & Pemasangan VD - Inst Ducting Fresh Air "BJLS" Uk300 - Pengadaan & Pemasangan VD
x x x x x
350 250 250 300 350
x 250 x 400
x x x x x x x x x x x
350 350 350 300 300 250 250 200 200 300 350
x 250 x 250 x 400
x x x x x x x x
350 350 300 300 250 250 300 350
x 250
22 / 51
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1 12 5 4 4 7 4 7 16 16 2 4 2 2
bh m m m m m m m bh bh bh m bh bh
1,854,380 923,400 795,150 666,900 564,300 513,000 487,350 359,100 123,340 583,050 928,630 181,720 123,340 246,680
301,880 32,400 32,400 28,350 28,350 24,300 24,300 20,250 31,050 31,050 31,050 29,700 31,050 31,050
2,156,260 11,469,600 4,137,750 2,781,000 2,370,600 3,761,100 2,046,600 2,655,450 2,470,240 9,825,600 1,919,360 845,680 308,780 555,460
1 2 8 10 6 3 1 1 4 1 1 1
bh m m m bh m bh bh m bh bh bh
1,854,380 538,650 333,450 256,500 583,050 513,000 928,630 123,340 165,200 123,340 246,680 123,340
301,880 28,350 20,250 20,250 31,050 20,250 31,050 31,050 27,000 31,050 31,050 31,050
2,156,260 1,134,000 2,829,600 2,767,500 3,684,600 1,599,750 959,680 154,390 768,800 154,390 277,730 154,390
1 2 4 4 4 4 4 8 15 3 6 5 1 1 6 2 2 1 2
bh m m m m m m m m m bh m bh bh m m bh bh bh
1,854,380 666,900 615,600 564,300 487,350 410,400 307,800 256,500 230,850 205,200 583,050 615,600 928,630 123,340 181,720 247,800 123,340 246,680 123,340
301,880 28,350 28,350 28,350 24,300 24,300 20,250 20,250 16,200 16,200 31,050 28,350 31,050 31,050 29,700 40,500 31,050 31,050 31,050
2,156,260 1,390,500 2,575,800 2,370,600 2,046,600 1,738,800 1,312,200 2,214,000 3,705,750 664,200 3,684,600 3,219,750 959,680 154,390 1,268,520 576,600 308,780 277,730 308,780
1 2 6 6 5 8 19 10 3 1 1 3 1
bh m m m m m m bh m bh bh m bh
1,854,380 666,900 538,650 487,350 410,400 333,450 256,500 583,050 564,300 928,630 123,340 181,720 123,340
301,880 28,350 28,350 24,300 24,300 20,250 20,250 31,050 28,350 31,050 31,050 29,700 31,050
2,156,260 1,390,500 3,402,000 3,069,900 2,173,500 2,829,600 5,258,250 6,141,000 1,777,950 959,680 154,390 634,260 154,390
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
1
Pengadaan & Pemasangan FAG 600 x 300
23 / 51
Sat
bh
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
246,680
31,050
277,730
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
7- Inst Ducting Dari IU/OU-3.04B - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk 950 700 500 400 250 - Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 - Pengadaan & Pemasangan RAG - Pengadaan & Pemasangan VD - Inst Ducting Fresh Air "BJLS" Uk300 - Pengadaan & Pemasangan VD Pengadaan & Pemasangan FAG 600
x x x x x x x
1 2 5 4 7 12 9 3 1 1 1 1 1
350 300 250 250 250 300 350
x 250 x 300
Sat
bh m m m m m bh m bh bh m bh bh
II - Sub Total Zone. B III
- Kap. 300.000 BTU, 700 cfm - Type. Cassete - Inst Pipa Refrigerant, L= 5/8 mm + S= 3/8 mm, Drain Pipa 25 mm2 + Isolasi
B - IU/OU-17.A & 17. B
- Kap. 40.000 BTU, 1.100 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 3/8 mm + S= 3/4 mm, Drain Pipa 25 mm2 + Isolasi
B. Lt. Satu I. Pengadaan Unit VAC A - IU/OU-1.01
- Kap. 60.000 BTU, 2.000 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 12.70 mm + S= 19.04 mm, Drain Pipa 25 mm2 + Isolasi
B - IU/OU-1.02.A & B
- Kap. 100.000 BTU, 3.200 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 15.88 mm + S= 28.58 mm, Drain Pipa 25 mm2 + Isolasi
C - IU/OU-1.03
- Kap. 50.000 BTU, 1.600 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 9.52 mm + S= 19.05 mm, Drain Pipa 25 mm2 + Isolasi
D - IU/OU-1.04.A & B
- Kap. 18.000 BTU, 500 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm, Drain Pipa 25 mm2 + Isolasi
D - IU/OU-1.05.A & B
- Kap. 12.200 BTU, 323 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm, Drain Pipa 25 mm2 + Isolasi
600 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 500 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 200 Pengadaan & Pemasangan FAG
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1,854,380 666,900 513,000 384,750 333,450 256,500 583,050 564,300 928,630 123,340 181,720 123,340 246,680
301,880 28,350 24,300 20,250 20,250 20,250 31,050 28,350 31,050 31,050 29,700 31,050 31,050
2,156,260 1,390,500 2,686,500 1,620,000 2,475,900 3,321,000 5,526,900 1,777,950 959,680 154,390 211,420 154,390 277,730 1,001,236,590
Zone - C A. Lt. Dasar I. Pengadaan Unit VAC A - IU/OU-15 & 16
II. Pekerjaan Instalasi Ducting 1- Dari IU/OU-1.01 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
Harga Satuan
x x x x x
300 250 200 300 300
x 200
24 / 51
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
bh m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
2- Dari IU/OU-1.02A - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
700 600 500 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 250 Pengadaan & Pemasangan FAG
3- Dari IU/OU-1.02B - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
750 650 600 500 500 400 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 250 Pengadaan & Pemasangan FAG
4- Dari IU/OU-1.03 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
500 250 200 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 500 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 200 Pengadaan & Pemasangan FAG
x x x x x x x
350 300 250 250 200 300 300
x 250
x x x x x x x x x x
300 300 300 300 250 250 250 200 300 300
x 250
x x x x x
300 250 200 300 250
x 200
C. Lt. Dua I. Pengadaan Unit VAC A - IU/OU-2.02A
- Kap. 60.000 BTU, 2.000 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 12.70 mm + S= 19.04 mm, Drain Pipa 25 mm2 + Isolasi
B - IU/OU-2.02B
- Kap. 100.000 BTU, 3.200 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 15.88 mm + S= 28.58 mm, Drain Pipa 25 mm2 + Isolasi
C - IU/OU-2.03
- Kap. 60.000 BTU, 2.000 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 12.70 mm + S= 19.04 mm, Drain Pipa 25 mm2 + Isolasi
D - IU/OU-2.04
- Kap. 100.000 BTU, 3.200 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 15.88 mm + S= 28.58 mm, Drain Pipa 25 mm2 + Isolasi
E - IU/OU-2.05A & B
- Kap. 75.000 BTU, 2.500 cfm - Type. Split Duct - Inst Pipa Refrigerant, L= 12.70 mm + S= 25.40 mm, Drain Pipa 25 mm2 + Isolasi
25 / 51
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
bh m m m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
bh m m m m m m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
bh m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
unit
Excluded
Ls
Excluded
413756492.xls
PT. Wijaya Kusuma Contractors
NO
Vol WKC
Uraian
II. Pekerjaan Instalasi Ducting 1- Dari IU/OU-2.03 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
600 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 500 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 200 Pengadaan & Pemasangan FAG
2- Dari IU/OU-2.04 - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
700 600 500 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 750 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 250 Pengadaan & Pemasangan FAG
3- Dari IU/OU-2.05A - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
700 500 450 300 250 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 600 Pengadaan & Pemasangan RAG
4- Dari IU/OU-2.05B - Pengadaan Plenum Box, Uk - Inst Ducting Supply "PU" Uk
700 400 300 200 Pengadaan & Pemasangan SAG 300 - Inst Ducting Return "PU" Uk 600 Pengadaan & Pemasangan RAG - Inst Ducting Fres Air "BJLS-50" 250 350 Pengadaan & Pemasangan FAG
x x x x x
300 250 200 300 300
x 200
x x x x x x x
350 300 250 250 200 300 300
x 250
x x x x x x x
300 300 250 250 200 300 300
x x x x x x
300 300 250 200 300 300
x 200 x 250
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
bh m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
bh m m m m m bh m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
bh m m m m m bh m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
bh m m m m bh m bh m m bh
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
II - Sub Total Zone. C
-
26 / 51
413756492.xls
PT. Wijaya Kusuma Contractors
NO
IV
Vol WKC
Uraian
Zone - E A. Lt. Dasar I. Pengadaan Ceiling Fan A - CF-D.01 & 02
B - WF-D.01A, B & D.02A, B
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
- Kap. 100 cfm - Type. Ceiling Fan
1 unit
2,689,990
403,500
3,093,490
- Kap. 3.000 cfm - Type. Wall Fan
4 unit
7,796,250
1,169,440
35,862,760
529,460
529,460
181,280
1,390,000
356,420
1,069,260
C - IU/OU-D.13
- Kap. 18.000 BTU, 500 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm, Drain Pipa 25 mm2 + Isolasi
D - IU/OU-D14.A, B & C
- Kap. 12.200 BTU, 323 cfm - Type. Split Wall - Inst Pipa Refrigerant, L= 1/4 mm + S= 1/2 mm, Drain Pipa 25 mm2 + Isolasi
III- Pekerjaan Instalasi Ducting - Dari TEF - 2.01 * Ducting Exhaust (BJLS-50), Uk
Sat
200 x 200 250 x 250 400 x 250
* EAG, Uk. 250 x 250 * EA, Uk. 400 x 250
1 unit 1
Ls
1,208,720
3 unit 1
Ls
4,532,700
679,800
5,212,500
4 2 1 4 1
m m m bh bh
132,160 165,200 214,760 122,130 244,260
21,600 27,000 35,100 31,050 62,100
615,040 384,400 249,860 612,720 306,360
49,325,850
III - Sub Total Zone. E
1 1
D Material Bantu E Test - Com
Grand Total Pekerjaan VAC
27 / 51
ls ls
139,161,000 6,958,000
52,186,000 10,437,000
191,347,000 17,395,000
1,310,108,040
413756492.xls
PT. Wijaya Kusuma Contractors
EL 28/51
PROYEK
: BINUS VIDA BEKASI
PAKET PEKERJAAN
: MEKANIKAL & ELEKTRIKAL
PERIHAL
: ELEKTRIKAL
REV / TANGGAL
: 1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
: PT. MITRA PERDANA ENGINEERING
No.
V
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN ELEKTRIKAL A PENGADAAN & PEMASANGAN PERALATAN UTAMA 1. PENGADAAN & PEMASANGAN SISTEM INSTALASI TRAFO LENGKAP DG TERMINASI ACCESORIESNYA - Kapasitas - Voltage
: 800 Kva : 380/220 V, 3P + N + 50 Hz, DYN 5, Z = 4,5%
1 Unit
178,200,000
8,910,000
187,110,000
20,587,500
20,587,500
2. PENGADAAN & PEMASANGAN SISTEM INSTALASI GENSET LENGKAP DG TERMINASI ACCESORIESNYA - Kapasitas - Voltage
: 625 Kva : 380 / 220 V, 50 Hz,
- Type
1 Unit
Prime Rating
3. - PENGADAAN & PEMASANGAN GROUNDING N 1 Ohm
1
Ttk
10,950,000
3,285,000
14,235,000
GENSET - PENGADAAN & PEMASANGAN GROUNDING N 1 Ohm
1
Ttk
10,950,000
3,285,000
14,235,000
TRAFO - PENGADAAN & PEMASANGAN GROUNDING B 1 Ohm
1
Ttk
10,950,000
3,285,000
14,235,000
U/ PUTM, TRAFO, PUTR, GENSET & TANGKI HARIAN 4. Tangki mingguan c/w Pompa, Inst Pipa yg ter 7.000 Ltr Pada Ganbar
1 Unit
4,950,000
4,950,000
5. Tangki Harian c/w Pompa, Inst Pipa yg tercan 1.000 Ltr Pada Ganbar 6. Inst Peredam Suara R.Genset, ( Lihat Gbr Datail)
1 Unit
1,350,000
1,350,000
1
Lot
191,565,360
20,133,000
211,698,360
7. TESTING & COMMISIONING
1
Lot
64,000,000
14,850,000
A - Sub Total Pengadaan & Pemasangan Peralatan Utama
78,850,000 547,250,860
B PENGADAAN & PEMASANGAN PANEL ZONA-E 1. P - PUTM 2. P - PUTR & PKG 3. P - CAPASITOR BANK 4. P - PKG 5. DP - POMPA 5.1. PP - Pompa Pond 5.2. PP - Sewage - Pid 5.3. PP - Siram Taman 6. DP - EMERGENCY 6.1. PP - HYDRANT 6.2. PP - LIFT 6.3. PP - EC 6. PL - PH PL-PH ALARM KEBAKARAN (TANPA UPS) TATA SUARA TELEPON DATA CCTV ZONA-A 1. DP - ZONE / A 1.1. PP - D / A 1.1.1. Box Hager, (R.Class), 10 GROUP + MCB 1.2. PL - OL / A 1.1. PP - 1 / A 1.1.1. Box Hager, (R.Class), 10 GROUP + MCB ZONE / B 1. DP - ZONE / B LT-DASAR, 1. PP - DS/B 2. PP - VAC - DS/B 3. PL - OL / B LT- 1,
1. PP - 1/B
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Unit
79,200,000
4,950,000
84,150,000
Unit Unit
644,000,000 112,880,000
16,100,000 2,822,000
660,100,000 115,702,000
Unit Unit
16,880,000
1,055,000
17,935,000
Unit Unit
5,040,000 5,120,000
315,000 320,000
5,355,000 5,440,000
Unit Unit Unit
8,320,000 17,120,000 16,320,000
520,000 428,000 408,000
8,840,000 17,548,000 16,728,000
Unit Unit
7,040,000 9,120,000
440,000 570,000
9,690,000
Unit Unit
6,400,000
400,000
400,000 315,000 315,000 315,000 315,000 315,000
6,800,000 6,800,000
Unit
6,400,000 5,040,000 5,040,000 5,040,000 5,040,000 5,040,000
1 Unit 1 Unit
10,480,000 34,240,000
655,000 856,000
11,135,000 35,096,000
Unit Unit Unit Unit
5,355,000 5,355,000 5,355,000 5,355,000 5,355,000
5 Unit
621,700
31,090
3,263,950
1 Unit 1 Unit 4 Unit
7,280,000 13,360,000
455,000 835,000
7,735,000 14,195,000
621,700
31,090
2,611,160
1 1 1 1 1
Unit Unit
45,600,000 15,760,000
1,140,000 985,000
46,740,000 16,745,000
Unit Unit
15,760,000 5,520,000
985,000 345,000
16,745,000 5,865,000
Unit
13,840,000
865,000
14,705,000
413756492.xls
PT. Wijaya Kusuma Contractors
EL 29/51
No.
Uraian
2. PP - VAC - 1/B LT- 2,
1. PP - 2/B
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
Vol WKC
Sat
1 Unit 1 Unit
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
13,360,000
835,000
14,195,000
7,040,000
440,000
7,480,000
413756492.xls
PT. Wijaya Kusuma Contractors
EL 30/51
No.
Vol WKC
Uraian
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1 Unit 1 Unit 1 Unit
27,280,000
682,000
27,962,000
20,960,000
1,310,000
15,760,000
985,000
22,270,000 16,745,000
ZONE / C 3. DP - ZONE / C
Unit
17,120,000
1,070,000
-
1. PP - DS/C 2. PP - 1/C
Unit Unit
7,680,000 14,400,000
480,000 900,000
-
3. PP - 2/C 4. PL - OL / C
Unit Unit
16,080,000 5,200,000
1,005,000 325,000
-
10,023,700 7,016,600
6,338,030 20,585,200
LT- 3,
1. PP - 3/B 2. PP - VAC - 3/B
PAC-DS/B
4. Pengadaan BAS 250 point
AZBIL
1 1 1
5. Material Bantu 6. Test - Com
Ls Lot Lot
SBO
B - Sub Total Pekerjaan Panel C
16,361,730 27,601,800 1,289,314,640
PEKERJAAN KABEL FEEDER 1. Kabel dari PLN ke Incoming PUTM : Kabel dari Outgoing PUTM ke Trafo :
N2XSEBY, 3 x 120mm2, MV Cabel Multi Core 3 x (N2XSY, 1 x 70 mm2), MV Cabel Single Core
150
m'
596,000
119,200
107,280,000
25
m'
531,180
106,240
15,935,500
m' m'
5,422,950 4,313,710
333,480 263,880
92,102,880 54,931,080
m'
4,313,710
263,880
41,198,310
m'
2,405,390 1,431,150
152,400 143,130
25,577,900
469,120
46,920
m'
785,590 1,018,680
78,570 54,360
12,901,000 233,922,720
2. Kabel dari Trafo KE PUTR: 3. Kabel dari Genset ke PKG :
NYY 4 (3 x 1C x 300 mm²) + BC 150 mm² NYY 4 (3 x 1C x 240 mm²) + BC 120 mm²
4. Kabel dari PKG ke PUTR :
NYY 4 (3 x 1C x 240 mm²) + BC 120 mm²
5. Kabel dari PUTR ke Capasitor Bank :
NYY 4 (2 x 1C x 185 mm²)
6. Kabel dari PUTR ke DP - Emergency:
FRC 4 (1 x 1c x 120 mm²) + BC 70 mm²
7. Kabel dari PUTR ke DP - Pompa : 8. Kabel dari PUTR ke DP - Zone / A :
NYY 4 x 70 mm² + BC 35 mm² NYY 4 ( 1 x 1C x 120 mm² + BC 70 mm²
8. Kabel dari PUTR ke DP - Zone / A : * Kabel dari PP - Dasar/A ke :
NYY 4 ( 1 x 1C x 150 mm² + BC 70 mm²
16 12 9 10 25 218
NYY 4 x 50 mm² + BC 25 mm² NYY 4 x 16 mm² + BC 16 mm² NYY 3 x 6 mm²
5 15 140
m' m' m'
344,200 129,420 34,860
34,420 12,940 3,490
1,893,100 2,135,400 5,369,000
30
m'
53,330
5,330
1,759,800
5
m'
469,120
46,920
2,580,200
175 m' 45 m' 1 Ttk 110 m'
34,860 25,220 257,860
3,490 2,520 93,000
6,711,250 1,248,300 350,860
3,443,140
212,110
402,077,500 -
m' m'
53,330 785,590
5,330 78,570
2,053,100 -
m' Ttk
469,120 605,280
46,920 90,720
27,840,000
Ttk m'
1,132,500 785,590
203,580 78,570
4,008,240 8,641,600
m' m'
785,590 84,600
78,570 8,460
4,320,800 3,815,460
Ttk m'
605,280 50,120
90,720 5,010
696,000 826,950
Ttk Ttk
605,280 257,860
90,720 93,000
1,392,000 1,052,580
8.2. PP - DS/A: 8.2. PP - 1/A: 8.2.1. Box Hager Tiap Kelas : * Kabel dari DP - Zone / A ke : 8.1. PL - OL/A : 8.2. PP - DS/A:
NYFGBY 4 x 4 mm² + NYA 4 mm² NYY 4 x 70 mm² + BC 35 mm²
m' m' m'
-
* Kabel dari PP - Dasar/A ke : 8.2.1. Box Hager Tiap Kelas ( 14 Kelas): 8.2.2. IU-D,06 : 8.2.3. TEF : 9. Kabel dari PUTR ke DP - Zone / B : * Kabel dari DP - Zone/B ke : 9.1. PL - OL/B : 9.2. PP - DS/B :
NYY 3 x 6 mm² NYY 3 x 4 mm² NYM 3 x 2,5 mm² NYY 4 ( 3 x 1c x 185 mm²) + BC 95 mm² NYFGBY 4 x 4 mm² + NYA 4 mm² NYY 4 (1 x 1c x 120 mm²) + BC 70 mm²
* Kabel dari PP - DS/B ke PAC-DS/B NYY 4 x 70 mm² + BC 35 mm² * Kabel dari PAC-DS/B ke IU-18 s/d IU-23 & IU NYY 3 x 4 mm² * Kabel dari PAC-DS/B ke IU-24.A, B & C 9.3. PP - 1/B : * Kabel dari PP - 1/B ke PAC-1/B * Kabel dari PAC-1/B ke IU-1.04A s/d 1.04F * Kabel dari PAC-1/B ke IU-1.04G 9.4. PP - 2/B : * Kabel dari PP - 2/B ke IU-2.01 A & B * Kabel dari PP - 2/B ke TEF-2.01 s/d 2.03
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
NYY 4 x 4 mm² NYY 4 (1 x 1c x 120 mm²) + BC 70 mm² NYY 4 (1 x 1c x 120 mm²) + BC 70 mm² NYY 4 x 10 mm² + BC 10 mm² NYY 3 x 4 mm² NYY 4 x 6 mm² + NYA 6 mm² NYY 3 x 4 mm² NYY 3 x 2.5 mm²
35 40 3 10 5 41 1 15 2 3
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 31/51
Vol WKC
Uraian
9.5. PP - 3/B : * Kabel dari PP - 3/B ke PP-VAC.3B * Kabel dari PP-VAC.3B ke :
9.5.1. IU-3.02: 9.5.1. P-UPS TATA SUARA
119,930 119,930
11,870,640
49 62 66 77
m' m'
129,420 50,120
12,940 5,010
6,975,640 3,418,060
m' m'
129,420 84,600
12,940 8,460
9,395,760 7,165,620
5 5
m'
1,199,030
119,930
6,594,800
m'
785,590
78,570
4,320,800
25 9
m'
1,366,240
82,000
36,206,000
m'
1,199,030
119,930
11,870,640
62 62 156
m' m'
84,600 84,600
8,460 8,460
5,769,720 5,769,720
m'
37,750
3,770
6,477,120
20
m' m'
84,600
8,460
1,199,030
119,930
1,861,200 -
m' m'
53,330 84,600
5,330 8,460
-
Ttk m' m'
605,280 179,240 37,750
90,720 11,680 3,770
-
m' m'
84,600 25,220
8,460 2,520
-
NYY 4 x 35 mm² + BC 16 mm² NYY 3 x 4 mm²
m' Ttk
179,240 605,280
11,680 90,720
-
NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 10 mm² + BC 10 mm²
m' m'
37,750 84,600
3,770 8,460
-
m' m'
50,120 1,431,150
5,010 143,130
-
m'
2,349,080
234,890
90,438,950
NYY 4 (2 x 1c x 95 mm²) + BC 50 mm² NYY 4 (1 x 1c x 120 mm²) + BC 70 mm²
NYY 4 ( 2 x 1c x 120 mm²) + BC 70 mm² NYY 4 ( 2 x 1c x 95 mm²) + BC 70 mm² NYY 4 x 10 mm² + BC 6 mm² NYY 4 x 10 mm² + BC 6 mm² NYY 4 x 4 mm² + BC 4mm
16.1. PL - PH : 10. Kabel dari PUTR ke DP - Zone / C :
NYY 4 x 10 mm² + BC 10mm NYY 4 ( 2 x 1c x 95 mm²) + BC 50 mm² NYFGBY 4 x 4 mm² + NYA 4 mm² NYY 4 x 10 mm² + BC 10 mm²
* Kabel dari PP - DS/C ke IU-DS.15 s/d IU-DS NYY 3 x 4 mm² 10.3. PP - 1/C : NYY 4 x 35 mm² + BC 16 mm² * Kabel dari PP - 1/C ke IU-1.01 & IU-1.03 : NYY 4 x 4 mm² + NYA 4 mm² * Kabel dari PP - 1/C ke IU-1.2A & IU-1.2B : NYY 4 x 10 mm² + BC 6 mm² * Kabel dari PP - 1/C ke IU-1.4A, B & IU-1.5A NYY 3 x 4 mm² 10.4. PP - 2/C : * Kabel dari PP - 2/C ke IU-2A & B : * Kabel dari PP - 2/C ke IU-2.03 : * Kabel dari PP - 2/C ke IU-2.04 :
Material + Upah ( Rp )
1,199,030
Dari P AC - 1 / B ke unit AC split 22 PK 6 unit 16. Kabel dari DP - EC ke :
10.1. PL - OL/C : 10.2. PP - DS/C :
Upah ( Rp )
1,199,030
NYY 4 x 16 mm² + BC 16 mm² NYY 4 x 10 mm² + BC 10 mm²
* Kabel dari PP - 3/B ke PP-VAC.3B * Kabel dari PP-VAC.3B ke :
Material ( Rp )
m'
9.5.1. IU-3.03: 9.5.1. IU-3.04A & 3.04B
9.4. PP - 2/B : 9.5. PP - 3/B :
Total Harga WKC
m'
NYY 4 ( 2 x 1c x 95 mm²) + BC 70 mm² NYY 4 x 16 mm² + BC 16 mm² NYY 4 x 6 mm² + BC 6 mm²
* Kabel dari PP - DS/B ke PAC-DS/B 9.3. PP - 1/B :
Harga Satuan
9
NYY 4 ( 2 x 1c x 95 mm²) + BC 70 mm²
9.5.1. IU-3.01A s/d 3.01E 9.5.1. IU-3.02:
9. Kabel dari PUTR ke DP - Zone / B : * Kabel dari DP - Zone/B ke : 9.2. PP - DS/B :
Sat
Harga Satuan
-
* Kabel dari PP - 2/C ke IU-2.0A & B : 11. Kabel dari PUTR ke DP - Emergency :
NYY 4 x 6 mm² + NYA 6 mm² FRC 4 (1 x 1c x 120²) + BC 70 mm²
6. Kabel dari PUTR ke DP - Emergency: * Kabel dari DP - Emergency ke :
FRC 4 (2 x 1c x 95 mm²) + BC 50 mm²
35
FRC 4 (2 x 1c x 95 mm²) + BC 50 mm²
22
m'
2,349,080
234,890
56,847,340
FRC 4 (2 x 1c x 95 mm²) + BC 50 mm² FRC 4 x 10 mm2 + BC 10 mm²
7 6 8 17 25 10 35
m' m'
2,349,080 246,380
234,890 24,640
18,087,790 1,626,120
m' m' m'
149,830 293,510 149,830
14,980 29,350 14,980
1,318,480 5,488,620 4,120,250
m' m'
84,600 246,380
8,460 24,640
930,600 9,485,700
33 26 20 21 19
m'
25,220
2,520
915,420
m' m'
25,220 25,220
2,520 2,520
721,240 554,800
m' m'
25,220 25,220
2,520 2,520
582,540 527,060
11.1. PP - Hydrant : * Kabel dari PP - Hydrant ke : 11.1.1. PC-Electric Pump : 11.1.2. PC-Jockey Pump :
11.1.3. PC-Diesel Pump : FRC 4 x 4 mm2 + BC 4 mm² 11.2. PP - EC : FRC 4 x 16 mm2 + BC 16 mm² * Kabel dari PP - EC ke Central TS, CCTV, D FRC 4 x 4 mm² + NYA 4 mm² * Kabel dari PP - EC ke PL - PH : 11.3. PP - Lift : 12. Kabel dari PL - PH ke : 12.1. IU-13 :
NYY 4 x 10 mm2 + BC 10 mm² FRC 4 x 10 mm2 + BC 10 mm² NYY 3 x 4 mm²
12.2. IU-14.A : 12.3. IU-14.B :
NYY 3 x 4 mm² NYY 3 x 4 mm²
12.4. IU-15 : 12.5. IU-16.A :
NYY 3 x 4 mm² NYY 3 x 4 mm²
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors
EL 32/51
No.
Vol WKC
Uraian
12.6. IU-16.B :
NYY 3 x 4 mm²
12.7. IU-17 : 12.8. EF-D.01 :
NYY 3 x 4 mm² NYY 3 x 2,5 mm²
12.9. WF-D.01.A, B & WF-D.02.A, B : 13. Kabel dari DP - Pompa ke :
NYY 3 x 2,5 mm²
13.1- PC - Boster 13.2- PC - Filter Pump
NYY 4 x 10 mm2 + BC 10 mm² NYY 4 x 10 mm2 + BC 10 mm²
13.3- PC - Circulation Pump 13.4- PC - Deep Well 13.5- PC - STP
NYY 4 x 10 mm2 + BC 10 mm² NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 4 mm² + NYA 4 mm²
13.6- PC - Pompa Siram Taman 13.7- PP - Pompa Pond
NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 4 mm² + NYA 4 mm²
13.8- PP - Sewagepit 14. Kabel dari PP - Sewagepit ke :
NYY 4 x 10 mm2 + BC 10 mm²
14.1- PC - Sewagepit - A 14.2- PC - Sewagepit - B
NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 4 mm² + NYA 4 mm²
14.3- PC - Sewagepit - C 14.4- PC - Sewagepit - D
NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 4 mm² + NYA 4 mm²
15. Kabel dari PP - Pond Pump ke : 15.1- Pond Pump - A
NYY 4 x 4 mm² + NYA 4 mm²
15.2- Pond Pump - B 15.3- Pond Pump - C
NYY 4 x 4 mm² + NYA 4 mm² NYY 4 x 4 mm² + NYA 4 mm²
15.4- Pond Pump - D
NYY 4 x 4 mm² + NYA 4 mm²
16. Kabel dari PL-OL/Zone.A ke Terminal B0x Tian NYFGBY 5 x 4 mm² NYFGBY 4 x 4 mm² NYFGBY 3 x 4 mm² NYA 3 x 2,5 mm² 17. Kabel dari PL-OL/Zone.B ke Terminal B0x Tian NYFGBY 5 x 4 mm² NYFGBY 4 x 4 mm² NYFGBY 3 x 4 mm² NYA 3 x 2,5 mm² 18. Kabel dari PL-OL/Zone.C ke Terminal B0x Tian NYFGBY 5 x 4 mm² NYFGBY 4 x 4 mm² NYFGBY 3 x 4 mm² NYA 3 x 2,5 mm²
20. Test - Com
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
17 4 25 35
m'
25,220
2,520
471,580
m' m'
25,220 17,080
2,520 1,710
110,960 469,750
m'
17,080
1,710
657,650
6 15 17 18 85 10 35 28
m' m'
84,600 84,600
8,460 8,460
558,360 1,395,900
m' m' m'
84,600 37,750 37,750
8,460 3,770 3,770
1,582,020 747,360 3,529,200
m' m'
37,750 37,750
3,770 3,770
415,200 1,453,200
m'
84,600
8,460
2,605,680
35 44 84 62
m' m'
37,750 37,750
3,770 3,770
1,453,200 1,826,880
m' m'
37,750 37,750
3,770 3,770
3,487,680 2,574,240
59 62 53 61
m'
37,750
3,770
2,449,680
m' m'
37,750 37,750
3,770 3,770
2,574,240 2,200,560
m'
37,750
3,770
2,532,720
565 325 456 54
m'
59,400
5,940
36,917,100
m' m' ttk
47,520 39,350 163,800
4,750 3,940 16,200
16,987,750 19,740,240 9,720,000
m'
59,400
5,940
6,468,660
m' m'
47,520 39,350
4,750 3,940
2,299,880 1,991,340
ttk
163,800
16,200
2,160,000
m' m'
59,400 47,520
5,940 4,750
5,684,580 2,770,310
m' ttk
39,350 163,800
3,940 16,200
1,428,570 2,160,000
lot
6,809,700 4,766,800
4,085,800 13,619,500
10,895,500
99 44 46 12 87 53 33 12 1 1
19. Material Bantu
Sat
Harga Satuan
lot
C - Sub Total Pekerjaan Kabel Feder D
18,386,300 1,542,668,450
PENGADAAN & PEMASANGAN INSTALASI & ARMATURE LAMPU ZONE - A 1. Lantai Dasar - A, (Area Coridor) 1. Lp - TKO, LED, 1 x 24 Watt Lp - TKO, LED, 1 x 24 Watt + NB
bh bh
453,860 1,597,860
10,000 10,000
-
2. LP- DL, LED, 1 x 11 Watt LP- DL, LED, 1 x 11 Watt + NB
bh bh
338,000 1,482,000
10,000 10,000
-
bh bh
338,000 27,100
10,000 7,000
341,000
bh bh
40,300 765,200
7,000 28,000
189,200 793,200
bh bh
24,800 24,800
7,000 7,000
445,200 508,800
ttk ttk
153,740 257,860
78,000 93,000
3,508,600
ttk
381,370
93,000
3,794,960
bh m'
104,500 267,380
10,000 10,000
bh bh
570,350 290,400
10,000 10,000
34,240,650 8,411,200
bh bh
1,830,400 4,864,750
10,000 40,000
3,680,800 83,380,750
bh
267,380
10,000
9,430,920
3. LP- DL, LED, 1 x 9 Watt 3. Saklar Engkel 4. Saklar Seri 5. Saklar Kelompok, 8 Group 6. Stop Kontak 1P, 200 W 7. Stop Kontak VC. 1P, 1.000 W 8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 10. Instalasi Stop kontak, (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm
10 4 1 14 16 10 8
1. Lantai Dasar - A, (Area Coridor) 1. Lp - Balk TL 36 Watt (indirect) 1. LED Light (indirect) 9W/M 2. Wall mount Uplight & Down Light Halogen 50W 3. Ceiling mounted Downlight halogen 50 W Ceiling mounted Downlight halogen 50 W + NB 3. Floor mounted Uplight halogen 50 W 1. Lp - TKO, LED, 1 x 14 Watt 5m = 12bh
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
dihilangkan sesuai BA dihilangkan sesuai BA
59 28 2 17 34
-
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 33/51
Uraian
4. Stop Kontak 1P, (2Lubang), @1 bh
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
Vol WKC
23
Sat
bh
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
49,600
14,000
1,462,800
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 34/51
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
140 23
ttk
153,740
78,000
32,443,600
ttk
257,860
93,000
8,069,780
216 18 36 18 288 54
bh
267,380
10,000
59,914,080
bh bh
40,300 24,800
7,000 7,000
851,400 1,144,800
bh ttk ttk
49,600 153,740 257,860
14,000 78,000 93,000
1,144,800 66,741,120 18,946,440
bh
4,738,640
211,170
232,641,070
bh ttk
2,023,480 17,080.00
234,000 8,670.00
15,802,360 1,390,500
1. LP- DL, PLC, 1 x 11 Watt LP- DL, PLC, 1 x 11 Watt + NB
bh bh
338,000 1,482,000
10,000 10,000
-
2. LP- DL, PLC, 1 x 9 Watt 3. Lp - TKO, LED, 1 x 24 Watt
bh bh
338,000 453,860
10,000 10,000
-
4. Lp - TKO, LED, 2 x 24 Watt Lp - TKO, LED, 2 x 24 Watt + NB
bh bh
813,590 1,957,590
10,000 10,000
-
bh bh
24,800 24,800
7,000 7,000
8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 2. Lantai Dasar - A, (Area Kelas), 11 Room 1. Lp - TKO, LED, 1 x 14 Watt, @24 bh
18 room
2. Saklar Seri, @1 bh 3. Stop Kontak 1P, 200 W, @2 bh 4. Stop Kontak 1P, (2Lubang), @1 bh 5. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 6. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 3. Dari PL-OL, Zone/A 1. Lp - Jalan, Mercury, 1 x 125 Watt + Tiang 6 m 2. Lp - Taman, 54 Watt 3. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm
47 7 54
ZONE - B
1. Lantai Dasar / B
5. Stop Kontak 1P, 200 W 6. Stop Kontak VC. 1P, 1.000 W 7. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 8. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm
3 6
95,400 190,800
ttk
153,740
78,000
3 6
ttk
257,860
93,000
1,052,580
ttk
381,370
93,000
2,846,220
45 274 45 2 19 8 1 64 366 64
bh m'
550,000 267,380
40,000 10,000
26,550,000 76,002,120
bh bh
290,400 1,830,400
10,000 10,000
13,518,000 3,680,800
bh bh
27,100 40,300
7,000 7,000
647,900 378,400
bh bh
765,200 49,600
28,000 14,000
793,200 4,070,400
ttk ttk
153,740 257,860
78,000 93,000
84,816,840 22,455,040
1. LP- DL, PLC, 1 x 11 Watt LP- DL, PLC, 1 x 11 Watt + NB
bh bh
338,000 1,482,000
10,000 10,000
-
2. Lp - TKO, LED, 1 x 24 Watt 3. Lp - TKO, LED, 2 x 24 Watt Lp - TKO, LED, 2 x 24 Watt + NB
bh bh bh
453,860 813,590 1,957,590
10,000 10,000 10,000
-
bh bh
24,800 24,800
7,000 7,000
ttk
153,740
78,000
13
ttk
257,860
93,000
4,561,180
3
ttk
381,370
93,000
1,423,110
351 24 13 2 1 4 375 4
m' bh
267,380 290,400
10,000 10,000
97,360,380 7,209,600
bh bh bh
27,100 40,300 765,200
7,000 7,000 28,000
443,300 94,600 793,200
bh ttk
265,210 153,740
28,000 78,000
1,172,840 86,902,500
ttk
257,860
93,000
1,403,440
bh
338,000
10,000
-
bh
1,482,000
10,000
-
9. Instalasi Stop kontak (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm 1. Lantai Dasar - B, 1. Pandent Lamp 50W 1. LED Light (indirect) 9W/M
-
Gambar baru
3. Ceiling mounted Downlight halogen 50 W Ceiling mounted Downlight halogen 50 W + NB 3. Saklar Engkel 4. Saklar Seri 5. Saklar Kelompok, 8 Group 4. Stop Kontak 1P, (2Lubang), @1 bh 8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 2. Lantai 1 / B
4. Stop Kontak 1P, 200 W 5. Stop Kontak VC. 1P, 1.000 W 6. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm 7. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 8. Instalasi Stop kontak (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm 2. Lantai 1 / B
3. Saklar Engkel 4. Saklar Seri 5. Saklar Kelompok, 8 Group 4. Stop Kontak 1P, Floor Outlet 8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm
LP- DL, PLC, 1 x 11 Watt + NB
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413,400 95,400 -
Gambar baru
1. LED Light (indirect) 9W/M 3. Ceiling mounted Downlight halogen 50 W
3. Lantai 2 / B 1. LP- DL, PLC, 1 x 11 Watt
13 3
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 35/51
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
2. LP- DL, PLC, 1 x 9 Watt
bh
338,000
10,000
-
3. Lp - TKO, LED, 1 x 24 Watt
bh
453,860
10,000
-
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 36/51
Uraian
4. Stop Kontak 1P, 200 W 5. Stop Kontak VC. 1P, 1.000 W 6. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 7. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 8. Instalasi Stop kontak (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Exhaust Fan Toilet Kabel NYA 3x2,5 mm²+Konduit 20 mm 3. Lantai 2 / B 1. LED Light (indirect) 9W/M
Vol WKC
7 6
7 6
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
bh
24,800
7,000
222,600
bh
24,800
7,000
190,800
ttk
153,740
78,000
ttk
257,860
93,000
ttk
381,370
93,000
3,320,590
ttk
381,370
93,000
2,846,220
-
Gambar baru
178 41 2 7 6 1 10 221 10
m'
267,380
10,000
49,373,640
bh bh
290,400 1,830,400
10,000 10,000
12,316,400 3,680,800
bh bh
27,100 40,300
7,000 7,000
238,700 283,800
bh bh
765,200 49,600
28,000 14,000
793,200 636,000
ttk ttk
153,740 257,860
78,000 93,000
51,214,540 3,508,600
1. LP- DL, PLC, 1 x 11 Watt LP- DL, PLC, 1 x 11 Watt + NB 2. Lp - TKO, LED, 1 x 24 Watt
bh bh bh
338,000 1,482,000 453,860
10,000 10,000 10,000
-
Lp - TKO, LED, 1 x 24 Watt + NB 3. LP- DL, PLC, 2 x 11 Watt
bh bh
1,597,860 338,000
10,000 10,000
-
LP- DL, PLC, 2 x 11 Watt + NB 4. LP- Sorot, 145 Watt
bh bh
1,482,000 5,408,000
10,000 202,800
-
bh bh
24,800 24,800
7,000 7,000
ttk
153,740
78,000
ttk
257,860
93,000
ttk
381,370
93,000
3. Ceiling mounted Downlight halogen 50 W Ceiling mounted Downlight halogen 50 W + NB 3. Saklar Engkel 4. Saklar Seri 5. Saklar Kelompok, 8 Group 4. Stop Kontak 1P, (2Lubang), @1 bh 8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 4. Lantai 3 / B
5. Stop Kontak 1P, 200 W 6. Stop Kontak VC. 1P, 1.000 W 7. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm 8. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm 4. Lantai 3 / B 1. LED Light (indirect) 9W/M
3
95,400 1,052,580 -
Gambar baru
3. Ceiling mounted Downlight halogen 50 W Ceiling mounted Downlight halogen 50 W + NB 1. Pandent Lamp 50W 1. Pandent Lamp 50W + NB 1. Latern Lamp 60W 1. Latern Lamp 60W + NB
3
HPIT 250Watt
3. Saklar Engkel 4. Saklar Seri 5. Saklar Kelompok, 8 Group 4. Stop Kontak 1P, (2Lubang), @1 bh 8. Instalasi Penerangan Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 5. Dari PL-OL, Zone/B 1. Lp - Taman, 54 Watt 2. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm ZONE - C 1. Lantai Dasar / C 1. Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre
116 33 4 18 1 8 5 1 2 9 180 9
12 12
m'
267,380
10,000
32,176,080
bh bh
290,400 1,830,400
10,000 10,000
9,913,200 7,361,600
bh bh
550,000 2,090,000
40,000 40,000
10,620,000 2,130,000
bh bh
2,000,000 8,643,800
40,000 40,000
16,320,000 -
bh bh
27,100 40,300
7,000 7,000
170,500 47,300
bh bh
765,200 49,600
28,000 14,000
1,586,400 572,400
ttk ttk
153,740 257,860
78,000 93,000
41,713,200 3,157,740
bh
2,023,480
234,000
27,089,760
ttk
681,770
156,000
10,053,240
bh
1,049,150
10,000
-
Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre + NB 2. LP- DL, PLC, 1 x 11 Watt
bh bh
2,193,150 338,000
10,000 10,000
-
LP- DL, PLC, 1 x 11 Watt + NB 5. Stop Kontak 1P, 200 W
bh bh
1,482,000 24,800
10,000 7,000
-
6. Stop Kontak VC. 1P, 1.000 W 7. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm
bh ttk
24,800 153,740
7,000 78,000
-
8. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 9. Instalasi Stop kontak (VACUM), Kabel NYA 3x2,5 mm²+Konduit 20 mm
ttk ttk
257,860 381,370
93,000 93,000
-
bh
1,049,150
10,000
-
bh bh bh
2,193,150 338,000 1,482,000
10,000 10,000 10,000
-
2. Lantai 1 / C 1. Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre + NB 2. LP- DL, LED, 1 x 11 Watt LP- DL, LED, 1 x 11 Watt + NB
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors
No.
EL 37/51
Uraian
Vol WKC
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
3. LP- DL, LED, 9 Watt
bh
338,000
10,000
-
4. Stop Kontak 1P, 200 W
bh
24,800
7,000
-
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
413756492.xls
PT. Wijaya Kusuma Contractors
EL 38/51
No.
Vol WKC
Uraian
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
5. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm
ttk
153,740
78,000
-
6. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm 3. Lantai 2 / C
ttk
257,860
93,000
-
1. Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre Lp - TKI, LED, 2 x 24 Watt, c/w Mirror Louvre + NB
bh bh
1,049,150 2,193,150
10,000 10,000
-
2. LP- DL, LED, 1 x 11 Watt LP- DL, LED, 1 x 11 Watt + NB
bh bh
338,000 1,482,000
10,000 10,000
-
bh
338,000
10,000
-
3. Stop Kontak 1P, 200 W 4. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm
LP- DL, LED, 1 x 9 Watt
bh ttk
24,800 153,740
7,000 78,000
-
5. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm D. AREA POWER HOUSE
ttk
257,860
93,000
-
bh bh
267,380 1,597,860
10,000 10,000
bh bh
813,590 1,957,590
10,000 10,000
bh ttk
24,800 153,740
7,000 78,000
445,200 8,342,640
ttk
257,860
93,000
5,262,900
9 3 28 208 208 208
bh bh
27,100 40,300
7,000 7,000
306,900 141,900
m m
266,760 315,720 220,320
53,350 63,140 2,520
8,963,080 78,802,880 46,350,720
1
ls
40,080,000
40,080,000
50 50
ttk
250,000 1,220,000
250,000 1,220,000
1 1
Lot Lot
5,828,200 3,850,200
3,496,900 11,000,500
1. Lp - TKO, LED, 1 x 24 Watt Lp - TKO, LED, 1 x 24 Watt + NB 2. Lp - TKO, LED, 2 x 24 Watt Lp - TKO, LED, 2 x 24 Watt + NB 2. Stop Kontak 1P, 200 W 3. Instalasi Penerangan Kabel NYM 3x2,5 mm²+Konduit 20 mm 4. Instalasi Stop kontak Kabel NYA 3x2,5 mm²+Konduit 20 mm
31 5 14 36 15
8,598,780 8,039,300 -
4. AREA POWER HOUSE 3. Saklar Engkel 4. Saklar Seri TRAY KABEL Lantai - Dasar, TRANCE KABEL
: 600 mm x 100 mm : 950 mm x 1250 mm
Kabel ladder 800x100mm Kabel ladder 300x100mm Konsuil dari Instalatir Kontak relay untuk sinyal ke Mimik panel
Excluded
Instalasi relay
Excluded
E. MATERIAL BANTU F. TEST - COM
m' m'
bh
-
D - Sub Total Pengadaan/Pemasangan Instalasi & Armature Lampu E
excluded excluded 9,325,100 14,850,700 1,550,444,070
PENGADAAN & PEMASANGAN RAK KABEL 1. LT- DASAR, ZONE/A : 300 mm x 100 mm
94
m
294,480
58,900
33,217,720
Lantai - Dasar Lantai - Satu
: 300 mm x 100 mm : 300 mm x 100 mm
m m
: 200 mm x 100 mm : 300 mm x 100 mm
m m
294,480 294,480 235,440 294,480
58,900 58,900 47,090 58,900
25,796,740 44,172,500
Lantai - Dua Lantai - Tiga
73 125 34 83
3. ZONE/C Lantai - Dasar
: 200 mm x 100 mm
m
235,440
47,090
m
353,160
70,630
m m
353,160 294,480
70,630 58,900
2,542,740 3,180,420
lot
38,399,400
9,599,900
47,999,300
Kabel Tray, Uk. 2. ZONE/B
4. AREA POWER HOUSE Lantai - Dasar, TRANCE KABEL TRAY KABEL
: 400 mm x 100 mm : 400 mm x 100 mm 300 mm x 100 mm
5. Material bantu
6 9 1
E . Sub Total Pengadaan & Pemasangan Rak Kabel F
PEKERJAAN PENANGKAL PETIR 1. Air terminal Elektro Statis R 100m , 2. Tiang GIP dia. 8 m 3. Kabel NYY 70 mm2 4. Obstruction Lamp, LED, 7 Watt 5. Photo Electric Switch 6. Pembuatan GTB, Uk. 60 x 60 x 60, Pentanahan Penangkal Petir, Max. 2 ohm F . Sub Total Pekerjaan Penangkal Petir GRAND Total Pekerjaan ELEKTRIKAL
PT. MITRA PERDANA ENGINEERING Mechanical Electrical Engineers
9,606,020 29,330,540 -
195,845,980
1 unit 1 ls 50 m 1 bh 1 bh 4 Unit
38,395,940
5,759,390
44,155,330
3,900,000 117,600 3,000,000
1,170,000 35,280 900,000
5,070,000 7,644,000 3,900,000
700,000 10,950,000
210,000 3,285,000
910,000 56,940,000 118,619,330 5,244,143,330
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK : PAKET PEKERJAAN : PERIHAL :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (TELEPHONE)
REV / TANGGAL DISIAPKAN OLEH
1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
: :
No.
Uraian
Vol WKC Sat
IX
PEKERJAAN TELEPHONE
A.
Peralatan Utama
1
3 4
Main Distribution Frame Telephone (MDF-TP) Kapasitas 2x150 Pairs, Lengkap dengan Line Surge Arrester 10 kA Digital PABX pstn Kapasitas 5 Line/ 50 Extention, Lengkap dengan Battery dan Line Surge Arres FAX Power Surge Arrester dan Charger
5 6 7 8 9
UPS 5 Kva By IT Grounding Setting & Program Testing and Commisioning Biaya Perijinan dan Penyambungan
2
1
Set
1
Set
2 1
Unit Set
1 1 1 1
Buah Unit Unit Lot Lot
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
3,000,000
600,000
SBO
3,300,000
165,000
3,000,000
1,500,000
250,000.00 350,000.00
750,000.00 1,250,000.00
Sub Total Pekerjaan Peralatan Utama B 1
3,600,000
SBO 3,465,000 SBO 4,500,000 1,000,000 1,600,000 BY OWNER 14,165,000
KABEL FEEDER Kabel feeder MDF-TP ke TELKOM (Provisional/by Telkom) Kabel TITC 20 x 2 x 0.6 mm (didalam PVC High Impact Conduit Ø20 mm)
100
m
22,500
2,250
2,475,000
Kabel feeder MDF-TP ke TBTP-Dasar Kabel TITC 50 x 2 x 0.6 mm (didalam PVC High Impact Conduit Ø20 mm)
150
m
45,000
4,500
7,425,000
Kabel feeder MDF-TP ke TBTP-1 Kabel TITC 20 x 2 x 0.6 mm (didalam PVC High Impact Conduit Ø20 mm)
155
m
22,500.00
2,250.00
3,836,250
4
Kabel feeder MDF-TP ke TBTP-2 Kabel TITC 20 x 2 x 0.6 mm (didalam PVC High Impact Conduit Ø20 mm)
160
m
22,500.00
2,250.00
3,960,000
5
Kabel feeder MDF-TP ke TBTP-3 Kabel TITC 10 x 2 x 0.6 mm (didalam PVC High Impact Conduit Ø20 mm)
165
m
11,700.00
1,170.00
2,123,550
1
Ls
99,100.00
59,500.00
158,600
2 3
6
Material bantu Sub Total Pekerjaan Installasi Fedder Telepone
C C.1 1 2 3 4 C.2 1 2 3 4 C.3 1 2 3 4 C.4 1 2 3
Instalasi Sistem TP per Lantai Lantai DASAR Terminal Box 50 Pairs Telephon Lantai Dasar (TBTP-D) Outlet Telephone Kabel Instalasi dari TBTP-Dasar ke Outlet Telephone Kabel TITC 2 x 2 x 0.6 mm (di dalam PVC High Impact Conduit Ø20 mm) Material Bantu Lantai SATU Terminal Box 20 pairs Telephon Lantai 1 (TBTP-1) Outlet Telephone Kabel Instalasi dari TBTP-1 ke Outlet Telephone Kabel TITC 2 x 2 x 0.6 mm (di dalam PVC High Impact Conduit Ø20 mm) Material Bantu Lantai DUA Terminal Box 20 pairs Telephon Lantai 2 (TBTP-2) Outlet Telephone Kabel Instalasi dari TBTP-2 ke Outlet Telephone Kabel TITC 2 x 2 x 0.6 mm (di dalam PVC High Impact Conduit Ø20 mm) Material Bantu Lantai TIGA Outlet Telephone Kabel Instalasi dari TBTP-3 ke Outlet Telephone Kabel TITC 2 x 2 x 0.6 mm (di dalam PVC High Impact Conduit Ø20 mm) Material Bantu Sub Total Pekerjaan Instalasi Telepone
19,978,400
1 20
Unit Buah
1,000,000 94,700
200,000 7,000
1,200,000 2,034,000
20 1
Titik Ls
121,100.00
72,600.00
108,000
13,838,800 193,700
1 8
Unit Buah
400,000 94,700
80,000 7,000
480,000 813,600
8 1
Titik Ls
583,940
108,000
50,000.00
30,000.00
5,535,520 80,000
1 1
Unit Buah
400,000 94,700
80,000 7,000
480,000 101,700
1 1
Titik Ls
583,940
108,000
26,200.00
15,700.00
691,940 41,900
1
Buah
94,700
7,000
101,700
1 1
Titik Ls
583,940
108,000
4,000.00
2,400.00
691,940 6,400
583,940
26,291,200
39 / 51
413756492.xls
PT. Wijaya Kusuma Contractors Sub Total Pekerjaan TELEPONE
60,434,600
40 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK PAKET PEKERJAAN PERIHAL REV / TANGGAL DISIAPKAN OLEH
: : : : :
No.
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (KABEL TRAY) 1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
Vol WKC
Uraian
VI
PEKERJAAN RAK KABEL ELEKTRONIK
A A.1 1
PEKERJAAN RAK KABEL Instalasi Lantai DASAR Tray Ukuran : 300 mm x 100 mm Tray Ukuran : 200 mm x 100 mm
A.2 1
Instalasi Lantai 1 Tray Ukuran Tray Ukuran
A.3 1
Instalasi Lantai 2 Tray Ukuran Tray Ukuran
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
5 201
m m
294,480 235,440
58,900 47,090
1,766,900 56,788,530
: 300 mm x 100 mm : 200 mm x 100 mm
5 96
m m
294,480 235,440
58,900 47,090
1,766,900 27,122,880
: 300 mm x 100 mm : 200 mm x 100 mm
5 159
m m
294,480 235,440
58,900 47,090
1,766,900 44,922,270
Sub Total Pekerjaan RAK KABEK ELEKTRONIK
41 / 51
134,134,380
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK : PAKET PEKERJAAN : PERIHAL :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (FIRE ALARM)
REV / TANGGAL DISIAPKAN OLEH
1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
: :
Uraian
VII A 1 2
PEKERJAAN PANEL FIRE ALARM Peralatan Utama Main Distribution Frame Fire Alarm (MDF-FA) Main Control Panel Fire Alarm (MCP-FA) Konvensional Kapasitas 20 zone c/w rectifier 48V, surge arester 10kA & battery Nicad ka Announciator
3 4 5 6 7 8 9 10
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1 Unit 1 Set
1,725,000 76,988,500
43,130 2,026,010
1,768,130 79,014,510
1 Unit 1 Set 1 Set 150 m 250 m
11,504,000 25,815,000 3,350,000 187,200 187,200
302,740 1,500,000 83,750 7,500 7,500
11,806,740 27,315,000 3,433,750 29,205,000 48,675,000
1,006,100
13,500,000
14,506,100
6,471,700
2,157,200
8,628,900
Vol WKC
No.
Grounding for Panel + UPS 5kVA Power Surge Arrester 40kA Kabel Feeder MDF-FA ke TBFA-Dasar s/d TBFA Lt.03, NYA 4(2x1,5mm2) Kabel Feeder MDF-FA ke Annunciator (di Ruang Security) Kabel NYA 15 x ( 2 x 1.5 mm2 ) dalam pipa conduit dia. 20 mm Testing and Commisioning Sertifikat Depnaker Material Bantu
1 1 1
Sat
Lot Lot ls
224,353,130
Sub Total Pekerjaan Peralatan Utama B B.1 1 2 3 4 5 6 7 8 8 10 11
B.2 1 2 3 4 5 6 7 8 9 10 11
B.3 1 2 3 4 5 6 7
Instalasi Sistem Fire Alarm Lantai DASAR Terminal Box Fire Alarm Lantai Dasar Smoke Detector (Photo Electric Type) Fixed Temperature Heat Detector Manual Push Button Alarm Bell Indicator Lamp End of Line Kabel Instalasi dari TBFA-DASAR ke Detector Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalsi dari TBFA-DASAR ke Indicator Lamp Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-DASAR ke Manual Push Button Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-DASAR ke Alarm Bell Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Lantai SATU Terminal Box Fire Alarm Lantai Satu Fixed Temperature Heat Detector Smoke Detector (Photo Electric Type) Manual Push Button Alarm Bell Indicator Lamp End of Line Kabel Instalasi dari TBFA-SATU ke Detector Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-SATU ke Indicator Lamp Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-SATU ke Manual Push Button Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Installasi dari TBFA – SATU ke Alarm Bell Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Lantai DUA Terminal Box Fire Alarm Lantai Dua Smoke Detector (Photo Electric Type) Fixed Temperature Heat Detector Manual Push Button Alarm Bell Indicator Lamp End of Line
1 52 3 4 4 4 5 55
Unit Buah Buah Buah Buah Buah Buah Titik
13,065,900 512,330 204,930 279,450 372,600 605,480 6,900 98,260
343,840 12,810 5,120 6,990 9,320 15,140 170 93,000
13,409,740 27,307,280 630,150 1,145,760 1,527,680 2,482,480 35,350 10,519,300
4 Titik
3,013,040
93,000
12,424,160
4 Titik
3,013,040
93,000
12,424,160
4 Titik
3,013,040
93,000
12,424,160
Unit Buah Buah Buah Buah Buah Buah Titik
16,078,940 204,930 512,330 279,450 372,600 372,600 6,900 98,260
423,130 5,120 12,810 6,990 9,320 9,320 170 93,000
16,502,070 2,100,500 11,553,080 572,880 763,840 763,840 14,140 6,120,320
2 Titik
3,013,040
93,000
6,212,080
2 Titik
3,013,040
93,000
6,212,080
2 Titik
3,013,040
93,000
6,212,080
14,000,180 512,330 204,930 279,450 372,600 372,600 6,900
350,000 12,810 5,120 6,990 9,320 9,320 170
14,350,180 7,351,960 286,440 381,920 381,920 7,070
1 10 22 2 2 2 2 32
1 14 1 1 1 1
42 / 51
Unit Buah Buah Buah Buah Buah Buah
413756492.xls
PT. Wijaya Kusuma Contractors
No.
8 9 10 11
B.2 1 2 3 4 5 6 7 8 9 10 11
Vol WKC
Uraian
Kabel Kabel Kabel Kabel Kabel Kabel Kabel Kabel
Instalasi dari TBFA-DUA ke Detector NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Instalasi dari TBFA-DUA ke Indicator Lamp NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Instalasi dari TBFA-DUA ke Manual Push Button NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Installasi dari TBFA - DUA ke Alarm Bell NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit
Ø20 mm) Ø20 mm) Ø20 mm)
Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
18 Titik
98,260
93,000
3,442,680
1 Titik
3,013,040
93,000
3,106,040
1 Titik
3,013,040
93,000
3,106,040
1 Titik
3,013,040
93,000
3,106,040
Unit Buah Buah Buah Buah Buah Buah Titik
11,910,800 17,521,500 512,330 279,450 372,600 372,600 6,900 98,260
313,440 461,090 12,810 6,990 9,320 9,320 170 93,000
12,224,240 35,965,180 6,301,680 286,440 381,920 381,920 14,140 2,677,640
1 Titik
3,013,040
93,000
3,106,040
1 Titik
3,013,040
93,000
3,106,040
1 Titik
3,013,040
93,000
3,106,040
Ø20 mm)
Lantai TIGA Terminal Box Fire Alarm Lantai Tiga Beam Detector Smoke Detector (Photo Electric Type) Manual Push Button Alarm Bell Indicator Lamp End of Line Kabel Instalasi dari TBFA-TIGA ke Detector Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-TIGA ke Indicator Lamp Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBFA-TIGA ke Manual Push Button Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Installasi dari TBFA – TIGA ke Alarm Bell Kabel NYA 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm)
1 2 12 1 1 1 2 14
Sub Total Pekerjaan Instalasi Fire Alarm
254,428,700
Sub Total Pekerjaan FIRE ALARM
478,781,830
43 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK : PAKET PEKERJAAN : PERIHAL :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (SOUND SYSTEM)
REV / TANGGAL DISIAPKAN OLEH
1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
: :
No.
VIII. A. A.1 1 2 3 4 5
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
1 Unit 5 Unit 1 Set 1 Set 1 Unit
1,000,000 12,633,400 3,600,000 3,500,000 86,354,600
50,000 664,920 180,000 175,000 4,544,980
1,050,000 66,491,600 3,780,000 3,675,000 90,899,580
1
Set
11,772,900
588,650
12,361,550
17,775,450 33,345,000 1,392,000 1,160,000
935,550 1,755,000 696,000 2,321,000
18,711,000 35,100,000 2,088,000 3,481,000
3,538,000 4,880,250 5,228,550
176,900 244,010 261,430
3,714,900 5,124,260 5,489,980
20,250
7,500
4,162,500
Vol WKC
Uraian
PEKERJAAN SOUND SYSTEM Peralatan Utama Evakuasi & Background Music Main Distribution Frame Sound System (MDF-SS), Kap 10" Power Amplifier Kap. 1 X 240 W Zone Selector (termasuk Relay dan Rectifire), kap 10 Zone Power Surge Arrester Equalizer
Sat
7 8 9
Mixer Pre Amplifier, AM/FM Radio Tuner + DVD MP3 Player, Emergency Mic dan Paging Mic, dan Remote microphone lengkap dengan key pad dan Instalasi yang dipasang di Reception Rack Cabinet UPS 3 kVA Setting & program
10
Testing & Commissioning
1 unit 1 unit 1 ls 1 ls
A.2 1 2 3
Car Call System Power Amplifier Kap. 1 X 240 W Paging Microphone Mixer Paging Microphone
1 Unit 1 Unit 1 Unit
A.3 1
Kabel feeder Kabel feeder MDF-SS ke TBSS-Dasar s/d TBSS-03 Kabel NYMHY 3 x 1.5 mm2 (didalam PVC High Impact Conduit Ø20 mm)
6
150
m'
256,129,370
A. Sub Total Pekerjaan Peralatan Utama B B.1 1 2 3 4 5 6 7 8 6 9
B.2 1 2 3 4 5 6
Instalasi Sistem Tata Suara Lantai DASAR Terminal Box Sound System Lantai Dasar Horn Speaker Kapasitas 15 W Two Way Speaker Kapasitas 30 W Ceiling Speaker Kapasitas 3 W (EVAC) & (BGM) Volume Control Kabel Instalasi dari TBSS-Dasar ke Two Way (EVAC) Kabel NYFGBY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-Dasar ke Horn (Evac) & Ceiiling Speaker Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-Dasar ke Volume Control Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-Dasar ke Horn Speaker (Car Call) Kabel NYFGBY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Material bantu
Lantai SATU Terminal Box Sound System Lantai Satu Ceiling Speaker Kapasitas 3 W (EVAC) & (BGM) Volume Control Kabel Instalasi dari TBSS-01 ke Ceiiling Speaker Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-01 ke Volume Control Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Material bantu
44 / 51
1 6 2 84 1 2
Unit Buah Buah Buah Buah titik
250,000 342,000 1,378,000 89,500 146,400 872,200
12,500 17,100 68,900 4,480 7,320 108,000
262,500 2,154,600 2,893,800 7,894,320 153,720 1,960,400
86 titik
164,870
93,000
22,176,820
1 titik
176,120
93,000
269,120
6 titik
670,920
108,000
4,673,520
1
lot
270,000
135,000
405,000
1 25 1 45
Unit Buah Buah titik
250,000 89,500 146,400 164,870
12,500 4,480 7,320 93,000
262,500 2,349,500 153,720 11,604,150
1 titik
176,120
93,000
269,120
99,000
50,000
149,000
1
ls
413756492.xls
PT. Wijaya Kusuma Contractors
No.
B.3 1 2 3 4 5 6 B.4 1 2 3 4 5 6 7 8 9
Harga Satuan
Harga Satuan
Unit Buah Buah titik
250,000 89,500 146,400 164,870
12,500 4,480 7,320 93,000
262,500 1,221,740 153,720 8,251,840
1 titik
176,120
93,000
269,120
72,000
36,000
108,000
Vol WKC
Uraian
Lantai DUA Terminal Box Sound System Lantai DUA Ceiling Speaker Kapasitas 3 W (EVAC) & (BGM) Volume Control Kabel Instalasi dari TBSS-02 ke Ceiiling Speaker Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-02 ke Volume Control Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Material bantu Lantai TIGA Terminal Box Sound System Lantai TIGA Horn Speaker Kapasitas 15 W Wall Speaker Kapasitas 6 W Ceiling Speaker Kapasitas 3 W (EVAC) Volume Control Kabel Instalasi dari TBSS-03 ke Horn Speaker Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-03 ke Wall & Ceiiling Speaker Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Kabel Instalasi dari TBSS-03 ke Volume Control Kabel NYMHY 2 x 1.5 mm2 (di dalam PVC High Impact Conduit Ø20 mm) Material bantu
1 13 1 32
Sat
1
ls
1 4 3 6 1 4
Unit Buah Buah Buah Buah titik
250,000 342,000 168,000 89,500 146,400 872,200
12,500 17,100 8,400 4,480 7,320 108,000
262,500 1,436,400 529,200 563,880 153,720 3,920,800
9 titik
164,870
93,000
2,320,830
1 titik
176,120
93,000
269,120
57,000
28,000
85,000
1
lot
B. Sub Total Pekerjaan Instalasi C
PEKERJAAN SPESIAL SOUND SYSTEM (AREA BASKET) 1 Pengadaan CD/MP3/DVD Player 2 Handheld Wireless Microphone w/Receiver, (WM - 5270) 3 Lavailer Wireless Microphone w/Receiver, (WM - 5325)
1 4 2 1 6 6 1 1 2 2 7 2 8 4 4 4 4 2 1
4 Wireless Antene Distributor w/Wireless Antenna, (WD - 4800) 5 Dynamic Microphone, (E935) 6 Inlet Mic, 7 Mixer 24CH, 8 Bus, (GL-2800-24) 8 Headphone 9 Digital Audio Processor, (DP-K1) 10 Dual Power Amplifier 500 W, (ZA-D500) 11 Multichannel Power Amplifier 7 x 250 W, (DA-250F) 12 Power Ampifier, 240 W, (ZP-2240) 13 HX-Series Speaker, (HX-7B) 14 Subwofeer, (FB-150B) 15 F-Series Box Speaker Tribun, (ZS-F2000B) 16 F-Series Box Speaker Ballet Room, (ZS-F2000B) 17 Monitor Speaker, (ZS-HS 1500B) 18 F-Series Box Speaker (R.Kontrol), (ZS-F2000B) 19 Cabinet Rack w/acc, (CR-392P)
bh bh bh set bh bh BH BH bh bh bh bh bh bh bh bh bh bh lot
C. Sub Total Pekerjaan Spesial Sound System
Total Pekerjaan SOUND SYSTEM
45 / 51
Total Harga WKC
77,440,160
Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded Excluded
-
333,569,530
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK : PAKET PEKERJAAN : PERIHAL :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (CCTV)
REV / TANGGAL : DISIAPKAN OLEH :
1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
Harga Satuan Harga Satuan No.
Uraian
X
PEKERJAAN CLOSE CIRCUIT TELEVISI ( CCTV )
A 1 2 3 4 5 6 7 8 9
Peralatan Utama DVR Analog Stand alone 16 Chanel , memory 4X1 tera Monitor LCD 22" Joystick Rack Cabinet Video Distribution 3 in 16 out Software & Training Grounding for Panel UPS 5 kVA Testing & Comisioning
A 1
Peralatan Utama Desktop PC c/w remote dan Software Monitor LCD 22", spot screen Monitor LCD 22", multi 16 disply split screen 48 channel NVR, Harddisk 4x1TB Patch panel 48 port c/w converter & switch HUB Patch panel 16 port c/w converter & switch HUB Patch panel 6 port c/w converter & switch HUB Kabel FO dari Patch panel ke R. Security Inst camera UTP Cat 6 Grounding for Panel UPS 2 kVA Power Surge Arrester dan Charger Testing & Comisioning
2 3 4 5 6 7 8 9 10 11 12 13
Vol WKC
Sat
-
Unit Unit Unit Unit Unit lot Unit lot lot
1 1 1 1 1 1 3 500 19 1 1 1 1
Unit Unit Unit Unit bh bh bh m' ttk Unit lot lot lot
Material ( Rp )
Upah ( Rp )
B.2 1 2
Instalasi Sistem CCTV per Lantai Lantai DASAR Camera Dome Colour (Indoor Type) Camera Fixed Colour c/w Heather & Blower (Outdoor Type) Camera Fixed Colour DAY/NIGHT VARIFOCAL Camera Fixed Colour (Indoor Type) Inst. power camera Kabel NYA 3x2,5 mm² + Konduit 20 mm lengkap Outlet Kabel Instalasi dari DVR ke Kamera Kabel Coaxial RG. 11 (di dalam PVC High Impact Conduit Ø20 mm) Lantai SATU Camera Dome Colour (Indoor Type) Camera Fixed Colour (Indoor Type) 3 Inst.power camera Kabel NYA 3x2,5 mm² + Konduit 20 mm lengkap Outlet 4 Kabel Instalasi dari DVR ke Kamera Kabel Coaxial RG. 6 (di dalam PVC High Impact Conduit Ø20 mm)
B.3 1 2 3 4
Lantai DUA Camera Dome Colour (Indoor Type) Camera Fixed Colour (Indoor Type) Inst. power camera Kabel NYA 3x2,5 mm² + Konduit 20 mm lengkap Outlet Kabel Instalasi dari DVR ke Kamera Kabel Coaxial RG. 6 (di dalam PVC High Impact Conduit Ø20 mm)
B.4 1 2 3 4
Lantai TIGA Camera Dome Colour (Indoor Type) Camera Fixed Colour (Indoor Type) Inst. power camera Kabel NYA 3x2,5 mm² + Konduit 20 mm lengkap Outlet Kabel Instalasi dari DVR ke Kamera Kabel Coaxial RG. 6 (di dalam PVC High Impact Conduit Ø20 mm)
3 5 1 4 14
Buah Buah Buah Buah ttk
16,929,000 7,187,400 7,187,400 67,320,990 15,400,000 12,430,000 11,770,000 200,000 1,826,160 3,000,000 26,676,000 3,500,000 835,000
891,000 359,370 359,370 765,450 770,000 621,500 588,500 10,000 115,000 1,500,000 1,404,000 175,000 1,670,000
1 Buah - Buah 5 ttk
5,940,000 7,692,300 10,769,220 6,474,600 1,572,830
297,000 384,620 538,460 323,730 108,000
18,711,000 40,384,600 11,307,680 27,193,320 23,531,620 -
5,940,000 6,474,600 1,572,830
297,000 323,730 108,000
6,237,000 8,404,150 -
5,940,000 6,474,600 1,572,830
297,000 323,730 108,000
12,474,000 6,723,320
4 Titik - Buah 3 Buah 3 ttk
-
347,939,020
5 Titik 2 Buah - Buah 4 ttk
-
17,820,000 7,546,770 7,546,770 68,086,440 16,170,000 13,051,500 37,075,500 105,000,000 36,882,040 4,500,000 28,080,000 3,675,000 2,505,000
14 Titik
5,940,000 6,474,600 1,572,830
297,000 323,730 108,000
20,394,990 5,042,490
3 Titik
Sub Total Pekerjaan Instalasi CCTV
46 / 51
Material + Upah ( Rp )
Include
Sub Total Pekerjaan Peralatan Utama B B.1 1 2 3 4 5 6
Total Harga WKC
180,404,170
413756492.xls
PT. Wijaya Kusuma Contractors Harga Satuan Harga Satuan No.
Vol WKC
Uraian
Sat
Sub Total Pekerjaan CCTV
47 / 51
Material ( Rp )
Upah ( Rp )
Total Harga WKC Material + Upah ( Rp ) 528,343,190
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK
:
LIFT48/51
BINUS VIDA
PAKET PEKERJAAN :
MEKANIKAL & ELEKTRIKAL
PERIHAL
:
TRANSPORTASI
REV / TANGGAL
:
1 / 25 FEBRUARI 2015
DISIAPKAN OLEH
:
PT. MITRA PERDANA ENGINEERING
No.
VI
Uraian
Vol
Sat
Harga Satuan
Harga Satuan
Total Harga
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN TRANSFORTASI Pengadaan dan pemasangan peralatan LIFT di bawah ini sesuai dengan spesifikasi lengkap dengan steel braket, support, klem dan accessories.
1
PENGADAAN UNIT LIFT PENUMPANG Kapasitas : 17 P / 1275 KG Type : Passanger
UNIT
2
PENGADAAN ACCESSORIES Pengadaan ARD Automatic Resqeu Divice
Unit
3
Pekerjaan CCTV area dalam Lift - Pekerjaan Kamera CCTV - Pekerjaan Instalasi Kamera CCTV
4
PEKERJAAN LAIN-LAIN - Pekerjaan Test Commisioning - Pekerjaan Ijin Depnaker - Pekerjaan Pengiriman ke Site Project GRAND TOTAL PEKERJAAN LIFT
PT. M ITRA PERDANA ENGINEERING Mechanical eletrcial Engineers
Unit Ttk
Include
Sudah masuk dalam pek CCTV
lot
-
-
Include
-
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK PAKET PEKERJAAN PERIHAL REV / TANGGAL DISIAPKAN OLEH
: : : : :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL ELEKTRONIK (DATA) 1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
No.
Uraian
XI. A.
Vol WKC Sat
Harga Satuan
Harga Satuan
Total Harga WKC
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN INSTALASI DATA
Peralatan Utama => SPEK HP Procure 1 Main Equipment Data c/w computer server & UPS - TERMASUK BIAYA TESTING COMMISSIONING 2 Rack 19" 3 Switch Hub 24 Port 10/100 4 Patch panel 24 Port 5 Sertifikasi Garansi UTP Cabling system 6 Termination & Labeling 7 Testing & Commisioning
1
set
1 unit 1 unit 1 unit - unit 1 unit 1 Ls
BY PROVIDER
600,000 402,000
1,200,000 1,148,000
3,350,000
Sub Total Pekerjaan Peralatan Utama ( Rp ) B B.1 1 2 3 4 2 3
Instalasi Sistem WIFI Lantai DASAR Patch panel 48 Port Data Outlet Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet Feeder Cable UTP Cat 6 in HIC 20 mm dari Box layanan ke Hub lantai 1 WIFI Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet
1 bh 30 bh 30 ttk 242 mtr 5 bh 5 ttk
1 2 3 4 2 3
Lantai SATU Patch panel 24 Port Data Outlet Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet Feeder Cable UTP Cat 6 in HIC 20 mm dari Box layanan ke Hub lantai 2 WIFI Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet
1 bh 8 bh 8 ttk 253 mtr 1 bh 1 ttk
1 2 3 4 2 3
Lantai DUA Patch panel 24 Port Data Outlet Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet Feeder Cable UTP Cat 6 in HIC 20 mm dari Box layanan ke Hub lantai 3 WIFI Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet
1 bh 1 bh 1 ttk 162 mtr 1 bh 1 ttk
1 2 3 2 3
Lantai TIGA Data Outlet Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet Feeder Cable UTP Cat 6 in HIC 20 mm dari Box layanan ke Hub lantai 2 WIFI Installation Cable UTP Cat 5 in HIC 20 mm for Data Outlet
1 bh 1 ttk 172 mtr 1 bh 1 ttk
B.2
B.3
B.4
Sub Total Pekerjaan Installasi DATA ( Rp )
SBO SBO SBO Include 1,800,000 1,550,000
120,700 583,940 44,990
7,000 108,000 7,500
583,940
108,000
120,700 583,940 44,990
7,000 108,000 7,500
583,940
108,000
120,700 583,940 44,990
7,000 108,000 7,500
583,940
108,000
120,700 583,940 44,990
7,000 108,000 7,500
583,940
108,000
SBO 3,831,000 20,758,200 12,702,580 SBO 3,459,700
SBO 1,021,600 5,535,520 13,279,970 SBO 691,940
SBO 127,700 691,940 8,503,380 SBO 691,940
127,700 691,940 9,028,280 SBO 691,940 81,835,330
85,185,330
TOTAL PEKERJAAN DATA
49 / 51
413756492.xls
PT. Wijaya Kusuma Contractors
50 / 51
413756492.xls
PT. Wijaya Kusuma Contractors PROYEK PAKET PEKERJAAN PERIHAL REV / TANGGAL DISIAPKAN OLEH
: : : : :
BINUS VIDA BEKASI MEKANIKAL & ELEKTRIKAL PLAMBING (AIR HUJAN) 1 / 25 FEBRUARI 2015 PT. MITRA PERDANA ENGINEERING
Harga Satuan Harga Satuan Total Harga WKC No.
VII
Uraian
Vol WKC Sat
Material ( Rp )
Upah ( Rp )
Material + Upah ( Rp )
PEKERJAAN PIPA AIR HUJAN Pengadaan/Pemasangan PAH, Kelas AW, Harus Lengkap Dengan ACC semua Material Bantu, Lengkap Support DLL yang Di Perlukan.
1 2 1
Blok - A Pengadaan dan Pemasangan Roof Drain Dia 4" Pengadaan dan Pemasangan Pipa PVC - AW, Dia 4" Pipa PVC - AW, Dia 4" (perporated)
39 104 268
bh m m
140,000 80,670 96,800
40,000 24,000 20,000
7,020,000 10,885,680 31,302,400
1 2
Blok - B Pengadaan dan Pemasangan Roof Drain Dia 4" Pengadaan dan Pemasangan Pipa PVC - AW, Dia 4"
7 143
bh m
140,000 80,670
40,000 24,000
1,260,000 14,967,810
1 2
Pengadaan dan Pemasangan Roof Drain Dia 4" Pengadaan dan Pemasangan Pipa PVC - AW, Dia 4"
8 83
bh m
140,000 80,670
40,000 24,000
1,440,000 8,687,610
1 2
Blok - E Pengadaan dan Pemasangan Roof Drain Dia 4" Pengadaan dan Pemasangan Pipa PVC - AW, Dia 4"
7 25
bh m
140,000 80,670
40,000 24,000
1,260,000 2,616,750
1
Ls
8,976,000
4,488,000
13,464,000
Material Bantu TOTAL PEKERJAAN PLAMBING (AIR HUJAN)
51 / 51
92,904,250
413756492.xls