Overview to Software Configuration Management



Why SCM: Main Classes of Problems



Definitions



Scope of Software Configuration Management



Configuration Management Planning



Software Configuration Management Tasks



Change Control



Software Configuration Management Tools

Page 2

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Overview: Software Configuration Management • Art of identifying, organizing and controlling modifications to the software and its work product being built • Software Configuration Management is one of the foundations of Software Engineering • It identifies and controls the configuration of software, hardware, systems and the tools that are used throughout the development lifecycle Identify Change, Control Change, Implement Change and Track Change Page 3

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Why SCM: Main Classes of Problems

Page 4

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Some Typical Problems • Program does not work • Works in Delhi, misbehaves in Bombay • I had fixed this bug last month. How did it reappear? • I haven’t changed the program. Why is it now blowing up? • Which is the latest source? I need to put a patch

Page 5

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Main Classes of Problems • Double maintenance problem • Shared data • Simultaneous update • Missing/unknown version problem

Page 6

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Main Classes Of Problem: Missing/Unknown Version Problem •

Consciously decide which version to keep, which to destroy



Use a systematic method to identify versions and changes across versions



Use consistent back-up procedures

Page 7

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Definitions

Page 8

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Definitions Configuration Item: •

An aggregation of software, documentation and data that is treated as a single entity in the configuration management process. Example: Project Plan, Code objects, Test Specification

Baselined Configuration Item: •

An item that is formally reviewed and agreed upon that thereafter serves as the basis for further development, and that can be changed only through formal change control procedures. Example: Approved Requirement Specification

Configuration Control Board •

Page 9

A board composed of technical and administrative representatives who recommend the approval or disapproval of proposed requirement changes to a baselined config item. Example: Systems Manager, Customer, Project Manager

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Scope of SCM

Page 10

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Scope of SCM •

Software entities that SCM is expected to manage include Plans, Specifications (SRS, Design), User Documentation, Test data, Support Software, Tools, Source Code, Executables, and Libraries, Third-Party Software Products & all DAR artifacts.



When every work product can be accounted for, tracked and controlled, when every change can be tracked and controlled, SCM is said to effective.

Page 11

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Management Planning

Page 12

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Management Planning •

Organization of SCM activities



Defining Roles and Responsibilities



Setting up of Change Control Board (CCB)



Monitoring implementation of CM activities, schedules and audits



Review of CM activities

Page 13

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Management Planning Configuration Management Plan • Introduction, Purpose & Scope • Organization of SCM activities • Defining Roles and Responsibilities • Configuration Identification • Configuration Control • Access Control • Backup procedures • CM Schedule • Change Control Board • Configuration Status Accounting • Configuration Audits • Release Management Page 14

Sep-07

P&Q

CM Plan template

Protection notice / Copyright notice For Internal Use Only

Quiz Q1 The Config Management Plan includes the following: b) Resource Plan, review details, schedule c) Baselines, release plan, backup plan, Change Mgmnt plan d) None of the above Q2 Configuration Management is 

The art of identifying, organizing and controlling modifications to software



Is one of the foundations of software engineering



Both the above

Page 15

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

S/W Configuration Management Tasks

Page 16

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks • • • • • • • • •

Page 17

Version Control Baselines Configurable item identification Process for Check-in and Check-out of any object from the Project library Configuration Control Configuration Status Reporting Backup Process Configuration Audit Release Management

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks –Version Control •

Version Control combines procedures and tools to manage different versions of configuration objects that are created during the software process



Keeping track of the software work product as it changes



Version Identification Rules and Version numbering Systems



Version Traceability (Author, Date, Baseline,Status and record of Change History and Approvals)



Release Identification and Storage Management of multiple versions

Page 18

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Baselines



‘A specification or product that has been formally reviewed and agreed upon, that thereafter serves as the basis for further development, and that can be changed only through formal Change Control Procedures’



Changes to the Baselined work product - approval required from CCB (Change Control Board) – Approval from CCB is taken on pre-defined category of changes. These categories are defined in Configuration Plan. For e.g. CRs where effort is more than 10 days.



The items of the next baseline are updated, reviewed and verified before they become baselines themselves

Page 19

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Configuration Items •

Configuration Item - An aggregation of software, documents and data that is treated as a single entity in the configuration management process. A set of configuration items form a “product” CI Identification



CIs

Current Configuration - Baselines plus approved changes from those baselines constitute the current configuration

Page 20

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Baseline Repositories •

Initial RepositoryComprises items available at the start of the project • Existing S/W source code (if available) • Existing Technical documentation (e.g. Requirements, Design, etc) • Existing Plans • Contract /Proposal



Page 21

As the project progresses, the subsequent baselines and repositories are created as per project requirements

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Baseline Repositories •

Definition Repository- Created at the end of Requirement Specifications • Requirement Specifications • Project Plan, Quality Plan, Configuration Management plan • Acceptance Test Plan • Design standards/Guidelines



Design Repository- Created during Design • • •

Page 22

DFS, GIS & DIS (Design documents – Detailed Functional Specs, Global Implementation Specs, Detailed Implementation Specs) Coding standards Testing standards

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Baseline Repositories •

Construction Repository- Created at the end of coding and Unit Testing • Source Code • Object Code • Unit test data/ Scripts



Testing Repository- Created at the end of System Testing • • • •

Page 23

System Test data and system test scripts Operation manual User Manual Installation Manual

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Check-out/Check-in Check-out Check-in process • The CIs available in the CM system will be in the read-only mode by default • Check out is a process that creates a new version of an object from an existing version stored in the database. Developers check out objects so they can work on them. • Check in an operation used to make a developer’s object version available to other users.

Page 24

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Configuration Control Configuration Control - Definition An element of configuration management, consisting of the evaluation, coordination, approval or disapproval and implementation of changes to configuration items after the formal establishment of their configuration identification

Page 25

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Configuration Control Problems that arise from lack of control, and they can waste an enormous amount of time: •What is my current software configuration? •What is its status? •How do I control changes to my configuration? •How do I inform everyone else of my changes? •What changes have been made to my software? •Do anyone else's changes affect my software?

The key role of Software Configuration Management (SCM) is to control change activity. --Watts Humphrey Managing the Software Process Addison-Wesley, 1989 Page 26

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Configuration Control • • •

Page 27

Documentation of Change Request Impact Analysis & Approval of Change Request Making Changes • Check out of configuration items from baseline repositories • Making change and maintaining the traceability between the change request and the physical change • Reviewing and testing as required • Check-in of changed configuration item with new version no.

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tasks – Configuration Control A Change is approved by CCB (Change Control Board) Changes are generated and tracked using change requests - what was done, by whom, when, what remains to be done, special conditions, current status etc... Establish a change control process that specifies: Who can initiate the change request The individuals, group, or groups who are responsible for evaluating, accepting, and tracking the change proposals for the various baselined products The “change impact” analysis required for each requested change How the change history should be kept

Page 28

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Incorporating a Change into the Current Configuration Baseline Change Requests

New Version of System Baseline

Impact Analysis

Approval of Change Request from CCB

No

Rejected Regression Tested Components

Yes Approved Change Design & Implement Changes

Page 29

Sep-07

P&Q

Regression Testing

Protection notice / Copyright notice For Internal Use Only

Configuration Status Reporting •

Generating configuration status report in the form of system log by configuration management tool



Maintaining a continuous record of the status and history of all baselined items and proposed changes to them



Reporting on the traceability of all changes to the baseline throughout the software lifecycle



Answers the questions

Page 30



What changes have been made to the system?



What changes remain to be implemented?

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Status Reporting Information required for comprehensive status accounting includes: •

The time at which each baseline was established



When each software configuration item is changed and change was included in the baseline



A description of each configuration item



All change requests



The description of each software change



The status of each software change request



The changes planned for each identified future baseline



A configuration item index that lists each configuration item along with its creation date and current released version



Change logs that show the history of the changes made to the source files Protection notice / Copyright notice as well asSep-07 their release histories Page 31 P&Q For Internal Use Only

SCM Tasks – Backup Process Backup Management • define the frequency of backup, medium of backup, responsibility of backup •

Identification of medium, storage location (fire proof cabinet), access control



System resources (disc space, memory etc...)



Course of action for disaster recovery



Restoration of Data on sample basis for checking the integrity of backup

Page 32

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Quiz Q1 Changes in baseline work product is done if: b) PM approves c) CCB approves d) TC approves Q2 What is the next step after receiving a Change Request 

Update CM Plan



Make changes to the software



Conduct an impact analysis

Page 33

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

S/W Configuration Audit

Page 34

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

What is Configuration Audit Definition Verification of compliance to the configuration management process defined by the project Verification that • what has been built is in conformance with what was required • change control procedures are followed and records are available • traceability is maintained between specification, product and change requests

Page 35

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Audit- Why? • • • • •

Page 36

Prevent the wrong product from being delivered Trap any incomplete implementation (of original specifications and change requests) Identify any mismatches (incompatibilities) between different configuration items Confirm that configuration items are baselined Confirm that the records and documentation maintain the traceability

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Audit- When? •

When a software is being delivered or a major release is being made



End of every phase



Periodically (monthly or alternate months)

Page 37

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Audit- Who? • •

Auditee Configuration Manager/ Team Auditor • PQM or • Internal/External auditor or • TC

Page 38

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Audit- How? •

Identify when the configuration audits will be done



Assign the auditor



Define the scope of the audit



Prepare the SCM audit checklist



Identify Non Conformances [Auditor]



Close Non Conformances [PM/CM]



Verify closure of Non Conformances [Auditor]

Page 39

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Configuration Audit Checklist Sl no 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

Page 40

CheckList Item Evidence Remarks  A reviewed and approved Configuration CM Plan  management plan exists Review protocols  All configurable items are identified along with CM plan owner for each one of them. Compliance with applicable SCM standards and CM plan procedures is verified.  Software baselines are identified. Baseline document Baseline library contents are complete and  Baseline document correct.  the Changes to baselines, if any are approved by Approved baseline changes approval authority (mentioned in CM plan)  Change Request Logs are maintained. Change request logs  All Change Requests can be tracked. Change requests  Comments in source code  Changes are approved by CCB before accepting Approved change requests the same  All Changes are documented & tracked to closure. Change requests  Changes are reviewed and tested before closure. Closed change requests Items can be traced back to their parents.  Tracebility  Latest items/documents are in use. Latest baseline Configuration Status Reports are available.(either Status reports through tool or logged manually)  All check-ins to the elements in the VOB (like Comments source code )are commented  Back-up/ archiving done as per plan Back up records  Metrics pertaining to configuration management Metrics data are collected as per QMS requirement  Senior management reviews the SCM activities MOM/ mails periodically Appropriate Access Control and  CM Plan automation is implemented for the configuration objects Ex. Use of triggers in Clear Case to prohibit remove operation to ordinary users Protection notice / Copyright notice - to automatically broadcast mails when baseline documents are released Sep-07 P&Q For Internal Use Only

Release Management •

Review and Approval of Baselines for Release



Release numbering and Release instructions



Release Media



Release Back-up and Archives



Release of Installation Instructions and other deliverables (identified in quality plan)

Page 41

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Release Management For releases to customer the following are required: •

"Release Notification" is prepared and sent for review and approval to stakeholders.



PES meeting may be scheduled, if required



Release to be baselined, verified and approved, as per Release Notification



Any deviations/concessions taken are documented in the release notification

Page 42

Sep-07

P&Q

Protection notice / Copyright notice Release Notes For Internal Use Only

Software Configuration Management Tools

Page 43

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

SCM Tools There are different SCM Tools available in the market The common tools are VSS,CVS,PVCS,Sub Version The tools like : CM Synergy, ClearCase,Perforce,Serena,StarTeam etc are efficient SCM tools which give support for multi site development.

Page 44

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Summary



Overview to Software Configuration Management



Scope of Software Configuration Management



Why SCM: Main Classes of Problems



Software Configuration Management Tasks



Change Control



Configuration Management Planning

Page 45

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Any Questions?

Page 46

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Thank you for your attention!

Page 47

Sep-07

P&Q

Protection notice / Copyright notice For Internal Use Only

Related Documents