Skema Irigasi Batang Hari 6

  • Uploaded by: Alfon Eka Satria
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Skema Irigasi Batang Hari 6 as PDF for free.

More details

  • Words: 5,424
  • Pages: 1
Batang Hari Irrigation System Schematic Map Ver.31 October 2006

-

49.2 -

KpB2Ka SD1Kr 36.2 -

55.4 -

KpB3Ka 17.7 -

27.1 -

KpB4Ka3 -

KpB4Ka2 -

KpB4Ka1 -

50.1 -

27.8 -

57.2 -

76.7 -

42.5 -

BG.7

87.5 -

M1Ka 9.1 -

13.9 -

G8Ka PK4Ka 43 -

66 -

PK3Ka 59.6 -

91.2 -

A=533 Ha Q=0.879 m3/s BPk4

PK2Ka 24.1 -

36.9 -

A=555 Ha Q=0.916 m3/s

BPk3

BPk2

PK1Ka 10 -

15 -

A=565 Ha Q=0.932 m3/s BPk1

PIRUKO MAIN CANAL

A=575 Ha Q=0.949 m3/s

PL2Ka PL2Kn 122.0 186.7 -

30.6 -

A=110 Ha Q=0.682 m3/s

Qs=0.500 m3/s

20.7 -

PL1Ka PL1Kn

BPL2

PALANGKO MC

G9Ka -

46.9 A=150 Ha Q=0.748 m3/s

BPL1

31.7 -

BPL0

81.7 -

A=236 Ha Q=389 m3/s

BG.9

183 -

BG.10

73.2 -

31.2 -

G9Ki 34 -

A=149 Ha Q=246 m3/s

PG4M 35.0 -

53.6 -

53.9 -

KPd6M1 22.5 -

KPd6M2 55.9 -

85.5 -

BSS.1

A=2420 Ha Q=5.037m3/s

SS 1 M

60.7 -

BSS.2

A=2368 Ha Q=5.924m3/s

92.9 -

SS2M

SS2M 61.2 -

93.6 -

PULAU MAINAN SC

25.9 -

BSS.4

A=2299 Ha Q=5.370 m3/s

SS3Ka 34.6 -

0 -

52.9 -

RB1Ka 37.6 -

57.6 -

RB2Ka 52.3 -

BRB.1

BRB.2

80.1 -

58.3 -

BSS.4A

BSS.5

RB2M 88.7 -

56 -

SS4A 61.5 -

94.1 -

AK1Ka 4.4 -

BAK.1

5.8 -

135.8 -

AK2Ka 33.3 -

78.5 -

120 -

BAK.3

BSS.7 A=1803 Ha Q=4.687 m3/s

SS6Ka 80.6 -

123.3 -

AK1Ki 63.0 -

95.8 -

AK2Ki -

BB.1

51.3 -

AK3Ka -

63 -

BSS.6

A=1857 Ha Q=4.805 m3/s

24.2 -

37.0 -

AK3Ki -

BSS.8

A=1800 Ha Q=3.373m3/s

SS7Ka 70.6 -

108.0 -

SKBA1Ki 96.1 -

147.0 -

SKBB1Ka 40.7 -

BSKBA1

SKBA1M 45.8 -

62.2 -

SKBA1Ka 5.1 -

7.7 -

SKBB2Ka 25.7 -

BSKBA1M

30.0 -

BSS.9 A=1708 Ha Q=4.420 m3/s

BSS.10

BSKBB.1

62.0 -

SKBB1Ki 17.1 -

9.5 -

14.5 -

SKBB2M -

SKBB3Ka -

SKBB3Ki -

112.7 172.4 -

14.7 -

22.5 -

37.5 -

28.1 -

42.9 -

82.4 -

16.3 -

BKB2

72.8 BKB3

58.4 -

73.1 -

KB3Ki 48.8 -

44.2 -

L2Ki1 78.5 -

122.5 187.4 -

BTP5 (BTP6)

67.6 -

TP6Ka (TP7Ka)

BTP6 (BPT7)

42.0 -

64.2 BPT7 (BPT8)

120.1 -

L2Ki2 23.5 -

35.9 -

BPT8 (BPT9)

L3Ki -

BL.3

BL.4

44.5 -

68.1 -

L4Ki 85.2 -

130.3 -

BPT9 (BPT10)

TP10Ka (TP11Ka)

92.5 -

141.5 -

34.4 -

TPK1Ki 25.2 -

38.6 -

TPK1Tg 37.4 -

57.2 -

TPK1Ka 93.1 TP7Ki (TP8Ki)

32.0 -

12.9 -

PK3Ka 37.7 -

142.4 -

BPK.3

57.7 -

26.3 -

40.2 -

PK3Ki 61 -

49 -

9.5 -

14.5 -

S3Ka 10.5 -

BS.3

104.0 -

S2Ki3 16 -

42.8 -

24 -

44.9 -

SK5Ki 80 -

30 -

33.5 -

52.6 -

80.5 -

39.0 -

30.5 -

A = 183 Ha Q = 0.302 m3/s

59.7 -

K3Ka 40 -

42 -

A = 174 Ha Q = 0.287 m3/s

A = 2934 Ha Q = 4.726 m3/s

17 -

A = 285 Ha Q = 0.470 m/s

A = 2633 Ha Q = 4.229 m3/s

BK.2

17.6 -

K3Ki -

BK.3

61 -

25 -

SKD4Ki -

38 -

26 -

34 -

20.5 -

BSKD.3

109 -

66 -

SKD1Ki 19 -

BSKD.2

BSKD.1

S7Ki -

A = 2545 Ha Q = 4.084 m3/s

S6Ka 16 -

24 -

S8Ki -

54.9 -

A = 2471 Ha Q = 3.962 m3/s

S7Ka 23 -

30.6 BS.8

35 -

46.8 -

A = 2425 Ha Q = 3.911 m3/s

S8Ka 21.3 -

S9Ki 18.2 BS.9

32.6 -

27.9 -

S10Ki 29.1 BS.10

A = 2382 Ha Q = 3.840 m3/s

S11Ki -

44.5 -

17.4 BS.11

A = 2365 Ha Q = 3.812 m3/s

26.6 -

44 -

19.0 -

7.8 BS.13 A = 2336 Ha Q = 3.764 m3/s

BS3M2 -

81 -

64.3 -

10.5 -

34.0 -

33.0 -

40 -

A = 216 Ha Q = 0.356 m3/s

26 -

76 -

47.8 -

76 -

76 -

BS2Ki 39.6 -

31 -

60.1 -

BS3Ki 47 -

73.1 -

76 -

KM3M 52 -

34 -

BKM.3

BKM.2

BKM.1

S14Ki 42.8 BS.14

S15Ki -

65.5 -

14.6 BS.15

A = 2006 Ha Q = 3.219 m3/s

S16Ki -

22.3 -

16.2 BS.16

S17Ki -

10.6 -

A = 1991 Ha Q = 3.194 m3/s

28.5 BS.17

A = 1965 Ha Q = 3.127 m3/s

S18Ki -

43.6 -

35 BS.18

54 -

A = 1950 Ha Q = 3.069 m3/s

KM3Ka 34 -

52 -

43 -

KM1Ka 39 -

-

A = 1790 Ha Q = 2.792 m3/s

6.9 -

S21Ki 5.4 BS.21 A = 1747 Ha Q = 2.792 m3/s

8.3 -

S22Ki1 -

S22Ki2 -

8.5 13.0 BS.22

A = 1731 Ha Q = 2.765 m3/s

6.8 -

A = 1637 Ha Q = 2.610 m3/s

S23Ki -

10.4 -

29.7 BS.23

S22Ka 38.5 -

58.9 -

TP10Ki (TP11Ki)

S25Ki2 -

118.7 -

7.6 -

A = 1453 Ha Q = 2.307 m3/s

S23Ka 50.6 -

26 -

75.6 -

77.6 BS.24

77.4 -

-

BB.2

40 -

S26Ki -

11.6 BS.25

33.0 BS.26

A = 1196 Ha Q = 1.883 m3/s

23 -

27 -

35 -

50.5 -

S26Ka -

71.2 -

7.6 -

11.6 -

RG2Ka 39 -

60 -

41 BRG.2

BPT10 (BPT11)

26.8 -

B2M 35 -

LCB Package-6 Lot-4 PT. Brantas Abipraya

LCB Package-7-2 Lot-5-2 PT. Hutama-PP (JO)

54 -

99.7 -

152.5 -

BKP.2

41 -

63 -

BRG.1

A = 108 Ha Q = 0.178 m3/s

BKP.3

23 -

S31Ki1 -

47 -

65.0 -

99.5 -

S31Ki2 15.8 -

S32Ki -

24.2 -

A = 241 Ha Q = 0.398 m3/s

BS.31

71.7 BS.32

109.7 -

A = 133 Ha Q = 0.219 m/s

65.9 -

100.8 -

KP1Ki 43 -

66 -

66 -

KP2Ki 101 -

KP4Ki 49 BKP.4

75 -

KP5Ki 65 BKP.5 A = 277 Ha Q = 0.457 m3/s

18 -

RG1Ki -

S30Ki 31 -

BS.30

S32Ka -

BKP.1

73 -

69.2 BS.29

BS.31M

BS.30M

A = 327 Ha Q = 0.540 m3/s

KP4Ka -

83 -

15 -

A = 387 Ha Q = 0.639 m3/s

A = 384 Ha Q = 0.568 m3/s

RG2Ki 54 -

39.9 -

RIMBO GUNUNG SC

BB.2M

41.0 -

S27Ka 26.1 -

KP2Ka -

A = 93 Ha Q = 0.153 m3/s

45.2 BS.28

A = 1077 Ha Q = 1.711 m3/s

48

B2Ki -

S29Ki -

74.1 -

KP1Ka -

139.8 -

S27Ki 48.4 BS.27

A = 1130 Ha Q = 1.774 m3/s

S25Ka 46.5 -

B1Ki -

BB.1

B2Ka -

-

S25Ki1 -

45.4 -

A = 1564 Ha Q = 2.490 m3/s

36 -

30.8 -

S30M 100.6 153.9 -

60 -

S20Ki 4.5 BS.20

S31M -

S25M 119.7 183.1 -

BS.25M

BS.19 A = 1915 Ha Q = 2.863m3/s

52 -

B1Ka -

TP9Ki (TP10Ki)

Canceled

116 -

80 -

52 -

BS3M2 -

Levelling and Canal Work are completed

116 -

S25M -

KM3Ki 34 -

Levelling is completed

116 -

S25M -

44.7 -

Area (Ha) Q (Lit/Sec)

Under Construction

116 -

S25M -

BS1Ki 22.2 -

BS3M1 -

23 -

56.6 -

Area (Ha) Q (Lit/sec)

Working Drawing LD is prepared

116 -

76 -

SM8Ka -

SKD1Ka -

A = 2037 Ha Q = 3.270 m3/s

S25M -

S25M -

37.0 -

BBS.3 M1

50.3 -

SKD2Ka 15 -

BBS.2

BBS.3M2

BS3Ka -

67 -

BBS.1

A = 71 Ha Q = 0.117 m3/s BBS.3

98.3 -

SKD3Ka -

28 -

S12Ki 5.1 BS.12

A = 2347 Ha Q = 3.782 m3/s

53 -

29 -

26 -

35.9 BS.7

12.4 -

SKD4Ka -

BSKD.4

40 -

43 -

35 -

45.3 -

119.3 -

Plan Actual

34.7 -

BSM.8

BS2Ka -

SKD2Ki -

S6Ki -

78.0 -

22.7 -

SM8Ki2 -

124.0 -

A = 330 Ha Q = 0.545 m/s

SM6Ka -

22.2 -

SKD3Ki -

29.6 BS.6

26 -

81.0 -

BSM.7 A = 643 Ha Q = 1.061 m3/s

27.0 -

71 -

A = 2598 Ha Q = 4.171 m3/s

S5Ka 13.4 -

17 -

SM5Ka -

SM8Ki -

19.0 -

BS1Ka -

64 -

S5Ki 10.8 16.5 BS.5

77.8 -

BSM.6

A = 665 Ha Q = 1.097 m3/s

8.9 -

SK2Ka -

BSK.2

BS.4

50.8 -

SK3Ka 23 -

A = 253 Ha Q = 0.417 m3/s

BSK.1

90.5 -

12.4 -

BSM.5

A = 785 Ha Q = 1.295 m3/s

SM4Ka -

SM7Ki -

106.3 -

K2Ki -

SK4Ka -

BSK.3

24 -

46.7 -

59.2 -

69.5 -

BSM.4

SM3Ka -

SK5Ka -

22 -

23 -

SK1Ki 16 -

BSK.4

86 -

SK2Ki 15 -

65.5 -

TP8Ki (TP9Ki)

49.4 -

51.2 -

SM5Ki -

107.2 -

A = 882 Ha Q = 1.455 m3/s

K1Ki -

BK.1

K2Ka -

46 -

SK3Ki 56 -

BSK.5

122 -

SK4Ki -

54 -

63 -

S2Ki2 -

S3Ki 29.3 -

16.1 -

41 -

K1Ka -

S2Ki1 68.0 -

BS.2

PK3Te 35 -

28.3 -

SM1Ka1 -

70.0 -

A = 298 Ha Q = 0.492 m3/s

18.5 -

SM1Ka2 -

SM4Ki -

125 -

BSM.3 A = 1050 Ha Q = 1.733 m3/s

A = 168 Ha Q = 0.277 m3/s

Q = 5.056 m3/s

A = 3134 Ha

BS.1

SM1Ka3 -

KUPON SC

BPK.2

21 -

S2Ka -

A = 1233 Ha Q = 2.034 m3/s

48.8 -

20.2 -

A = 58 Ha Q = 0.096 m3/s

A = 98 Ha Q = 0.162 m3/s

8.4 -

40 -

14 -

BSM.2

A = 1352 Ha Q = 2.231 m3/s

S1Ki -

SM3Ki2 82 -

38 -

A = 254 Ha Q = 0.419 m3/s

KHB2M 26 -

15 -

PK2Ki -

BSM.1

SM3Ki1 25 -

BAMBANG SUGIANTO SC

21 -

7 -

17.9 -

S1Ka2 -

SIMALIDU SC

A = 65 Ha Q = 0.107 m3/s

KHB2Ka 14 -

11.7 -

28 -

A = 192 Ha Q = 0.317 m3/s

44.9 -

54.5 -

BBH.28

S1Ka (S1Ka1)

PK1Ki -

18 -

A = 54 Ha Q = 0.089 m3/s

KHB1M 29.3 -

9.2 -

PK2Ka KHB1Ka -

BPK.1

A = 4504 Ha Q = 7.316 m3/s

SM1Ki -

28 -

A = 79 Ha Q = 0.130 m3/s

40 -

BBH.27

A = 4740 Ha Q = 7.640 m3/s

6.0 -

BKHB.1M

18 -

A = 3094 Ha Q = 4.990 m3/s

BKHB.2M

BH28Ki -

41.6 -

BBH.26

PK1Ka -

KOTO HILALANG B SC

29.4 -

A3Ki -

A = 149 Ha Q = 0.246 m3/s

KOTO HILALANG A SC

BKHB.2

94.8 -

27.2 -

A = 2986 Ha Q = 4.811 m3/s

A = 26 Ha Q = 0.043 m3/s

BH27Ki -

BPM.1

A = 177 Ha Q = 0.292 m3/s

A = 40 Ha Q = 0.066 m3/s

BKHB.1

35.5 -

26 -

A = 4905 Ha Q = 7.912 m3/s

BBH.25

15.9 -

A = 167 Ha Q = 0.276 m3/s

62.0 -

10.4 -

A = 124 Ha Q = 0.250 m3/s

29.4 -

PM1Ki -

BKHA.1M

A = 53 Ha Q = 0.087 m3/s

A = 81 Ha Q = 0.134 m/s A = 142 Ha Q = 0.234 m/s

PULAU PENDAM SC

A = 212 Ha Q = 0.35 m/s

BBH.23M

-

A = 30 Ha Q = 0.050 m3/s

BKHA.1

PADUKUHAN SC

A=716 Ha Q=1.297m3/s

TELUK PURI KIRI SC

101 -

A = 79 Ha Q = 0.130 m3/s

BH23Ka(BH23M)

A2Ki 19.2 -

A = 5045 Ha

A = 87 Ha Q = 0.144 m/s

A = 181 Ha Q = 0.299 m3/s

66 -

-

BTPK1

A = 163 Ha Q = 0.269 m3/s

A3M -

BL.4M

L4M -

AMPALU SC BA.3M

95.4 -

22.5 -

91.4 -

41.6 -

62.4 -

BA.3

40 -

TP4Ki (TP5Ki)

140.2 -

TP5Ka (TP6Ka)

NKB4M (BKB3M)

44.4 -

-

BTP4 (BTP5)

-

31.9 -

24.9 -

26 -

TP3Ki2(TP4Ki2)

TP4Ka (TP5Ka)

91.7 -

29.0 -

A3Ka -

27.2 -

BTP3 (BTP4)

149.1 -

KB2Ki 47.8 -

50.9 -

TP3Ki1(TP4Ki1)

-

KB1Ki 97.4 -

33.3 -

BA.2

27.3 -

57.1 -

SIAT KUPON SC

-

83.2 -

A2M -

19.2 -

17.9 -

BBH.24 Q = 8.143 m3/s

BBH.23 ~ BBH.2 3M SSC A1Ki -

PP1Ka -

BPP.1

37.3 -

A = 194 Ha Q = 0.320 m3/s

KB2Ka 47.6 -

140.1 -

TP4Ka 95 -

54.4 -

TP3Ki -

BA.1

A = 118 Ha Q = 0.195 m3/s

91.6 -

BTP3

KB4M (KB3M)

BSKB.B3M

53.9 -

LCB Package-8 Lot-6 PT. Duta Graha Inda

BL.1

57.4 -

46 -

A2Ka -

BTP2

71.2 -

TP3Ka -

KB4Ka -

BL.2

BSKBB.2

BSKBB.3

BSS.11

107.2 -

SKBB2Ki -

BSKBB.2M

9.0 -

SS10Ka 70.1 -

46.5 -

KB3Ka -

SKBB3M -

LCB Package-8 Lot-6 PT. Duta Graha Inda

94.8 -

36 -

TP2Ka -

52.0 -

38.2 -

L1Ka -

11.2 -

95.9 -

A=769 Ha Q=1.384m3/s

BKB1

SS12Ka -

A=1513 Ha Q=3.703m3/s

A=1573 Ha Q=3.747m3/s

39.3 -

5.9 -

89.2 -

62.7 -

TELUK PURI SC

A=329 Ha Q=0.542m3/s

SS10Ki -

61 -

91.7 -

A1Ka -

A = 609 Ha Q = 1.120 m/s

BSS.13

BSS.12

98.4 -

59.9 -

SLC1M -

34.0 -

61 -

SS4A Ka -

SIAT MC

BSS.3 A=2328 Ha Q=5.837 m3/s

61.8 -

SS14Ka1(TP1Ka)

15.3 -

A = 5257 Ha Q = 8.493 m3/s

BSLC.1M

SLC1Ka -

73.5 -

BSLB.1M

BBH.23

BTP.1

BSS.14

A=860 Ha Q=1.535m3/s

A=121 Ha Q=0.200 m3/s A=40 Ha Q=0.066 m3/s

SUNGAI KALANG SC

40.4 -

39.5 -

48.0 -

41.0 -

SM9Ka -

BSM.9

126.0 -

SIMALIDU SC

A=65 Ha Q=0.107 m3/s

SIPANGKUR SC

A=139 Ha Q=0.225 m3/s A=230 Ha Q=0.380 m3/s

A=95 Ha Q=0.157 m3/s

BH21Ka 25.8 -

39.2 -

G10Ki 38 -

A=433 Ha Q=0.714 m3/s

A=82 Ha Q=0.135 m3/s

A=128 Ha Q=0.211 m3/s

TARANTANG SC

A=221 Ha Q=0.365 m3/s

A=30 Ha Q=0.050 m3/s

TIUMANG SC

A=297 Ha Q=0.490 m3/s A=319 Ha Q=0.526 m3/s

16.3 -

BSGG3M

A = 49 Ha Q = 0.081 m3/s

PP1Ki -

74.9 -

SUNGAI LANGKOK C SC

KOTO BARU SC

42.7 -

BSLB.1

49.0 -

BSLC.1

SP1KaM -

SGG3M -

BSS.0

SEBERANG PIRUKO SC

SIALANG GAUNG SC

5.4 -

64.3 -

14.7 -

A=79 Ha Q=0.130 m3/s

PADANG BINTUNGAN Ki SC

A=60 Ha Q=0.099 m3/s

A=75 Ha Q=0.124 m3/s A=43 Ha Q=0.071m3/s

3.5 -

120.6 -

40 -

BBSP.1M

SLB1M -

80.2 -

SUNGAI LANGKOK B SC

TP1Ki -

SGG3Ki -

BKPd6M2

BKPd6M1

82.5 -

78.8 -

A = 71 Ha Q = 0.117 m/s

SKL1M -

57.4 -

25.4 -

SGG2M 25.6 -

BSGG2M

BSGG3

SGG3Ka -

SS1M -

LCB Package-6 Lot-4 Brantas Abipraya

A=125 Ha Q=0.206 m3/s

KOTO BERINGIN S C

BKPd6

46.4 -

KPd6Ki -

37.5 -

A = 117 Ha Q = 0.193 m3/s

A=5549 Ha Q=9.156m3/s

A = 5730 Ha Q = 9.349 m/s

SGG2Ki2 16.6 -

52.5 -

26.8 -

62.0 -

SM9Ki1 82.4 -

A = 86 Ha Q = 0.142m3/s

30.3 -

PG4Ki -

105.6 -

BSKL1M

-

SLB1Ki -

75 -

BBH.22

BBSP.1

SP1Ka(SP1Ka1)

97.6 -

BBH.21

A=5818 Ha Q=9.600 m3/s

BSKL1

124 -

49 -

38.2 -

40.5 -

73 -

SIAT KIRI DURI SC

127.6 -

KPd6Ka -

KPd5Ki 69.0 -

63.8 -

BSGG2

SLK1Ka -

SL3M -

BSL3M A=49 Ha Q=0.081m3/s

SUNGAI LANGKOK SC

A=269 Ha Q=0.444m3/s

BBH20

BSL3 A=117 Ha Q=0.193m3/s

25.0 -

104 -

BPM.2

A = 252 Ha Q = 0.416 m3/s

83.4 -

BKPd5

55.1 -

66.9 -

26.6 -

68 -

48 -

Old Name (SEDASI)

A = 68 Ha Q = 0.112 m/s

BPG4M

PG3Ki1 -

KPd5Ka 36.0 -

43.7 -

PBKa1M 17.4 -

92 -

40.1 -

PM3Ka -

137.9 -

PM2Ki -

Name

28.0 -

A = 55 Ha Q = 0.091 m3/s

12.2 -

102.8 -

62.0 -

60 -

26.2 BSL2

A=5939 Ha Q=9.799 m3/s

81 -

95 -

A=171 Ha Q=0.282m3/s

BSL1

BBH19

BBH18

62 -

90.1 -

18.3 -

KUAMANG SC

8.0 -

BPG4

67.2 -

40.5 -

55 -

SGG2Ki1 -

A=6372 Ha Q=10.514 m3/s

143.3 -

BPP.2

PM3 (PM3Ki)

46 -

A = 299 Ha Q = 0.493 m3/s

SUNGAI DUO SECONDARY CANAL

A=37 Ha A=300 Ha A=122 Ha A=316 Ha A=157 Ha Q=0.521 m3/s Q=0.4952 m3/s Q=0.259 m3/s Q=0.2012 m3/s Q=0.061 m3/s

SUNGAI ATANG SC

A=67 Ha Q=0.111 m3/s

119 -

PG4Ka -

PG3M -

BPG3M

BPG3

13 3.8 -

KPd4Ki -

BKPd4

17.6 -

36 -

SP1Ka2 -

93.7 -

-

A = 66 Ha Q = 0.109 m3/s

PG3Ka 9.0 -

22.2 -

11.5 -

SGG2Ka -

BPBKa1M

-

SGG1Ki2 -

27.1 -

SL3Ki -

SL2 (SL2Ki)

30 -

Q = 0.201 m3/s A = 122 Ha

78 -

109 -

66 -

14.5 -

124.4 -

82 -

A=82 Ha Q=0.135 m3/s

96.4 -

A=6467 Ha Q=10.671 m3/s

SGG1M -

BSGG1M

BSGG1

16.7 -

63.0 -

-

KHA1M -

82.0 -

A = 301 Ha Q = 0.497 m3/s

71 -

43 -

43.1 -

KPd4Ka -

62.7 -

81.3 -

10.9 -

SP1Ki1 -

64.3 -

75 -

17.7 -

BSP.1M

SL1Ki2 -

SL1Ki(SL1Ki1)

53.6 -

PP2Ka -

SM10Ka -

BSM.10

41.9 -

SM9Ki2 -

SIAT SC

152.2 -

DU3Ka1 -

BKPd3M1 BKPd3

KPd3Ka -

SGG1Ka -

BPBKa1

38.1 -

98 -

SP1Ka -

BSP1

A=501 Ha Q=0.825m3/s

99.5 -

BDU.3M A=43 Ha Q=0.071 m3/s

DU3Ka2 -

28.2 -

PG3Ki2 41.0 -

24.9 -

KPd3M -

64 -

TRT1Ka3 42.0 -

BBH17

SGG1Ki1 49 -

88.5 -

A=64 Ha Q=0.106 m3/s

A=146 Ha Q=0.241m3/s

BDU.3 A=226 Ha Q=0.373 m3/s

DU2Ka D1Kn

DU3M DU2Tg

PBKa1Ka -

37.9 -

BBH16 Q=11.035 m3/s

SP1M -

KHA1Ki -

BPP.2M

PP2Ki -

A=82 Ha A=145 Ha A=257 Ha Q=0.135m3/s Q=0.239m3/s Q=0.424m3/s

47 -

111.8 -

24.8 -

A=468 Ha Q=0.772 m3/s

BKPd2 A=562 Ha Q=0.911 m3/s

KPd1Ka -

KPd3Ki2 -

8.6 -

57.8 -

40.5 -

A=1189 Ha Q=2.755m3/s

DU2Kr 73.1 -

BDU.2 A=313 Ha Q=0.516 m3/s

DU1Ka P4Kr-Kn 31 -

DU3(DU3Ki)

49 -

5.6 -

TRT1Ka2 -

A=6688 Ha

BBH15-2

26.5 -

A=1239 Ha

A=313 Ha Q=0.516 m3/s

DU2Ki DU1Kr 32 -

KPd3Ki1 -

127.9 -

68.4 -

SP1Ki2 -

68.4 -

A=353 Ha Q=0.582m3/s

87.0 -

BDU.1 BP.4

BKPd1 A=586 Ha Q=0.967 m3/s

KPd2Ki 83.6 -

44.7 -

TRT1Ka1 44.7 -

27.4 -

A = 165 Ha Q = 0.272 m3/s

A=533 Ha A=659 Ha Q=1.087 m3/s Q=0.879 m3/s A=819 Ha Q=1.587 m3/s

A=885 Ha Q=1.460 m3/s

A=80 Ha Q=0.132 m3/s A=205 Ha Q=0.338 m3/s

PULAI SC

A=299 Ha Q=0.493 m3/s

PULAI A. SC.

A=67 Ha Q=0.111 m3/s A=87 Ha Q=0.144 m3/s

100.4 -

63.1 -

DU1Ki P4Kr-Kn 56.9 -

6.9 -

BBH15-1

41.3 -

T1Ka -

BT1

113.8 -

A=7304 Ha A=6985 Ha Q=12.052 m3/s Q=11.525 m3/s

28.5 -

KPd1Ki 4.5 -

74.4 -

27.0 -

G8Ki 20.4 -

87 -

G10Ka 111 -

BG.8

67.0 -

G7Ki 47.9 -

A=276 Ha Q=455 m3/s

65.5 -

5.2 -

G6Ki 43.8 -

A=323 Ha Q=533 m3/s

47.2 -

18.6 -

BPG2

80.2 -

BBH14

PG1Ki -

A=960 Ha Q=1.584 m3/s

92.4 -

27.8 -

A=7504 Ha Q=12.382 m3/s

G5Ki2 3.4 -

BG.6

30.7 -

GUNUNG MEDAN A SC

6.2 -

BPG1

108.5 -

73 -

T1Ki1 -

BPBKi.1

99 -

KBR1Ka 70.9 -

48 -

T2Ka -

BT2

SM10Ki -

77 -

A = 690 Ha Q = 1.073 m3/s

112 -

57.1 -

GA2Ka P6Kr

41.3 -

60 0.4 -

65 -

T1Ki2 -

BPBK.i1M

PBKi1Ki -

65.8 -

109.9 -

BPM.3M

A = 111 Ha Q = 0.183 m3/s

73 -

37.3 -

GA1Ka2 -

4.8 -

PKa2Ki BPKa2

PG1Ka -

109 -

KBR2Ka 43.0 -

A=425 Ha Q=0.701 m3/s

BBH13

65.5 -

71.8 -

10.9 -

110.2 -

BIAWAK SC

A=73 Ha Q=0.120 m3/s

50 -

G5Ki1 4.1 -

GA1Ka1 -

63.1 -

18.1 -

BKBR2

42.8 -

T2Ki -

127 -

7.1 -

A=168 Ha A=228 Ha Q=0.277m3/s Q=0.376m3/s

KpB4M -

BKpB4M

G5Ki -

88.4 -

PKa1Ki PA1

26 -

BBH12

P3AKi 52.5 -

17 -

BKBR1

A=9209 Ha Q=15.195 m3/s

P3Ki P2Kr 18.2 -

KBR2Ki -

A=320 Ha Q=0.528 m3/s

KBR3Ka -

PBKi1M 83.1 -

44.4 -

A=148 Ha Q=0.244m3/s

KpB1Ka SD1Kr 32.2 -

BKpB4

A=214 Ha Q=0.353 m3/s

41.2 -

GA2Tg P5Kr 57.8 -

71 -

52.9 -

75.0 -

BBH.11

BBH11 -

50.7 -

BSA1

53.1 -

34.6 -

BKBR3

60.4 -

29.0 -

106 -

PP2M 72.0 -

A = 599 Ha Q = 0.922 m3/s

-

KAMPUNG BARU SC

39.2 BG.A.2

34.7 -

48.0 -

KBR3Ki -

KBR4Ka 39.5 -

44.5 -

14.4 -

SP2Ka -

A = 492 Ha Q = 0.746 m3/s

35.9 -

BKpB3 A=270 Ha Q=0.446 m3/s

A=147 Ha Q=242 m3/s

31.4 -

BKBR4

64.0 -

29.1 -

9.4 -

A = 88 Ha Q = 0.145 m3/s

23.5 -

BKpB2 A=362 Ha Q=0.597 m3/s

25.6 BG.A.1

49.1 -

SA1Ki -

BRB3Ka -

48.9 -

A=344 Ha Q=568 m3/s

BP.3

20.7 -

PKa1AKi PA1 3.2 -

BRB1Ka 32.0 -

KBR4Ki 41.8 -

24.5 -

BSP2

A = 35 Ha Q = 0.058 m3/s

57.9 -

MP3Ka -

BKpB1 A=490 Ha Q=0.809 m3/s

PKa2Ka -

GA2Ki P6Kn

83.2 -

A=214 Ha Q=353 m3/s

30 -

54.7 -

5.9 -

13.5 -

11.8 -

34.3 -

BRA1Ka -

32.3 -

94.9 -

16.0 -

BSP3

142.6 -

SP2Ki -

A=123 Ha Q=0.203m3/s

37.8 -

MP2Ka -

94.6 -

54.4 BG.5

48.2 -

KpB3Ki 35.8 -

3.8 -

49.9 -

P3Ka P2Kr

BP.3A

BPKa1

22.4 -

21.1 -

BSA2

SA3Ka 62 -

24.5 -

93.2 -

T2Ki -

A=108 Ha Q=0.178m3/s

MP1Ka -

MP3M 82.0 -

30.2 -

PKa1AKa PA1

G4Ki -

BP.2

52 -

BRA2Ka -

BSA3

78.0 -

SA2Ki -

16.0 -

48.2 -

BTRT2M

A=316 Ha Q=0.521m3/s

BmP2M (BMP3M) A=45 Ha Q=0.074 m3/s

19.7 -

34 -

51.0 -

A=66 Ha Q=0.019 m3/s

15.3 -

31.5 -

65.0 -

KBR5Ka -

A=167 Ha Q=0.276m3/s

(BMP3) A=116 Ha Q=0.191 m3/s

KpB2Ki SD1Kr

111.6 -

46 -

SA3Ki BBRB.3

BBRB.2 A=118 Ha Q=0.195 m3/s

10.0 -

42.5 -

LUBUK AUR SC

A=141 Ha Q=0.233 m3/s

KpB1ki SD1Kr 72.3 -

30 -

BBRB.1 A=187 Ha Q=0.308 m3/s

22.2 -

BKBR5

A=132 Ha Q=0.218m3/s

BMP2

-

BG.4 A=615 Ha Q=1.015 m3/s

GUNUNG MEDAN SC

MIMPI SC A=154 Ha Q=0.254 m3/s

A=490 Ha Q=0.809 m3/s

MP3Ki -

-

7.5 -

G3Ki G2Tg 32.6 -

A=707 Ha Q=1.166 m3/s

43.4 -

-

4.9 -

58 -

BBRA.1

52.9 -

P1Ki P1Kr 33.2 -

14.8 -

A=437 Ha Q=921 m3/s

37.5 -

BKA.4

KA4Ka SD11Kn

BBRA.2

41.5 -

A=10660 Ha Q=17.589 m3/s

BP.1

54.2 -

32.3 -

KBR5Ki -

A=82Ha Q=0.135m3/s

31.5 -

58.7 -

G5Ka 28.4 -

BG.3

17.2 -

G4Ka -

24.5 -

A=68 Ha Q=0.112 m3/s

KA3Ka -

A=470 Ha Q=775 m3/s

P1Ka -

52 -

35.5 -

21.1 -

SA4Ka -

Tertiary Block

PM3 -

A=135 Ha Q=0.223 m3/s

20.8 -

88.3 -

G3Ka G2Kn 11.2 -

34 -

BKA.3

BKA.2 A=98 Ha Q=0.162 m3/s

KA2Ka -

49.5 -

KA4Ki SD10Kn

69.3 -

75.6 -

47.3 -

BSA4M

SP3Ka -

A=75 Ha Q=0.124m3/s

13.6 -

39.9 -

KA2Ki 45.3 -

52.0 -

SA4Ki -

SP3Ki -

BT2M

SIMPANG KOTO BARU B SC

83 -

KW7M2 -

35 -

22.8 -

KOTO AGUNG SC

A=128 Ha Q=0.211 m3/s

G2Ki3 G1Kr-Kn

G2M2 G1Kn

38.3 BKW7M2

32.4 -

62.3 -

KA1Ki 14.9 -

BKA.1

54 -

34.6 -

56.0 -

BRB3Ki -

BATU RIZAL B SC

BRA1Ki -

BBH.10-2

36.6 -

BRB2Ki -

T2M -

KBR6Ka -

A=75 Ha Q=0.124m3/s

106.7 -

35 -

106 -

BRB1Ki -

BKBR.5M

KBR6Ki -

128.7 -

A=92 Ha Q=0.152 m3/s

89.7 -

66.6 -

69 -

30.9 -

17.2 -

BBRA.3

41.9 -

BRA2Ki 27.1 -

BRA4Ka 11.2 -

84.1 -

A=60 Ha Q=0.099 m3/s

KW7M1(KW6M1)

26.1 -

43.5 -

51.6 -

KA1Ka1 -

G2Ki2 G1Kr-Kn

BG.2

G2M1 G1Kn

57.7 -

33.8 -

BPL1

A=11902 Ha

27.4 -

SA4M -

BSP3M

TRT2M -

106.0 -

A=54 Ha Q=0.089 m3/s

49 -

BKW7

53 -

55.9 -

PR4Ki 32 -

42.7 -

-

122.5 -

G2Ki1 G1Kr-Kn

21.6 -

27.6 -

PLi1Ki1 SD11Kr-Kn

23.4 -

BRA3Ki -

65.9 -

69.3 -

23.3 -

SIMPANG KOTO BARU A SC

36.5 -

49.0 -

-

G2Ka G1Kn

80.1 -

14.1 -

18.0 -

43.1 -

KBR6M -

BRA5Ka 15.2 -

A=256 Ha Q=0.426 m3/s

129.4 -

74.4 -

PR3Ki 32.0 -

43 -

BG.1

PLiA1Ka -

BBH.10-1 Q=19.638 m3/s

BBH.9

KA1Ka(KA1Ka2)

PLi1Ki SD11Kr-Kn

15.3 -

PLi3Ka -

BPL3 BPL2

SP3M -

A=216 Ha Q=0.356 m3/s

84.6 -

48.6 -

BKW7M1 (BKW6M1)

KW6Ka -

A=991 Ha Q=1.635m3/s

36.4 -

G1Ki SD8Tg

18.6 -

84.5 -

47.5 -

70 -

AMPANG KURANJI SC

57 -

G1Ka SD8Kn 23.8 -

G1Ka1 PR2Ki -

Q=0.087 m3/s A=53 Ha

KW6M2 -

-

12.2 -

A=12095 Ha Q=19.957 m3/s

55.3 -

45.7 -

75.8 -

A=132 Ha Q=0.218 m3/s

16 -

KW5Ka2 -

-

60.7 -

A=12446Ha

12.5 -

PLiA1Ki1 -

PLi2Ki SD11Kr-Kn

31.0 -

25.5 -

A=184 Ha Q=0.304 m3/s

BKW6 BKW6M2

KW5Ka1 -

45.5 -

8.2 -

BBH8Ki -

8.8 -

BRA13Ka -

16.7 -

96.9 -

Q=86 m3/s A=0.109 Ha

M3Tg M2Kr

19.9 -

29.7 -

84 -

BBH.7 Q=20.539m3/s BBH.8

BBH8Ka -

A=48 Ha Q=0.079 m3/s

A=150 Ha Q=0.248 m3/s

BKW5

KW4Ka -

13.0 -

KW7Ki -

106.3 -

PLi.A1Ki2 -

PLiA2Ka 5.8 -

BRA12Ka -

63.3 -

RANAH BARU SC

69.5

TKT1Ka2 SD7Kr

44.5 -

BRA11Ka -

20.8 -

BRA10KaM -

A=40 Ha Q=0.056 m3/s

KW6Ki -

18.9 -

29.1 -

BRA10Ka2 31.9 -

Construction Work is not yet Under Construction Completed

BBRA.13

A=94 Ha Q=0.155 m3/s

SIAT 2 M

BPR.4

99 -

PLi.A2Ki -

57.4 -

BPL3M

55.4 -

BBRA.12

A=111 Ha Q=0.183 m3/s

PADANG BINTUNGAN KANAN SC

BPR.3

BPLi.A.2

SD6Kr

55 -

49.8 -

36.2 -

BBRA.11

A=328 Ha Q=0.541 m3/s

SIAT 1 M

KW5Ki 12.3 -

Q=0.134 m3/s

KW4Ka(KW4M)

MP1Ki -

Main / Secondary Canals

95.0 -

111.0 170.0 -

BBRA.4

A=52 Ha Q=0.086 m3/s

BRC1Ka -

BATU RIZAL A SC

62.1 -

KOTO PADANG SC.

29 -

111.7 -

TKT1Ka (TKT1Ka1)

37.5 BTKT.1

39.7 -

A=12666Ha Q=20.899 m3/s

BPR.2

K3Ka 75.0 -

106.0 -

32.6 -

BBRC1

BBRC1M

BRA10Ka1 -

62.4 -

A=114 Ha Q=0.188 m3/s

A=340 Ha Q=0.561 m3/s

19 -

98 -

32 -

ST1Ka SD5Kr 69.3 -

A=191 Ha Q=315 m3/s

BPR.1

87.1 -

KW2Ka -

A=264 Ha Q=0.406 m3/s

86.5 -

A=60 Ha Q=0.099 m3/s A=94 Ha Q=0.155 m3/s A=161 Ha Q=0.226 m3/s

SITIUNG SC 57.0 -

TT1M 64 -

121.1 -

BKW4 BKW4M

-

LCB Package-7-1 Lot-5-1 PT. Ashfri Putralora

BRA13Ki -

BBRA.11M

59.3 -

A=181 Ha A=287 Ha Q=0.248 m3/s Q=0.474 m3/s

MIMPI MC Q=0.081 m3/s A=49 Ha A=138 Ha Q=0.288 m3/s

BTT.1M

62.1 -

PR4Ka -

KELAWA SC

56.5 -

40.6 -

PR1Ka -

65 -

M3Ka M3Kr

BMP1

A=292 Ha Q=0.482 m3/s

15.5 -

TT1Ki -

BTT.1

35.4 -

21 -

131.4 201.0 -

90.0 -

38.8 -

A=56 Ha Q=0.092 m3/s

10.1 -

99 -

53.6 -

23.1 -

BM2

A=295 Ha Q=0.487 m3/s

23.2 -

KW4Ki -

-

BM0

139.1 -

KW3Ki -

A=13062 Ha Q=21.522 m3/s BBH.6

49.1 -

ST2Ka2 SD5Kr

84.7 -

A=313 Ha Q=516 m3/s

90.9 -

TT1Ka -

79.1 -

BM3

BM1

99.6 -

KW2Ki -

32.1 -

55.3 -

PIRUKO SC

15.1 -

BPC1

65.1 -

ST2Ka SD5Kr

BST.2

BST.1

BBH5

KW1Ki SD3Kn

A=774 Ha Q=1.277 m3/s

34.4 -

PC1Ki PC4Kr

31.5 -

A=13277 Ha Q=21.907 m3/s

BBH4

KW3Ka (KW3Ka1)

55.9 -

BKT1

33.6 -

73 -

BRC1M -

124.7 -

PLiA2Tg SD10Kr

A=93 Ha Q=0.153 m3/s

41 -

LK1M -

BWK3

22.0 -

38.9 -

48 -

81.5 -

TKT2Ka SD6Kr

PIRUKO KANAN SC

BWK2

117.3 -

KT1Ki -

12.4 -

25.4 -

70 -

BTKT.2

A=82 Ha Q=0.135 m3/s

BKW1

KW3Ka2 -

TR1Ka SD3Kr 8.1 -

BKT2

40.3 -

TKT2Ki SD6Kr

BPKa1A

PADANG CANDI SC

76.7 -

BLK1M

A=13400 Ha Q=22.110 m3/s

BBH3

39.9 -

KW2Ka -

BLK1

96.7 -

36.6 -

PC1Ka PC4Kr

26.1 -

43.8 -

26.4 -

KT2Ka -

PLi3M SD11Kr-Kn

15.0 -

46 -

PISANG REBUS SC

LK1Ka 63.2 -

KW1Ka -

BH2Ka 28.5 -

BATANG HARI MAIN CANAL

A=14174 Ha Q=23.387 m3/s

BBH2

85.3 -

KT2Ki -

BTR1

63.7 -

55.7 -

A=205 Ha Q=0.338 m3/s

A=110 Ha Q=0.182 m3/s

A=45 Ha Q=0.074 m3/s

20.6 -

A=14431 Ha Q=23.811 m3/s

BBH1

SKB1Ka 41.7 -

9.6 -

58.8 -

BRA11Ki -

57.5 -

BBRA.10 A=470 Ha Q=0.776 m3/s

BRA9Ka 40.8 -

50.1 -

49.6 -

BBRA.5

15.0 -

BRC1Ki -

BATU RIZAL C SC

ST2Ka1 SD5Kr-Kn

TR3Ka -

28.4 -

9.8 -

15.0 -

ST3Ka SD5Kr-Kn

BST.3

86 -

A=157 Ha Q=0.259 m3/s

15.2 -

-

56 -

BTR3 (BTR2M)

A=425 Ha Q=0.701 m3/s

A=15,271 Ha Q=25.197 m3/s

9.9 -

-

TR2M -

131.4 -

9.8 -

45.9 -

BRA5Ki2 -

ST4Ka SD5Kr-Kn

A=138 Ha Q=0.228 m3/s

A=140 Ha Q=0.231 m3/s A=226 Ha Q=0.373 m3/s

M4Ka BM4

BPk5

6.7 -

TR2Ka SD3Kr 18.5 -

SKB2Ka -

BSKB2

BSKB1

A=33 Ha Q=0.054 m3/s

BTR2

127.6 -

85.9 -

A=56 Ha Q=0.092 m3/s

A=50 Ha Q=0.083 m3/s

A=24 Ha Q=0.040 m3/s BM5

1.7 -

M4Ki 4.4 -

10.0 -

83.4 -

TR3Ki -

6.2 -

KOTO TUO SC

6.6 -

A=40 Ha Q=0.066 m3/s

M5Ki -

8.7 -

8.0 -

M6Ka -

SIKABAU SC

5.2 -

A=685 Ha Q=1.130 m3/s

BM6

1.1 -

5.7 -

M7Ka BM7

A=14 Ha Q=0.023 m3/s

LIMAU KAPEH SC

1.2 -

BSKB3

A=188 Ha Q=0.310 m3/s

BM8

M7Ki 0.8 -

TR2Ki SD3Kr 4.1 -

SKB3Ka -

A=114 Ha Q=0.188 m3/s

BSKB3M

M8Ka -

A=101 Ha Q=0.167 m3/s

21 -

A=685 Ha Q=1.130 m3/s

A=64 Ha Q=0.106 m3/s

54 -

BM9

96.6 -

TEBING TINGGI SC

63.1 -

SG1Ka LK1Kr

TERANG SC

BSG1

BST.4 (BST.3M)

SKB3M -

30.0 -

10.9 -

37.6 -

BRA6Ka -

A=962 Ha Q=1.587 m3/s

21.4 -

A=97 Ha Q=0.160 m3/s

14.0 -

7.1 -

BBRA.6

97.6 -

BRA10Ki -

63 -

BBRA.9

BRA7Ka 32.7 -

A=763 Ha Q=1.259 m3/s

ST5Ka SD5Kr-Kn BST.5

BBRA.7

BRA5Ki1 -

BST.5M

38 -

A=511 Ha Q=0.843 m3/s

A=1179 Ha Q=1.945 m3/s

137.1 -

SG3Ka -

26.5 -

A=1229 Ha A=1313 Ha Q=2.166 m3/s Q=2.028 m3/s

89.6 -

63.8 -

74.7 -

BPLi.A.1

-

48.8 -

RK2Ka(RK3Ka)

BRA9Ki -

33.2 -

BBRA.8

37.9 -

BRA6Ki -

ST5M SD5

A=193 Ha Q=0.318 m3/s

-

A=72 Ha Q=0.119 m3/s

17.3 -

128.7 -

A=911 Ha Q=1.503 m3/s

18.4 -

84.1 -

A=750 Ha Q=1.237 m3/s

12.0 -

A=196 Ha Q=0.323 m3/s

RK2Ka -

RK3M BRK4Tg

BRK3M

A=366 Ha Q=604 m3/s

A=284 Ha Q=0.469 m3/s

RK1Ka -

37.1 -

A=93 Ha Q=0.153 m3/s

A=338 Ha Q=0.558 m3/s

24.2 BRK3

A=620 Ha Q=1.023 m3/s

14.6 -

21.7 -

76.1 -

BR7Ki1 -

-

-

A=218 Ha Q=0.360 m3/s

BRK2

TARAKTAK KOTO TUO SC

15.5 -

24.7 -

RK2Ki(RK3Ki)

A=94 Ha Q=0.155 m3/s

9.6 -

10.1 BRK1

RK2Ki -

A=123 Ha Q=0.203 m3/s

41.3 -

49.7 -

A=562 Ha A=672 Ha Q=0.927 m3/s Q=1.109 m3/s

25.9 -

SG1Ki M9Kr

BRA8Ki -

BR7KiM -

20.2 -

BSG2

5.4 -

113.9 -

SG8Ka 13.2 -

A=73 Ha Q=0.120 m3/s

SG1Ki' -

8.1 -

A=211 Ha A=134 Ha A=82 Ha Q=0.348 m3/s Q=0.221 m3/s Q=0.135 m3/s

SIGUNTUR SC BSG3

SG2Ki 3.6 -

60.9 -

A=589 Ha Q=0.927 m3/s

BSG4

10.7 -

5.3 -

RK1Ki -

RAWAH KAPEH SC

A=599 Ha Q=0.988 m3/s

7.8 -

87.5 -

SG7Ka -

97.4 -

LCB Package-3 Lot-1 PT. Adhi Karya

BRA11M 113.9 173.7 -

BR7Ki2 SG5Ka 39.8 -

BSG5

SG4Ki -

63.6 -

A=630 Ha Q=1.039 m3/s

39.1 -

SG8M SG9

A=296 Ha Q=0.488 m3/s

SG6Ka -

25.6 -

24.2 -

A=149 Ha Q=0.246 m3/s

A=237 Ha Q=0.391m3/s

SG5Ki -

15.8 BSG8

LCB Package-4 Lot-2 PT. Waskita Karya

LCB Package-5 Lot-3 PT. Istaka Karya

SG8Ki -

8.7 -

A=96 Ha Q=0.158 m3/s

5.7 BSG7

A=35 Ha Q=0.058 m3/s

SG7Ki -

27.0 -

A=46 Ha Q=0.076 m3/s

SG6Ki 17.7 BSG6

PINANG GADANG SC

LCB Package-6 Lot-4 PT. Brantas Abipraya

28 -

KP6Ki -

99 -

43 BKP.6

66 -

A = 252 Ha Q = 0.416 m3/s

KAYU PUTIH SC

KP7Ki 26 BKP.7

40 -

A = 209 Ha Q = 0.345 m3/s

57 -

66 -

KP8Ka 26 -

KP8Tg -

A = 140 Ha Q = 0.231 m3/s

KP7Ka 43 -

KP8Ki 37 BKP.8

40 -

-

Related Documents

Batang
June 2020 21
Irigasi
July 2020 19
Makro Lower 6 - Skema
April 2020 2
Batang Tubuh
April 2020 22
Proyek Irigasi
July 2020 19

More Documents from "I Gede Gegiranang Wiryadi"