B. O. T. BOT: n
Build l Set-up the facility and infrastructure, staff the development center, and establish knowledge transfer
n
Operate l Manage the offshore organization: Program Management, Development, QA, maintenance, enhancements, and product support
n
Transfer l Register a new offshore subsidiary for the customer, transfer assets, and handover operations
B. O. T. Comparative Advantage BPO/KPO Sectors Public Private Partnership Reduction of Risk
Built - Operate - Transfer S.W.O.T Analysis
STRENGTHS INTERNAL ü
Easing Budgetary Constraints
ü
Speedy Working
ü
Reliability & Efficiency
ü
Access to International Finance
ü
Technology Transfer
ü
Training & Innovation
ü
Raising quality of life
STRENGTHS ü Optimal Risk Allocation.
WEAKNESSES INTERNAL ü Based on Probabilities
ü Company selection is by its past performance
OPPORTUNITIES EXTERNAL ü
Currently only Airports & Highways
BOT can be used in: ü
Railways – Track lines and Trains
ü
Power & Energy Plants
ü
Research and Development
ü
Hospitals and Educational Institutes.
THREATS EXTERNAL Continues failure of past B-O-T projects.
Extreme economic Recession or Depression.
Unstable Government or Leftist Govt. Policies.
Importance Popularity Stages Benefits Alternative
Examples ☛ITS system ☛Margaon extension ☛Pune metro-DMRC
PHYSICAL EVIDENCE
Process
People Building of working force. Take care of administration. Provide resources and facilities. After a period transfer it.
Internal marketing.
PRICE Total Cost of Project Traffic Time Period Maintenance and Service Expenses
PROMOTION
PRODUCT Construction Operation Engineering
PLACE Why Noida ? Quick Connectivity Physical Infrastructure Resources Mobilization H R Catchments Destination Malls
EXAMPLES Some Existing BOT Projects
GMR - DIAL ü
GMR- 50.1% , AAI – 26%
ü
Modernize – Operate – Develop – Transfer
ü
Fraport (Ger) (10%) - Airport Operator
ü
Eraman Malaysia (10%) – Retail Investors
ü
IDF (3.9%) – Financial Investor
GMR - DIAL Upgrade existing terminals ü New Domestic terminal – T 1D (10m Pasgr) ü 4 level in line baggage handling system ü Spacious , F&B and Retail Facilities, Special Contact Zones
GMR - DIAL Integrated Passenger Terminal – 3 Common Use Terminal Equipment (CUTE) •
5 level in-line baggage handling system
•
160 + check-in counters
•
90 desk for immigration procedures
•
By 31stMar 2010 - Common Wealth Games
GMR - HIAL ü GMR-63%, AAI – 13%, Malaysian Airport holding 11%, Govt. of AP – 13% ü Greenfield Project
GMR - HIAL ü
12m Passengers per Annum. Max 40m
ü
1m tones of cargo per annum
ü
12 boarding bridges & 30 remote stands
ü
16 self check-in kiosks
ü
46 immigration
Counters. ü
130 (CUTE)
check-in desks
AMBALA – CHANDIGARH Location - NH22-21, Haryana-Punjab Project Distance - 35 km. Widening (4 – Lane)
AMBALA – CHANDIGARH GMR Projects Private Limited(GPPL) Engineering, Procurement & Construction (EPC)
Concession Period - 20 years
Reduce Travel Time
Farukh nagar – Jadcherla Location - NH 7, Bangalore-Hyderabad Project Distance - 58 km. Made in 2.5yrs 4 Lane. Improvement, maintenance, strengthening of existing road.
ü
Farukh nagar – 6 lane improved toll plaza Jadcherla
ü Ease traffic congestion
ü Boost trade and commerce ü HASSEL FREE experience
Delhi-Noida Direct (DND) Toll Bridge 4-6 lane, 1.5 km Halcrow Consulting India Pvt Ltd. Silver Lane Facilities
Noida – Gr. Noida Expressway 8 lane, 23.64 km. Silver Lane Facilities
Delhi – Gurgaon Expressway 6-8 lane, NH – 8, 28 km. D S Constructions Ltd. Gives fastest access to IGI Airport.
Future B-O-T Projects
Golden Quadrilateral
ADAG – DMRC
High Speed Airport Metro Express AIRPORT Express Line ü From AjmeriGate - IGI Airport (22km). 30 yrs (BOT basis) ü NDRS - City Airport Terminal (CAT) ü Non Stop - High Speed journey ü JUST 20 mins.
High Speed Airport Metro Express FACILITIES Provided: Buy Air tickets, Check timings etc. Check-in baggage Get boarding pass Shopping – Duty Free Shops Multi Level Parking Conveniences of an Airport terminal