Service Marketing Build Operate Transfer

  • Uploaded by: harshlee
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Service Marketing Build Operate Transfer as PDF for free.

More details

  • Words: 625
  • Pages: 35
B. O. T. BOT: n

Build l Set-up the facility and infrastructure, staff the development center, and establish knowledge transfer

n

Operate l Manage the offshore organization: Program Management, Development, QA, maintenance, enhancements, and product support

n

Transfer l Register a new offshore subsidiary for the customer, transfer assets, and handover operations

B. O. T. Comparative Advantage BPO/KPO Sectors Public Private Partnership Reduction of Risk

Built - Operate - Transfer S.W.O.T Analysis

STRENGTHS INTERNAL ü

Easing Budgetary Constraints

ü

Speedy Working

ü

Reliability & Efficiency

ü

Access to International Finance

ü

Technology Transfer

ü

Training & Innovation

ü

Raising quality of life

STRENGTHS ü Optimal Risk Allocation.

WEAKNESSES INTERNAL ü Based on Probabilities

ü Company selection is by its past performance

OPPORTUNITIES EXTERNAL ü

Currently only Airports & Highways

BOT can be used in: ü

Railways – Track lines and Trains

ü

Power & Energy Plants

ü

Research and Development

ü

Hospitals and Educational Institutes.

THREATS EXTERNAL Continues failure of past B-O-T projects.

Extreme economic Recession or Depression.

Unstable Government or Leftist Govt. Policies.

Importance Popularity Stages Benefits Alternative

Examples ☛ITS system ☛Margaon extension ☛Pune metro-DMRC

PHYSICAL EVIDENCE

Process

People Building of working force. Take care of administration. Provide resources and facilities. After a period transfer it.

Internal marketing.

PRICE Total Cost of Project Traffic Time Period Maintenance and Service Expenses

PROMOTION

PRODUCT Construction Operation Engineering

PLACE Why Noida ? Quick Connectivity Physical Infrastructure Resources Mobilization H R Catchments Destination Malls

EXAMPLES Some Existing BOT Projects

GMR - DIAL ü

GMR- 50.1% , AAI – 26%

ü

Modernize – Operate – Develop – Transfer

ü

Fraport (Ger) (10%) - Airport Operator

ü

Eraman Malaysia (10%) – Retail Investors

ü

IDF (3.9%) – Financial Investor

GMR - DIAL Upgrade existing terminals ü New Domestic terminal – T 1D (10m Pasgr) ü 4 level in line baggage handling system ü Spacious , F&B and Retail Facilities, Special Contact Zones

GMR - DIAL Integrated Passenger Terminal – 3 Common Use Terminal Equipment (CUTE) •

5 level in-line baggage handling system



160 + check-in counters



90 desk for immigration procedures



By 31stMar 2010 - Common Wealth Games

GMR - HIAL ü GMR-63%, AAI – 13%, Malaysian Airport holding 11%, Govt. of AP – 13% ü Greenfield Project

GMR - HIAL ü

12m Passengers per Annum. Max 40m

ü

1m tones of cargo per annum

ü

12 boarding bridges & 30 remote stands

ü

16 self check-in kiosks

ü

46 immigration

Counters. ü

130 (CUTE)

check-in desks

AMBALA – CHANDIGARH Location - NH22-21, Haryana-Punjab Project Distance - 35 km. Widening (4 – Lane)

AMBALA – CHANDIGARH GMR Projects Private Limited(GPPL) Engineering, Procurement & Construction (EPC)

Concession Period - 20 years

Reduce Travel Time

Farukh nagar – Jadcherla Location - NH 7, Bangalore-Hyderabad Project Distance - 58 km. Made in 2.5yrs 4 Lane. Improvement, maintenance, strengthening of existing road.

ü

Farukh nagar – 6 lane improved toll plaza Jadcherla

ü Ease traffic congestion

ü Boost trade and commerce ü HASSEL FREE experience

Delhi-Noida Direct (DND) Toll Bridge 4-6 lane, 1.5 km Halcrow Consulting India Pvt Ltd. Silver Lane Facilities

Noida – Gr. Noida Expressway 8 lane, 23.64 km. Silver Lane Facilities

Delhi – Gurgaon Expressway 6-8 lane, NH – 8, 28 km. D S Constructions Ltd. Gives fastest access to IGI Airport.

Future B-O-T Projects

Golden Quadrilateral

ADAG – DMRC

High Speed Airport Metro Express AIRPORT Express Line ü From AjmeriGate - IGI Airport (22km). 30 yrs (BOT basis) ü NDRS - City Airport Terminal (CAT) ü Non Stop - High Speed journey ü JUST 20 mins.

High Speed Airport Metro Express FACILITIES Provided: Buy Air tickets, Check timings etc. Check-in baggage Get boarding pass Shopping – Duty Free Shops Multi Level Parking Conveniences of an Airport terminal

Related Documents


More Documents from "anjum_87"